B. The relationship between the annual pollutant loading rate (APLR) for a pollutant and the AWBAR is shown in Equation (1).
where:
APLR = annual pollutant loading rate in kilograms per hectare per 365-day period
C = pollutant concentration in milligrams per kilogram of total solids (dry weight basis)
AWBAR = annual whole biosolids application rate in metric tons per hectare per 365-day period (dry weight basis) 0.001
= a conversion factor