The Judgment of the Court was delivered by
1. In this writ proceeding the writ-petitioners have challenged a letter, dated 14 November 2000, issued by the Deputy General Manager (Personnel) for Garden Reach Ship Builders and Engineers Ltd. (a Government of India Undertaking). The relevant part of the aforesaid letter, dated 14 November 2000, is set out hereunder:
“The President
GRW Ltd. Clerks' Union,
43/46, Garden Reach Road,
Calcutta-700 024.
Re: Termination of agreement, dated 9 May 1988 - Constitution of India, Art. 226 - Industrial Disputes Act, 1947, Ss. 2(p), 9A, 18(1) and (3) - West Bengal Industrial Disputes Rules, Rule 68, - Settlement of Incentive Scheme - Agreement, dated 9 May 1988.
Dear Sir,
The management is regretfully constrained to give you notice hereby that due to supervening impossibility, the agreement, dated 9 May 1988, shall stand terminated with effect from 15 January, 2001.
Yours faithfully,
For Garden Reach Ship Builders and Engineers Ltd.
(illegible)
Dy. General Manager (Personnel)”
2. There are three petitioners. Petitioner No. 1 is a registered trade union. It is the case of the petitioners that the petitioner-union and the respondent-company on 9 May 1988 signed a memorandum of settlement, within the meaning of S. 2(p) of the Industrial Disputes Act, 1947, on incentive scheme for clerical graded staff after replacing the scheme prevailing at that material time.
In Cl. 5.12 of the aforesaid incentive scheme, dated 9 May 1988, it was stated that as a special gesture of goodwill the management agreed to pay all clerical grade staff/employees for the period of 1 June 1987 to 30 April 1988 additional incentive by lowering qualifying level applicable to such employees of overall GRSE efficiency of 50 per cent to 45 per cent only. In Cl. 6.1 of the aforesaid incentive scheme, dated 9 May 1988, it was clearly stated that the scheme would be put into operation on and from 1 May 1988 and in Cl. 6.2 it was stated that the scheme would be binding on the parties up to 31 December 1989 and the scheme would continue even thereafter till a new agreement is signed.
3. It is the case of the petitioners that after the aforesaid incentive scheme no further agreement was made on the incentive scheme. It is the case of the petitioners that the terms of the said incentive scheme continued upto 30 October 2000 without any change or reduction of wages. In Para. 5 of the writ petition the writ-petitioners narrated how the clerical graded staff of the respondent-company are getting incentive. The relevan part of Para. 5 is set out hereunder:
“It is stated that on the basis of the said incentive scheme, dated 9 May 1988, all the employees/workmen of the respondent company are getting incentive in the manner as stated hereinbelow:
Incentive for 25 days, i.e, 200 normal hours worked
Particulars
Grade I
Grade II
Grade III
5.3.3.1
Based on average of related
Rs. 180.00
Rs. 150.00
Rs. 120.00
5.2.3.2
Direct performance
Rs. 420.00
Rs. 350.00
Rs. 280.00
5.3.3.3
Total Incentive Earnings
Rs. 600.00
Rs. 500.00
Rs. 400.00
5.3.4
Incentive based on average earnings of Direct Operatives
5.3.4.1
Incentive earning for 200 normal hours worked in respect of Clerk Grade II on this account will be where is the efficiency of the direct operatives of the related shops/department, etc.”
4. In Para. 6 of the writ application the writ-petitioners stated that a settlement was made on 6 September 2000 and as per provision of rules 68 of the West Bengal Industrial Disputes Rules, the settlement was duly communicated by the parties to the Labour Commissioner, Government of West Bengal for his recording. In the said settlement, dated 6 September 2000, under Cl. 10 it has been agreed by and between the parties that the existing benefits and facilities not covered by the settlement dated 6 September 2000, will remain unchanged and the amount of Rs. 280 paid per month for the year 1996 and Rs. 390 paid per month from 1 January 1997 as interim relief shall be fully recovered and adjusted with the arrear payment and any other advance or ad hoc payments made against the said wage settlement, dated 6 September 2000, shall also be recovered and adjusted with the arrear payments.
5. The Chief General Manager (Personnel) for Garden Reach Shipbuilders and Engineers, Lid., by a letter, dated 30 October 2000, intimated the President of the petitioner No. 1 that in accordance with S. 9A of the Industrial Disputes Act, 1947 (hereinafter referred to as the said Act) it was the intention of the company to effect the change specified in the annexure to the said letter with effect from 12 December 2000. In the annexure to the said letter it was stated as follows:
“(1) The norms set in the agreement, dated 9 May 1988, relating to Incentive Scheme for Clerical Graded Staff is totally outdated and not workable and hence cannot have any impact so far as performance is concerned.
(2) The company, therefore, proposes to discontinue the incentive scheme permanently as formulated in the agreement, dated 9 May 1988.”
6. After receiving the aforesaid letter, dated 30 October 2000, the President of the petitioner No. 1 by a letter, dated 3 November 2000, inter alia, intimated that:
(a) the proposal for withdrawal of the incentive scheme was in contravention of Cl. 6.2 of the agreement, dated 9 May 1988;
(b) without offering any alternative proposal to protect the interest of the workmen as well as the company, drastic deduction of wages would put the workmen in great difficulty;
(c) without making any supplementary agreement the management cannot withdraw the benefits granted to the workmen by the aforesaid incentive scheme, dated 9 May 1988. The respondent-company by the letter, dated 14 November 2000, terminated the incentive agreement, dated 9 May 1988. The relevant part of this letter, dated 14 November 2000 has already been set out in the earlier part of this judgment.
7. The respondents Nos. 1, 2 and 3 in their affidavit-in-opposition, in Para. 13, inter alia, stated that:
(a) what was arrived at on 9 May 1988 is not a settlement as contemplated under the said Act but merely an agreement,
(b) under S. 2(p) of the said Act a written agreement and workmen arrived at otherwise than in course of conciliation proceeding, for elevation to the status of settlement, requires to be signed by the parties thereto in such a manner as may be prescribed and a copy thereof is required to be sent to an officer authorised in this behalf by the appropriate Government and the Conciliation Officer,
(c) the agreement, dated 9 May 1988, is not a settlement within the meaning of S. 2(p) of the said Act because the second condition of jointly sending copy thereof to an officer authorised in this behalf by the appropriate Government and the Conciliation Officer was not complied with.
8. In Para. 15 of the affidavit-in-opposition respondents Nos. 1, 2 and 3 stated that it is apparent from the aforesaid incentive scheme itself that it was not just like a benefit or facility but the payment was conditional upon achievement of certain targets and norms of production and productivity and had inseverable correlation with production group. In the said Para. 15 the respondents Nos. 1, 2 and 3 stated about:
(a) Performance criteria and report of clerks;
(b) Performance criteria for stenographer/stenotypist; and
(c) Overtime work. The relevant part of the said Para. 15 is set out hereunder:
(a) Performance criteria and report of clerks:
Slippage occasions
No. of days
Performance factor
Slippage Occasions
No. of days
Performance factor
(b) Performance criteria for stenographer/stenotypist.
Performance criteria:
Performance factor
Excellent
…
1.0
Very Good
…
0.9
Good
…
0.8
Fair
…
0.7
Satisfactory
…
0.5
Unsatisfactory
…
Nil (0.0)
(c) Overtime work:
If a clerical grade staff works on overtime more than 5 per cent his incentive bonus earning will be reduced accordingly. For overtime work more or equal to 15 per cent his incentive bonus earning will be nil.
O.T is given since the clerk did not complete his work in normal time.
It is, therefore, apparent that such incentive scheme cannot come within the purviewed benefits or facility as wrongly sought to be contended.”
9. In Para. 17 of the affidavit-in-opposition respondents Nos. 1, 2 and 3 stated that the settlement dated 6 September 2000, has nothing to do so far as incentive agreement is concerned. It has also been stated in the said Para. 17 that the letter, dated 30 October 2000, had been correctly issued. Said Para. 17 of the affidavit-in-opposition of respondents Nos. 1, 2 and 3 is set out hereunder:
“17. The contentions sought to be put forward in Para. 7 of the said application are denied and disputed. The settlement, dated 6 September 2000, has nothing to do so far as incentive agreement is concerned. The incentive agreement is a separate agreement and as would appear from the agreement itself that the same is production oriented and cannot in any manner come under the purview of existing benefit or facility. The letter, dated 30 October 2000, has been correctly issued. First, the incentive scheme is correlated with production incentive of operatives which stand withdrawn. Secondly, due to procedural/system changes in the working of different departments shops from time to time, the working schedule and work norms of clerical oriented have undergone wide changes during the year after implementation of incentive schemes. Thirdly, due to mechanisation through use of electronic equipments, installation of P.C along with LAN connection, use of CAD etc. there have been changes of norms in respect of clerical workload. Fourthly, implementation of electronic card attendance system has greatly reduced the clerical workload of ime office. Fifthly, the new order position of the company is almost nil and the existing orders are mostly in near completion stage. Consequently, a large number of workers are being paid idle wages.”
10. In Para. 20 of the affidavit-in-opposition, the respondent Nos. 1, 2 and 3 stated that firstly, what was sought to be terminated was not a settlement but an agreement, secondly, the incentive scheme has nothing to do so far as wage revision settlement, dated 6 September 2000, is concerned and hence the question of termination of settlement, dated 6 September 2000, does not arise. It was stated that the Cl. 10 of the settlement, dated 6 September 2000, has nothing to do so far as incentive agreement, dated 9 May 1988, is concerned. It was further stated that the allegation of mala fide intention/purpose for reduction of wages of the employees is totally baseless.
11. In Para. 28 of the affidavit-in-opposition, the respondents Nos. 1, 2 and 3 slated that the incentive scheme of 1988 has become totally infractuous and in the said Para. 28, the respondents Nos. 1, 2 and 3 also stated the reasons justifying their action. The said Para. 28 is set out hereunder:
“28. The contentions and allegations put forward in Para. 19 of the said application are denied and disputed. The contention in the context of Art. 21 the Constitution is totally misconceived and misleading. The incentive scheme of 1988 has become totally infractuous. The agreement, dated 9 May 1988, was entered into on certain set of work norm existing at that point of time. With the passage of time such norm has become outmoded and have lost their significance. As a result, the incentive scheme of the operatives as well as the supervisors had to be discontinued. As a result of computerisation which has brought about procedural and system changes in the working of different departments and shops from time to time, the working schedule and working norm of clerical graded staff had undergone wide changes during the years after introduction of incentive scheme of 1988. In other words, the norms has derated. Due to mechanisation through the use of electronic equipment, installation of personal computer along with local area network connection, use of computer aided design have given a new dimension so far as work norm is concerned. Implementation of electronic card attendance system has greatly reduced the clerical workload of time office and accordingly the agreement of 9 May 1988, has become totally obsolute. In view of the critical order position, there is hardly any scope for formulation of any scheme at all.”
In Para. 30 of the affidavit-in-opposition, the respondents Nos. 1, 2 and 3 stated that there does not arise any question for reduction of wages. It has been stated that incentive is work related and that is why and same does not come within the purview of wages under S. 2(rr) of the said Act.
12. The learned advocate appearing for the petitioners argued that:
(a) the agreement, dated 9 May 1988, regarding incentive scheme is a settlement within the meaning of S. 2(p) of the said Act;
(b) it is still binding upon the parties to the said agreement, dated 9 May 1988; and
(c) it shall continue to remain binding on the parties till it is altered by fresh settlement, award or valid legislation;
(d) transmission of copies of agreement to an officer authorised in this behalf by the appropriate Government and the Conciliation Officer under S. 2(p) of the said Act should not be held to be a mandatory requirement for the validity of the settlement;
(e) transmission of copies of agreement to the officer authorised in this behalf by the appropriate Government and the Conciliation Officer under S. 2(p) of the said Act is clearly directory.
In support of his argument the learned Advocate for the petitioners referred to and relied upon the following cases:
(1) Life Insurance Corporation of India v. D.J Bahadur, [1980 (2) L.L.N 575];
(2) Mettur Chemicals Thozhilalar Sangam, Mettur v. Chemplast Sanmar, Ltd., Mettur and Chemplast Employees Union, Mettur v. Chemplast Sanmar, Ltd., Mettur, [1997 (4) L.L.N 673];
(3) Sudhir Chandra Sarkar v. Tata Iron and Steel Company, Ltd., [1984 (2) L.L.N 229];
(4) Hindustan Lever, Ltd. v. Hindustan Lever Mazdoor Sabha, [1994 (1) L.L.N 884];
(5) Management of Karnataka State Road Transport Corporation v. KSRTC Staff and Workers' Federation, [1999 (2) L.L.N 16];
(6) State Bank of India Staff Union v. State Bank of India, [1991 (1) L.L.N 427],
(7) I. Hirday Narain v. Income Tax Officer, Bareilly† , Bareilly, [(1970) 2 SCC 355 : A.I.R 1971 S.C 33];
13. The learned advocate for the respondents Nos. 1, 2 and 3 argued the following points.
(1) The agreement, dated 9 May 1988, regarding incentive scheme is not a settlement within the meaning of S. 2(p) of the said Act because of noncompliance of the procedures which are mandatory. Therefore, at best this may be an agreement by and between the parties but not a settlement under S. 2(p) of the said Act.
(2) Agreement cannot be enforced by a writ application.
(3) Petitioners cannot pursue parallel proceeding.
(4) Remedy, if any, lies under the provision under the said Act but not in writ jurisdiction.
14. The learned advocate for the respondents Nos. 1, 2 and 3 raised a preliminary objection regarding maintainability of the writ application on the ground that the subject-matter involved in the present writ application can only be decided by the appropriate forum under the provisions of the said Act and not in writ jurisdiction. In support of his arguments the learned advocate for the respondents Nos. 1, 2 and 3 referred to and relied upon the following decisions.
(1) Bihar Rajya Vidyut Parisad v. State of Bihar, [1987 (2) L.L.N 293].
(2) Rajasthan State Road Transport Corporation v. Krishna Kant, [1995 (2) L.L.N 271].
(3) Mayurakshi Cotton Mills v. Panchra Mayurakshi Cotton Mills Employees' Union, [2000 (2) L.L.N 49].
(4) Workmen of Delhi Cloth and General Mills, Ltd. v. Delhi Cloth and General Mills, Ltd., [1972-I L.L.J 99].
(5) Jhagrakhan Colleries (Private) Ltd. v. G.C Agarwal, Presiding Officer, Central Government. Industrial Tribunal-cum-Labour Court, Jabalpur, [1994 (2) L.L.N 511],
(6) Steel Authority of India, Ltd. v. Awadhesh Singh, [2001 (2) L.L.N 754].
(7) Jyotish v. Union of India, [1994 (1) L.L.N 942]
(8) National Textile Corpn. (APKKM) Ltd. v. Sree Yellamma Cotton Woollen and Silk Mills Staff Association, [2001 (2) L.L.N 795].
15. In Life Insurance Corporation of India v. D.J Bahadur, [1980 (2) L.L.N 575] (vide supra), it was held that unless a settlement within the meaning of S. 2(p) of the said Act is subsequently altered by fresh settlement, award or valid legislation the same would continue to be in force. This view of Supreme Court was reiterated in Management of Karnataka State Road Transport Corporation v. KSRTC Staff and Workers' Federation, [1999 (2) L.L.N 16] (vide supra). In Sudhir Chandra Sarkar v. Tata Iron and Steel Company Limited, [1984 (2) L.L.N 229] (vide supra), Supreme Court held that a facet of collective bargaining is that any settlement arrived at between the parties would be treated as incorporated in the contract of service of each employee governed by the settlement. There remains no doubt that in Sudhir Ch. Sarkar v. Tata Iron and Steel case (vide supra), Supreme Court by the words “any settlement arrived at between the parties” meant settlement as contemplated under S. 2(p) of the said Act. It is well settled law that a settlement within the meaning of S. 2(p) of the said Act continues to be in force unless it is altered subsequently by a fresh settlement, award or valid legislation. But the question which has to be decided here, in this writ proceeding, is whether the agreement, dated 9 May 1988, regarding incentive scheme is a settlement within the meaning of S.(p) of the said Act.
Section 2(p) of the said Act reads as follows:
“2(p): ‘Settlement’ means a settlement arrived at in the course of conciliation proceedings and includes a written agreement between the employer and workmen arrived at otherwise than in the course of conciliation proceeding where such agreement has been signed by the parties thereto in such manner as may be prescribed and a copy thereof has been sent to an officer authorised in this behalf by appropriate Government and the Conciliation Officer.”
The question of a valid and binding settlement is governed by the said Act and the Rules made thereunder. “Settlement” as defined in S. 2(p) of the said Act, means a settlement arrived at in the course of conciliation proceeding and includes a written agreement between the employer and workmen arrived at otherwise than in course of conciliation proceeding where such agreement has been signed by the parties thereto, in such manner as may be prescribed and a copy thereof has been sent to an officer authorised in this behalf by appropriate Government and the Conciliation Officer. The settlement has to be in compliance with the statutory provision. In Workmen of Delhi Cloth and General Mills v. Management (vide supra), Supreme Court in Para. 14 of the reported decision, held as follows:
“Reliance was next placed on S. 18(1) to support the binding character of the settlements. This subsection for its proper construction must be read with the other sub-sections and the relevant rules, in the light of the definition of ‘settlement’ as contained in S. 2(p) of the Industrial Disputes Act. ‘settlement’ as defined therein means a settlement arrived at in the course of conciliation proceedings and includes a written agreement between the employer and workmen arrived at otherwise than in the course of conciliation proceeding where such agreement has been signed by the parties thereto in such manner as may be prescribed and a copy thereof has been set to the appropriate Government and the Conciliation Officer. In the light of these provisions we do not think that S. 18(1) vests in the management and the union unfettered freedom to settle the dispute as they please and clothes it with a binding effect on all workmen or even on all members workmen of the union. The settlement has to be in compliance with the satisfactory provisions.”
(emphasis supplied.)
16. In Jhagrakhan Colleries (Private), Ltd. v. G.C Agarwal, [1974 (2) L.L.N 511] (vide supra), Supreme Court in Para. 11, at page 514, of the reported decision held as follows:
“An analysis of the above definition would show that it contemplates only two kinds of settlements:
(i) A settlement arrived at in the course of conciliation proceedings under the Act, and
(ii) a written agreement between the employer and the workmen arrived at otherwise than in the course of conciliation proceedings.
But a written agreement of the latter kind in order to fall within the definition must satisfy two more conditions, namely
(a) it must have been signed by the parties thereto in the prescribed manner, and
(b) a copy thereof must have been sent to the authorities indicated in S. 2(p).”
(emphasis supplied.)
17. The learned advocate for the petitioners referred to Madras High Court decision in State Bank of India Staff Union v. State Bank of India, [1991 (1) L.L.N 427] (vide supra), and argued that even when the agreement, dated 9 May 1988, was not forwarded to officer authorised in this behalf by the appropriate Government and the Conciliation Officer, the same is a settlement within the meaning of S. 2(p) of the said Act. I am unable to accept this argument of the learned advocate for the petitioners because of the Supreme Court decision in Workmen of Delhi Cloth and General Mills case (vide supra), and Jhagrakhan Colleries (Private) Ltd. case (vide supra). I am of the view that the said agreement, dated 9 May 1988, is not a settlement within the meaning of S. 2(p) of the said Act because of non-compliance of the conditions mentioned in S. 2(p) of the said Act.
18. Though a specific point was taken in Para. 13 of the affidavit-in-opposition that the agreement, dated 9 May 1988, is not a settlement within the meaning of S. 2(p) of the said Act, as the second condition of jointly sending a copy thereof to the officer authorised in this behalf by the appropriate Government and the Conciliation Officer, was not complied with, yet the same was not denied in Para. 15 of the aftidavit-in-reply filed by the writ-petitioner, which deals with Para. 13 of the affidavit-in-opposition. Thus the petitioners also accepted that the copy of such agreement, dated 9 May 1988, was not sent to the officer authorised in this behalf by the appropriate Government and the Conciliation Officer. It is important to note here that in Para. 6 of the writ application, while referring to the settlement, dated 6 September 2000, the petitioners categorically stated that as per provisions of rule 68 of the West Bengal Industrial Disputes Rules, the settlement was duly communicated by the parties to the Labour Commissioner, Government of West Bengal for his recording. But while referring to agreement, dated 9 May 1988, in Para. 3 of the writ petition, no such statement regarding compliance of the said rule 68 has been stated. Under the circumstances I am of the view that the agreement, dated 9 May 1988, is not a settlement within the meaning of S. 2(p) of the said Act because of non-compliance of the conditions mentioned in S. 2(p) of the said Act.
19. Rule 68 of the West Bengal Industrial Disputes Rules, 1958 (hereinafter referred to as the said Rules) reads as follows:
“68. Memorandum of settlement.— (1) A settlement arrived at in the course of conciliation proceeding or otherwise shall be in Form J.
(2) The settlement shall be signed—
(a) In the case of the employer.—
(i) by the employer himself or by his authorised agent or where the employer is an incorporated company or other body corporate, by the agent, manager or any other principal officer of the company or other corporate body; or
(ii) by an officer referred to in Cl.(a) or Cl. (b) of Sub-sec. (2) of S. 36, or where the employer is not a member of any association of employers, by officer or other employer referred to in Cl. (c) of the said sub-section authorised in the manner laid down in sub-rule (2) of rule 78A.
(b) in the case of the workman.—
(i) by the workman himself; or
(ii) by the President or Secretary of a trade union or federation of trade unions referred to in Cl. (a) or Cl. (b) of Sub-sec. (1) of S. 38, or where the workmen is not a member of any trade union, by an officer or other workmen referred to in Cl. (c) of the said sub-section authorised in the manner laid down in sub-rule (1) of rule 78A.
(3) Where a settlement is arrived at between an employer and his workman/workmen otherwise than in course of conciliation proceeding before a Board or Conciliation Officer, the parties to the settlement shall jointly send a copy thereof to the Assistant Secretary to the Government of West Bengal, Labour Department and the Conciliation Officer concerned, either by registered post with acknowledgement due or by personal service upon receipt, during the hours respectively fixed for the purpose by the officers concerned”.
20. In Workmen of Delhi Cloth and General Mills v. Management (vide supra), Supreme Court also considered S. 18 of the said Act and rule 58 of the Industrial Disputes (Central) Rules, 1957, made under S. 38 of the Industrial Disputes Act, 1947. Sub-rule (4) of rule 58 reads as follows:
“(4) Where a settlement is arrived at between an employer and his workmen otherwise than in the course of conciliation proceeding before a Board or a Conciliation Officer, the parties to the settlement shall jointly send a copy thereof to the Central Government, the Chief Labour Commissioner (Central), New Delhi and the Regional Labour Commissioner (Central) and to the Conciliation Officer (Central) concerned”.
If sub-rule (4) of rule 58 of Industrial Disputes (Central) Rules, 1957, is compared with sub-rule (3) of rule 68 of the said Rules then it will be found that both the rules are similar. One relates to the Central Government the other relates to the State Government. In Workmen of Delhi Cloth Mills Ltd. (vide supra), Supreme Court held that keeping in view its object and purpose, the rule 58 of the Industrial Disputes (Central) Rules, 1947, does seem to demand full compliance in order to clothe the settlement with a binding character. On the same analogy rule 68 of the said Rule also demands full compliance in order to clothe the agreement with a binding character.
21. In Jhagrakhan Colleries (Privae), Ltd. v. G.C Agarwal (vide supra), in Para. 16, at page 515, of the reported decision, Supreme Court, inter alia, held as follows:
“We have already noticed that according to the Scheme of S. 18 read with S. 2(p) an agreement, made otherwise than in the course of conciliation proceedings to be settlement within the meaning of the Act must be a written agreement signed in the manner prescribed by the rules framed under the Act. As rightly pointed out by Sri Ramamurthy, learned counsel for the respondents, an implied agreement by acquiescence, or conduct such as acceptance of a benefit under an agreement to which the worker acquiescing or accepting the benefit was not a party, being outside the purview of the Act, is not binding on such a worker either under Sub-sec. (1) or under Sub-sec. (3) of S. 18…”
22. In my opinion the agreement, dated 9 May 1988, regarding incentive scheme is not a settlement within the meaning of S. 2(p) of the said Act and such agreement does neither bind the employer nor the workman either under S. 18(1) or S. 18(3) of the said Act. Section 19 of the said Act also has no manner of application in respect of such an agreement.
23. The agreement, dated 9 May 1988, is nothing but an agreement by and between the parties to the said agreement. The said agreement, dated 9 May 1988, is neither a statutory agreement nor a statutory scheme and, therefore, would be unenforceable in an application under Art. 226 of the Constitution of India. This view is supported by the decision of Supreme Court in Steel Authority of India v. Awadesh Singh, [2001 (2) L.L.N 754] (vide supra), wherein it was held that a memorandum of agreement not being a statutory scheme is unenforceable in an application under Art. 226 of the Constitution of India. Even a settlement within the meaning of S. 2(p) of the said Act, cannot be enforced by a writ application. In this connection reference to may be made to Jyotish v. Union of India, [1994 (1) L.L.N 942] (vide supra) wherein, in Para. 9, at page 944, the Division Bench of Patna High Court, inter alia, observed as follows:
“It is true that the National Coal Wage Agreement is a settlement within the meaning of S. 2(p) of the said Act. However, as the respondent-company is a ‘State’ within the meaning of Art. 12 of the Constitution of India and in my opinion, a writ application does not lie under Art. 226 of the Constitution of India for enforcement of rights under a settlement. Such a right can be enforced only by raising an industrial dispute It is now well-known that the Writ Court cannot convert itself as Industrial Court for the purpose of determining industrial dispute.
Reference in this connection may be made to Basant Kumar Sarkar v. Eagle Rolling Mills Ltd., [A.I.R 1964 S.C 1260].
It further appears from Annexure P of the affidavit-in-opposition filed by respondents Nos. 1, 2 and 3 that a proceeding under the said Act is already pending before the Conciliation Officer in respect of the notice dated 31 October 2000 issued by the Chief General Manager (Personnel) for respondent No. 1.”
24. I find from the relative positions taken by the parties in the writ petition, affidavit-in-opposition and affidavit-in-reply that there are other disputes between the parties regarding service condition of the workmen. I find that there are considerable disputes in regard to the material facts and that the disputes are of nature which cannot be conveniently adjudicated in a writ proceeding. These disputes, it seems to me, are more appropriate for adjudication under the Industrial Disputes Act. I, therefore, decline to interfere in this matter before me. My view is supported by a decision of Supreme Court in Bihar Rajya Vidyut Parisad v. State of Bihar, [1987 (2) L.L.N 293], (vide supra). Assuming that the disputes involved in the present writ proceeding relate to recognition, observance or enforcement of any of the rights or obligations created by the said Act then the only remedy is to approach the forums created by the said Act. This view is supported by a decision df Supreme Court in Rajasthan State Road Transport Corporation v. Krishna Kant, [1995 (2) L.L.N 27] (vide supra) and in the matter of Chandrakant Tukram Nikam v. Municipal Corporation, of Ahmedabad, [2002 (1) L.L.N 1153]. The disputes sought to be resolved partake the character of Industrial Dispute and, therefore, parties may move the appropriate authority under the said Act so that the dispute may be resolved before the appropriate forum under the said Act. This view is also supported by the decision of Supreme Court in Mayurakshi Cotton Mills v. Panchra Mayurakshi Cotton Mills Employees' Union, [2002 (2) L.L.N 49] (vide supra). The learned advocate for the petitioners relying upon I. Hirday Narain v. Income Tax Officer, Bareilly† , Bareilly, [(1970) 2 SCC 355 : A.I.R 1971 S.C 33] (vide supra), argued that High Court entertaining petition and giving hearing on merits thereafter cannot reject the petition on the ground that statutory remedy was not availed off. I am not rejecting the writ application on the said ground at all. I have discussed the matter hereinabove. I have recorded my findings in respect of the agreement, dated 9 May 1988, in respect of incentive scheme. I have held that the said agreement, dated 9 May 1988, is not a settlement within the meaning of S. 2(p) of the said Act and neither the employer nor the workmen are bound by the said agreement either under S. 18(1) or under S. 18(3) of the said Act. I have also held that S. 19 of the said Act has no manner of application in respect of such an agreement. I find that:
(a) there is other dispute between the parties regarding service conditions of the workmen;
(b) there is considerable dispute in regard to the material facts in respect of the other dispute involved in the matter.
(c) the dispute is of a nature which cannot be conveniently adjudicated in this writ proceeding. Under these circumstances I decline to interfere in this matter before me. Thus the writ petition is disposed of. All interim orders are vacated. However there will be no order as to costs.
All parties are to act on a signed copy of the minutes of the operative part of this judgment on the usual undertakings.