1. Introduction

The Supreme Court considered whether a contractual prohibition against interest, concluding with the words “or otherwise”, prevented an arbitral tribunal from awarding interest before the award. The dispute arose from a construction subcontract between M/s Sharma Enterprises and National Building Construction Corporation Limited (“NBCC”), but the appeal concerned only interest: the contractor’s successful substantive claims were no longer in issue.

The Court held that Clause 26 of the Special Conditions of Contract (“SCC”) contained a comprehensive prohibition covering both pre-reference and pendente lite interest. Its residual words, “or otherwise”, could not be confined to delays in monthly or final payments. Section 31(7)(a) of the Arbitration and Conciliation Act, 1996 (“1996 Act”) required the tribunal to respect that contractual restriction.

At the same time, the Court preserved post-award interest, emphasizing the different statutory foundations of interest before and after an arbitral award. The decision therefore combines an expansive, context-sensitive reading of a contractual exclusion with a clear separation between the two statutory interest regimes.

2. Background and Procedural History

The construction dispute

On 11 January 1991, NBCC awarded Sharma Enterprises a subcontract worth Rs.9,50,73,603.20 for flooring and cladding works at Vashi Railway Station-cum-Commercial Complex, New Bombay, now Navi Mumbai. Completion was stipulated for 10 January 1993.

The subcontractor’s work depended on the completion of civil works by another contractor, M/s Mohinder Singh & Co. Delays in those works restricted the available work fronts. Although Sharma Enterprises completed priority platform areas for the inauguration on 9 May 1992, NBCC terminated the contract on 22 September 1992 and encashed its bank guarantees.

Arbitration and subsequent proceedings

Stage Material development
Appointment proceedings Following NBCC’s failure to appoint an arbitrator and several rounds of litigation, the Supreme Court appointed an arbitrator on 3 August 2011 to decide all claims and counterclaims.
Award: 28 July 2016 The arbitrator held that NBCC had wrongfully terminated the contract and failed to provide the necessary work fronts. Several contractor claims were allowed, and all NBCC counterclaims were rejected.
Applicable statute: 15 December 2021 The Supreme Court determined in earlier litigation between the parties that the arbitration was governed by the 1996 Act, rather than the Arbitration Act, 1940.
Section 34 judgment: 19 November 2025 The Delhi High Court’s Single Judge upheld the substantive award but set aside pre-reference and pendente lite interest because of Clause 26.
Section 37 judgment: 20 March 2026 The Division Bench affirmed the Single Judge’s decision.
Present appeal The Supreme Court dismissed the contractor’s appeal, leaving the limited setting aside of interest undisturbed.

The monetary award

The arbitrator granted the following relief:

  • Executed work: Rs.45,653.15.
  • Extra items: Rs.26,03,465.
  • Bank guarantee extension charges: Rs.2,77,500.
  • Refund of the encashed security-deposit bank guarantee: Rs.19,01,480.
  • Litigation costs: Rs.5,00,000.
  • Interest: 10% per annum on the awarded sums, excluding costs, from 22 September 1992 until actual payment.

The final result preserved the substantive monetary relief and post-award interest, but removed interest for the period preceding the award.

3. Summary of the Judgment

The Supreme Court’s conclusions were:

  1. Contractual restrictions govern pre-award interest. Section 31(7)(a), beginning with “Unless otherwise agreed by the parties”, makes the tribunal’s power subject to the parties’ agreement.
  2. Clause 26 was not confined to delayed running bills. It separately addressed disputed balances or deposits, delayed monthly or final payments, and other circumstances through the words “or otherwise”.
  3. The residual words were expansive. In this clause, “or otherwise” performed the same function as “or any other respect whatsoever” in earlier decisions.
  4. The proposed restrictive interpretation failed. The preceding expressions did not establish the narrow common category needed to restrict the residual wording through ejusdem generis.
  5. Post-award interest remained payable. Section 31(7)(b) operates differently from Section 31(7)(a), and the contractual exclusion did not defeat the post-award interest awarded here.

The Court accordingly upheld the High Court’s limited intervention under Sections 34 and 37 and dismissed the appeal.

4. Analysis

4.1 Precedents Cited and Their Influence

M/s Sharma Enterprises v. N.B.C.C. (India) Ltd.

Civil Appeal Nos. 7701-7702 of 2021, decided on 15 December 2021. This earlier decision between the same parties established that the arbitration was governed by the 1996 Act. Its significance was foundational: the present dispute had to be resolved through Section 31(7), rather than through the distinct legal framework governing arbitrations under the 1940 Act.

Union of India v. Larsen & Toubro Limited

2026 INSC 203. This was the principal recent authority supporting the Court’s reasoning. It concerned contractual provisions prohibiting interest on earnest money, security deposits and amounts payable under the contract, reinforced by an express prohibition covering the period up to the award.

The present Court drew three propositions from it: Sections 28(3) and 31(7)(a) subordinate arbitral discretion to the relevant contractual terms; independently expressed categories should not be artificially narrowed; and a contractual prohibition cannot be circumvented by awarding the excluded interest as compensation. Its discussion of post-award interest also supplied the basis for preserving that part of Sharma Enterprises’ award.

The contracts were not identically worded. The importance of this precedent lay in its interpretive principles and statutory analysis, which the Court applied to Clause 26.

Union of India v. Manraj Enterprises

(2022) 2 SCC 331. This decision supported the treatment of disjunctively expressed contractual categories as independent. In the clause considered there, “amounts payable to the contractor under the contract” could not be confined to earnest money or security deposits by applying ejusdem generis.

The Court used that reasoning to reject the contractor’s attempt to restrict “or otherwise” to delayed interim payments. Its application was contextual: the separate categories in Clause 26 and the absence of the suggested narrow genus were central, rather than the mere presence of the word “or” alone.

Union of India v. Bright Power Projects (India) Private Limited

(2015) 9 SCC 695. This three-judge Bench authority established that, under Section 31(7)(a), an arbitrator is bound by the contract concerning interest between the accrual of the cause of action and the award. Where the parties have validly excluded such interest, equitable considerations cannot independently authorize it.

Its influence appears through the passages reproduced from later decisions. It reinforced the proposition that prolonged non-payment or a desire to achieve substantive fairness cannot override a binding contractual exclusion.

Sayeed Ahmed and Company v. State of Uttar Pradesh & Ors.

(2009) 12 SCC 26. This was the closest textual comparator. The interest prohibition there covered specified payment-related situations and concluded with “or any other respect whatsoever”. The High Court had relied on it, and the Supreme Court agreed that the closing words “or otherwise” in Clause 26 performed an equivalent residual function.

The precedent therefore helped establish that the prohibition was comprehensive, rather than merely a restriction on interest associated with routine payment delays.

Jaiprakash Associates Limited (JAL) through its Director v. Tehri Hydro Development Corporation (India) Limited (THDC) through its Director

(2019) 17 SCC 786. This three-judge Bench decision similarly concerned a broadly framed interest exclusion. It supported both the enforceability of such exclusions and the requirement that a genuine, identifiable genus must exist before general words can be restricted through ejusdem generis.

The present Court treated it, together with Sayeed Ahmed and Company v. State of Uttar Pradesh & Ors., as confirming that a sufficiently wide prohibition can exclude pendente lite interest expressly or by necessary implication.

Lilavati Bai v. State of Bombay

(1957) 1 SCC 411. The Constitution Bench decision supplied direct interpretive support for treating “or otherwise” as words of extension rather than limitation. Applied here, that approach prevented the residual phrase from becoming redundant.

Its role was linguistic rather than arbitration-specific: it assisted the Court in deciding the scope of the contractual words before applying Section 31(7)(a).

Oil and Natural Gas Corporation Ltd. v. G&T Beckfield Drilling Services Pvt. Ltd.

2025 SCC OnLine SC 1888. The contractor relied on this decision because it distinguished a prohibition concerning delayed payments or disputed claims from a comprehensive prohibition on pendente lite interest.

The Supreme Court distinguished it on the wording of the clause. The provision there stated that no interest was payable on “any delayed payment / disputed claim” and lacked a residual expression equivalent to “or otherwise”. The decision also recognized that an express prohibition, or one arising by necessary implication, could exclude arbitral power to award pendente lite interest.

This distinction is important: the present judgment does not erase the difference between narrow and comprehensive exclusions. It places Clause 26 in the latter category.

Ferro Concrete Construction (India) Pvt. Ltd. v. State of Rajasthan

2025 SCC OnLine SC 708. The contractor cited this authority to support the distinction between delayed-payment restrictions and exclusions of pendente lite interest. NBCC responded that it concerned the 1940 Act and lacked a comparable residual clause.

The judgment records those competing submissions but does not separately undertake a detailed analysis of this authority. It would therefore be inaccurate to describe it as overruled or comprehensively reconsidered. The operative reasoning instead rests on the governing 1996 Act and the breadth of Clause 26.

Authorities appearing within the quoted passages

  • Ambica Construction v. Union of India, (2017) 14 SCC 323: Mentioned in the discussion reproduced from earlier decisions. The present Court did not independently examine its facts or formulate a separate holding concerning it.
  • Raveechee and Company: Likewise appears in the quoted chain of authorities, without an independent analysis in the present judgment.
  • R.P. Garg: The reproduced passage states that Section 31(7)(b) does not permit parties to contract out of post-award interest and treats “unless the award otherwise directs” as relating to the rate rather than entitlement. This proposition directly supports preservation of post-award interest.

The supplied text also contains an unresolved citation marker accompanied by (2010) 8 SCC 767. Since it supplies no identifiable case title at that location, no title or independent proposition is attributed to that citation here.

4.2 Legal Reasoning

A. The statutory power was conditional, not unrestricted

Section 31(7)(a) authorizes reasonable interest for all or part of the period between the cause of action and the award, but begins:

“Unless otherwise agreed by the parties”.

This opening qualification was decisive. Both pre-reference interest and interest accruing during arbitration fall within the pre-award period. Neither category escapes an applicable contractual prohibition merely because arbitration has commenced.

Reading the provision alongside Section 28(3), the Court emphasized the tribunal’s obligation to respect the contractual framework. The statutory power exists, but its exercise depends on whether the parties have agreed otherwise.

B. Clause 26 had to be read beyond its payment-administration setting

The first part of Clause 26 governed running bills, interim advances and the timing of payments following NBCC’s receipt of payment from its clients. Its interest provision stated:

“No claim for interest will be entertained by the corporation in respect of any balance payments or any deposit which may be held up with the corporation due to any dispute between the Corporation and sub-contractor or in respect of any delay on the part of the corporation in making monthly or final payments or otherwise.”

The contractor argued that this setting confined the prohibition to routine contractual payment delays. The Court instead identified three independently expressed situations:

  1. Balances or deposits withheld because of disputes;
  2. Delay in monthly or final payments; and
  3. Other circumstances captured by “or otherwise”.

The clause therefore extended beyond delayed running bills. Treating its residual words as merely repeating the preceding payment-delay category would deprive them of meaningful work.

C. The interpretive canons could not narrow the clause

The contractor invoked ejusdem generis and noscitur a sociis, arguing that “or otherwise” should take its meaning from the preceding payment-related expressions.

The Court’s detailed analysis focused on ejusdem generis. It found no single, narrow genus corresponding to the contractor’s proposed limitation: disputed deposits and balances were not simply delayed interim bills. The disjunctive structure reinforced their independence.

The accompanying contextual argument under noscitur a sociis also failed in substance because the Court regarded the language and structure as expansive. The judgment does not, however, establish that either interpretive canon is invariably unavailable whenever a contract uses “or”. Its conclusion concerned this clause read as a whole.

D. An exclusion need not expressly mention arbitration

Sharma Enterprises emphasized that Clause 26 did not expressly prohibit interest during arbitration or expressly exclude the tribunal’s jurisdiction. The Court rejected the premise that those precise words were indispensable.

A prohibition may arise expressly or by necessary implication. Here, the breadth of the residual wording supplied the necessary implication. The tribunal could not avoid an otherwise comprehensive exclusion simply because the clause did not use the expression “pendente lite”.

E. Wrongful termination and prolonged litigation did not restore excluded interest

The finding that NBCC had wrongfully terminated the contract supported the principal monetary relief, but it did not displace the interest provision. Entitlement to the underlying money and entitlement to interest were separate questions.

Similarly, the dispute’s exceptional duration did not enlarge the tribunal’s powers. The practical hardship caused by decades of litigation could not override the agreement governing pre-award interest.

F. Post-award interest followed a different statutory rule

Section 31(7)(b), unlike Section 31(7)(a), does not begin with a qualification preserving contrary party agreement. It addresses interest after the award and gives precedence to the award’s direction concerning the applicable rate.

Adopting the reasoning reproduced from the cited authorities, the Court treated post-award interest as serving two purposes: compensating the successful party for delayed realization and encouraging prompt compliance. A pre-award contractual exclusion could not be carried forward automatically into this separate statutory period.

Accordingly, the contractor retained the awarded 10% annual post-award interest on the relevant sums, excluding costs, until payment.

G. Judicial intervention remained limited to the defective component

The Court characterized the pre-award interest award as exceeding the arbitrator’s authority because it contradicted Clause 26. It approved setting aside that separable component without disturbing the substantive findings or post-award interest.

The decision does not authorize a general rehearing of contractual disputes under Sections 34 and 37. Here, the courts preserved factual findings supporting the principal claims while correcting the specific interest award made contrary to the contractual restriction.

H. A procedural submission remained unresolved

The contractor also submitted that NBCC had not relied on Clause 26 before the tribunal to oppose interest. Although recorded, that argument received no express determination. The judgment should therefore not be treated as establishing a general rule about waiver or the permissibility of raising contractual interest objections for the first time in court.

4.3 Potential Impact

  • Residual wording can materially alter financial exposure. A short phrase such as “or otherwise” may transform a targeted payment restriction into a comprehensive pre-award interest exclusion when the surrounding text supports that construction.
  • Contract drafting requires precision. Parties intending only to exclude interest on running bills should define that limited scope. Parties seeking a broader exclusion should articulate its coverage clearly rather than assume that every general phrase will receive the same interpretation.
  • Arbitral awards should separate interest periods. Tribunals must independently assess pre-reference, pendente lite and post-award interest instead of applying one undifferentiated rate across the entire dispute.
  • Successful principal claims do not guarantee pre-award interest. Even findings of wrongful termination or unjustified retention do not necessarily overcome a comprehensive contractual prohibition.
  • Interpretation remains clause-specific. Narrow exclusions lacking comparable residual wording remain distinguishable. The judgment does not turn every delayed-payment clause into a blanket prohibition.
  • Partial setting aside may preserve the award’s valid core. A defective interest component need not invalidate otherwise sustainable monetary relief.

The ruling’s principal contribution is thus an application and consolidation of existing doctrine: party autonomy governs the pre-award period, but the contractual language must first be interpreted correctly, and post-award interest must be considered separately.

5. Complex Concepts Simplified

Pre-reference interest
Interest for the relevant period before the dispute is referred to arbitration.
Pendente lite interest
Interest accruing while arbitration is pending, until the award.
Pre-award interest
The umbrella category covering both pre-reference and pendente lite interest.
Post-award interest
Interest accruing after the award until payment, governed separately by Section 31(7)(b).
Ejusdem generis
A rule under which general words following a specific list may be confined to the same identifiable category. It could not supply the narrow category proposed by the contractor here.
Noscitur a sociis
The principle that surrounding words can help explain a word’s meaning. Context assists interpretation but does not automatically eliminate deliberately broad residual language.
Residual or residuary expression
A catch-all phrase addressing situations not specifically listed. “Or otherwise” performed that role in Clause 26.
Party autonomy
The parties’ freedom to agree on contractual and arbitral arrangements, within statutory limits. Section 31(7)(a) expressly recognizes that freedom concerning pre-award interest.
Necessary implication
A conclusion compelled by the agreement’s meaning even without particular formulaic words. A sufficiently comprehensive exclusion can therefore cover pendente lite interest without naming it expressly.
An arbitrator as a “creature of the contract”
The tribunal derives its authority from the arbitration agreement and must exercise its statutory powers consistently with applicable contractual restrictions.

6. Conclusion

The Supreme Court held that Clause 26’s concluding words, “or otherwise”, extended its interest prohibition beyond specified payment delays and barred interest throughout the pre-award period. Neither the contractor’s substantive success nor the dispute’s lengthy history authorized the tribunal to disregard that restriction.

The equally important limit is that post-award interest survived. The judgment reinforces a two-stage inquiry: determine the scope of the contractual exclusion for Section 31(7)(a), then separately apply Section 31(7)(b). Its lasting significance lies in the financial consequences of careful contractual wording and the distinct treatment of interest before and after an award.