AMICUS AI
Citation Codes
Neutral Citations
2010 INSC 771
Equivalent Citations
citation codes
Case Number
Disposition
Attorney(S)
Judges
Acts
  • Section 6 of the Land Acquisition Act, 1894
  • Sections 23(1), 28 and 34 of the Act
  • Section 4 of the Land Acquisition Act, 1894
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Neutral Citations
2010 INSC 771
Equivalent Citations
citation codes
Case Number
Disposition
Attorney(S)
Judges
Acts
  • Section 6 of the Land Acquisition Act, 1894
  • Sections 23(1), 28 and 34 of the Act
  • Section 4 of the Land Acquisition Act, 1894
Smart Summary

Factual and Procedural Background

The State of Maharashtra issued a notification under Section 4 of the Land Acquisition Act, 1894 on 15 September 1983 to acquire the appellants’ lands and standing structures for the Hatnoor Project. A Section 6 declaration followed on 24 May 1984. The Land Acquisition Officer’s award dated 22 September 1986 fixed compensation for three separate reference cases (Nos. 2–4 of 1991) at Rs 1,10,547.50, Rs 4,67,500.53 and Rs 7,20,464.91 respectively, and possession was taken on 18 October 1986.

Dissatisfied, the claimants sought references to the civil court, claiming Rs 350 per sq m for land and Rs 2000 per sq m for structures. The Reference Court enhanced compensation to Rs 2,48,526; Rs 5,10,562.50; and Rs 10,84,605, valuing open land at Rs 225 per sq m and structures at Rs 1200 per sq m.

The State appealed (First Appeals Nos. 133–134/1995) and the claimants cross-appealed (First Appeals Nos. 338–340/1995). The Bombay High Court, by common judgment dated 23 September 2003, allowed the State’s appeals and dismissed the claimants’, upholding Rs 225 per sq m for land and rejecting any increase for structures.

The present Supreme Court appeals are by the claimants seeking further enhancement, particularly for the structures.

Legal Issues Presented

  1. Whether the compensation for open land should be increased beyond Rs 225 per square metre fixed by the Reference Court and upheld by the High Court.
  2. Whether the compensation for the acquired structures should be enhanced above Rs 1200 per square metre, and if so, the appropriate methodology for such valuation.

Arguments of the Parties

Appellants (Claimants)

  • Relied on an expert witness who valued the structures higher (though without specifying the age of the buildings).
  • Cited a 3 January 1991 circular of the Chief Engineer, Amravati setting district schedule rates for construction (Rs 2800 per sq m for ground floor; Rs 2200 per sq m for upper floors) to justify higher structural compensation.
  • Sought a corresponding rise in compensation for open land, arguing the exemplar sale indicated a higher base value.

Respondent (State of Maharashtra)

  • Supported the High Court’s deduction from the small-plot exemplar and contended that Rs 225 per sq m adequately reflected market value for open land.
  • Challenged the reliability of the expert’s testimony due to lack of data on the building’s age.
  • Argued the 1991 schedule rates were inapplicable for a 1983 acquisition.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
ONGC Ltd. v. Rameshbhai Jivanbhai Patel (2008) 14 SCC 745 Unsafety of determining market value by back-projecting prices from future transactions. Used to caution against mechanically applying 1991 schedule rates to a 1983 acquisition without careful deductions.
Administrator General of West Bengal v. Collector, Varanasi (1988) 2 SCC 150 Valuation of buildings: replacement cost less depreciation, with maintenance affecting depreciation rate. Guided the Court’s approach in adjusting construction cost to 1983 levels and considering depreciation.
Sunder v. Union of India (2001) 7 SCC 211 Statutory benefits payable under Sections 23(1), 28 and 34 of the Act. Cited to clarify that enhanced amounts would carry all statutory additions.
Gurpreet Singh v. Union of India (2006) 8 SCC 457 Further elaboration of statutory benefits on enhanced compensation. Reaffirmed that the claimants are entitled to such benefits on the revised structural compensation.

Court's Reasoning and Analysis

Open land: The Supreme Court upheld Rs 225 per sq m. The exemplar sale (16′×16′ plot sold for Rs 8000 in 1982) translated to approx. Rs 336 per sq m, but standard deductions of about 33% for large-scale acquisition of a much larger tract justified the Reference Court/High Court figure. The appellants showed no cogent basis for further enhancement.

Structures: The Reference Court’s reliance on expert evidence was found deficient because the expert omitted the age of the buildings and ignored cost differentials between floors. Nonetheless, the Court accepted that the structures were of superior quality and in good condition, and considered the 1991 district schedule rates a useful—though not decisive—indicator.

Applying principles from ONGC and Administrator General, the Court:

  • Recognised using future-dated rates requires caution but is less risky for construction costs than for land values.
  • Took 1991 rates (Rs 2800/2200 per sq m) and made a 60% deduction to approximate 1983 costs and account for depreciation, arriving at Rs 1700 per sq m.
  • Found this adjustment consonant with the Central Public Works Department building cost index between 1983 and 1991.

Holding and Implications

PARTLY ALLOWED: Compensation for structures increased from Rs 1200 to Rs 1700 per square metre; request for higher land compensation rejected.

Implications: The appellants receive enhanced compensation for buildings together with statutory additions under Sections 23(1), 28 and 34 of the Land Acquisition Act as clarified in Sunder and Gurpreet Singh. No new legal principle was formulated, but the judgment illustrates cautious use of later-dated construction cost indices when contemporary data are unavailable. Each party bears its own costs.

To access the original judgment, please Sign In or Subscribe.

    Prabhakar Raghunath Patil And Others v. State Of Maharashtra .

    Dr. M.K Sharma, J.— The present appeals are filed by the appellant claimants praying for higher compensation for their lands as also for the structures standing thereon which were acquired by the State of Maharashtra by issuing a notification under Section 4 of the Land Acquisition Act, 1894 (hereinafter referred to as “the Act”).

    2. The aforesaid properties were proposed to be acquired by issuing a Notification under Section 4 of the Act for the purpose of Hatnoor Project which was published on 15-9-1983. Subsequently, a declaration was issued under Section 6 of the Act which was published on 24-5-1984. The Land Acquisition Officer passed an award on 22-9-1986 and possession of the properties was also taken on 18-10-1986. By the aforesaid award passed by the Land Acquisition Officer, compensation for the properties was valued at Rs. 1,10,547.50 which was directed to be paid to the claimants in Land Acquisition Reference No. 2 of 1991. Insofar as Land Acquisition Reference No. 3 of 1991 was concerned, the Land Acquisition Officer determined the compensation at Rs. 4,67,500.53 and for the case in Land Acquisition Reference No. 4 of 1991, the Land Acquisition Officer determined the compensation at Rs. 7,20,464.91.

    3. The appellant claimants not being satisfied with the compensation awarded by the Land Acquisition Officer, requested a reference of their claims to the civil court on the basis of which the aforesaid reference cases viz. Land Acquisition References Nos. 2 to 4 of 1991 were numbered. The claimants claimed compensation at the rate of Rs. 350 per square metre for the open land and at Rs. 2000 per square metre for the structures. After recording evidence adduced by the parties and considering the oral as well as documentary evidence placed before the Reference Court, it granted enhanced compensation of Rs. 2,48,526 to the claimants in Land Acquisition Reference No. 2 of 1991, Rs. 5,10,562.50 to the claimants in Land Acquisition Reference No. 3 of 1991 and Rs. 10,84,605 to the claimants in Land Acquisition Reference No. 4 of 1991.

    4. At this stage, however, we would like to record that the Reference Court, while relying on the sale instance and the oral evidence of the expert, enhanced the compensation determining the value of the open land at the rate of Rs. 225 per square metre and at the rate of Rs. 1200 per square metre for the structure. Being aggrieved by the aforesaid judgment and order passed by the Reference Court, the State of Maharashtra filed appeals in the Bombay High Court which were registered as First Appeals Nos. 133 and 134 of 1995 whereas the three appeals filed by the claimants were registered as First Appeals Nos. 338, 339 and 340 of 1995.

    5. Since the issues involved in the said appeals were similar, all the aforesaid appeals were taken up together for consideration by the High Court which disposed of the same by a common judgment and order dated 23-9-2003 whereby the High Court allowed the appeals filed by the State and dismissed the appeals filed by the claimants. So far as the valuation with regard to the open land is concerned, the High Court held that the Reference Court was justified in awarding compensation at the rate of Rs. 225 per square metre for open space. While coming to the aforesaid conclusion, the High Court considered a sale deed dated 11-12-1982 for an open space admeasuring 16′ × 16′ for which sale consideration of Rs. 8000 was received. But, since the same related to a small plot of land as compared to the acquired land, therefore, deduction was made by the High Court from the exemplar value and on the basis thereof it upheld the valuation of the Reference Court fixed at Rs. 225 per square metre for the open space.

    6. Although a faint argument was made before us, seeking an increase in the valuation of compensation for the said open land, the counsel appearing for the appellants, however, could not show any cogent reason for such increase in the valuation. Even if the aforesaid sale consideration is taken to be the exemplar, the same would indicate that in the year 1982, the approximate price was around Rs. 336 per square metre for the land. When a large tract of land is acquired and the valuation thereof is sought to be determined on the basis of sale instances relating to a small portion of land, the general trend of this Court is to deduct 33% from the value of such small tract of land. Since a very small portion of land was sold by the aforesaid sale deed admeasuring 16′ × 16′, the same can be treated as a base guide only after proper deduction is made from the value fixed in such sale deed. Consequently, the plea for increase of compensation, insofar as open space is concerned, stands rejected by this common judgment and order.

    7. Subsequent to the determination of the valuation of the open space, we are required to decide regarding the prayer of the claimants with regard to increase in the valuation of the structure that was acquired by the respondents. On this count, reliance was placed by the appellants on the evidence of the expert witness and also on the circular dated 3-1-1991 issued by the Chief Engineer, Amravati in respect of cost of construction in justification of their prayer for the increase of the valuation of the structure. Under the aforesaid circular dated 3-1-1991 issued by the Chief Engineer, Amravati, the cost of residential building was fixed as under:

    Ground floor Rs. 2800 per square metre First floor Rs. 2200 per square metre Second floor Rs. 2200 per square metre

    8. Insofar as the evidence of the expert witness is concerned, the Reference Court, however, considered the same to be unreliable as the expert had failed to state in his evidence, details regarding the age of the building which was acquired under the notification. Since the counsel appearing for the appellants made a sincere attempt to justify the increase as sought for by the appellants, we have looked into the evidence of the expert as also the aforesaid notification.

    9. Insofar as the opinion of the expert is concerned, he has not given any specific evidence as to what was the age of the structure when it was notified for acquisition. Without making an enquiry with regard to the age of the structure which was acquired, it would be difficult to assess the valuation and, therefore, the expert was not justified in not making an assessment with regard to the age of the structure. He has faulted on the basic principle of assessment of valuation of a construction. Besides, the cost of construction of the ground floor is always on the higher side while the cost of construction of first floor and second floor is on the lower side. The expert examined has also ignored the said fact which goes to the root of the valuation and for that also the evidence of the expert, in our considered opinion, is not reliable. The only evidence that, therefore, is available before us is the circular issued by the Chief Engineer, Amravati dated 3-1-1991 regarding district schedule rates in respect of cost of construction with reference to the Building and Construction Department of the State of Maharashtra. The High Court, however, held that the aforesaid evidence is also not reliable as the same shows the district schedule rates for the year 1991 in District Amravati and that the same cannot be a safe guide for the determination of the compensation of the structure in question acquired in the year 1983.

    10. It is established from the records that the practice of issuing circular by the Chief Engineer with regard to the cost of construction was for the first time introduced in the year 1991 and no such practice was in existence in the year 1983. But since there is at least some evidence indicating the district schedule rates for the standing structure in the year 1991 we can relate back the said valuation to the year 1983. However, such an exercise to determine the compensation with reference to future documents must be undertaken with great care and caution. The dangers of such a comparison have already been amply illustrated by this Court in ONGC Ltd. v. Rameshbhai Jivanbhai Patel (2008) 14 SCC 745 wherein it was observed:

    “16. Much more unsafe is the recent trend to determine the market value of acquired lands with reference to future sale transactions or acquisitions. To illustrate, if the market value of a land acquired in 1992 has to be determined and if there are no sale transactions/acquisitions of 1991 or 1992 (prior to the date of preliminary notification), the statistics relating to sales/acquisitions in future, say of the years 1994-1995 or 1995-1996 are taken as the base price and the market value in 1992 is worked back by making deductions at the rate of 10% to 15% per annum. How far is this safe? One of the fundamental principles of valuation is that the transactions subsequent to the acquisition should be ignored for determining the market value of acquired lands, as the very acquisition and the consequential development would accelerate the overall development of the surrounding areas resulting in a sudden or steep spurt in the prices. Let us illustrate. Let us assume there was no development activity in a particular area. The appreciation in market price in such area would be slow and minimal. But if some lands in that area are acquired for a residential/commercial/industrial layout, there will be all round development and improvement in the infrastructure/amenities/facilities in the next one or two years, as a result of which the surrounding lands will become more valuable. Even if there is no actual improvement in infrastructure, the potential and possibility of improvement on account of the proposed residential/commercial/industrial layout will result in a higher rate of escalation in prices. As a result, if the annual increase in market value was around 10% per annum before the acquisition, the annual increase of market value of lands in the areas neighbouring the acquired land, will become much more, say 20% to 30%, or even more on account of the development/proposed development. Therefore, if the percentage to be added with reference to previous acquisitions/sale transactions is 10% per annum, the percentage to be deducted to arrive at a market value with reference to future acquisitions/sale transactions should not be 10% per annum, but much more. The percentage of standard increase becomes unreliable. Courts should therefore avoid determination of market value with reference to subsequent/future transactions. Even if it becomes inevitable, there should be greater caution in applying the prices fetched for transactions in future.”
    (emphasis in original)

    11. In this instance, however, we are of the considered opinion that the compensation as determined by the Reference Court for the plot containing the structures is on the lower side. The High Court, while referring to the oral evidence adduced by the expert, has stated that the fine condition of the structures and the superior quality of materials used for construction of the same is beyond doubt. Despite the ambiguity surrounding the age of the structures, the condition and quality of the building has never been called into question. Therefore, we are inclined to raise the compensation awarded in the present case.

    12. We are also of the opinion that the margin of error in comparing schedule rates for construction of buildings in the same district would be lesser than in attempting to use future sale transactions as exemplars. The schedule rates cover costs of construction in the entire district, thus factoring any sudden spurt in increase of land prices owing to acquisition in the area. Moreover, the quality of the structures stands testimony of the fact that the building possesses considerable value, notwithstanding the fact that its age has not been correctly ascertained.

    13. In Administrator General of W.B v. Collector (1988) 2 SCC 150 this Court held that:

    “17. … building value is estimated on the basis of the prime cost or replacement cost less depreciation. The rate of depreciation is, generally, arrived at by dividing the cost of construction (less the salvage value at the end of the period of utility) by the number of years of utility of the building. The factors that prolong the life and utility of the building, such as good maintenance, necessarily influence and bring down the rate of depreciation.”

    14. Therefore, the cost of construction, which would be admittedly lower in 1983 than in 1991, must also be juxtaposed with the depreciation that would have accrued to the structures owing to wear and tear over a period of 8 years. In the year 1991, the cost of construction of residential building was Rs. 2800 per square metre for the ground floor and Rs. 2200 per square metre for the second and third floors. We are of the considered opinion that a deduction of 60% (approximate) from the said valuation of the cost of construction in 1991 would be appropriate, and accordingly arrive at a compensation of Rs. 1700 per square metre for the structure. Our decision to deduct the said percentage of 60% is based on the building cost index between 1983 and 1991 published by the Central Public Works Department, which reflects the rise in cost of construction over the said period of time.

    15. Therefore, we allow these appeals partly to the extent of the valuation fixed with regard to the compensation payable in respect of the structure which was acquired under the notification for acquisition raising it from Rs. 1200 per square metre to Rs. 1700 per square metre. We, however, reject the prayer for increase in the amount of compensation so far as open space is concerned. It is needless to point out here that the respondents shall also be entitled to the statutory benefits as provided for under Sections 23(1), 28 and 34 of the Act for which the decision rendered in Sunder v. Union of India (2001) 7 SCC 211 which was later affirmed and elaborated in Gurpreet Singh v. Union of India (2006) 8 SCC 457 would be applicable.

    16. We leave the parties to bear their own costs.

    Use AI to get other relevant cases.

    Comments

    Prabhakar Raghunath Patil And Others v. State Of Maharashtra .
    (Nov 11, 2010)