AMICUS AI
Citation Codes
Equivalent Citations
citation codes
Case Number
Disposition
Advocates
Judges
Acts
  • The Act (under which the competent authority is mentioned)
  • Article 14
  • Section 1(3), Section 16, and Section 3 of the Act
  • the Provident Fund Act
  • Schedule I of the Act
  • Section 5, Subsection 2 of the 1983 Income Tax Act
  • Section 7-Q of the Act in question
  • Section 269-UD of the Income Tax Act, 1961
  • Section 15(1) of the Sick Industrial Companies (Special Provisions) Act, 1985
  • Employees' Provident Funds and Miscellaneous Provisions Act, 1952, Section 7-Q
  • Article 226 of the Constitution of India
  • Section 14-B of the Act in question
  • Finance Act of 1986
  • Section 7-Q of the Employees' Provident Funds and Miscellaneous Provisions Act, 1952
  • Section 8-F of the Act
  • Section 7-I of the Act
  • Section 7-A, Section 7-I, and Section 7-Q of the Act
  • Section 7-Q, Section 11(2) of the Act
  • The Sick Industrial Companies (Special Provisions) Act, 1985
  • Sub-section (4) of Section 1 of the Act
  • Chapter XX-C of the Income Tax Act, 1961
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Equivalent Citations
citation codes
Case Number
Disposition
Advocates
Judges
Acts
  • The Act (under which the competent authority is mentioned)
  • Article 14
  • Section 1(3), Section 16, and Section 3 of the Act
  • the Provident Fund Act
  • Schedule I of the Act
  • Section 5, Subsection 2 of the 1983 Income Tax Act
  • Section 7-Q of the Act in question
  • Section 269-UD of the Income Tax Act, 1961
  • Section 15(1) of the Sick Industrial Companies (Special Provisions) Act, 1985
  • Employees' Provident Funds and Miscellaneous Provisions Act, 1952, Section 7-Q
  • Article 226 of the Constitution of India
  • Section 14-B of the Act in question
  • Finance Act of 1986
  • Section 7-Q of the Employees' Provident Funds and Miscellaneous Provisions Act, 1952
  • Section 8-F of the Act
  • Section 7-I of the Act
  • Section 7-A, Section 7-I, and Section 7-Q of the Act
  • Section 7-Q, Section 11(2) of the Act
  • The Sick Industrial Companies (Special Provisions) Act, 1985
  • Sub-section (4) of Section 1 of the Act
  • Chapter XX-C of the Income Tax Act, 1961
Smart Summary

Factual and Procedural Background

Arcot Textile Mills Ltd., established in 1964, operates a textile factory at Kallakurichi. A severe slump in the cotton industry in 1997 led to financial distress, prompting the company to be declared a “sick industrial company” by the Board for Industrial and Financial Reconstruction (BIFR) on 4-5-1999, with IDBI appointed as the operating agency.

Due to its precarious finances, the company defaulted on statutory provident-fund (PF) contributions. On 3-10-2007 it cleared arrears of PF contributions amounting to Rs 83,01,037.80 and informed the Regional Provident Fund Commissioner (RPFC) of its sick-industry status.

Subsequently, on 23-10-2007 the Assistant Provident Fund Commissioner (APFC) issued a demand for Rs 94,27,334 as interest under Section 7-Q of the Employees’ Provident Funds and Miscellaneous Provisions Act, 1952 (“the Act”). The company requested the underlying computation sheet, asserting it had not been furnished. An order under Section 8-F followed on 3-3-2008 authorising coercive recovery measures.

The company filed Writ Petition No. 7046 of 2008 before the Madras High Court, which initially granted interim stay on condition of depositing Rs 34,00,000. On 21-4-2011 the Single Judge dismissed the writ petition, holding that an appeal lay to the Employees’ Provident Funds Appellate Tribunal under Section 7-I. The Division Bench affirmed that view on 19-12-2011 (WA No. 2230 of 2011). The present appeal by special leave challenges those High Court decisions.

Legal Issues Presented

  1. Whether an order levying interest for delayed PF remittances under Section 7-Q of the Act is appealable to the Employees’ Provident Funds Appellate Tribunal under Section 7-I.
  2. Whether, when such an order is issued independently under Section 7-Q, principles of natural justice require that the employer be supplied with the computation sheet and given an opportunity to object to the calculation.

Arguments of the Parties

Appellant’s Arguments

  • The High Court erred in directing the appellant to avail the appellate remedy; Section 7-I does not provide for an appeal against an order passed solely under Section 7-Q.
  • Failure of the authorities to furnish the detailed interest computation violates principles of natural justice, vitiating the demand.

Respondents’ Arguments

  • The levy of interest is automatic and mandatory; the APFC has no discretion, making appellate interference unnecessary.
  • An appeal is maintainable because the interest demand forms part of monies due under the Act.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Maharashtra State Coop. Bank Ltd. v. Provident Fund Commr. (2009) 10 SCC 123 “Any amount due from an employer” includes interest under Section 7-Q. Cited to show that interest is an inseparable component of amounts recoverable.
Organo Chemical Industries v. Union of India (1979) 4 SCC 573 Damages under Section 14-B are transferred to the PF fund. Used to contrast appealability under Section 14-B with non-appealability under Section 7-Q.
Ganga Bai v. Vijay Kumar (1974) 2 SCC 393 Right of appeal is a creature of statute. Relied upon to hold that no appeal lies unless expressly provided.
Gujarat Agro Industries Corpn. v. Ahmedabad Municipal Corpn. (1999) 4 SCC 468; State of Haryana v. Maruti Udyog Ltd. (2000) 7 SCC 348; Super Cassettes Industries Ltd. v. State of U.P. (2009) 10 SCC 531; Raj Kumar Shivhare v. Directorate of Enforcement (2010) 4 SCC 772; Competition Commission of India v. SAIL (2010) 10 SCC 744 Series reaffirming that appellate jurisdiction must be expressly conferred. Cited collectively to reinforce the statutory-creation doctrine of appeals.
C.B. Gautam v. Union of India (1993) 1 SCC 78 Need to read opportunity of hearing into statutes lacking explicit provision when civil consequences ensue. Basis for requiring limited opportunity to contest computation under Section 7-Q.
Union of India v. Col. J.N. Sinha (1970) 2 SCC 458; Olga Tellis v. Bombay Municipal Corpn. (1985) 3 SCC 545 Foundational natural-justice jurisprudence. Referred while discussing audi alteram partem.
Regl. Provident Fund Commr. v. S.D. College (1997) 1 SCC 241 Section 14-B penalises defaulting employers. Used to explain object of damages vis-à-vis employees’ welfare.
Regl. Provident Fund Commr. v. Hooghly Mills Co. Ltd. (2012) 2 SCC 489 Section 7-Q ensures just and humane working conditions. Cited to characterise interest as compensatory.
Ajit Kumar Nag v. Indian Oil Corpn. Ltd. (2005) 7 SCC 764 Flexibility of natural-justice requirements; urgency may modulate hearing. Quoted to justify a limited, summary hearing on computation.
R. v. Gaming Board, ex p Benaim and Khaida (1970) 2 QB 417 (CA) as quoted in Natwar Singh v. Director of Enforcement (2010) 13 SCC 255 Scope of natural justice depends on the subject-matter. Supports the Court’s view that only a confined enquiry into computation is necessary.
Swadeshi Cotton Mills v. Union of India (1981) 1 SCC 664; Canara Bank v. V.K. Awasthy (2005) 6 SCC 321; Sahara India (Firm) v. CIT (2008) 14 SCC 151; Kesar Enterprises Ltd. v. State of U.P. (2011) 13 SCC 733 Authorities must afford hearing where orders entail adverse civil consequences. Invoked to underline the need for an opportunity to dispute the interest calculation.

Court's Reasoning and Analysis

1 | Appealability under Section 7-I: A textual examination of Section 7-I shows that appeals lie against orders under Sections 7-A, 7-B, 7-C, 14-B, etc., but not against orders imposing interest under Section 7-Q. As the right of appeal is purely statutory, the High Court erred in requiring the appellant to approach the Tribunal. A composite order under Sections 7-A and 7-Q would be appealable, but an independent order under Section 7-Q is not.

2 | Natural justice in stand-alone Section 7-Q orders: Even though interest is arithmetical and mandatory, errors can occur in period or rate. Drawing on C.B. Gautam and related jurisprudence, the Court held that where an independent demand is raised, the employer must be supplied with the computation and afforded a limited, summary opportunity to object, confined strictly to the accuracy of the calculation.

3 | Application to present facts: The APFC’s 23-10-2007 demand was a stand-alone Section 7-Q order. The computation sheet was not provided despite the appellant’s request. This violated the audi alteram partem principle. Therefore, the High Court’s dismissal of the writ petition on the ground of an alternative remedy was unsustainable.

4 | Directions issued: The Court directed the authorities to: (a) supply the computation sheets within three weeks; (b) permit the appellant to file objections within two weeks thereafter; (c) conduct a reconciliation of accounts. Given the social-welfare character of the statute, the appellant was ordered to deposit an additional Rs 16,00,000 within four weeks; failure to do so would render the entire demand immediately leviable and extinguish the right to object.

Holding and Implications

ALLOWED. The Supreme Court set aside the judgments of both the Single Judge and the Division Bench of the Madras High Court.

Implications: The ruling clarifies that no statutory appeal lies against a stand-alone Section 7-Q order; instead, such orders are subject to judicial review under Article 226 where necessary. It also establishes that, despite interest being automatic, employers are entitled to a limited opportunity to contest computational errors. The decision primarily affects the parties by reinstating the writ remedy and directing a fresh, summary reconciliation; it does not create a new appellate right nor set a broader precedent beyond confirming existing principles of statutory construction and natural justice.

To access the original judgment, please Sign In or Subscribe.

    Arcot Textile Mills Limited v. Regional Provident Fund Commissioner And Others

    Dipak Misra, J.— Leave granted. This appeal is directed against the judgment and order dated 19-12-2011 passed by the High Court of Judicature of Madras in Arcot Textile Mills Ltd. v. Regl. Provident Fund Commr. WA No. 2230 of 2011 whereby the Division Bench has concurred with the judgment and order dated 21-4-2011 passed in Arcot Textile Mills Ltd. v. Regl. Provident Fund Commr. WP (C) No. 7046 of 2008 by the learned Single Judge holding that the order passed by the Assistant Provident Fund Commissioner under the Employees' Provident Funds and Miscellaneous Provisions Act, 1952 (for brevity “the Act”) requiring the appellant to remit a sum of Rs 94,27,334 towards interest under Section 7-Q of the Act for belated remittances, was to be assailed in appeal before the Employees' Provident Funds Appellate Tribunal (for short “the Tribunal”) and, therefore, it was appropriate on the part of the appellant to take recourse to the alternative remedy and not to approach the High Court under Article 226 of the Constitution of India.

    2. The facts giving rise to the present appeal, bereft of unnecessary details, are that the appellant Company has a textile factory at Kallakurichi and it was established in the year 1964 and with passage of time it took steps for modernisation but it suffered a setback in the year 1997 due to slump in the cotton industry affecting the industrial base in South India. The financial constraints compelled the Company to make a reference to the Board for Industrial and Financial Reconstruction (BIFR) under Section 15(1) of the Sick Industrial Companies (Special Provisions) Act, 1985 and BIFR by order dated 4-5-1999 declared the appellant Company as a sick industrial company and appointed Industrial Development Bank of India (IDBI) as the operating agency.

    3. Because of the prevalent situation, the appellant Company defaulted in making contributions towards the Provident Fund and delay occurred in remitting the dues under the Act. On 3-10-2007 the appellant had paid a sum of Rs 83,01,037.80 (Rupees eighty-three lakhs one thousand thirty-seven and eighty paise only) being arrears of the Provident Fund contribution to the Regional Provident Fund Commissioner, the first respondent herein. A letter was also sent by the Company stating that the appellant Company had become a sick industry and a scheme for rehabilitation of the Company had been submitted to BIFR and the same was pending consideration.

    4. On 23-10-2007 the Assistant Provident Fund Commissioner, Trichy, the second respondent herein, issued a demand requiring the appellant to deposit a sum of Rs 94,27,334 towards interest under Section 7-Q of the Act for belated remittances. On receipt of the said letter the appellant replied that the report stated to have been annexed with the calculation had not been sent along with the notice and the same may be provided to it to reconcile the accounts. In the meantime, certain proceedings went on before BIFR and, eventually, a joint meeting was held between the operating agency, the Company and the employees of the establishment and it was agreed that the amount due towards the Provident Fund shall be paid in a phased manner. On 3-3-2008 an order came to be passed under Section 8-F of the Act demanding the amount of interest and an order was passed by the Assistant Provident Fund Commissioner taking certain coercive measures to realise the amount.

    5. Being aggrieved by the aforesaid action the appellant approached the High Court in WP No. 7046 of 2008. The learned Single Judge, by order dated 25-3-2008, granted an interim stay subject to the appellant depositing 25% of the interest amount within 10 days and in pursuance of the said order the appellant deposited Rs 34,00,000 before the competent authority under the Act. When the writ petition came up for hearing on 21-4-2011, the learned Single Judge came to hold that it was appropriate to approach the Tribunal under Section 7-I of the Act and, accordingly, dismissed the writ petition.

    6. The said order of the learned Single Judge was assailed before the Division Bench which concurred with the view expressed by the learned Single Judge opining that the order impugned charging interest on the belated payment of Provident Fund is appealable and, accordingly, granted liberty to the appellant to move the appellate authority. The said order is the subject-matter of challenge in this appeal by special leave.

    7. We have heard Mr Nikhil Nayyar, learned counsel appearing for the appellant; Ms Aparna Bhat, learned counsel appearing for Respondents 1 to 3 and Mr C.S Ashri, learned counsel for Respondent 6.

    8. At the outset, it is obligatory to state that when this matter came up on 20-4-2012, this Court had passed the following order SLP (C) CC No. 7337 of 2012:

    “One of the contentions urged by the learned counsel appearing for the petitioner is that despite specific request, the detailed working of interest, amounting to Rs 94,27,334 on account of delay in remission of the statutory dues under the Employees' Provident Funds and Miscellaneous Provisions Act, 1952 had not been provided by the Assistant Provident Fund Commissioner. It is further submitted that in fact an amount of Rs 34 lakhs has already been deposited by the petitioner towards the interest under Section 7-Q of the said Act. In view of the submission, issue notice.”

    After so stating, the Court restrained the respondents from taking any further action in terms of public notice dated 21-3-2012 fixing the date for auction of the appellant Company's property.

    9. Mr Nikhil Nayyar, learned counsel appearing for the appellant has raised two contentions, namely,

    (i) the learned Single Judge as well as the Division Bench erred by expressing the view that an appeal would lie to the Tribunal under Section 7-I of the Act when the said provision does not so envisage, and
    (ii) when the appellant asked for the documents relating to computation, it was obligatory on the part of the third respondent to provide the same so that the accounts could be reconciled and a proper view could be taken as regards the computation but the same having not been acceded to the action taken is vitiated being violative of the principles of natural justice.

    10. Ms Aparna Bhat, learned counsel appearing for Respondents 1 to 3, supporting the order passed by the High Court, submitted that when the statute commands levy of interest and no discretion is left to the authority, there is no warrant for interference with the impugned order WA No. 2230 of 2011.

    11. First we shall deal with the maintainability of an appeal against an order passed under Section 7-Q of the Act. To address the said controversy it is necessary to appreciate the scheme of the Act. Section 1(3) stipulates that subject to the provisions contained in Section 16 the Act shall apply to every establishment which is a factory engaged in any industry specified in Schedule I and in which twenty or more persons are employees and to any other establishment employing twenty or more persons or class of such establishments which the Central Government may, by notification in the Official Gazette, specify in this behalf. Sub-section (4) of Section 1 provides that where it appears to the Central Provident Fund Commissioner, whether on an application made in this behalf or otherwise that the employer and the majority of employees in relation to any establishment have agreed that the provisions of this Act should be made applicable to the establishment, he may, by notification in the Official Gazette, apply the provisions of this Act to that establishment on and from the date of such agreement or from any subsequent date specified in that agreement. Section 3 confers power on the Central Government to issue notification directing that the provisions of the Act could apply to such other establishment which has a common Provident Fund with other establishments.

    12. Section 7-A(1) provides for determination of monies due from employers. Section 7-B deals with review of orders passed under Section 7-A. Section 7-C deals with determination of escaped amount. Section 8 provides for mode of recovery of monies due from the employer. The said provision stipulates that the arrears can be recovered in the manner specified in Sections 8-B to 8-G. Section 8-B provides for issue of certificate by the authorised officer in respect of the amount due to the recovery officer so as to unable him to recover the amount by way of attachment and sale of movable and immovable property of the establishment or the employer or take such coercive measurers as provided therein.

    13. Section 11 gives a statutory priority of payment of contributions over other debts. Section 11(2) contains non obstante clause which prescribes for if any amount is due from the employer the said amount shall be deemed to be the first charge on the assets of the establishment. Section 14-B confers power on the competent authority under the Act to recover damages. Section 17 provides for power to exempt.

    14. This Court in Maharashtra State Coop. Bank Ltd. v. Provident Fund Commr. (2009) 10 SCC 123 while interpreting the expression “any amount due from an employer” has opined as follows:

    “67. The expression ‘any amount due from an employer’ appearing in sub-section (2) of Section 11 has to be interpreted keeping in view the object of the Act and other provisions contained therein including sub-section (1) of Section 11 and Sections 7-A, 7-Q, 14-B and 15(2) which provide for determination of the dues payable by the employer, liability of the employer to pay interest in case the payment of the amount due is delayed and also pay damages, if there is default in making contribution to the Fund. If any amount payable by the employer becomes due and the same is not paid within the stipulated time, then the employer is required to pay interest in terms of the mandate of Section 7-Q. Likewise, default on the employer's part to pay any contribution to the Fund can visit him with the consequence of levy of damages.”

    15. We have referred to the aforesaid decision only for the purpose of the levy of interest under Section 7-Q which is a part of the sum recoverable under Section 11(2) of the Act, and it is an insegregable part of the total amount due from the employer.

    16. At this juncture, it is relevant to state that the Tribunal was constituted at a later stage. Section 7-I provides for appeals to the Tribunal. The said provision reads as follows:

    “7-I. Appeals to Tribunal.—(1) Any person aggrieved by a notification issued by the Central Government, or an order passed by the Central Government or any authority, under the proviso to sub-section (3), or sub-section (4) of Section 1, or Section 3, or sub-section (1) of Section 7-A, or Section 7-B [except an order rejecting an application for review referred to in sub-section (5) thereof], or Section 7-C, or Section 14-B, may prefer an appeal to a Tribunal against such notification or order.
    (2) Every appeal under sub-section (1) shall be filed in such form and manner, within such time and be accompanied by such fees, as may be prescribed.”

    17. On a perusal of the aforesaid provision it is evident that an appeal to the Tribunal lies in respect of certain action of the Central Government or order passed by the Central Government or any authority on certain provisions of the Act. We have scanned the anatomy of the said provisions before. On a studied scrutiny, it is quite vivid that though an appeal lies against recovery of damages under Section 14-B of the Act, no appeal is provided for against imposition of interest as stipulated under Section 7-Q. It is seemly to note here that Section 14-B has been enacted to penalise the defaulting employers as also to provide reparation for the amount of loss suffered by the employees. It is not only a warning to the employers in general not to commit a breach of the statutory requirements but at the same time it is meant to provide compensation or redress to the beneficiaries i.e to recompense the employees for the loss sustained by them. The entire amount of damages awarded under Section 14-B except for the amount relatable to administrative charges is to be transferred to the Employees' Provident Fund. (See Organo Chemical Industries v. Union of India (1979) 4 SCC 573, AIR 1979 SC 1803.)

    18. Presently we shall refer to Section 7-Q of the Act. It is as follows:

    “7-Q. Interest payable by the employer.—The employer shall be liable to pay simple interest at the rate of twelve per cent per annum or at such higher rate as may be specified in the Scheme on any amount due from him under this Act from the date on which the amount has become so due till the date of its actual payment:
    Provided that higher rate of interest specified in the Scheme shall not exceed the lending rate of interest charged by any scheduled bank.”

    19. Ms Aparna Bhat, learned counsel for Respondents 1 to 3 would contend that the payment of interest by the employer in case of belated payment is statutorily leviable and a specified rate having been provided, the authority has no discretion and, therefore, it is only a matter of computation and there cannot be any challenge to it. Be it noted, it was canvassed by the said respondents before the High Court that an appeal would lie against an order passed under Section 7-Q.

    20. On a scrutiny of Section 7-I, we notice that the language is clear and unambiguous and it does not provide for an appeal against the determination made under Section 7-Q. It is well settled in law that right of appeal is a creature of statute, for the right of appeal inheres in no one and, therefore, for maintainability of an appeal there must be authority of law. This being the position a provision providing for appeal should neither be construed too strictly nor too liberally, for if given either of these extreme interpretations, it is bound to adversely affect the legislative object as well as hamper the proceedings before the appropriate forum. Needless to say, a right of appeal cannot be assumed to exist unless expressly provided for by the statute and a remedy of appeal must be legitimately traceable to the statutory provisions. If the express words employed in a provision do not provide an appeal from a particular order, the court is bound to follow the express words. To put it otherwise, an appeal for its maintainability must have the clear authority of law and that explains why the right of appeal is described as a creature of statute. (See Ganga Bai v. Vijay Kumar (1974) 2 SCC 393, Gujarat Agro Industries Co. Ltd. v. Municipal Corpn. of the City of Ahmedabad (1999) 4 SCC 468, State of Haryana v. Maruti Udyog Ltd. (2000) 7 SCC 348, Super Cassettes Industries Ltd. v. State of U.P (2009) 10 SCC 531, Raj Kumar Shivhare v. Directorate of Enforcement (2010) 4 SCC 772, Competition Commission of India v. SAIL (2010) 10 SCC 744.)

    21. At this stage, it is necessary to clarify the position of law which does arise in certain situations. The competent authority under the Act while determining the monies due from the employee shall be required to conduct an inquiry and pass an order. An order under Section 7-A is an order that determines the liability of the employer under the provisions of the Act and while determining the liability the competent authority offers an opportunity of hearing to the establishment concerned. At that stage, the delay in payment of the dues and component of interest are determined. It is a composite order. To elaborate, it is an order passed under Sections 7-A and 7-Q together. Such an order shall be amenable to appeal under Section 7-I. The same is true of any composite order a facet of which is amenable to appeal and Section 7-I of the Act. But, if for some reason when the authority chooses to pass an independent order under Section 7-Q the same is not appealable.

    22. Coming to the case at hand, it is evident that the appellant had sent a communication dated 3-10-2007 to the Regional Provident Fund Commissioner submitting that that establishment could not pay the Provident Fund dues from 1998 due to financial crisis, etc. and it was remitting Rs 83,01,037.80 (Rupees eighty-three lakhs one thousand thirty-seven and eighty paise only) from 1998 to April 2006. Under these circumstances, there was no adjudication with regard to liability as the appellant Company had accepted the fault on its own. As it appears the respondent does not have any cavil with regard to the dues payable towards the Provident Fund by the appellant to the Company. What is disputed is that the third respondent issued a demand notice on 23-10-2007 requiring the appellant to remit a sum of Rs 94,27,334 towards interest under Section 7-Q of the Act for the belated remittances made from December 1998 to April 2006. The letter stated that a computation sheet was attached to the said demand notice which was rebutted by the petitioner by sending a communication stating that it was not sent and it may be provided so that they may reconcile the accounts. The demand notice manifestly has been issued in exercise of power under Section 7-Q of the Act and is an independent action and against such an order or issue of demand no appeal could have been filed. Therefore, the conclusion of the learned Single Judge as well as by the Division Bench on the said score is not sustainable.

    23. The next issue that arises for consideration is when in independent exercise of power under Section 7-Q a demand comes into existence, whether the principle of natural justice would get attracted or not.

    24. Section 7-A(3) provides that:

    “7-A. (3) No order shall be made under sub-section (1), unless the employer concerned is given a reasonable opportunity of representing his case.”

    Section 14-B which provides for recovery of damages stipulates that before levying and recovery of such damages, the employer shall be given a reasonable opportunity of being heard. The learned counsel for Respondents 1 to 3 would submit that the first one is the initial determination and, therefore, an opportunity of hearing is given and the second one which relates to imposition of damages there is discretion on the part of the authorities but as far as the levy of interest is component is concerned, it being only an arithmetical calculation the question of affording an opportunity to the employer does not arise. The learned counsel for the respondent has stressed upon the fact that when interest payable by the employer is automatic and the competent authority has no discretion to waive the interest or reduce the interest or limit the interest otherwise, the question of affording of an opportunity of hearing to the employer is not warranted.

    25. To appreciate the said submission we may refer to the Constitution Bench decision in C.B Gautam v. Union of India (1993) 1 SCC 78. In the said case, the Constitution Bench was dealing with the validity of provision of Chapter XX-C inserted in the Income Tax Act, 1961 by the Finance Act of 1986. A contention was advanced that by virtue of incorporation of the provision the appropriate authority had been conferred powers of compulsory purchase of immovable property which was punitive in nature. It was submitted on behalf of the Union of India that the said Chapter had been introduced to curb the large-scale evasion of income tax and to counter the modes of tax evasion adopted by various assessees which deprive the Government of its legitimate tax deals. Section 269-UD provided for order by appropriate authority for purchase of immovable property by the Central Government. The larger Bench adverted to the issue of natural justice as a contention was raised that there was no provision for giving an opportunity of being heard before an order was passed under the provision of Section 269-UD occurring in the said Chapter. The Court referred to the pronouncements in Union of India v. Col. J.N Sinha (1970) 2 SCC 458 and Olga Tellis v. Bombay Municipal Corpn. (1985) 3 SCC 545 and opined thus: (C.B Gautam case (1993) 1 SCC 78)

    “28. It must, however, be borne in mind that courts have generally read into the provisions of the relevant sections a requirement of giving a reasonable opportunity of being heard before an order is made which would have adverse civil consequences for the parties affected. This would be particularly so in a case where the validity of the section would be open to a serious challenge for want of such an opportunity.
    29. It is true that the time frame within which the order for compulsory purchase has to be made is a fairly tight one but in our view the urgency is not such as would preclude a reasonable opportunity of being heard or to show cause being given to the parties likely to be adversely affected by an order of purchase under Section 269-UD(1). The enquiry pursuant to the explanation given by the intending purchaser or the intending seller might be a somewhat limited one or a summary one but we decline to accept the submission that the time-limit provided is so short as to preclude an enquiry or show cause altogether.”
    (emphasis supplied)

    26. After so stating the Constitution Bench (1993) 1 SCC 78 proceeded to lay down that the requirement of a reasonable opportunity being given to the parties concerned, particularly, the intending purchaser and the intending seller must be read into the provisions of Chapter XX-C. In that context, the Constitution Bench observed thus: (C.B Gautam case (1993) 1 SCC 78, p. 104, para 30)

    “30. … The observance of principles of natural justice is the pragmatic requirement of fair play in action. In our view, therefore, the requirement of an opportunity to show cause being given before an order for purchase by the Central Government is made by an appropriate authority under Section 269-UD must be read into the provisions of Chapter XX-C. There is nothing in the language of Section 269-UD or any other provision in the said Chapter which would negate such an opportunity being given. Moreover, if such a requirement were not read into the provisions of the said Chapter, they would be seriously open to challenge on the ground of violations of the provisions of Article 14 on the ground of non-compliance with principles of natural justice.”

    27. Presently we shall address to the nature of the lis that can arise under this provision. There cannot be any dispute that the Act in question is a beneficial social legislation to ensure health and other benefits of the employees and the employer under the Act is under statutory obligation to make the deposit that is due from him. In the event of default committed by the employer Section 14-B steps in and calls upon the employer to pay the damages. (See Regl. Provident Fund Commr. v. S.D College (1997) 1 SCC 241.) Section 7-Q which provides for interest for belated payment is basically a compensation for payment of interest to the affected employees. This provision has been made to secure just and humane conditions of work as has been opined in Regl. Provident Fund Commr. v. Hooghly Mills Co. Ltd. (2012) 2 SCC 489 The language employed in Section 7-Q provides for levy of interest on delayed payment and the rates have been stipulated. When a composite order is passed or order imposing interest becomes a part of the order or levy in any of the provisions of the Act the authority grants a reasonable opportunity of hearing to the employer/affected party.

    28. The issue that falls for consideration in this case is when the employer volunteers may be after long delay to pay the dues, can he claim any right to object pertaining to the interest component. On certain occasions the authority on its own may issue a demand notice under Section 7-Q after a long lapse of time by computing the delay committed by the employer in payment of the dues. We repeat at the cost of repetition that it is a matter of computation but sometimes computation is done when the main order is passed and at times an interest component is demanded separately by the competent authority. To say that there cannot be any error at any point of time will be an absolute proposition. There can be errors in computation. It is difficult to hold that when a demand of this nature is made in a unilateral manner and the affected person is visited with some adverse consequences no prejudice is caused.

    29. The learned counsel for the respondent would contend that the natural justice has been impliedly excluded and for the said purpose she would emphasise upon the scheme and the purpose of the Act. There is no cavil for the fact that it is a social welfare legislation to meet the constitutional requirement to protect the employees. That is why the legislature has provided for imposition of damages, levy of interest and penalty. It is contended that it is luminous that the legislature always intended that when hearing takes place for determination of the money due, the component of interest would be computed and in that backdrop the affected person will have opportunity of hearing. But in reality when an independent order is passed under Section 7-Q which can also be done as has been done in the present case the affected person, we are inclined to think, should have the right to file an objection if he intends to do. We are disposed to think so, when a demand of this nature is made, it cannot be said that no prejudice is caused.

    30. It is highlighted by the respondents that once the amount due is determined the levy of interest is automatic. The rate of interest is stipulated at 12% or at a higher rate if so is provided in the scheme. Despite this, there can be errors with regard to the period and the calculation. It is a statutory power which is exercised by the competent authority under the Act. Once the said authority takes recourse to the measure for computation and sends a bald order definitely the affected person can ask for clarification and when the computation sheet is provided to him he can file an objection. Though, the area of delineation would be extremely limited yet the said opportunity cannot be denied to the affected person.

    31. We may state with profit that principles of natural justice should neither be treated with absolute rigidity nor should they be imprisoned in a straitjacket. It has been held in Ajit Kumar Nag v. Indian Oil Corpn. Ltd. (2005) 7 SCC 764 that:

    “30. … The maxim audi alteram partem cannot be invoked if [the] import of such maxim would have the effect of paralysing the administrative process or where the need for promptitude or the urgency so demands.”

    It has been stated therein that the approach of the Court in dealing with such cases should be pragmatic rather than pedantic, realistic rather than doctrinaire, functional rather than formal and practical rather than precedential. The concept of natural justice sometimes requires flexibility in the application of the rule. What is required to be seen is the ultimate weighing on the balance of fairness. The requirements of natural justice depend upon the circumstances of the case.

    32. In Natwar Singh v. Director of Enforcement (2010) 13 SCC 255 this Court while discussing about the applicability of the rule had reproduced the following passage:

    “25. … ‘It is not possible to lay down rigid rules as to when the principles of natural justice are to apply: nor as to their scope and extent. Everything depends on the subject-matter:’ [see R. v. Gaming Board for Great Britain, ex p Benaim and Khaida (1970) 2 QB 417, (1970) 2 WLR 1009, (1970) 2 All ER 528 (CA) at QB p. 430 C], observed Lord Denning, M.R
    ‘… Their application, resting as it does upon statutory implication, must always be in conformity with the scheme of the Act and with the subject-matter of the case.’”

    33. In this context, we may fruitfully refer to the verdict in Kesar Enterprises Ltd. v. State of U.P (2011) 13 SCC 733 wherein the Court was considering the applicability of principles of natural justice to Rule 633(7) of the Uttar Pradesh Excise Manual. The said Rule provided that if certificate was not received within the time mentioned in the bond or pass, or if the condition of bond was infringed, the Collector of the exporting district or the Excise Inspector who granted the pass shall take necessary steps to recover from executant or his surety the penalty due under the bond. A two-Judge Bench referred to the decisions in Swadeshi Cotton Mills v. Union of India (1981) 1 SCC 664, Canara Bank v. V.K Awasthy (2005) 6 SCC 321 and Sahara India (Firm) (1) v. CIT (2008) 14 SCC 151 and came to hold as follows: (Kesar Enterprises Ltd. case (2011) 13 SCC 733, p. 743, para 30)

    “30. … we are of the opinion that keeping in view the nature, scope and consequences of direction under sub-rule (7) of Rule 633 of the Excise Manual, the principles of natural justice demand that a show-cause notice should be issued and an opportunity of hearing should be afforded to the person concerned before an order under the said Rule is made, notwithstanding the fact that the said Rule does not contain any express provision for the affected party being given an opportunity of being heard.”

    34. Regard being had to the discussions made and the law stated in the field, we are of the considered opinion that natural justice has many facets. Sometimes, the said doctrine applied in a broad way, sometimes in a limited or narrow manner. Therefore, there has to be a limited enquiry only to the realm of computation which is statutorily provided regard being had to the range of delay. Beyond that nothing is permissible. We are disposed to think so, for when an independent order is passed making a demand, the employer cannot be totally remediless and would have no right even to file an objection pertaining to computation. Hence, we hold that an objection can be filed challenging the computation in a limited spectrum which shall be dealt with in a summary manner by the competent authority.

    35. In the present case, it is manifest from the record that the appellant had already deposited a sum of Rs 34,00,000 before the competent authority and sought for supply of the calculation sheet, the basis on which the computation had been made so that it could reconcile the accounts. We think it appropriate to direct that the computation sheets shall be provided to the appellant within three weeks and it shall file its objection within two weeks therefrom and thereafter the competent authority shall fix a date for reconciliation of the accounts. However, regard being had to the fact that the Act is a piece of social welfare legislation, we direct the appellant to deposit a further sum of Rs 16,00,000 within a period of four weeks from today. If the amount is not deposited within the time stipulated hereinabove, the entire amount would be leviable and the right to file objection shall stand extinguished.

    36. Consequently, the appeal is allowed to the aforesaid extent and the judgment and order passed by the Division Bench WA No. 2230 of 2011 and that of the learned Single Judge WP (C) No. 7046 of 2008 of the High Court are set aside. In the facts and circumstances of the case, there shall be no order as to costs.