Analytical Summary of the Opinion (Vineet Saran, J.)

Factual and Procedural Background

Respondent Nos. 2 to 8 were employed on muster-roll in the Electricity Distribution Division, Mathura; their services were terminated on 3.4.1976. They raised a dispute under Section 4K of the U.P. Industrial Disputes Act, 1947. The Industrial Tribunal III, Kanpur dismissed the claim by its award dated 10.11.1979, holding the terminations valid. The workmen challenged that award by Civil Misc. Writ Petition No. 3876 of 1980 before the High Court; on 28.4.1988 the High Court allowed the writ petition, quashed the tribunal's award and directed reinstatement with full back wages and costs.

The Supreme Court dismissed the U.P.S.E.B.'s Special Leave Petition on 9.11.1989. Following reinstatement, respondent Nos. 2–8 filed applications in 1989 under Section 6H(1) of the Act for recovery of back wages (including ex-gratia and other payments). The Deputy Labour Commissioner, Agra, allowed those 1989 applications by order dated 11.4.1990, directing recovery of Rs. 12,24,403.16 from U.P.S.E.B. The U.P.S.E.B. deposited that amount with the Collector, Mathura on 7.5.1991 and the amount was disbursed to respondent Nos. 2–8.

In August 1993 the same respondents filed fresh applications under Section 6H(1), alleging non-compliance of the High Court's 28.4.1988 order and claiming further amounts — notably ex-gratia for respondents 2 and 3 and encashment of earned leave for respondents 2–8 for the period 1976–1992. The petitioners (U.P.S.E.B.) objected on 27.8.1993. On 23.9.1993 the Deputy Labour Commissioner, Agra, passed the impugned order directing payment of Rs. 4,52,994.58 to respondent Nos. 2–8. This writ petition challenges that order.

Legal Issues Presented

  1. Whether subsequent applications filed by respondent Nos. 2–8 in August 1993 under Section 6H(1) of the Act were maintainable after payment pursuant to earlier applications finalized in 1991.
  2. Whether an order for recovery under Section 6H(1) could be issued in respect of encashment of earned leave while the workmen were still in service, and without prior adjudication as to entitlement and quantum.
  3. Whether the Deputy Labour Commissioner’s order dated 23.9.1993 was a speaking order recording the requisite satisfaction under Section 6H(1) that any money was due to the workmen.

Arguments of the Parties

Petitioners' Arguments (U.P.S.E.B.)

  • The 1993 applications under Section 6H(1) were not maintainable because ex-gratia and related back-wage claims had already been made and paid pursuant to the 1989 applications and the 1990 order (amount disbursed in 1991).
  • Encashment of earned leave was not payable at this stage because (a) the respondents were still in service and encashment typically becomes due on superannuation, and (b) leave accrues only on working a calendar year and accumulates subject to limits; respondents did not work during 1976–1988 and therefore were not entitled to leave for that period.
  • The encashment amount claimed was calculated on 1993 wages for a period 1976–1992 when wages were much lower, making the calculation erroneous and reflecting lack of application of mind.
  • The Deputy Labour Commissioner’s order dated 23.9.1993 was a non-speaking order: he failed to record reasons or to show that he was actually satisfied under Section 6H(1) that money was due; objections filed on 27.8.1993 had not been considered.
  • The subsequent claim was time-barred/contrary to the limited operation of awards under Section 6C (awards operate for one year unless extended by State Government), and the respondents offered no explanation for delay in making the later claim.

Respondents' Arguments (Workmen)

  • If a sum remained unpaid or was left out in the earlier applications, the subsequent (1993) application could pursue recovery of that unpaid amount; the Code of Civil Procedure principles were not necessarily applicable to these proceedings and subsequent applications were permissible.
  • Encashment of earned leave is part of back wages and hence recoverable where reinstatement with full back wages has been ordered; cited Gammon India Ltd. v. Niranjan Dass to say encashment is included in back wages in appropriate circumstances (noting that in Gammon the workmen had superannuated).
  • If any computational error was alleged (calculation based on 1993 wages), that could be corrected by the Deputy Labour Commissioner on application.
  • If the Court remanded the matter, the Deputy Labour Commissioner could rectify mistakes and consider the petitioners' objections on merits.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Central Inland Water Transport Corporation Ltd. v. Workmen, (1974) 4 SCC 696 : AIR 1974 SC 1604 Principle (analogous to Section 6H): the right to a benefit sought to be computed must be an existing one — already adjudicated upon or provided for. The Court relied on this principle to hold that benefits like leave-encashment must be an already adjudicated or existing right before recovery under Section 6H(1) can be ordered; if disputed, the claim must be determined under Section 6H(2).
Punjab Beverages Pvt. Ltd. v. Suresh Chand, (1978) 2 SCC 144 : AIR 1978 SC 995 Similar principle under Section 33C (Central enactment analogous to s.6H): only existing/adjudicated benefits can be the subject of recovery without separate adjudication. The Court treated this decision as supporting the need for prior adjudication/determination of disputed monetary benefits before invoking recovery under Section 6H(1).
Jessop and Co. v. M. Mukherfee, 1975 LIC 1307 (Calcutta High Court) Interpreted principles similar to the Supreme Court decisions: benefit must be an existing right before computation/recovery. Cited as supportive authority for the proposition that claims must be adjudicated or established before recovery under the statutory provision analogous to Section 6H(1).
Gammon India Limited v. Niranjan Dass, 1984 (48) FLR 310 Authority for the proposition that encashment of earned leave may form part of back wages in appropriate circumstances (noting context where workmen had superannuated). The Court noted the respondents' reliance on this case but distinguished it on facts because in Gammon the workmen had superannuated; here respondents were still in service, so the ratio did not directly apply.
Kisan Sewa Sahakari Samiti Ltd. v. Deputy Labour Commissioner, 1991 (63) FLR 418 Held that powers under Section 6H(1) are quasi-judicial and the authority must record reasons demonstrating satisfaction that money is due. The Court applied this principle to determine that the impugned order was non-speaking and legally deficient because the Deputy Labour Commissioner did not record the reasons or show the requisite satisfaction.

Court's Reasoning and Analysis

The Court examined facts and submissions and proceeded in a stepwise legal analysis:

  1. On the ex-gratia claims of respondent Nos. 2 and 3: the Court found those claims were already made in the 1989 applications (Annexures-2 and 3), allowed in toto by the earlier order, and paid in 1991. Therefore those particular claims were not maintainable as fresh claims in 1993.
  2. On encashment of earned leave claimed by respondents 2–8: the Court characterized this as a disputed claim. The petitioners' assertion (that earned leave accrues only after working a calendar year, is capped, and typically becomes due on superannuation) was not denied by the respondents in their counter-affidavit. Consequently, it could not be said that any money for leave-encashment had already become due to respondents.
  3. Legal framework: the Court analyzed Sections 6H(1) and 6H(2) of the U.P. Industrial Disputes Act. It emphasized that Section 6H(1) permits recovery by the Collector only where the State Government (or its delegated officer) is satisfied that money is due; Section 6H(2) provides for determination by a labour court of benefits capable of being computed in money.
  4. Applying authorities: relying on Supreme Court precedents (Central Inland Water Transport Corporation and Punjab Beverages) and analogous decisions, the Court held that a right sought to be computed must be an existing or adjudicated right; a disputed benefit must first be determined (for example under Section 6H(2)) before a recovery order under Section 6H(1) can be made.
  5. On the quality of the Deputy Labour Commissioner's order: the Court found the 23.9.1993 order to be a non-speaking order that merely recited that the workmen had claimed sums and stated satisfaction that Rs. 4,52,994.58 was payable, without recording any reasons or addressing the petitioners' objections filed on 27.8.1993. This was legally insufficient given the quasi-judicial nature of the power (as per Kisan Sewa decision).
  6. On remedial possibilities and finality: the Court considered whether remand would help. It concluded remand would be futile because (a) the Deputy Labour Commissioner was not the competent forum to adjudicate the disputed claim about entitlement to leave-encashment (that function lies with the labour court under s.6H(2)), and (b) general principles of finality (res judicata/constructive res judicata) require that workmen cannot keep raising the same disputes indefinitely after long gaps without explanation.
  7. Therefore, the Court concluded the Deputy Labour Commissioner had no basis to have issued the recovery under Section 6H(1) for the disputed leave-encashment amount and the order lacked the required recorded satisfaction and reasoning.

Holding and Implications

Holding: The writ petition succeeds and the order dated 23.9.1993 passed by the Deputy Labour Commissioner, Agra, is quashed. There shall be no order as to costs.

Implications:

  • Direct effect: The recovery direction for Rs. 4,52,994.58 issued by the Deputy Labour Commissioner on 23.9.1993 is set aside; respondent Nos. 2–8 cannot rely on that order to recover the impugned sum.
  • Procedural consequence: Where a claimed monetary benefit (such as encashment of earned leave) is disputed, the proper course is adjudication of entitlement/quantum (for example under Section 6H(2) or by a competent labour court) before a recovery under Section 6H(1) can be ordered. The Deputy Labour Commissioner cannot determine disputed questions of entitlement in proceedings under Section 6H(1).
  • On payments already made: the Court treated the ex-gratia payments already allowed and disbursed pursuant to earlier proceedings as having been paid and hence not open to a fresh recovery by way of the later application.
  • No broader precedent set: the Court applied existing principles from prior authorities to the facts; the judgment does not purport to lay down a novel legal principle beyond the application of those authorities and statutory provisions to the facts before it.

This summary is prepared strictly from the information contained in the provided opinion. No facts or holdings beyond those expressly stated in the opinion have been added.

    U.P State Electricity Board And Another v. Deputy Labour Commissioner, Agra And Others

    Vineet Saran, J.:— This writ petition is directed against the order dated 23.9.1993 of the Deputy Labour Commissioner, Agra, passed under Section 6H(1) of the U.P Industrial Disputes Act, 1947 (hereinafter referred to as the Act) directing the Collector, Mathura to recover a sum of Rs. 4,52,994.58p. from the petitioners, U.P State Electricity Board hereinafter referred to as the U.P.S.E.B

    2. The brief facts of the case are that respondent Nos. 2 to 8 were employed on muster roll in Electricity Distribution Division, Mathura. Their services were dispensed with on 3.4.1976 A dispute was raised under Section 4K of the Act by the said respondents as to whether the U.P.S.E.B was justified in terminating the services of the workers (respondent Nos. 2 to 8) on 3.4.1976 and as to what relief, if any, were the workers are entitled to. Vide its order dated 10.11.1979 the Industrial Tribunal III, Kanpur, dismissed the case and held that the termination of the workers was valid. Against such award of the Industrial Tribunal, respondent Nos. 2 to 8 filed Civil Misc. Writ Petition No. 3876 of 1980 before this Court, which was allowed on 28.4.1988 The operative portion of the judgment is quoted below:

    “In the result, therefore, 8 petitioners who are represented by the Sangh in this petition, are entitled to be reinstated with full back wages. The petitioners will also be entitled to their cost. The petition is accordingly allowed and the award dated 10.11.1979 is quashed and set aside.”

    3. Against the said judgment of the High Court, the Supreme Court dismissed the Special Leave Petition of the U.P.S.E.B on 9.11.1989 The respondent Nos. 2 to 8 were thus, reinstated in service. The said respondents then filed an application in 1989 under Section 6H(1) of the Act for recovery of back wages Including ex-gratia payment, etc. The Deputy Labour Commissioner, Agra, vide his order dated 11.4.1990 allowed the applications of the respondents in toto and directed that the sum of Rs. 12,24,403.16p. as claimed, be recovered from U.P.S.E.B Against the aforesaid order of the Deputy Labour Commissioner, the petitioners filed eight writ petitions Bearing Nos. 10984 to 10991 of 1990, which were dismissed by this Court on 29.5.1990 After dismissal of the writ petitions, the U.P.S.E.B deposited the sum of Rs. 12,24,403.16p. with the Collector, Mathura by Cheque No. 010136 dated 7.5.1991, which amount was disbursed to respondent Nos. 2 to 8 by the Deputy Labour Commissioner, Agra. According to the petitioners, the judgment of the High Court in Civil Misc. Writ Petition No. 3876 of 1980 was thus, fully complied with as the entire amount as claimed by their applications filed in the year 1989 had been paid to the respondent Nos. 2 to 8. However, after having received the aforesaid payment, the respondent Nos. 2 to 8 in August, 1993, again filed applications under Section 6H(1) of the Act before the Deputy Labour Commissioner, Agra, alleging that the judgment of the High Court in Civil Misc. Writ Petition No. 3876 of 1980 had not been fully complied with. They claimed that they were entitled to receive further amounts. The respondent Nos. 2 and 3 claimed ex-gratia payment allegedly due to them from 1976 to 1988 and also encashment of earned leave for the period 1976 to 1992. The other respondent Nos. 4 to 8 had only claimed for encashment of earned leave for the period 1976 to 1992 and not ex-gratia payment.

    4. The petitioners filed objections to the aforesaid applications of respondent Nos. 2 to 8 on 27.8.1993 Thereafter on 23.9.1993 the Deputy Labour Commissioner. Agra, passed an order directing the petitioners to pay a sum of Rs. 4,52,994.58p. to the said respondent Nos. 2 to 8. In the aforesaid order, which is impugned in this writ petition, the Deputy Labour Commissioner, Agra, (respondent No. 1) has merely stated that the workmen (respondent Nos. 2 to 8) have filed applications under Section 6H(1) of the Act that certain amounts have not been paid in compliance of the High Court's order dated 28.4.1988 and as such he was satisfied that a sum of Rs. 4,52,994.58p. was payable to the workmen. The aforesaid order of the Deputy Labour Commissioner, Agra, is under challenge in this writ petition.

    5. I have heard Sri Tarun Agarwal, learned counsel appearing for the petitioners and Sri K.P Agrawal, learned senior counsel assisted by Ms. Bushrah Mariyam, appearing for the contesting respondent Nos. 2 to 8 at length. The facts as stated above have not been disputed by counsel for the parties.

    6. Sri Tarun Agrawal has mainly raised three points, namely:

    (i) the subsequent applications under Section 6H(1) of the Act, filed by respondent Nos. 2 to 8 were not maintainable;

    (ii) the alleged amount for encashment of earned leave was not payable at this stage as the said respondent Nos. 2 to 8 were still continuing in service of U.P.S.E.B; and in the alternative, amount claimed was calculated on the wages of 1993 for the entire period of claim from 1976 to 1992; and

    (iii) that the Deputy Labour Commissioner, Agra, has given no reasons in his order dated 23.9.1993, while allowing the applications of respondent Nos. 2 to 8.

    7. With regard to the first point, the learned counsel for the petitioners submitted that a bare perusal of the applications filed by respondent Nos. 2 to 3 in the year 1989 (Annexures-2 and 3 to the writ petition) would show that the claim for ex-gratia payment was made by both the respondents in the said application which had admittedly been allowed in toto; as such the said amount had been paid to them in pursuance of the earlier proceedings under Section 6H(1) of the Act. Sri K.P Agrawal, learned senior counsel appearing for the respondents could not dispute this position on facts and stated if that was so, the mistake could be corrected by the Deputy Labour Commissioner.

    8. Sri Tarun Agarwal then submitted that the claim filed in August, 1993 was made five years after the Judgment in Civil Misc. Writ Petition No. 3876 of 1980 passed on 28.4.1988, and two years after the earlier applications were finalised and payment was received by the respondents in 1991. It was contended by the learned counsel that the subsequent claim, in any case, is barred by limitation as under Section 6C of the Act, an award remains in operation only for a period of one year unless extended by the State Government, which according to him, had not been done.

    9. Sri Tarun Agrawal then submitted that under the provisions of Section 6H(1) of the Act it is only the “money due” to the workmen which can be recovered and that too “if the State Government is satisfied that any money is so due”. According to him the money which was due to the respondent Nos. 2 to 8 was the back wages which only included the ex-gratia payment (bonus) and not the encashment of earned leave. He submitted that it was only under Section 6H(2) of the Act where the labour court could have determined the amount, which the workmen may have been entitled to receive from their employer towards any benefit, which was capable of being computed in terms of the money.

    10. Section 6H(1) and (2) of the Act read as under:

    “6H. Recovery of money due from an employer.—(1) Where any money is due to a workman from an employer under, the provisions of Sections 6J to 6R or under a settlement or award, or under an award given by an adjudicator or the State Industrial Tribunal appointed or constituted under this Act, before the commencement of the Uttar Pradesh Industrial Disputes (Amendment and Miscellaneous Provisions) Act, 1956, the workman may, without prejudice to any other mode of recovery, make an application to the State Government for the recovery of the money due to him and if the State Government is satisfied that any money is so due, it shall issue a certificate for that amount to the Collector who shall proceed to recover the same as if it were an arrear of land revenue.

    (2) Where any workman is entitled to receive from the employer any benefit which is capable of being computed in terms of money, the amount at which such benefit should be computed may, subject to any rules that may be made under this Act, be determined by such labour court as may be specified in this behalf by the State Government, and the amount so determined may be recovered as provided for in sub-section (1).”

    (Emphasis supplied)

    11. Learned counsel for the petitioners thus, submitted that if the workmen felt aggrieved, they were entitled to any benefit which was capable of being computed in terms of money, they could have filed an application under Section 6H(2) of the Act for proper determination by the labour court and not under Section 6H(1) of the Act, which could have been made only after any money was so determined to be due. Without there being any finding that the respondents were entitled to any money towards encashment of leave, no amount could be said to be due to the respondents and thus no order could be passed for recovery under Section 6H(1) of the Act. In support of his submission, the learned counsel has relied on two judgments of the Apex Court rendered in Central Inland Water Transport Corporation Ltd. v. Workmen, (1974) 4 SCC 696 : AIR 1974 SC 1604 and Punjab Beverages Pvt. Ltd. v. Suresh Chand, (1978) 2 SCC 144 : AIR 1978 SC 995. In the aforesaid two cases, the Supreme Court, while dealing with the provisions of Section 33C of the Industrial Disputes Act, 1947 (Central enactment) (which is analogous to Section 6H of the State Government), has held that the right to the benefit which is sought to be computed must be an existing one, that is to say, already adjudicated upon or provided for. The same view was taken by the Calcutta High Court in Jessop and Co. v. M. Mukherfee, 1975 LIC 1307. Accordingly, it was submitted that the amount as claimed towards encashment of earned leave could have been claimed only under Section 6H(2) of the Act and until such amount was computed and determined to be due by a competent authority, no recovery could be issued against the petitioners under Section 6H(1) of the Act.

    12. With regard to the second point that the respondents were in any case not entitled to encashment of earned leave at this stage, it was urged by Sri Tarun Agarwal that such encashment would become due only after superannuation of the workmen. Further since the respondents did not work from 1976 to 1988, they would not be entitled to any earned leave for such period. The respondents would be entitled to 30 days earned leave provided they work for one calendar year and such leave would accumulate, up to a maximum of eight months, and would become due only at the time of superannuation. Thus, by issuing order for recovery of 17 months of wages towards encashment of earned leave and that too during the period when the respondents were still in employment of U.P.S.E.B, the learned counsel submitted that the respondent No. 1 has passed a wholly erroneous and illegal order. Specific averments in regard to this have been made in paragraphs 30, 31, 32 and 33 of the writ petition. The same have not been denied by the contesting respondents in paragraph 12 of the their counter-affidavit and it has merely been stated that the same would be effectively replied to at the time of hearing of the case. Further, the learned counsel submitted that in any case, the claim of the respondents for encashment of earned leave for the entire period of 1976 to 1992 had been made on the wages paid to them in 1993, although the wages in 1976 and thereafter were much lesser. As such also the impugned order was unjustified, having been passed without application of mind.

    13. With regard to the third point that no reasons have been given in the Impugned order, the learned counsel for the petitioners submitted that regarding the grounds raised in the first two points above, the petitioners had filed objections dated 27.8.1993 (Annexure-12 to the writ petition) but the same had not even been considered or decided by the Deputy Labour Commissioner, Agra. He submitted that in any case under Section 6H(1) of the Act, the State Government had to be satisfied that the money was due to the workmen before directing for its recovery. The impugned order passed by the respondent No. 1 was a totally non-speaking order without recording any satisfaction of his own that money was due to the respondents. It has merely been stated in the order that the amount has been claimed by the workmen and that he was satisfied, that the amount of Rs. 4,52,994.58p. was due to them. The respondent No. 1 did not record any reasons whatsoever, as to on what basis the said amount was being awarded in favour of respondent Nos. 2 to 8. In support of this contention, learned counsel for the petitioners has relied on a judgment of this Court in Kisan Sewa Sahakari Samiti Ltd. v. Deputy Labour Commissioner, 1991 (63) FLR 418, wherein it has been held that the powers exercised by the Deputy Labour Commissioner under Section 6H(1) are quasi-judicial and the order must contain the reasons on the basis of which the authority was satisfied that any money was found due to the employee. It has been submitted that in the present case the application of the respondents ought to have been decided by a reasoned order specially since there were objections regarding the maintainability of the application under Section 6H(1) of the Act as well as the fact that no amount was due to the respondents.

    14. Sri K.P Agrawal, learned senior counsel appearing for the contesting respondents has submitted that the second application would not be barred if some amount, to which the respondents were entitled to, had been left out in the earlier application under Section 6H(1). He has argued that the principles of the Code of Civil Procedure would not be applicable to the present proceedings and subsequent applications are permissible. He has further submitted that the amount towards encashment of earned leave is included in back wages as held by the Apex Court in Gammon India Limited v. Niranjan Dass, 1984 (48) FLR 310 and as such since the respondents had been held to be entitled to reinstatement with full back wages, the said encashment of earned leave would be payable to the respondents. In the case before the Supreme Court, which has been cited above, the workmen had superannuated and thus the Court held that with the back wages, the workmen would be entitled to encashment of earned leave if other workmen in the same category were paid the same. The ratio of the said decision would thus not apply to the present case as admittedly, the respondents are still in service of the U.P.S.E.B

    15. In reply to the contention of the learned counsel for the petitioners that the amount of leave encashment as claimed and directed to be recovered was calculated on the basis of the wages which the respondents were getting in the year 1993, at the time of making the application whereas the claim was for the period of 1976 to 1992 when the wages were much lesser, Sri K.P Agrawal submitted that if it was so, the same could be corrected by the Deputy Labour Commissioner on an application, if so filed by the petitioners.

    16. In reply to the third point argued by the learned counsel for the petitioners that reasons ought to have been given by the Deputy Labour Commissioner while allowing the application under Section 6H(1) of the Act. Sri K.P Agrawal has submitted that if the matter was remanded back to the said authority, the mistake could be rectified and the objections of the petitioners could be considered on merits.

    17. After having perused the record and considered the arguments advanced by the learned counsel for the parties, I am of the view that the claim of the respondent Nos. 2 and 3 for ex-gratia payment was not maintainable as the same had already been allowed and paid to them in pursuance of the earlier application under Section 6H(1) of the Act. With regard to the other claim for encashment of earned leave filed by all the contesting respondents, I am of the view that the same was certainly a disputed claim. The assertion of the petitioners in the writ petition that the respondents-workmen would be entitled to 30 days of earned leave for every year that they have worked, up to a maximum of eight months and that too after the workmen retire, has not been denied by the respondents in the counter-affidavit. As such, it cannot be said that such money became due to the respondents to which they allege to be entitled to. It has to be first determined by the competent authority as to whether the respondents have become entitled to the said amount and any such money had become due to the petitioners before the application under Section 6H(1) of the Act could be allowed by the Deputy Labour Commissioner. The law provides for adjudication of such claim by the concerned labour court under Section 6H(2) of the Act, and only after such amount is determined, it can be held that the money has become due to the workmen. In the present case, the claim made by the respondents in their applications were seriously disputed by the petitioners by way of filing their objections, which were not even considered by the Deputy Labour Commissioner. The order of the Deputy Labour Commissioner, Agra, is a totally no speaking order and no reasons have been recorded on the basis of which satisfaction could be said to be arrived at by him in holding that the money was due to the workmen for which the recovery was issued. In my view, even remanding the case back to the Deputy Labour Commissioner would serve no useful purpose as the Deputy Labour Commissioner is not competent to adjudicate upon the claim made by the respondents which is seriously disputed by the petitioners. Otherwise also, even though the Code of Civil Procedure may not apply to the present proceedings, yet the general principles of res Judicata and constructive res Judicata would apply. Finality has to be given to proceeding at some stage. The workmen cannot be permitted to keep raising disputes time and again, without there being any fresh cause of action; and that too after a long gap of time, without there being any explanation for the delay in making the subsequent claim or any explanation as to why the claim being made subsequently was not made at the initial stage. The workmen might and ought to have raised this claim for encashment of earned leave in the first application itself. If at all, the respondents were aggrieved that they had not been paid the entire dues in accordance with the directions of this Court in Civil Misc. Writ Petition No. 3876 of 1980, they would first have to get the dispute resolved, by the competent authority and after it is found that certain money is due to them, then alone an application under Section 6H(1) of the Act could be filed for recovery of the said amount. It is not for the Deputy Labour Commissioner to adjudicate upon a dispute with regard to any benefit, which the workmen may be entitled to. In the result, the writ petition succeeds and is allowed. The order dated 23.9.1993 passed by the Deputy Labour Commissioner, Agra, is quashed. However, there shall be no order as to costs.

    Use AI to get other relevant cases.

    Comments

    U.P State Electricity Board And Another v. Deputy Labour Commissioner, Agra And Others