  • Section 13(2) read with Section 13(1)(e) of the Prevention of Corruption Act, 1988 (PC Act)
  • Water (Prevention and Control of Pollution) Act, 1974
  • Section 6 of the Delhi Special Police Establishment Act, 1946 (in short “the DSPE Act”)
  • Article 32 and 226 of the Constitution
  • Section 6 of the DSPE Act, Code of Criminal Procedure, 1973 (in short “the Code”), Section 156 and Section 157 of the Code
  • Section 5, Subsection 2 of the Income Tax Act
  • Articles 32/136/142 of the Constitution of India
  • Article 226 of the Constitution of India
  • Section 5, Subsection 2 of the 1983 Income Tax Act
  • The DSPE Act (Delhi Special Police Establishment Act)
  • Section 120-B read with Sections 420, 467, 468 and 471 IPC and Section 13(2) read with Section 13(1)(d) of the PC Act
  • Article 32 of the Constitution of India
  • Part III in general and under Article 21 of the Constitution in particular
  • Section 13(2) read with Section 13(1)(e) of the PC Act
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Equivalent Citations
citation codes
Case Number
Disposition
Advocates
Judges
Acts
  • Section 13(2) read with Section 13(1)(e) of the Prevention of Corruption Act, 1988 (PC Act)
  • Water (Prevention and Control of Pollution) Act, 1974
  • Section 6 of the Delhi Special Police Establishment Act, 1946 (in short “the DSPE Act”)
  • Article 32 and 226 of the Constitution
  • Section 6 of the DSPE Act, Code of Criminal Procedure, 1973 (in short “the Code”), Section 156 and Section 157 of the Code
  • Section 5, Subsection 2 of the Income Tax Act
  • Articles 32/136/142 of the Constitution of India
  • Article 226 of the Constitution of India
  • Section 5, Subsection 2 of the 1983 Income Tax Act
  • The DSPE Act (Delhi Special Police Establishment Act)
  • Section 120-B read with Sections 420, 467, 468 and 471 IPC and Section 13(2) read with Section 13(1)(d) of the PC Act
  • Article 32 of the Constitution of India
  • Part III in general and under Article 21 of the Constitution in particular
  • Section 13(2) read with Section 13(1)(e) of the PC Act
Smart Summary

Factual and Procedural Background

The petitioner, a former Chief Minister of Uttar Pradesh and president of a national political party, challenged the registration of FIR No. RC 0062003A0019 dated 5-10-2003 by the Central Bureau of Investigation (CBI). The impugned FIR alleged possession of disproportionate assets under Section 13(2) read with Section 13(1)(e) of the Prevention of Corruption Act, 1988.

Earlier, while monitoring alleged irregularities in the “Taj Heritage Corridor Project”, a special Bench of the Supreme Court had, on 18-9-2003 in M.C. Mehta v. Union of India (2003 8 SCC 696), directed the CBI to lodge an FIR and investigate offences connected with the release of Rs 17 crore for that project (registered as FIR No. RC 0062003A0018). The petitioner contended that the second FIR on disproportionate assets exceeded the Court’s mandate.

Following investigation in FIR 18, the CBI sought sanction to prosecute the petitioner; the Governor of Uttar Pradesh declined sanction on 3-6-2007. The Special Judge (CBI) thereafter held that, absent sanction, cognizance could not be taken. Repeated representations to terminate investigation in FIR 19 were unsuccessful, prompting the present writ petition under Article 32 seeking quashing of FIR 19 and allied reliefs.

Legal Issues Presented

  1. Whether the Supreme Court’s order dated 18-9-2003 authorised the CBI to register a second FIR (RC 0062003A0019) investigating the petitioner’s alleged disproportionate assets.
  2. Whether, in the absence of a specific judicial direction and without State consent under Section 6 of the Delhi Special Police Establishment Act, 1946, the CBI possessed jurisdiction to investigate offences allegedly committed within Uttar Pradesh.
  3. Whether continued investigation in FIR 19 is sustainable after the Governor’s refusal to grant sanction for prosecution.

Arguments of the Parties

Petitioner’s Arguments

  • The Court’s direction on 18-9-2003 was confined to the Taj Heritage Corridor Project and authorised only one FIR relating to the Rs 17 crore release; no mandate existed to probe personal assets.
  • Registration of FIR 19 without prior consent of the State violated Section 6 of the DSPE Act and Section 157 CrPC, rendering the investigation void ab initio.
  • Subsequent Supreme Court orders (25-10-2004 & 7-8-2006) expressly recorded that no link was found between the assets inquiry and the Taj Corridor case, and the Court had discontinued monitoring the assets issue.
  • Income-tax and appellate orders (1995-2004) upheld the genuineness of the petitioner’s income, undermining allegations of disproportionate assets.

CBI / Union of India’s Arguments

  • Paragraph 13(g) of the 18-9-2003 order directed the CBI to “take appropriate steps for holding investigation against the Chief Minister” and thus empowered a separate assets probe.
  • The Allahabad High Court, on 22-10-2003, declined to interfere with FIR 19, recognising that it stemmed from Supreme Court directions.
  • Investigation revealed extensive assets disproportionate to known sources of income, justifying continuation of FIR 19.

Intervener’s Arguments (Kamlesh Verma)

  • Supported the CBI, asserting that the assets investigation was a logical extension of the Taj Corridor probe and that public interest warranted its continuation.

Table of Precedents Cited

PrecedentRule or Principle Cited ForApplication by the Court
State of W.B. v. Committee for Protection of Democratic Rights (2010) 3 SCC 571 High Courts/Supreme Court may direct CBI investigation without State consent, but only on prima facie material and in exceptional circumstances. Relied upon to emphasise that such directions must be explicit; as no prima facie finding or specific direction existed regarding petitioner’s assets, FIR 19 lacked jurisdictional foundation.
Minor Irrigation & Rural Engg. Services v. Sahngoo Ram Arya (2002) 5 SCC 521 CBI inquiry should be ordered only when material discloses a prima facie case. Cited in conjunction with the above case to underline the absence of any Court-recorded satisfaction justifying a disproportionate-assets inquiry.
Union of India v. W.N. Chadha 1993 Supp (4) SCC 260 Limits on third-party intervention in criminal proceedings. Referred while considering, yet ultimately allowing, the intervener’s application only for assistance, not as of right.
Janata Dal v. H.S. Chowdhary (1991) 3 SCC 756 Public Interest Litigation cannot substitute statutory procedure in criminal matters. Used to caution against unwarranted third-party intervention; exception carved out solely on facts of the case.
M.C. Mehta v. Union of India (Taj Corridor orders) (2003 8 SCC 696, 2003 8 SCC 711, etc.) Original directions limited to investigation of illegal release of Rs 17 crore for Taj Corridor Project. Formed the core textual basis for holding that no directive covered the petitioner’s personal assets.

Court's Reasoning and Analysis

The Court undertook a chronological reading of all orders passed in the Taj Corridor litigation. It noted that the mandate given to the CBI was narrowly tailored to investigate:

  • Who sanctioned and disbursed Rs 17 crore for the project, and
  • Whether any officers committed illegality or irregularity in that regard.

Although paragraph 13(g) of the 18-9-2003 order directed investigation against the petitioner and others, the Court found that, read in context with earlier and subsequent orders, the directive related only to the Taj Corridor matter. Importantly:

  • Subsequent orders dated 25-10-2004 and 7-8-2006 expressly recorded that no link existed between any “assets” issue and the Taj Corridor case, and that the Court had ceased to monitor the assets investigation.
  • Section 6 of the DSPE Act bars CBI from investigating in a State without that State’s consent; the Governor of Uttar Pradesh had expressly declined sanction.
  • No prima facie satisfaction or explicit judicial direction existed to justify a roving inquiry into the petitioner’s assets from 1995-2003.
  • The CBI’s designation of a Supreme Court Assistant Registrar as complainant in FIR 19 was procedurally unsustainable, as the Registrar had issued no complaint and could not corroborate FIR statements.

Applying the constitutional restraint highlighted in Committee for Protection of Democratic Rights, the Court concluded that the CBI had “exceeded its jurisdiction” by registering FIR 19 and continuing investigation without legal authority.

Holding and Implications

Holding: FIR No. RC 0062003A0019 dated 5-10-2003, together with all investigation pursuant thereto, is quashed. The writ petition is allowed.

Implications: The decision confines CBI’s investigative authority to the explicit boundaries set by judicial directions and reinforces the requirement of State consent under Section 6 of the DSPE Act when no such direction exists. While no new doctrinal precedent is announced, the judgment serves as a cautionary reminder that investigative agencies cannot rely on broad or contextual readings of court orders to initiate independent prosecutions.

To access the original judgment, please Sign In or Subscribe.

    Ms Mayawati v. Union Of India And Others

    P. Sathasivam, J.— The only question raised in this writ petition, filed under Article 32 of the Constitution of India, is as to whether FIR No. RC 0062003A0019 dated 5-10-2003 lodged under Section 13(2) read with Section 13(1)(e) of the Prevention of Corruption Act, 1988 (hereinafter referred to as “the PC Act”) against the petitioner herein to investigate into the matter of alleged disproportionate assets is beyond the scope of the directions passed by this Court in the order dated 18-9-2003 in M.C Mehta v. Union of India (2003) 8 SCC 696?

    2. The case of the petitioner as stated in the writ petition, is summarised hereunder: on the date of filing of this writ petition before this Court, the petitioner was the Chief Minister of U.P Earlier also, the petitioner had been the Chief Minister of U.P for three times. The petitioner had also served as a Member of Parliament many a time both as a Member of Lok Sabha and Rajya Sabha and had also served as a Member of the Legislative Assembly and Legislative Council of the State of U.P The petitioner is a law graduate and had been a teacher from 1977 to 1984. At present, the petitioner is the President of a national political party called as “Bahujan Samaj Party (BSP)”, which is one of the six national parties recognised by the Election Commission of India.

    3. This Court, by order dated 16-7-2003 in IA No. 387 of 2003 in Writ Petition (C) No. 13381 of 1984 titled M.C Mehta v. Union of India (2003) 8 SCC 706 directed CBI to conduct an inquiry on the basis of an IA filed in the aforesaid writ petition alleging various irregularities committed by the officers/persons in the Taj Heritage Corridor Project and to submit a preliminary report. By means of an order dated 21-8-2003 (2003) 8 SCC 711, this Court issued certain directions to CBI to interrogate and verify the assets of the persons concerned with regard to outflow of Rs 17 crores which was alleged to have been released without proper sanction for the said project. When the case was taken up for hearing on 11-9-2003, a report was submitted by CBI and it was directed (2012) 8 SCC 132 to be kept in a sealed cover in the Registry.

    4. This Court, in its further order dated 18-9-2003 (2003) 8 SCC 696, on the basis of the report dated 11-9-2003, granted further time to CBI for verification of the assets of the officers/persons involved. CBI, Respondent 2 herein submitted a report on 18-9-2003 before this Court which formed the basis of order dated 18-9-2003 (2003) 8 SCC 696 wherein CBI was directed to conduct an inquiry with respect to the execution of the Taj Heritage Corridor Project under the Taj Trapezium Zone (TTZ) Area at Agra.

    5. Pursuant to the orders of this Court, an FIR was lodged on 5-10-2003 being No. RC 0062003A0018 of 2003 under Section 120-B read with Sections 420, 467, 468 and 471 IPC and under Section 13(2) read with Section 13(1)(d) of the PC Act against several persons including the petitioner herein. In the said FIR, certain details and several developments which took place with regard to the aforesaid project have been given. As per the allegations contained in the report dated 11-9-2003, several irregularities were allegedly being found in the aforesaid project. Pursuant to the same, investigation has been completed and the report was forwarded to obtain the sanction from the competent authority, namely, the Governor for prosecuting the Chief Minister of the State. The Governor, by order dated 3-6-2007, declined to accord sanction to prosecute the petitioner.

    6. According to the petitioner, in the aforesaid FIR, it was stated that this Court also directed CBI to conduct an inquiry pertaining to the assets of the officers/individuals concerned in the aforesaid project as mentioned in the judgment (2003) 8 SCC 711 passed by this Court in the aforesaid case in order to ascertain whether any misappropriation of funds have been done with regard to outflow of Rs 17 crores released for the construction of the said project. A perusal of the order dated 18-9-2003 (2003) 8 SCC 696 would reveal that whatever directions were issued by this Court were only in respect of Rs 17 crores alleged to have been released without proper sanction and there is not even a whisper about making an investigation into any other assets of the persons involved in general. In other words, the scope of the order (2003) 8 SCC 711 of this Court was limited to the extent of money released in the said project and not otherwise. This is clear from the order of this Court dated 18-9-2003 (2003) 8 SCC 696 wherein it had specifically observed about lodging of FIR only with regard to the Taj Heritage Corridor Project case. That order nowhere mentioned about lodging of second FIR in regard to the disproportionate assets of the petitioner.

    7. It is the further case of the petitioner that contrary to the orders of this Court, with mala fide intentions, CBI registered another FIR being No. RC 19 of 2003 on the same date i.e 5-10-2003 only against the petitioner alleging therein that in pursuance of the orders dated 21-8-2003 (2003) 8 SCC 711, 11-9-2003 (2012) 8 SCC 132 and 18-9-2003 (2003) 8 SCC 696 passed by this Court, they conducted an inquiry with regard to the acquiring of disproportionate movable and immovable assets by the petitioner and her close relatives and on the basis of this inquiry lodged the said FIR, whereas there was no direction or observation by this Court to inquire into the assets of the petitioner not related to the said project case.

    8. The said FIR has been lodged by Shri K.N Tewari, Superintendent of Police, CBI/ACP, Lucknow, however, in the column of complaint at p. 2 of the FIR, the name of the complainant/informant has been mentioned as Shri Inder Pal, Assistant Registrar, PIL Branch, Supreme Court of India, New Delhi even though no such order or direction was issued by him for registration of the case. It is further pointed out that Shri Inder Pal has not signed any such FIR as complainant/informant. Pursuant to the impugned FIR No. RC 19 of 2003 CBI conducted raids, search and seizure operations at all the premises of the petitioner and her relatives and seized all the bank accounts.

    9. The petitioner has made several representations to CBI officials, the State Minister of Personnel and the Hon'ble Prime Minister who heads the Personnel Department drawing their attention that the Supreme Court had not given any such direction or authority to CBI to lodge an FIR in respect of the alleged disproportionate assets and investigate the entire assets of the petitioner from the year 1995 which have no relation with the case of Taj Heritage Corridor Project which came into being only in August 2003. In spite of several reminders and further representations, till date no communication has been received from CBI. The absence of any reply by any of the authorities including CBI shows that there was no direction or authority to CBI in the order dated 18-9-2003 (2003) 8 SCC 696 to lodge an FIR or to investigate into the assets of the petitioner which are not related to the said project. Hence, it was incumbent upon CBI to comply with the provisions of Section 6 of the Delhi Special Police Establishment Act, 1946 (in short “the DSPE Act”) which makes it obligatory to obtain the consent of the Government of the State concerned to confer jurisdiction on CBI to investigate any case arising within the jurisdiction of a State. In the present case, FIR was lodged and investigation was conducted without obtaining consent of the State Government which is in flagrant violation of Section 6 of the DSPE Act. In the absence of the consent of the State Government, the whole exercise of CBI about lodging of FIR and investigating into the assets of the petitioner not related to the Taj Heritage Corridor Project is without jurisdiction and, therefore, the same is non est and void ab initio.

    10. It is further pointed out that this Court in its order dated 25-10-2004 (2007) 1 SCC 137, after perusing the investigation reports filed by CBI, held that no link was found between the irregularities alleged to have been found in respect of the assets matter and the Taj Heritage Corridor Project which was the subject-matter of the reference before the Special Bench. The fact that this Court had stopped monitoring the assets case was again reiterated in the order dated 7-8-2006 (2012) 8 SCC 137 passed by this Court.

    11. On 27-11-2006 this Court finally decided the issue in respect to the FIR being No. RC 18 relating to the Taj Heritage Corridor matter reported in M.C Mehta (Taj Corridor Scam) v. Union of India (2007) 1 SCC 110. In the said judgment, this Court observed that it should not embark upon an enquiry in regard to the allegations of criminal misconduct in order to form an opinion one way or the other so as to prima facie determine guilt of a person or otherwise. When the matter came up before the Governor of U.P to grant or refuse sanction for prosecution, he sought legal opinion from the Additional Solicitor General of India and based on his opinion and on appreciation of entire materials, the Governor has concluded that the petitioner was not even remotely connected with the sanction of the said project or the payment released for the same. After the above order of the Governor, the directions given by this Court in the order dated 18-9-2003 (2003) 8 SCC 696 were fully complied with including in respect to consider violations of the provisions of the PC Act. After this, there was no justification or authority with CBI to continue with the investigation in other personal assets of the petitioner.

    12. On 5-6-2007 CBI moved an application before the Special Judge, Anti-Corruption Bureau (CBI), Lucknow informing that the Governor had refused to grant sanction. On perusal of all the materials including the order of the Governor declining to grant sanction, the Special Judge held that in the absence of sanction to prosecute the petitioner, the Court has no jurisdiction to take cognizance.

    13. The order of the Governor was also challenged before this Court in Rohitash Singh Nagar v. Union of India WP (C) No. 434 of 2007. However, this Court, by order dated 6-8-2007 WP (C) No. 434 of 2007, dismissed the same as withdrawn. Even thereafter, the petitioner has made several representations to the Director, CBI to drop the investigation on the basis of the aforesaid FIR. However, CBI is bent upon harassing the petitioner. Hence, she approached this Court by filing the present writ petition.

    Stand of CBI, Respondent 2

    14. Pursuant to the notice issued on 15-5-2008 (2012) 8 SCC 143 (1), CBI, Respondent 2 herein has filed its counter-affidavit wherein it was stated that in the order dated 18-9-2003 (2003) 8 SCC 696 of this Court, there was a clear direction to register an FIR for investigating into disproportionate assets of the petitioner on the ground that in the said order it was mentioned that: (M.C Mehta case (2003) 8 SCC 696)

    “12. Apart from what has been stated in the reports with regard to the assets, the learned Additional Solicitor General Mr Altaf Ahmed [has] submitted that further inquiry/investigation is necessary by CBI.”

    It is further stated that the validity of the aforesaid FIRs was not disturbed by the Allahabad High Court by its order dated 22-10-2003 on the ground that the FIR in question was filed as per the directions of this Court. It is further stated by CBI that FIR No. RC 19 dated 5-10-2003 under Section 13(2) read with Section 13(1)(e) of the PC Act reveals the details of huge amount of disproportionate assets possessed by the petitioner and her family members beyond their known sources of income.

    Further case of the petitioner

    15. A rejoinder-affidavit, supplementary affidavit and supplementary counter-affidavits have also been filed wherein subsequent developments which took place during the pendency of the writ petition, especially, passing of various orders by the Income Tax Authorities, Income Tax Appellate Tribunal and the Delhi High Court in favour of the petitioner for different assessment years have been mentioned holding that all income shown in her accounts in the form of gift or otherwise are genuine and legal, covering from 1995 to 2004 of which period the assessments were reopened, investigated and reassessed.

    Case of the intervener

    16. During the pendency of this writ petition, which was filed in 2008, one Mr Kamlesh Verma has filed IA No. 8 of 2010 claiming that he is a social worker and petitioner in Writ Petition No. 2019 of 2009 (M/B) concerning FIR being No. RC 18 dated 5-10-2003 for intervention in the above matter and to assist the Court. By pointing out that it was he who challenged the order of the Governor declining to grant sanction in respect of FIR No. 18 and filed Writ Petition No. 2019 of 2009 which is pending in the Allahabad High Court, Lucknow Bench, Mr Verma sought to intervene to put forth certain factual details. In the said application, the intervener has also highlighted various earlier orders of this Court.

    17. The said IA was resisted by the petitioner by pointing out that in the present writ petition the petitioner seeks quashing of the second FIR i.e No. RC 19 only on the ground that there was no such direction in the order dated 18-9-2003 (2003) 8 SCC 696 passed by this Court. The intervention application is therefore, misconceived. It is also pointed out that the intervener had filed his writ petition in Lucknow in 2009 and his intervention application was filed on 8-9-2010 whereas the petitioner had filed the writ petition in May 2008 and this Court had issued notice on 15-5-2008 (2012) 8 SCC 143 (1). It is also pointed out that the intervener was not associated with the project matter before this Court at any stage when orders were passed on several dates commencing from 2003 ending with 2009.

    18. In the light of the above pleadings of the parties, we heard Mr Harish Salve, learned Senior Counsel for the petitioner, Mr Mohan Parasaran, learned Additional Solicitor General for the Union of India and CBI and Ms Kamini Jaiswal, learned counsel for the intervener.

    19. The relief(s) sought for in the writ petition are reproduced hereunder:

    “(i) Issue a writ, order or direction in the nature of certiorari quashing FIR No. RC 0062003A0019 of 2003 dated 5-10-2003 lodged by the Superintendent of Police, CBI/ACB, Lucknow and investigation proceedings being made in pursuance thereof.
    (ii) Issue a writ, order or direction in the nature of mandamus restraining Respondents 2 and 3 from proceeding further in pursuance of the said FIR and direct them to close and drop the said proceedings;
    (iii) Issue a writ, order or direction in the nature of mandamus directing the release of all seized bank accounts of the petitioner which have been seized by CBI in pursuance of the impugned FIR.
    (iv) Issue an appropriate writ, order or direction declaring that this Hon'ble Court under Articles 32/136/142 of the Constitution of India or the High Court under Article 226 of the Constitution of India cannot direct the Central Bureau of Investigation (CBI), an establishment created under the Delhi Special Police Establishment Act, 1946 to investigate a cognizable offence which is alleged to have taken place in a State without the consent of the State Government under Section 6 of the Delhi Special Police Establishment Act, 1946.
    (v) Issue any other writ, order or direction which this Hon'ble Court may deem fit and proper in the circumstances of the present case.”

    20. It is clear from the narration of facts as well as the relief(s) sought for in the writ petition that the petitioner is aggrieved by second FIR being No. RC 0062003A0019 dated 5-10-2003. It is also clear that the petitioner has assailed the said FIR on the ground that there was no direction by this Court in its order dated 18-9-2003 (2003) 8 SCC 696 which could have empowered CBI to lodge two FIRs, namely, (i) FIR No. RC 0062003A0018 dated 5-10-2003 under Section 120-B read with Sections 420, 467, 468 and 471 IPC and Section 13(2) read with Section 13(1)(d) of the PC Act against the petitioner as well as 10 other accused persons in respect of Taj Corridor matter; and (ii) FIR No. RC 0062003A0019 dated 5-10-2003 under Section 13(2) read with Section 13(1)(e) of the PC Act against the petitioner only.

    21. It is the specific stand of CBI that in the order dated 18-9-2003 passed by this Court in M.C Mehta v. Union of India (2003) 8 SCC 696, there was a clear direction to register an FIR for investigating into disproportionate assets of the petitioner on the ground that in the said order, it is mentioned that:

    “12. Apart from what has been stated in the reports with regard to the assets, the learned Additional Solicitor General Mr Altaf Ahmed [has] submitted that further inquiry/investigation is necessary by CBI.”
    (emphasis supplied)

    It is also their stand that the validity of the aforesaid FIRs was not disturbed by the Allahabad High Court by its order dated 22-10-2003 on the ground that the FIR in question was filed as per the directions of this Court. It is further stated that the second FIR being No. RC 0062003A0019 dated 5-10-2003 revealed the details of huge amount of disproportionate assets possessed by the petitioner and her family members beyond their known sources of income.

    22. As against the abovesaid stand of CBI, the petitioner, in the form of rejoinder and supplementary affidavits, has pointed out that all income shown in her accounts in the form of gift or otherwise are genuine and legal covering from 1995 to 2004. It is further pointed out that all orders passed by the Income Tax Authorities have been brought on record and all of them attained finality and no further appeal is pending against them and all the assessments were reopened investigated and reassessed.

    23. The petitioner has also filed a consolidated compilation of orders passed by this Court commencing from 16-7-2003 (2003) 8 SCC 706 and ending with 27-4-2007 (2012) 8 SCC 143 (2). Mr Harish Salve, learned Senior Counsel for the petitioner and Mr Mohan Parasaran, learned ASG took us through all those orders. Among those orders, we are very much concerned about the order dated 18-9-2003 (2003) 8 SCC 696. Before going into the various directions issued in the said order, it is also relevant to refer the earlier orders dated 16-7-2003 (2003) 8 SCC 706, 21-8-2003 (2003) 8 SCC 711 and 11-9-2003 (2012) 8 SCC 132. It is clear from those orders that this Court by order dated 30-12-1996 in M.C Mehta (Taj Trapezium Matter) v. Union of India (1997) 2 SCC 353 issued a number of directions to protect the national and world heritage monument, namely, the Taj. Thereafter, a number of interim applications were filed by the persons concerned who were required to shift their business or manufacturing activities. This Court has also appointed a Monitoring Committee to report whether those directions issued by this Court are complied with or not.

    24. In the order dated 16-7-2003, M.C Mehta v. Union of India (2003) 8 SCC 706, this Court, in order to find out as to who cleared the project i.e construction of the “Heritage Corridor” at Agra and for what purpose it was cleared without obtaining necessary sanction from the Department concerned and whether there was any illegality or irregularity committed by the officers/persons, came to the conclusion that inquiry by CBI is necessary. Accordingly, in para 16 of the said order, this Court directed the Director of CBI to see that inquiry with regard to any illegality/irregularity committed by the officers/persons be conducted at the earliest and directed to submit a report to this Court. This Court also directed CBI to submit a preliminary report within four weeks and final report within two months from 16-7-2003.

    25. In the next order dated 21-8-2003, M.C Mehta v. Union of India (2003) 8 SCC 711, this Court, after going through the preliminary confidential report submitted by CBI, directed the higher officer of CBI to interrogate four, five or six more persons who are involved in the decision making of granting contract for construction of the Taj Heritage Corridor. In the same order, this Court observed that:

    “2. … It would be open to CBI officer to interrogate and verify their assets because it [was] alleged that Rs 17 crores were released without proper sanction.”

    26. The next order is dated 18-9-2003, M.C Mehta v. Union of India (2003) 8 SCC 696. In this order, this Court referred to the earlier directions and orders, more particularly, the direction to CBI to interrogate the persons involved and verify their assets in view of the fact that it was alleged that an amount of Rs 17 crores was released without proper sanction. After going through the report of CBI submitted on 11-9-2003, further time was given to CBI for verification of the assets of the persons/officers involved. In the course of hearing, CBI has pointed out that income tax returns of various persons including the petitioner were collected from different Income Tax Authorities. In the course of the said proceedings, apart from various reports with regard to the assets, the learned ASG Mr Altaf Ahmed submitted that further inquiry/investigation is necessary by CBI. Based on his request, this Court issued the following directions: (M.C Mehta case (2003) 8 SCC 696)

    “13. Considering the aforesaid report and the serious irregularities/illegalities committed in carrying out the so-called Taj Heritage Corridor Project, we direct:
    (a) the Central Government to hold immediate departmental enquiry against Shri K.C Mishra, former Secretary, Environment, Union of India;
    (b) the State of Uttar Pradesh to hold departmental enquiry against Shri R.K Sharma, former Principal Environment Secretary, Shri P.L Punia, former Principal Secretary to Chief Minister, Shri D.S Bagga, Chief Secretary and Shri V.K Gupta, former Secretary, Environment;
    (c) NPCC or the competent authority including the Central Government to hold inquiry against Shri S.C Bali, Managing Director of NPCC;
    (d) the State Government as well as the officers concerned of the Central Government are directed to see that departmental enquiry is completed within four months from today. The State of U.P and the Central Government would appoint respective inquiry officers for holding inquiry, within a period of seven days from today;
    (e) it would be open to the State Government if called for to pass order for suspension of the delinquent officers in accordance with the rules;
    (f) for the officers and the persons involved in the matter, CBI is directed to lodge an FIR and make further investigation in accordance with law;
    (g) CBI shall take appropriate steps for holding investigation against the Chief Minister, Ms Mayawati and Naseemuddin Siddiqui, former Minister for Environment, U.P and other officers involved;
    (h) the Income Tax Department is also directed to cooperate in further investigation which is required to be carried out by CBI;
    (i) CBI would take into consideration all the relevant Acts i.e IPC/Prevention of Corruption Act and the Water (Prevention and Control of Pollution) Act, 1974, etc.;
    (j) CBI to submit a self-contained note to the Chief Secretary to the Government of Uttar Pradesh as well as to the Cabinet Secretary, Union Government and to the Ministry concerned dealing with NPCC.”

    27. A perusal of the orders prior to the order dated 18-9-2003 (2003) 8 SCC 696 and several directions in the order dated 18-9-2003 (2003) 8 SCC 696 clearly show that this Court was concerned with illegality/irregularity committed by the officers/persons in carrying out the Taj Heritage Corridor Project. The main allegation relates to an amount of Rs 17 crores which was released by the State Government without proper sanction. It is also clear that in order to find out as to who cleared the project and for what purpose it was cleared without obtaining necessary sanction from the department concerned and whether there was any illegality/irregularity committed by the officers/persons, this Court thought an inquiry by CBI was considered necessary. In such a situation, CBI was directed to interrogate and verify their assets. As rightly pointed out by Mr Harish Salve, there was no occasion for this Court to consider the alleged disproportionate assets of the petitioner separately that too from 1995 to 2003 when admittedly Rs 17 crores were released in September 2002.

    28. A thorough scrutiny of all the orders including the specific directions dated 18-9-2003 (2003) 8 SCC 696 clearly show that the same were confined only in respect to the case relating to Taj Corridor Project which was the subject-matter of reference before the Special Bench. It is relevant to point out para 13(f) of the order dated 18-9-2003 (2003) 8 SCC 696 which makes it clear that CBI could have lodged only one FIR, No. RC 0062003A0018 dated 5-10-2003. In other words, inasmuch as there being no consideration of alleged disproportionate assets at any stage of the proceedings while dealing with the Taj Corridor matter, there could not have been and in fact there was no such direction to lodge another FIR being No. RC 0062003A0019 dated 5-10-2003 exclusively against the petitioner under the PC Act.

    29. In this regard, the learned Senior Counsel for the petitioner pressed into service a Constitution Bench decision rendered in State of W.B v. Committee for Protection of Democratic Rights (2010) 3 SCC 571. After considering various constitutional provisions relating to the State and the Union as well as Section 6 of the DSPE Act, the Bench has concluded thus:

    “69. In the final analysis, our answer to the question referred is that a direction by the High Court, in exercise of its jurisdiction under Article 226 of the Constitution, to CBI to investigate a cognizable offence alleged to have been committed within the territory of a State without the consent of that State will neither impinge upon the federal structure of the Constitution nor violate the doctrine of separation of power and shall be valid in law. Being the protectors of civil liberties of the citizens, this Court and the High Courts have not only the power and jurisdiction but also an obligation to protect the fundamental rights, guaranteed by Part III in general and under Article 21 of the Constitution in particular, zealously and vigilantly.
    70. Before parting with the case, we deem it necessary to emphasise that despite wide powers conferred by Articles 32 and 226 of the Constitution, while passing any order, the courts must bear in mind certain self-imposed limitations on the exercise of these constitutional powers. The very plenitude of the power under the said articles requires great caution in its exercise. Insofar as the question of issuing a direction to CBI to conduct investigation in a case is concerned, although no inflexible guidelines can be laid down to decide whether or not such power should be exercised but time and again it has been reiterated that such an order is not to be passed as a matter of routine or merely because a party has levelled some allegations against the local police. This extraordinary power must be exercised sparingly, cautiously and in exceptional situations where it becomes necessary to provide credibility and instil confidence in investigations or where the incident may have national and international ramifications or where such an order may be necessary for doing complete justice and enforcing the fundamental rights. Otherwise CBI would be flooded with a large number of cases and with limited resources, may find it difficult to properly investigate even serious cases and in the process lose its credibility and purpose with unsatisfactory investigations.
    71. In Minor Irrigation & Rural Engg. Services v. Sahngoo Ram Arya (2002) 5 SCC 521 this Court had said that an order directing an enquiry by CBI should be passed only when the High Court, after considering the material on record, comes to a conclusion that such material does disclose a prima facie case calling for an investigation by CBI or any other similar agency. We respectfully concur with these observations.”

    30. As rightly pointed out that in the absence of any direction by this Court to lodge an FIR into the matter of alleged disproportionate assets against the petitioner, the investigating officer could not take resort to Section 157 of the Code of Criminal Procedure, 1973 (in short “the Code”) wherein the officer in charge of a police station is empowered under Section 156 of the Code to investigate on information received or otherwise. Section 6 of the DSPE Act prohibits CBI from exercising its powers and jurisdiction without the consent of the Government of the State. It is pointed out on the side of the petitioner that, in the present case, no such consent was obtained by CBI and submitted that the second FIR against the petitioner is contrary to Section 157 of the Code and Section 6 of the DSPE Act. It is not in dispute that the consent was declined by the Governor of the State and in such circumstance also the second FIR No. RC 0062003A0019 dated 5-10-2003 is not sustainable.

    31. Mr Mohan Parasaran, learned ASG as well as Ms Kamini Jaiswal, learned counsel for the intervener after taking us through the order dated 18-9-2003 (2003) 8 SCC 696 and other orders submitted that CBI was well within its power to pursue the second FIR No. RC 0062003A0019 dated 5-10-2003. Among various directions, Mr Mohan Parasaran, learned ASG very much pressed into service the direction in para 13(g) of the order dated 18-9-2003 (2003) 8 SCC 696. The said direction reads as under: (M.C Mehta case (2003) 8 SCC 696)

    “13. (g) CBI shall take appropriate steps for holding investigation against the Chief Minister, Ms Mayawati and Naseemuddin Siddiqui, former Minister for Environment, U.P and other officers involved;”

    32. According to Mr Mohan Parasaran, liberty was granted by this Court to proceed against the petitioner. He also relied on para 9 of the order dated 25-10-2004, M.C Mehta v. Union of India (2007) 1 SCC 137, which reads as under:

    “Re: FIR No. RC 0062003A0019
    9. The further investigation report filed by CBI in this connection while indicating large-scale irregularities does not in fact show any link between such irregularities and the Taj Corridor matter which is the subject-matter of reference before the Special Bench. CBI therefore is at liberty to proceed with and take action on the basis of their investigation in respect of this FIR. In the event any link is disclosed in the course of such investigation between facts as found and the Taj Corridor Project, CBI will bring the same to the notice of this Court. In any event, CBI will be entitled to take action on the basis of the investigation as it may think fit.”

    33. In addition to the above, Mr Parasaran also pressed into service para 4 of the order dated 19-7-2004, M.C Mehta v. Union of India (2007) 1 SCC 136. The said order reads as under:

    “4. CBI is permitted further eight weeks' time to complete the investigation in respect of FIR No. RC 0062003A0018. As far as FIR No. RC 0062003A0019 is concerned, three months' time is granted.”

    34. In view of the argument of Mr Mohan Parasaran as well as Ms Kamini Jaiswal relying on the above directions, we have gone through all those orders meticulously. According to us, the entire issue revolves around the order dated 18-9-2003 (2003) 8 SCC 696 passed by this Court as the FIR was filed immediately thereafter on 5-10-2003. The said FIR as well as the counter-affidavit filed by CBI states that the FIR has been filed as per the directions contained in the order dated 18-9-2003 (2003) 8 SCC 696. A perusal of the same shows that the Assistant Registrar of this Court has been described as the complainant. On going through all the orders, we are of the view that the said objection of the petitioner cannot be rejected.

    35. A perusal of the series of orders passed in WP No. 13381 of 1984, M.C Mehta v. Union of India clearly shows that the order dated 18-9-2003 (2003) 8 SCC 696 is preceded by other orders issued from time to time only in connection with the Taj Heritage Corridor Project. While considering the directions issued in the order dated 18-9-2003 (2003) 8 SCC 696, it is incumbent to refer to the orders dated 16-7-2003 (2003) 8 SCC 706, 21-8-2003 (2003) 8 SCC 711 and 11-9-2003 (2012) 8 SCC 132. We have already noted that those previous three orders passed by this Court state that CBI was directed to interrogate the persons involved and also to verify their assets because it was alleged that the amount of Rs 17 crores was released without proper sanction. It is relevant to mention that in the order dated 25-10-2004 (2007) 1 SCC 137 (which we have already quoted in the earlier paragraphs) this Court mentioned that it was not monitoring disproportionate assets case since no link could be found between the Taj Corridor matter and the assets of the petitioner (para 9 of the order dated 25-10-2004 (2007) 1 SCC 137). It is also relevant to refer to the next order dated 7-8-2006 (2012) 8 SCC 137 wherein the same was once again reiterated.

    36. It is true that in the order dated 25-10-2004 (2007) 1 SCC 137, liberty was granted to CBI that in the event any link is disclosed in the course of such investigation between the Taj Corridor Project and the assets, CBI is free to bring it to the notice of this Court. The fact remains that the investigation report filed by CBI before this Court which was considered on 25-10-2004 (2007) 1 SCC 137 shows that large-scale irregularities do not show any link between such irregularities and the Taj Corridor matter. The said finding/conclusion by this Court was based on the investigation report of CBI. In view of the same, we are satisfied that CBI cannot be permitted to take the view that two cases, namely, “Taj Corridor” and “Disproportionate Assets” case are same and the investigation was done in both the cases as per the directions of this Court. After reading the entire orders dated 18-9-2003 (2003) 8 SCC 696 and 25-10-2004 (2007) 1 SCC 137, the stand of CBI is to be rejected as unacceptable.

    37. It is also brought to our notice that merely because various orders of this Court including the order dated 18-9-2003 (2003) 8 SCC 696 have been communicated to various authorities in terms of the provisions of the Rules of this Court, CBI is not justified in putting the Assistant Registrar of this Court as the informant/complainant. Further, as rightly pointed out by Mr Salve, the complainant/Assistant Registrar would not and cannot be a witness in the case to corroborate the statements made in FIR No. RC 0062003A0019 dated 5-10-2003. As rightly pointed out, proceeding further, as if the said Assistant Registrar of this Court made a complaint cannot be sustained.

    38. We have already pointed out after reading various orders of this Court which show that Taj Corridor was the subject-matter of reference before the Special Bench. Various directions issued in the order dated 18-9-2003 (2003) 8 SCC 696 have to be read in the light of the previous orders dated 16-7-2003 (2003) 8 SCC 706, 21-8-2003 (2003) 8 SCC 711 and 11-9-2003 (2012) 8 SCC 132 as well as subsequent orders dated 25-10-2004 (2007) 1 SCC 137 and 7-8-2006 (2012) 8 SCC 137 wherein this Court has clarified that it was not monitoring the disproportionate assets case. We are satisfied that a reading of all the orders of this Court clearly shows that the direction to lodge FIR was issued only with respect to Taj Corridor matter, more particularly, irregularities therein. In fact, the direction was confined to find out as to who cleared the project of Taj Corridor and for what purpose it was cleared and whether there was any illegality or irregularity committed by officers and other persons concerned in the State. We have already noted all those orders which clearly state that CBI is free to interrogate and verify the assets of the officers/persons relating to release of Rs 17 crores in connection with Taj Corridor matter.

    39. As discussed above and after reading all the orders of this Court which are available in the “compilation”, we are satisfied that this Court being the ultimate custodian of the fundamental rights did not issue any direction to CBI to conduct a roving inquiry against the assets of the petitioner commencing from 1995 to 2003 even though the Taj Heritage Corridor Project was conceived only in July 2002 and an amount of Rs 17 crores was released in August/September 2002. The method adopted by CBI is unwarranted and without jurisdiction. We are also satisfied that CBI has proceeded without proper understanding of various orders dated 16-7-2003 (2003) 8 SCC 706, 21-8-2003 (2003) 8 SCC 711, 18-9-2003 (2003) 8 SCC 696, 25-10-2004 (2007) 1 SCC 137 and 7-8-2006 (2012) 8 SCC 137 passed by this Court. We are also satisfied that there was no such direction relating to second FIR, namely, FIR No. RC 0062003A0019 dated 5-10-2003.

    40. We have already referred to the Constitution Bench decision of this Court in Committee for Protection of Democratic Rights (2010) 3 SCC 571 wherein this Court observed that only when this Court after considering the material on record comes to a conclusion that such material does disclose a prima facie case calling for investigation by CBI for the alleged offence, an order directing inquiry by CBI could be passed and that too after giving opportunity of hearing to the affected person. We are satisfied that there was no such finding or satisfaction recorded by this Court in the matter of disproportionate assets of the petitioner on the basis of the status report dated 11-9-2003 and, in fact, the petitioner was not a party before this Court in the case in question. From the perusal of those orders, we are also satisfied that there could not have been any material before this Court about the disproportionate assets case of the petitioner beyond the Taj Corridor Project case and there was no such question or issue about disproportionate assets of the petitioner. In view of the same, giving any direction to lodge FIR relating to disproportionate assets case did not arise.

    41. We finally conclude that anything beyond the Taj Corridor matter was not the subject-matter of reference before the Taj Corridor Bench (2003) 8 SCC 711, (2003) 8 SCC 696. Since the order dated 18-9-2003 (2003) 8 SCC 696 does not contain any specific direction regarding lodging of FIR in the matter of disproportionate assets case against the petitioner, CBI is not justified in proceeding with FIR No. RC 0062003A0019 dated 5-10-2003. In view of the above discussion, we are satisfied that CBI exceeded its jurisdiction in lodging FIR No. RC 0062003A0019 dated 5-10-2003 in the absence of any direction from this Court in the order dated 18-9-2003 (2003) 8 SCC 696 or in any subsequent orders.

    42. Regarding the intervention application IA No. 8 of 2010 filed by Shri Kamlesh Verma, though an objection was raised about his right to intervene in the matter, it is not in dispute that against the rejection of the sanction to proceed against the petitioner by the State, he had preferred Writ Petition (C) No. 2019 of 2009 in the Allahabad High Court which is still pending. It is pointed out that the intervener was not associated with the Taj Corridor matter before this Court at any stage when the orders dated 16-7-2003 (2003) 8 SCC 706, 21-8-2003 (2003) 8 SCC 711, 11-9-2003 (2012) 8 SCC 132, 18-9-2003 (2003) 8 SCC 696, 19-7-2004 (2002) 5 SCC 521, 25-10-2004 (2007) 1 SCC 137, 7-8-2006 (2012) 8 SCC 137, 27-11-2006 (2007) 1 SCC 110, 6-8-2007 (2012) 8 SCC 144, 10-10-2007 (2008) 1 SCC 407 and 27-4-2007 (2012) 8 SCC 143 (2) were passed. It is true that the intervener has no legal right to intervene in the matter of this kind where CBI has been prosecuting the case vigorously against the petitioner. Inasmuch as the intervener has challenged the order of the Governor of U.P declining to grant sanction to prosecute the petitioner and the said matter is pending in the Lucknow Bench of the Allahabad High Court, in order to assist the Court, we heard his counsel Ms Kamini Jaiswal.

    43. It is true that this Court has held that when an investigating agency like CBI and the Union of India are contesting the matter effectively, a third party was not permitted to canvass the correctness of the judgment by way of PIL (Union of India v. W.N Chadha 1993 Supp (4) SCC 260 and Janata Dal v. H.S Chowdhary (1991) 3 SCC 756). While accepting the above principles reiterated in those decisions, in view of the peculiar facts that the intervener Kamlesh Verma is pursuing his writ petition against the petitioner in the High Court, we heard his counsel to assist the Court. In view of the above special circumstance, we allow IA No. 8 of 2010 and the same cannot be cited as a precedent for other cases.

    44. In the light of the above discussion, we hold that in the absence of any specific direction from this Court in the order dated 18-9-2003 (2003) 8 SCC 696 or any subsequent orders, CBI has exceeded its jurisdiction in lodging FIR No. RC 0062003A0019 dated 5-10-2003. The impugned FIR is without jurisdiction and any investigation pursuant thereto is illegal and liable to be quashed, and is accordingly quashed. The writ petition is allowed.