AMICUS AI
Citation Codes
Equivalent Citations
citation codes
Case Number
Judges
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Equivalent Citations
citation codes
Case Number
Judges
Smart Summary

Factual and Procedural Background

This revision petition under Article 227 of the Constitution of India challenges the order dated 02.12.2011 passed by the Additional District Judge, Gurgaon, which dismissed the petition under Section 14 of the Arbitration and Conciliation Act, 1996 seeking termination of the mandate of respondent No. 2 as Arbitrator. The dispute originated from a lease agreement containing an arbitration clause between the petitioner and respondent No. 1. Respondent No. 1 referred the dispute to respondent No. 2 as Arbitrator. The petitioner challenged the Arbitrator's mandate under Sections 12 and 13 of the Act on grounds of non-disclosure of the Arbitrator's position as Director of respondent No. 1 and possible bias. After the Arbitrator dismissed the petitioner's challenge, the petitioner filed a petition under Section 14 seeking termination of the Arbitrator’s mandate, which was dismissed by the trial court. The petitioner filed the present revision petition against that dismissal.

Legal Issues Presented

  1. Whether the Arbitrator, being a Director of one party and failing to disclose this fact, is disqualified under Sections 12 and 14 of the Arbitration and Conciliation Act, 1996?
  2. Whether the petitioner can seek termination of the Arbitrator’s mandate under Section 14 of the Act after the Arbitrator has dismissed the challenge under Sections 12 and 13, or is the only remedy to challenge the final Award under Section 34?
  3. Whether the petition under Section 14 is maintainable despite an earlier revision petition on the same issue being disposed of as infructuous?

Arguments of the Parties

Petitioner's Arguments

  • The Arbitrator was required under Section 12(1) and (2) to disclose in writing any circumstance likely to give rise to justifiable doubts about his independence or impartiality, which he failed to do by not disclosing his directorship in respondent No. 1.
  • Because of this non-disclosure and resulting bias, the Arbitrator is de jure unable to perform his functions, making his mandate liable to termination under Section 14.
  • The trial court erred in holding that the remedy lies only in challenging the final Award under Section 34; the petitioner also has a remedy under Section 14 to terminate the Arbitrator’s mandate.
  • Relied on Supreme Court judgments in Jiwan Kumar Lohia v. Durgadutt Lohia and Bihar State Mineral Dev. Corpn. v. Encor Builders (I) Pvt Ltd. to support termination in case of bias.
  • Relied on Division Bench and Single Bench judgments, including Satish Chander Gupta v. Union of India and Opbk Construction Pvt. Ltd. v. Punjab Small Industries, to assert the availability of remedy under Section 14 even after dismissal of challenge under Section 12 and 13.

Respondent No. 1's Arguments

  • The petitioner is not entitled to seek termination under Section 14 after having already sought the same relief in an earlier petition disposed of as infructuous.
  • The Arbitrator disclosed his relationship as Director in early correspondence and the petitioner had knowledge of this relationship at the time of appointment, as evidenced by no objection recorded during initial proceedings.
  • The Arbitrator’s application under Sections 12 and 13 was dismissed, and in view of Section 13(5) of the Act, the only remedy available to the petitioner is to challenge the final Award under Section 34.
  • Relied on Supreme Court judgments including Ace Pipeline Contracts (P) Ltd. v. Bharat Petroleum Corpn. Ltd. and SBP & Co. v. Patel Engineering Ltd., and various High Court judgments supporting the exclusivity of remedy under Section 34 after dismissal of challenge under Sections 12 and 13.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Jiwan Kumar Lohia v. Durgadutt Lohia (1992) 1 SCC 56 Mandate of arbitrator liable to termination in case of bias. Supported petitioner's argument that bias arising from nondisclosure of directorship justifies termination.
Bihar State Mineral Dev. Corpn. v. Encor Builders (I) Pvt Ltd. (2003) 7 SCC 418 Bias or lack of independence/impartiality grounds for termination of arbitrator’s mandate. Reinforced the principle that arbitrator’s mandate can be terminated for bias.
Satish Chander Gupta and Sons v. Union of India 2003 (1) R.C.R (Civil) 721 Petitioner has remedy under Section 14 of the Act to seek termination of arbitrator’s mandate even after dismissal of challenge under Sections 12 and 13. Court followed this Division Bench judgment to hold Section 14 remedy is available.
Opbk Construction Pvt Ltd. v. Punjab Small Industries 2008 (3) ARBLR 189 PH Supports availability of remedy under Section 14 after dismissal of challenge under Sections 12 and 13. Court relied on this Single Bench judgment to affirm availability of termination petition under Section 14.
State of Arunachal Pradesh v. Subhash Projects 2007 (1) Arblr 564 Gau Supports remedy under Section 14 for termination of arbitrator’s mandate. Considered in support of petitioner’s right to file Section 14 petition.
Ace Pipeline Contracts (P) Ltd. v. Bharat Petroleum Corpn. Ltd. (2007) 5 SCC 304 After dismissal of challenge under Sections 12 and 13, remedy lies in challenging final Award under Section 34. Cited by respondent No. 1 to argue exclusivity of remedy under Section 34 post dismissal of challenge.
SBP & Co. v. Patel Engineering Ltd. (2005) 8 SCC 618 Only remedy after dismissal of challenge under Sections 12 and 13 is to challenge final Award under Section 34. Relied upon by respondent No. 1 to support their contention on remedy limitation.
Mindmill Software Ltd. v. Paragon Construction (India) Pvt. Ltd. 2010 (6) R.C.R (Civil) 125 Supports remedy limitation to challenge final Award under Section 34. Used by respondent No. 1 to support their position on non-maintainability of Section 14 petition.
Progressive Career Academy Pvt. Ltd. v. Fiit Jee Ltd. 2011 (6) R.C.R (Civil) 418 Similar principle limiting remedy to Section 34 challenge. Relied upon by respondent No. 1 for remedy exclusivity argument.
Neeru Walia v. Inderbir Singh Uppal & Anr. 2010 (7) R.C.R (Civil) 508 Supports limitation of remedy to Section 34 challenge. Cited by respondent No. 1 in support of their contention.
Chintakayala Siva Rama Krishna v. Nadimpalli Venkata Rama Raju 2006 (2) R.A.J 507 (AP) Supports remedy limitation to challenging final Award under Section 34. Relied upon by respondent No. 1 to argue against maintainability of Section 14 petition.

Court's Reasoning and Analysis

The Court examined Sections 12 to 14 of the Arbitration and Conciliation Act, focusing on the mandatory requirement under Section 12(1) and (2) for an arbitrator to disclose in writing any circumstance likely to raise justifiable doubts about independence or impartiality. It was undisputed that respondent No. 2 was a Director of respondent No. 1, a material circumstance that should have been disclosed but was not. The Court held that the possibility of bias arising from this relationship gives rise to justifiable doubts, rendering the arbitrator de jure unable to perform his functions.

The Court rejected respondent No. 1’s contention that the petitioner had knowledge of the Arbitrator’s directorship, finding that references made by the Arbitrator did not amount to the required written disclosure under the Act. It further held that any purported consent or no objection by the petitioner was legally ineffective if it was given without knowledge of this material fact.

Regarding the remedy, the Court considered conflicting precedents on whether a petitioner can seek termination of the arbitrator’s mandate under Section 14 after dismissal of the challenge under Sections 12 and 13, or must await the final award and challenge under Section 34. The Court followed the Division Bench judgment in Satish Chander Gupta and the Single Bench judgment in Opbk Construction Pvt. Ltd., which allow a remedy under Section 14. It reasoned that it would be futile and unfair to force the petitioner to complete arbitration proceedings and then challenge the award if the arbitrator is de jure unable to perform his functions.

The Court also dismissed the argument that the previous revision petition barred the present petition, noting that the earlier petition was disposed of as infructuous with liberty to pursue other remedies, including under Section 14.

Holding and Implications

The Court allowed the revision petition, set aside the impugned order dismissing the Section 14 petition, and terminated the mandate of respondent No. 2 as Arbitrator.

The matter was remitted to the trial court for appointment of a substitute Arbitrator as per Section 15(2) of the Act. The parties were directed to appear before the trial court on a specified date.

This decision directly affects the parties by removing the challenged Arbitrator and enabling fresh appointment, but does not establish a new precedent beyond reaffirming the applicability of Section 14 as a remedy for termination of an arbitrator’s mandate when non-disclosure and bias arise.

    Imaging Solutions Pvt. Ltd. v. Hughes Communications India Ltd. And Another

    L.N Mittal, J. (Oral):— This revision petition filed under Article 227 of the Constitution of India is directed against order dated 02.12.2011 (Annexure P- 19) passed by learned Additional District Judge, Gurgaon, thereby dismissing petition under Section 14 of the Arbitration and Conciliation Act, 1996 (in short — the Act), filed by the petitioner herein for terminating the mandate of respondent No. 2-Arbitrator Mr. Vijay Dhar.

    2. Invoking the arbitration clause contained in lease agreement between petitioner and respondent No. 1, dispute between them was referred by respondent No. 1 to respondent No. 2 as Arbitrator. During pendency of the arbitration proceedings, petitioner moved application under Section 12 and 13 of the Act before the Arbitrator challenging the mandate of the Arbitrator on the ground that the Arbitrator is Director of respondent No. 1- Company, but the Arbitrator did not disclose the said fact before entering into the arbitration and also on the ground of possible bias i.e lack of independence or impartiality on account thereof. When the Arbitrator failed to decide the said application, the petitioner filed C.R No. 1614 of 2011 in this Court seeking direction to respondent No. 2 for deciding the said application and also seeking removal/termination of the mandate of respondent No. 2. Before the said revision petition could be decided, respondent No. 2 disposed of and dismissed the petitioner's application under Sections 12 and 13 of the Act. In view thereof, the said revision petition was disposed of as infructuous with liberty to the petitioner to raise all objections/pleas qua its grievance before the appropriate Forum for any other legal remedy available in accordance with law. Thereafter, the petitioner filed petition under Section 14 of the Act before the lower court seeking termination of the mandate of respondent No. 2 — Arbitrator on the aforesaid grounds. Respondent No. 1 contested the said petition and controverted the averments of the petitioner.

    3. Learned trial court, vide impugned order (Annexure P-19), has dismissed the petitioner's petition under Section 14 of the Act. Feeling aggrieved, petitioner has filed this revision petition to challenge the said order.

    4. I have heard counsel for the parties at considerable length and perused the case file with their assistance.

    5. Counsel for the petitioner contended that under Section 12(1) and 12 (2) of the Act, respondent No. 2 — Arbitrator was required to disclose in writing any circumstance likely to give rise to justifiable doubt as to his independence and impartiality, but respondent No. 2 did not do so as he did not disclose the factum of his being Director of respondent No. 1 — Company. Consequently, respondent No. 2 is de jure unable to perform his function as Arbitrator, and therefore, his mandate is liable to termination in view of Section 14 of the Act. It was also argued that bias or lack of independence or impartiality on the part of respondent No. 2 is apparent because respondent No. 2 is Director of respondent No. 1 — Company. Relying on judgments of Hon'ble Supreme Court in Jiwan Kumar Lohia v. Durgadutt Lohia reported as (1992) 1 SCC 56 : AIR 1992 SC 188 and Bihar State Mineral Dev. Corpn. v. Encor Builders (I) Pvt Ltd. reported as (2003) 7 SCC 418 : 2003 AIR (SC) 3688, it was contended that in case of bias, mandate of Arbitrator is liable to termination.

    6. It was also argued by counsel for the petitioner that the lower court has dismissed the petitioner's petition under Section 14 of the Act holding that by virtue of Section 13(5) of the Act, the remedy available to the petitioner is to challenge the final Award of the Arbitrator under Section 34 of the Act and petition under Section 14 of the Act is not maintainable. It was contended that aforesaid approach of the trial court is erroneous and illegal. It was argued that the petitioner also has remedy under Section 14 of the Act to seek termination of mandate of the Arbitrator on the aforesaid grounds even after the Arbitrator has dismissed the petitioner's application under Sections 12 and 13 of the Act. In this respect, reliance has been placed on Division Bench judgment of this Court in the case of Satish Chander Gupta and Sons v. Union of India reported as 2003 (1) R.C.R (Civil) 721 : (2003-1) The Punjab Law Reporter 164, Single Bench judgment of this Court in the case of Opbk Construction Pvt Ltd. v. Punjab Small Industries reported as 2008 (3) ARBLR 189 PH and also a Division Bench judgment of Gauhati High Court namely State of Arunachal Pradesh v. Subhash Projects and Marketing… reported as 2007 (1) Arblr 564 Gau.

    7. On the other hand, counsel for respondent No. 1 contended that the petitioner, having sought termination of mandate of respondent No. 2 in earlier C.R No. 1614 of 2011, is not entitled to seek the same remedy by way of petition under Section 14 of the Act and by way of instant revision petition. It was also pointed out that in very first letter dated 13.0? 2008, addressed by the Arbitrator to both petitioner and respondent No. 1, the Arbitrator mentioned that he was named, nominated and appointed as agreed Arbitrator by both the parties with knowledge of relationship with both and on first date of proceedings on 28.04.2008 also, the Arbitrator observed that the parties had no objection to his appointment to act as Arbitrator, and therefore, it cannot be said that relationship of respondent No. 2 with respondent No. 1 being Director thereof, was not known to the petitioner. Reference was also made to order dated 08.04.2011 (Annexure A-21) passed by the Arbitrator, thereby dismissing the petitioner's application under Sections 12 and 13 of the Act, wherein it was observed that the Arbitrator was personally known to petitioner's Managing Director Mr. Imran Baig, who was, therefore, aware of the Arbitrator's position as Director of respondent No. 1 — Company. It was thus argued that respondent No. 2 was named as Arbitrator by both the parties with their eyes open, and therefore, petitioner cannot now object to the continuation of respondent No. 2 as Arbitrator. It was next argued that petitioner's application under Sections 12 and 13 of the Act, having been dismissed by the Arbitrator, then in view of Section 13(5) of the Act, the only remedy available to the petitioner is to challenge the ultimate Award of the Arbitrator under Section 34 of the Act. Reliance in support of these contentions has been placed on various judgments i.e two judgments of Hon'ble Supreme Court namely Ace Pipeline Contracts (P) Ltd. v. Bharat Petroleum Corpn. Ltd.. reported as 2007 (2) R.C.R (Civil) 407 : 2007 (2) Recent Apex Judgments (R.A.J) 335 : (2007) 5 SCC 304 and SBP & Co. v. Patel Engineering Ltd., 2005 (4) R.C.R (Civil) 747 : (2005) 8 SCC 618; three judgments of Mindmill Software Ltd.… v. Paragon Construction (India) Pvt. Ltd.…. reported as 2010 (6) R.C.R (Civil) 125 : (166) 2010 The Delhi Law Times 94; Progressive Career Academy Pvt. Ltd.… v. Fiit Jee Ltd.…. reported as 2011 (6) R.C.R (Civil) 418 : 2011 (2) Arbi LR 323 and Neeru Walia… v. Inderbir Singh Uppal & Anr.…, 2010 (7) R.C.R (Civil) 508 : 160 (2009) Delhi Law Times 55 and one judgment of Andhra Pradesh High Court in the case of Chintakayala Siva Rama Krishna v. Nadimpalli Venkata Rama Raju reported as 2006 (2) R.A.J 507 (AP).

    8. I have carefully considered the matter.

    9. Sections 12 to 14 of the Act are reproduced hereunder:—

    “12. Grounds for challenge:

    1. When a person is approached in correction with his possible appointment as an arbitrator, he shall disclose in writing any circumstances likely to give rise to justifiable doubts as to his independence or impartiality.

    2. An arbitrator, from the time of his appointment and throughout the arbitral proceedings, shall, without delay, disclose to the parties in writing any circumstances referred to in sub section (1) unless they have already been informed of them by him.

    3. An arbitrator may be challenged only if-

    (a) circumstances exist that give rise to justifiable doubts as to his independence or impartiality, or

    (b) he does not possess the qualifications agreed to by the parties.

    4. A party may challenge an arbitrator appointed by him, or in whose appointment he has participated, only for reason, of which he becomes aware after the appointment has been made.

    10. Challenge Procedure:

    1. Subject to sub-section (4), the parties are free to agree on a procedure for challenging an arbitrator.

    2. Failing any agreement referred to in sub-section (1), a party who intends to challenge an arbitrator shall, within fifteen days after becoming aware of the constitution of the arbitral tribunal or after becoming aware of any circumstances referred to in subsection (3) of section 12, send a written statement of the reasons for the challenge to the arbitral tribunal.

    3. Unless the arbitrator challenged under sub-section (2) withdraws from his office or the other party agrees to the challenge, the arbitral tribunal shall decide on the challenge.

    4. If a challenge tinder any procedure agreed upon by the parties or tinder the procedure under sub-section (2) is not successful, the arbitral tribunal shall continue the arbitral proceedings and make an arbitral award.

    5. Where an arbitral award is made under sub-section (4), the party challenging the arbitrator may make an application for setting aside such an arbitral award in accordance with section 34.

    6. Where an arbitral award is set aside on an application made under sub-section (5), the Court may decide as to whether the arbitrator who is challenged is untitled to any fees.

    11. Failure or impossibility to act:

    1. The, mandate of an arbitrator shall terminate if-

    (a) he becomes de jure or de facto unable to perform his functions or for other reasons fails to act without undue delay; and

    (b) he withdraws from his office or the parties agree to the termination of his mandate.

    2. If a controversy remains concerning any of the grounds referred to in clause (a) of sub-section (1), a party may, unless otherwise agreed by the parties, apply to the Court to decide on the termination of the mandate.

    3. If, under this section or sub-section (3) of section 1.3, an arbitrator withdraws from his office or a party agrees to the termination of the mandate of an arbitrator, it shall not imply acceptance of the validity of any ground referred to in this section or subsection (3) of section 12.”

    12. A bare perusal of sub-sections (1) and (2) of Section 12 of the Act reveals that at the time of possible appointment of Arbitrator as well as throughout the arbitral proceedings, the Arbitrator is required to disclose in writing any circumstance likely to give rise to justifiable doubt as to his independence or impartiality. In the instant case, it is undisputed that respondent No. 2 is Director of respondent No. 1 — Company. This is certainly a material circumstance likely to give rise to justifiable doubts as to his independence or impartiality as Arbitrator. Justice should not only be done, but should also seem to be done. The possibility of bias of respondent No. 2 being Director of respondent No. 1 is very distinct and most probable. In any event, it has rightly given rise to justifiable doubt about independence or impartiality of the Arbitrator in the mind of petitioner Company.

    13. According to sub-sections (1) and (2) of Section 12 of the Act, the aforesaid circumstance had to be disclosed by the Arbitrator in writing to both the parties. However, it was not so done. Reference to letter dated 13.03.2008 (Annexure A-9) written by the Arbitrator to both the parties mentioning that he was named as Arbitrator with knowledge of relationship with both does not even remotely suggest that the Arbitrator was Director of respondent No. 1 and this fact was known to petitioner Company. Similarly, order dated 28.04.2008 (Annexure A-10) does not at all refer to any relationship of respondent No. 2 with respondent No. 1. It simply records that parties had no objection to respondent No. 2 acting as Arbitrator. However, if the petitioner did not know at that stage that respondent No. 2 was Director of respondent No. 1, the so called consent or no objection given by the petitioner would be of no value in the eyes of law, particularly in view of mandatory provisions of sub-sections (1) and (2) of Section 12 of the Act.

    14. In the instant case, at no stage, respondent No. 2 informed the parties in writing that respondent No. 2 is Director of respondent No. 1. Consequently, in view of violation of aforesaid mandatory provisions of sub-sections (1) and (2) of Section 12 of the Act and also in view of possible bias and justifiable doubt as to his independence and impartiality, mandate of respondent No. 2 as Arbitrator is liable to termination under Sections 12 and 14 of the Act.

    15. Counsel for respondent No. 1 pointed out that respondent No. 2 was Director of respondent No. 1 since the year 1992 i.e since before the date of lease agreement containing the arbitration clause. However, at that time, respondent No. 2 was only alternate or substitute Director in the absence of a regular Director. On the contrary, as per information Annexure P-6, respondent No. 2 became Director of respondent No. 1 w.e.f 20.04.2006 i.e long after the date of lease agreement dated 23.03.2001 containing the arbitration clause. Consequently, while entering into arbitration agreement, the petitioner could not be aware of position of respondent No. 2 as Director of respondent No. 1 nor the petitioner was made aware of the said position at any stage.

    16. In the aforesaid circumstances, the Arbitrator having rejected the application moved by petitioner under Section 12 and 13 of the Act, the question would arise whether in view of Section 13(5) of the Act, the only remedy available to the petitioner is by challenging the ultimate Award under Section 34 of the Act or whether the petitioner has remedy to seek termination of mandate of the Arbitrator by filing petition under Section 14 of the Act. Judgments in the cases of Satish Chander Gupta (supra), Opbk Construction Pvt. Ltd. (supra) and State of Arunachal Pradesh (supra), cited by counsel for the petitioner supports the view that the petitioner has remedy under Section 14 of the Act. However, judgments in the cases of Progressive Career Academy Pvt. Ltd. (supra), Chintakayala Siva Rama Krishna (supra), Neeru Walia (supra) and Mindmill Software Ltd. (supra) do support the contention of counsel for respondent No. 1 that the only remedy with the petitioner is to challenge the ultimate Award under Section 34 of the Act, as stipulated in Section 13(5) of the Act. However, I have to follow the Division Bench judgment of this Court in the case of Satish Chander Gupta (supra) and also judgment of Single Bench of this Court in Opbk Construction Pvt. Ltd. (supra), with which I have no ground to differ.

    17. Even on principle, the petitioner cannot be left remedyless. It would be futile to go through the whole exercise of arbitration proceedings leading to the final Award and then challenging the same under Section 34 of the Act. On the contrary, if the Arbitrator becomes de jure unable to perform his function, then his mandate is liable to termination under Section 14 of the Act. In the instant case, respondent No. 2 became de jure unable to perform his functions as Arbitrator because of his being Director of respondent No. 1, which fact was not earlier known to the petitioner.

    18. Consequently, this ground squarely falls within parameters of Section 14 of the Act for termination of mandate of respondent No. 2 as Arbitrator, without resorting to Section 34 of the Act read with Section 13(5) of the Act.

    19. The contention of counsel for respondent No. 1, based on earlier C.R No. 1614 of 2011, to bar the subsequent petition under Section 14 of the Act and the instant revision petition, is untenable because the said revision petition was disposed of as infructuous on account of decision by Arbitrator on application of petitioner under Sections 12 and 13 of the Act, with liberty to petitioner to avail of any other remedy available in accordance with law. Consequently, petitioner is not debarred from availing of remedy available to it under Section 14 of the Act. For the reasons aforesaid, I find that the lower court erred in holding that petition under Section 14 of the Act is not maintainable at this stage. The said approach of the lower court is erroneous and illegal.

    20. Accordingly, the instant revision petition is allowed. Impugned order Annexure P-19 passed by the lower court is set aside. Petition Annexure P-7 filed by the petitioner under Section 14 of the Act is allowed and mandate of respondent No. 2 to act as Arbitrator is terminated. The matter is remitted to trial court for appointing a substitute Arbitrator, as required by Section 15(2) of the Act. Parties are directed to appear before the trial court on 10.12.2012

    21. Petition allowed.