Translate
Text Highlighter

Bookmark

PDF

Share

Report a problem
AMICUS AI
Citation Codes
Neutral Citations
2003 INSC 495
Equivalent Citations
citation codes
Case Number
Disposition
Attorney(S)
Judges
Acts
  • Section 3 of the Environment Protection Act, 1986
  • Prevention of Corruption Act
  • Section 5, Subsection 2 of the 1983 Income Tax Act
  • Water (Prevention and Control of Pollution) Act, 1974
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Neutral Citations
2003 INSC 495
Equivalent Citations
citation codes
Case Number
Disposition
Attorney(S)
Judges
Acts
  • Section 3 of the Environment Protection Act, 1986
  • Prevention of Corruption Act
  • Section 5, Subsection 2 of the 1983 Income Tax Act
  • Water (Prevention and Control of Pollution) Act, 1974
Smart Summary

Factual and Procedural Background

Following this Court’s landmark 30-12-1996 judgment in M.C. Mehta v. Union of India (1997) 2 SCC 353 concerning protection of the Taj Mahal (the “Taj Trapezium Matter”), several interlocutory applications (IAs) sought removal of polluting industries and encroachments near the monument. A Monitoring Committee was appointed to report on compliance by the Agra Mission Management Board and other authorities.

On 25-03-2003 the Committee reported that the Uttar Pradesh (U.P.) authorities were diverting the River Yamuna and reclaiming its bed without statutory clearances, and prayed for an immediate stop-work order. Although notice issued on 27-03-2003, the Court initially declined a stay, assuming the State and Central Governments would act lawfully.

Subsequent affidavits revealed that reclamation for the “Taj Heritage Corridor Project” had progressed without mandatory approval under the Environment (Protection) Act, 1986. Disturbed, the Court (i) called for a river-behaviour study by the Central Water Power Research Station, Khadakwasla, and (ii) on 16-07-2003 ordered a Central Bureau of Investigation (CBI) inquiry after noting a misleading signboard by National Projects Construction Corporation (NPCC) claiming work was under Supreme Court directives.

CBI submitted a preliminary report (25-07-2003) and follow-up reports (21-08-2003 & 11-09-2003) uncovering extensive procedural violations, unauthorised financial releases of Rs. 17 crores and Rs. 20 crores, and tampering of official records by high-ranking State and Central officials. The Court now decides the corrective and punitive measures required.

Legal Issues Presented

  1. Whether construction of the Taj Heritage Corridor commenced without statutory environmental clearances and in breach of prior Supreme Court directions.
  2. Whether senior officials of the State of U.P., the Union Ministry of Environment & Forests, and NPCC engaged in illegal financial releases, record tampering, and other corrupt practices.
  3. Whether circumstances warranted a CBI investigation, departmental inquiries, and related remedial directions.

Arguments of the Parties

Monitoring Committee & Petitioner (M.C. Mehta)

  • Asserted that reclamation and construction were proceeding on the Yamuna riverbed without Central Government clearance.
  • Sought an immediate halt to all work pending an environment-impact assessment.

State of Uttar Pradesh

  • Submitted that no work was underway on Component A and that only partial reclamation (25 of 40 acres) had occurred on Component B; no work on Components C or D.
  • Stated it would confine itself to “filling of sand” and build only temporary embankments, subject to Central Government clearance.

Union of India

  • Initially sought time to study the project and file an affidavit; later admitted it lacked knowledge that U.P. had started work without clearance.

NPCC

  • Through counsel, contended that any misleading signage was a “mistake” because work orders had purportedly been issued by the Government.

Central Bureau of Investigation

  • Requested additional time to complete inquiries, including verification of assets and forensic examination of tampered files.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
M.C. Mehta v. Union of India, (1997) 2 SCC 353 (“Taj Trapezium Matter”) Continuing mandamus to protect Taj Mahal; requirement of pollution and encroachment control within the prohibited zone. Formed the foundational authority enabling ongoing monitoring, appointment of the Monitoring Committee, and invocation of Court’s supervisory jurisdiction over later developments.

Court's Reasoning and Analysis

1. The Court traced the chain of events demonstrating that the State began physical work on the riverbed before preparing techno-feasibility studies, Detailed Project Reports (DPRs), or securing Central Government/Environment Ministry approval, contrary to Section 3 of the Environment (Protection) Act, 1986.

2. Affidavits and the CBI preliminary report established prima facie that:

  • No tender process or work order existed; NPCC commenced work on oral instructions.
  • Rs. 17 crores and Rs. 20 crores were released without sanction, bypassing the State’s Expenditure Finance Committee and the Union Cabinet Committee on Economic Affairs.
  • Minutes of the Mission Management Board were adulterated by inserting the phrase “tatkal karya prarambha karne” to fabricate permission for immediate commencement.
  • Senior officials—including the then Chief Minister, Environment Minister of U.P., Secretaries of the State Environment Department, and the Union Environment Secretary—were implicated in record tampering, as confirmed by Central Forensic Science Laboratory findings.

3. Because of the gravity of the misconduct, the Court concluded that mere administrative correction was inadequate; criminal investigation and disciplinary proceedings were indispensable to uphold rule of law and protect a World Heritage monument.

4. Responsibility for the lapses was allocated to specific institutions: Union Government (for its own Secretary), State of U.P. (for its officers), NPCC (for its Managing Director), and CBI (for comprehensive investigation under IPC, Prevention of Corruption Act, Water Act).

Holding and Implications

ORDER: The Court directs—

  • Immediate departmental inquiries by the Union Government against Shri K.C. Mishra (former Union Environment Secretary) and by the State of U.P. against named former and current senior officers.
  • NPCC/competent authority to inquire into the conduct of its Managing Director, Shri S.C. Bali.
  • Completion of all departmental inquiries within four months, with inquiry officers appointed within seven days; power to place delinquent officials under suspension left to the State.
  • CBI to register an FIR and conduct a full investigation against former Chief Minister Ms Mayawati, former Environment Minister Shri Naseemuddin Siddiqui, NPCC personnel, and other officers, considering all relevant penal and anti-corruption statutes.
  • Income Tax Department to cooperate; CBI to furnish a self-contained note to the Chief Secretary, U.P., the Union Cabinet Secretary, and the Ministry overseeing NPCC.
  • Matter adjourned for four months for compliance and progress report.

Implications: The order shifts the case from environmental compliance supervision to accountability for administrative and financial misconduct. It affirms the Supreme Court’s willingness to invoke investigative machinery to safeguard cultural heritage and public funds, yet it sets no new doctrinal precedent beyond rigorous enforcement of existing environmental and anti-corruption laws.

To access the original judgment, please Sign In or Subscribe.

    M.C Mehta v. Union Of India And Others

    Order

    1. On the basis of the decision rendered by this Court on 30-12-1996 in M.C Mehta v. Union of India (1997) 2 SCC 353 (Taj Trapezium Matter) various IAs were filed before this Court either for removal of the industries which are polluting the atmosphere in the vicinity of the Taj Mahal or for removal of the encroachment because appropriate steps were not taken by the authorities concerned. For this purpose, this Court had appointed a Monitoring Committee to report to this Court for the action being taken by the Agra Mission Management Board and other authorities. On 25-3-2003 on behalf of the Monitoring Committee a report was submitted before this Court wherein it was prayed that the respondents including the State of U.P be directed to immediately stop the diversion of River Yamuna and any further action on the bed of the river in proximity of the international heritage monuments till the Union Ministry clears such projects upon an environment-impact-assessment report. On the said application this Court issued a notice on 27-3-2003. At that time, the learned counsel for the Monitoring Committee as well as Mr M.C Mehta insisted that the authorities are proceeding with the construction without appropriate clearance. Still, however, we thought that as the State Government and the Central Government are involved in the matter, they would proceed in accordance with law. Therefore, the stay order as prayed for was not granted. Subsequently, on 8-4-2003 (2003) 10 SCC 165 along with other matters this IA was also considered. On 9-4-2003 on the request of the learned counsel for the Union of India for studying the detailed project report and for filing the necessary affidavit, the matter was adjourned for three weeks. At the relevant time the counsel for the Union of India did not know whether officers of the U.P Government were proceeding with construction without clearance from the Central Government.

    2. Thereafter, on 1-5-2003 (2003) 8 SCC 704, the Court perused the affidavit filed on behalf of the Union Government and recorded as under:

    “2. Heard the learned counsel for the parties. In the affidavit dated 29-4-2003 of Dr (Mrs) Sunita V. Auluck, Additional Director, Ministry of Environment and Forests, New Delhi (tendered in court) the area which is sought to be reclaimed is divided into four parts as under:
    Component A
    On the right bank between upstream-end of Taj Mahal to upstream-end of Fort (near railway bridge).
    Component B
    On the left bank between Ram Bagh and opposite Agra Fort and upstream of Ram Bagh.
    Component C
    On the right-bank upstream of Agra Fort up to the point opposite of Ram Bagh.
    Component D
    On the left bank from the point opposite the upstream of Agra Fort to near Mehtab Bagh and the right-bank downstream of the Taj.
    3. For Component A, the learned counsel appearing for the State Government states that at present no work of reclamation of land is going on. For Component B, on the left bank between Ram Bagh and opposite Agra Fort, it is stated that reclamation of 25 acres of land out of 40 acres of land is over. With regard to Components C and D, no reclamation work is done. He further submits that henceforth the State Government would not carry out any further reclamation work except filling of sand. For the work done in the area of Components A and B, it would be open to the State Government to have temporary embankment by using stones and clay. However, this would be subject to further directions and clearance by the Central Government under Section 3 of the Environment Protection Act, 1986.
    4. Meantime, the Central Water Power Research Station, Khadakwasla would assess the behaviour of the river and the impact of reclamation of riverbed on the monuments in Agra and its protection thereof. The entire cost of this study would be borne by the Central Government.”

    3. We directed the Central Water Power Research Station, Khadakwasla to assess the behaviour of the river and impact of reclamation of riverbed on the monuments in Agra and its protection thereof as we were under the impression that the project was carried out as per the direction of the Central Government. Hence, we directed the Central Government to bear the costs of the project. From the said affidavit it was apparent that the construction work commenced without clearance and this Court was not informed about it at the relevant time.

    4. Thereafter, on 16-7-2003 (2003) 8 SCC 706, this Court directed a CBI inquiry in the matter, wherein it was inter alia mentioned that for some ulterior motive under the directions of some persons without getting necessary clearance from the authority concerned, work of the project had continued and that NPCC which is Government of India undertaking has placed a board at the site stating:

    npcc ltd., a government of india enterprise, engaged for development of heritage corridor for ttz area at agra under the directives of the hon'ble supreme court of india.

    When this was pointed out to the learned counsel for NPCC, he submitted that there was some mistake committed because the work orders were issued by the Government. At that time also we had not agreed with the said submission. It was also mentioned that it was painful to note that instead of creating something new which could be classified as a world heritage or national heritage, persons concerned who were in power were inclined to damage or endanger the world heritage by their hasty/irregular/illegal activities. Therefore, CBI was directed to submit the preliminary report within four weeks. For this the learned Additional Solicitor General Mr Altaf Ahmed stated that the report would be submitted at the earliest.

    5. We note down here that the said statement made before the Court is fully complied with.

    6. Thereafter, on 25-7-2003 (2003) 8 SCC 710, we directed the Committee to find out whether any damage is likely to be caused by the construction work carried out by the government agency.

    7. In the said inquiry report, CBI after recording the statements of various persons including the persons involved, stated that the conclusions drawn in the preliminary report are based on examination of documents and examination of officers/persons which could be done during the inquiry and that conclusions were provisional because some further inquiry was necessary. Mainly, it was pointed out that the opinion of a forensic expert was also required to be obtained as there was tampering of records and interpolations. The conclusions are summarised below:

    1. The techno-feasibility report, detailed project reports (DPRs), detailed drawings and cost estimates were not prepared before the physical commencement of work of Taj Heritage Corridor Project at Agra.
    2. The techno-feasibility report and DPRs were not sent to the Government of India for necessary approvals and clearances.
    3. The meeting of the Mission Management Board held on 12-10-2002 does not appear to have taken a decision for immediate commencement of work. It had only decided for preparation of a techno-feasibility report and DPRs. Only the actual commencement of work would have logically followed preparation of the techno-feasibility report, DPRs, detailed drawings, cost estimates and their necessary approval.
    4. On the basis of the above, a note in the file of the Environment Department, U.P was put up before the Chief Secretary, U.P stating that the Mission Management Board had decided to get DPRs and techno-feasibility reports prepared for which it was also decided in the meeting to release required funds. It was further recorded in the said note itself that the proceedings of the said meeting were prepared accordingly and placed in the file for approval. But the proceedings of the meeting recorded a different decision so much so that the words ‘tatkal karya prarambha karne’ (immediate commencement of work) had been added in the proceedings apparently with ulterior motives. Initials of the Chief Secretary, U.P were also obtained on each page of the minutes of the meeting.
    5. The file was, therefore, sent to the Office of the Chief Minister, U.P, Ms Mayawati through Shri Naseemuddin Siddiqui, attached Minister, stating that the Chief Secretary, U.P had approved the decision of the Mission Management Board for immediate commencement of the work, preparation of techno-feasibility report and DPRs. The said note was not routed through Shri D.S Bagga, Chief Secretary, U.P It was proposed in the note that approval be accorded for taking action as per the approval of the Chief Secretary and also for informing the Ministry of Environment and Forests, Government of India and the Hon'ble Supreme Court through quarterly reports. The said proposal for starting work in terms of the purported approval of the Chief Secretary was accorded approval by the Chief Minister which was communicated by Shri P.L Punia, Principal Secretary to the Chief Minister, U.P vide his note recorded in the file. This shows that the Office of the Chief Minister was apprised of the impending construction at the site as the approval of the Chief Minister was communicated as stated above.
    6. No tender enquiry was floated for preparation of a techno-feasibility report, detailed project report (DPR) and for awarding the work for execution.
    7. No work order was issued to NPCC for executing the work specifying the material and technical specifications and quantities of different works.
    8. Work was started by NPCC on the verbal instructions of Shri R.K Sharma, Secretary, Environment, U.P for which no memorandum of understanding or agreement was signed between the State Government and NPCC. Only a copy of the government order dated 1-11-2002 sanctioning Rs 17 crores for this project was sent to NPCC.
    9. The entire work of the project was left at the mercy of NPCC and its subcontractor M/s Ishvakoo (India) Pvt. Limited and no government department or authority or agency was made responsible to supervise the ongoing work, to check the material and technical specifications and to take measurement of the work executed by NPCC or its subcontractor.
    10. NPCC entered in a pre-tender tie-up with M/s Ishvakoo (India) Pvt. Limited for execution of this project without exploring the possibility of entering into such arrangement with other parties on competitive terms.
    11. No approval of the Cabinet Committee on Economic Affairs (CCEA) was obtained before commencement of work of the project, contrary to the decisions taken jointly by the Government of India and the Government of U.P which was reiterated on more than one occasion in the files of the Environment Department.
    12. An amount of Rs 17 crores was unauthorisedly released by Shri R.K Sharma, Secretary, Environment, U.P for commencement of the work and preparation of DPR and techno-feasibility report. No approval was obtained from the departmental Minister for release of the said amount. The government order was issued in the name of the Government without obtaining the approval of the departmental Minister or the Chief Minister by sending a specific proposal.
    13. Contrary to the provisions existing in the State Government which require that in case of every non-recurring expenditure of Rs 5 crores and above, approval of the Expenditure Finance Committee (EFC) of the State Government is required, no such approval was either sought or obtained before sanctioning the amount of Rs 17 crores.
    14. An amount of Rs 20 crores was sanctioned by Shri Naseemuddin Siddiqui, presently Minister of Environment, U.P for release without approval of DPRs and techno-feasibility report and without consideration of the matter by the Expenditure Finance Committee (EFC) of the State Government and CCEA, Government of India.
    15. Shri Siddiqui appears to have subsequently tampered with the file and to have made interpolations in the government records with an objective to cover up the fact that he had sanctioned Rs 20 crores on 21-5-2003.
    16. Shri Siddiqui and Dr V.K Gupta, the present Secretary, Environment, U.P are reported to have pressurised Shri Rajendra Prasad, Under-Secretary, Environment Department, U.P to tamper with the file and to make interpolations in the official records so that his subsequent note in the file matched and was in line with the interpolations made in the note of the Minister.
    17. Shri K.C Mishra, Secretary, Environment and Forests, Government of India appears to have tampered with the file and made interpolations in government records in order to cover up his omissions of not approving the proposals of his Joint Secretary and Special Secretary for writing to the State Government for a report and to ask them to carry out work only after necessary approvals and clearances.

    8. Thereafter, as requested by CBI, further time was given by the order dated 21-8-2003 (2003) 8 SCC 711. In that order we had specifically directed the CBI officer to interrogate the persons involved and also to verify their assets because it was alleged that an amount of Rs 17 crores was released without proper sanction.

    9. Thereafter, a report was submitted on 11-9-2003 with the following further conclusions:

    “15. An amount of Rs 17 crores was unauthorisedly released by Shri R.K Sharma, Secretary, Environment, U.P without the approval of the departmental Minister. (Ref. para 3.1.E.4, p. 64 and para 3.1.E.31, p. 81.)
    16. Contrary to the provisions existing in the State Government which require that in case of every non-recurring expenditure of Rs 5 crores and above, approval of the Expenditure Finance Committee (EFC) of the State Government is required, no such approval was either sought or obtained before sanctioning the amount of Rs 17 crores. (Ref. para 3.1.E.11, p. 67.)
    17. An amount of Rs 20 crores was sanctioned by Shri Naseemuddin Siddiqui, the then Minister of Environment, U.P for release without approval of DPRs and techno-feasibility reports and without clearance of the Expenditure Finance Committee (EFC) of the State Government and CCEA, Government of India. (Ref. para 3.1.E.39, p. 86.)
    18. Shri Siddiqui subsequently tampered with the file and made interpolations in the government records with an objective to cover up the fact that he had sanctioned Rs 20 crores on 21-5-2003. [Ref. para 3.1.E.40 (1 and 2), p. 87.]
    19. Shri Siddiqui and Dr V.K Gupta, the present Secretary, Environment, U.P pressurized Shri Rajendra Prasad, Under-Secretary, Environment Department, U.P who also tampered with the file and made interpolations to cover the fact that the Minister had sanctioned Rs 20 crores. (Ref. para 3.1.E.37, p. 86.)
    20. Shri K.C Mishra, Secretary, Environment and Forests, Government of India tampered with the file and made interpolations in government records in order to cover up his omissions of not approving the proposals of his Joint Secretary and Special Secretary for writing to the State Government for a report and to ask them to carry out work only after necessary approvals and clearances. He obscured some portions of the notes dated 21-10-2002 and 8-5-2003 of Dr Saroj, Additional Director, Ministry of Environment and Forests so as to show that he was not a part of the decision-making and had not shown his consent to the proposed project. (Ref. para 3.1.E.42, p. 89.)
    21. Central Forensic Science Laboratory has given a report that interpolations were made in the files by Shri Naseemuddin Siddiqui, the then Minister, U.P, Shri Rajendra Prasad, Under-Secretary, U.P and Shri K.C Mishra, Secretary, Environment and Forests, Government of India. [Ref. para 3.1.G.21, pp. 106-07 and para 3.1.E.44 (5-6), p. 90.]
    22. Collection of information/intelligence and discreet verification of assets acquired/held by the persons/officers involved with the decision-making process in this case could not be completed. Considering the enormity of task, it is likely to take considerable time. (Ref. para 3.1.K.1, pp. 112-13.)”

    10. On the basis of the said report further time was given to CBI for verification of the assets of the persons/officers involved and the same report inter alia reveals as under:

    “In addition to the above, enquiry was also made regarding the outflow of Rs 17 crores, released by the State Government of M/s NPCC for this project, major part of which was paid by M/s NPCC to M/s Ishvakoo (India) Private Limited and M/s Consultant Architect and Planner Services Limited (CAPS).”

    11. Income tax returns of the following persons/officers were collected from different Income Tax Authorities:

    (i) Ms Mayawati, former Chief Minister, Uttar Pradesh.
    (ii) Shri Naseemuddin Siddiqui, the then Minister, Uttar Pradesh.
    (iii) Shri K.C Mishra, the then Secretary, Ministry of Environment and Forests, Government of India, New Delhi.
    (iv) Shri D.S Bagga, the then Chief Secretary, Government of Uttar Pradesh, Lucknow.
    (v) Shri P.L Punia, the then Principal Secretary to the Chief Minister, Uttar Pradesh.
    (vi) Shri R.K Sharma, the then Principal Secretary, Environment, Government of Uttar Pradesh.

    12. Apart from what has been stated in the reports with regard to the assets, the learned Additional Solicitor General Mr Altaf Ahmed, submitted that further inquiry/investigation is necessary by CBI.

    13. Considering the aforesaid report and the serious irregularities/illegalities committed in carrying out the so-called Taj Heritage Corridor Project, we direct:

    (a) the Central Government to hold immediate departmental inquiry against Shri K.C Mishra, former Secretary, Environment, Union of India;
    (b) the State of Uttar Pradesh to hold departmental inquiry against Shri R.K Sharma, former Principal Environment Secretary, Shri P.L Punia, former Principal Secretary to Chief Minister, Shri D.S Bagga, Chief Secretary and Shri V.K Gupta, former Secretary, Environment;
    (c) NPCC or the competent authority including the Central Government to hold inquiry against Shri S.C Bali, Managing Director of NPCC;
    (d) the State Government as well as the officers concerned of the Central Government are directed to see that departmental inquiry is completed within four months from today. The State of U.P and the Central Government would appoint respective inquiry officers for holding inquiry, within a period of seven days from today;
    (e) it would be open to the State Government if called for to pass order for suspension of the delinquent officers in accordance with the rules;
    (f) for the officers and the persons involved in the matter, CBI is directed to lodge an FIR and make further investigation in accordance with law;
    (g) CBI shall take appropriate steps for holding investigation against the Chief Minister Ms Mayawati and Naseemuddin Siddiqui, former Minister for Environment, U.P and other officers involved;
    (h) the Income Tax Department is also directed to cooperate in further investigation which is required to be carried out by CBI;
    (i) CBI would take into consideration all the relevant Acts i.e IPC/Prevention of Corruption Act and the Water (Prevention and Control of Pollution) Act, 1974 etc.;
    (j) CBI to submit a self-contained note to the Chief Secretary to the Government of Uttar Pradesh as well as to the Cabinet Secretary, Union Government and to the Ministry concerned dealing with NPCC.

    14. Stand over for four months for report and compliance.