Street-Works Permit Fees May Recover Historic Deficits: Annual Cost Calculation Does Not Require Annual Cost Recovery

Court: Court of Appeal of England and Wales, Civil Division

Citation: [2026] EWCA Civ 1464

Date: 19 November 2026

Judges: Lord Justice Newey, Lord Justice Miles and Lady Justice Lieven

1. Introduction

The Court of Appeal has confirmed that a highway authority may set street-works permit fees to recover deficits accumulated in earlier years. The requirement to calculate recoverable costs by reference to a financial year does not require fee income and expenditure to balance within that same year.

The dispute arose between Swindon Borough Council and Thames Water Utilities Limited. Thames Water challenged the Council’s revised permit fees because they included an allowance for historic operating deficits. Dias J accepted that challenge and quashed the revised scheme. The Court of Appeal unanimously reversed her decision.

The judgment establishes an important distinction between calculating eligible costs annually and recovering those costs annually. It also clarifies the separate treatment of permit fees and fixed-penalty income, and the respective roles of statutory language, explanatory materials and statutory guidance.

2. Background and Procedural History

The Council introduced its permit scheme in 2021. The scheme required statutory undertakers undertaking street works in its area to obtain permits and pay the applicable fees. Thames Water was an undertaker entitled to carry out street works under the New Roads and Street Works Act 1991.

The distinction between street works and roadworks matters. Street works generally concern utility apparatus, such as pipes and cables. Roadworks concern the road infrastructure itself and are ordinarily undertaken by, or on behalf of, highway authorities.

By the end of the scheme’s third year, the Council had accumulated a deficit of £139,577. Following consultation in February 2025, it introduced revised fees with effect from 1 June 2025. Illustrative changes included:

Permit category Original fee Revised fee
Major provisional advanced authorisation on a category 0–2 street £21 £74
Other major work £48 £168

The Council explained that the revised charges were intended to recover the historic deficit, projected to be eliminated by 2028. It anticipated reviewing fees again if projected income would produce a sustained surplus.

Thames Water sought judicial review on consultation and statutory-power grounds. Permission was refused on the consultation ground but granted on the argument that the Council lacked power to recover past deficits through future fees.

Dias J allowed that challenge. Although she accepted that a surplus could be carried forward, she considered that increasing later fees to meet earlier deficits would unfairly require later applicants to subsidise earlier ones. She also identified fixed-penalty income as a possible source of deficit funding.

3. Summary of the Decision

Lady Justice Lieven delivered the substantive judgment, with which Lord Justice Miles and Lord Justice Newey agreed. The Court allowed the appeal and set aside the order quashing the permit scheme.

The central holding was that regulations 29 and 32 of the Traffic Management Permit Scheme (England) Regulations 2007 permit fees to be set by reference to historic deficits and surpluses:

  • Regulation 29 identifies and calculates the prescribed costs attributable to a financial year.
  • Regulation 32 restricts the use of fee income to prescribed costs, but does not require those costs to have arisen in the year when the fees are received.

The Court therefore rejected the proposition that every financial year must be treated as a separate, closed accounting period for cost recovery. Its conclusion concerned the existence of the statutory power, not a general approval of every possible fee increase or recovery timetable.

4. The Statutory Framework

The Traffic Management Act 2004

Section 33 authorises local highway authorities to prepare permit schemes. Authorities must comply with the permit regulations and have regard to statutory guidance. Section 36 provides for schemes to be varied or revoked. Since the Deregulation Act 2015, English schemes no longer require the Secretary of State’s approval before implementation.

Section 37 authorises regulations governing permit fees. Under section 37(9), the Secretary of State must try, so far as reasonably practicable, to ensure that fees do not exceed prescribed costs. Crucially, that provision does not specify the period over which the comparison must be made.

The 2007 Regulations

  • Regulation 29: prescribed costs are the proportion of a financial year’s scheme-operating costs attributable to undertakers.
  • Regulation 30: authorises fees and regulates discounts and maximum charges. The highest current maximum identified in the judgment was £240.
  • Regulation 31: exempts highway authorities from permit fees.
  • Regulation 32: requires fee income to be applied towards prescribed operating costs.
  • Regulation 28: separately governs fixed-penalty income, permitting deductions for remaining scheme costs and requiring net proceeds to support specified transport policies.
  • Regulation 16A: requires evaluation after the first, second and third anniversaries, and every third anniversary thereafter, including consideration of whether surpluses or deficits require changes to the fee structure.

These provisions distinguish the identification of recoverable expenditure, the collection and application of fees, and the treatment of sanctions income. The Court’s reasoning depended on preserving those distinctions.

5. Analysis of the Court’s Reasoning

A. Annual calculation is not an annual recovery restriction

The decisive interpretation appears at paragraphs 61–62. Regulation 29’s references to costs incurred “in any financial year” and “in that year” provide a method of calculating prescribed costs. They do not determine when those costs must be recovered.

Regulation 32 addresses the application of fee income. It restricts the purposes for which fees may be used, but contains no requirement that income received in one year be applied only to costs incurred in that year. The Court considered that such a restriction would probably have been stated expressly if intended.

The conceptual distinction is straightforward: a cost does not cease to be a prescribed cost merely because the financial year in which it arose has ended. Annual accounting identifies the cost; it does not impose an expiry date on its recovery.

B. The regulations must operate coherently as a whole

The Court tested Thames Water’s interpretation against the practical operation of the scheme. Fees necessarily depend on estimates of expenditure and activity. Actual income and costs may therefore differ, producing either a deficit or a surplus.

A strictly annual system could leave deficits to be funded from the Council’s general resources. But it failed to explain satisfactorily what should happen to surplus fee income. The Court rejected an interpretation that would leave that money in “legal limbo” once the relevant year had ended.

Allowing adjustments across years supplies a coherent answer in both directions: later fees may address an earlier shortfall, while earlier surplus income must inform later charging. The judgment therefore treats multi-year balancing as a mechanism for achieving cost recovery, not an exception permitting profit-making.

C. Fixed-penalty income and permit fees are different revenue streams

Thames Water argued that surplus fees could be applied to the transport purposes identified in regulation 28. The Court rejected that submission. Regulation 28 concerns fixed penalties and appears in Part 5, dealing with sanctions. Permit fees are governed separately by Part 6.

The distinction is substantive. Fixed-penalty income can meet remaining scheme-operating costs, including costs outside the prescribed-cost category, before its net proceeds are applied to the specified transport purposes. Fee income, by contrast, remains restricted by regulation 32 to prescribed costs.

Accordingly, the availability of penalty income neither imposed an annual limit on fee recovery nor authorised surplus permit fees to be diverted to general transport expenditure. Regulation 28 itself also contained no relevant temporal restriction.

D. Continuous fee adjustment was not a convincing alternative

Thames Water suggested that authorities could maintain an annual balance through rolling reviews and in-year fee changes. The Court considered that approach unrealistic and costly. Reviews require resources and consultation; repeated adjustments would themselves add operating expenditure ultimately borne by undertakers.

Regulation 16A reinforced that conclusion. Its annual and later three-yearly evaluation cycle did not prohibit more frequent reviews, but it suggested that the scheme was not intended to depend on continual adjustments to function lawfully.

Practical workability thus supported the interpretation emerging from the statutory text. It did not supply an independent power absent from that text.

E. Express carry-forward provisions elsewhere were not decisive

Thames Water relied on other legislation expressly permitting balances to be carried forward or costs and income to be considered “taking one year with another”. The examples included the Road Traffic Regulation Act 1984, the City of Westminster Act 1999, the Local Government Act 2003 and the Children and Social Work Act 2017.

The Court rejected the proposed inference that the absence of equivalent wording necessarily required annual balancing here. Each statute had its own context and structure. There was no supporting authority for a universal rule that cross-year recovery always requires a particular verbal formula.

The judgment therefore does not create a general presumption permitting authorities to carry forward balances. It requires the power to be established through interpretation of the particular statutory scheme.

F. The policy arguments did not override the statutory structure

Thames Water emphasised the scheme’s wider objectives: better coordination, less disruption and behavioural incentives through discounts. It argued that higher charges to recover deficits could undermine those incentives.

The Court noted that the concern about excessive fees was constrained by statutory maxima. More fundamentally, the scheme’s public benefits did not establish that local authorities must bear unrecovered prescribed costs indefinitely.

The decision also displaced the first-instance view that charging later applicants for earlier deficits necessarily demonstrated an unlawful subsidy. The legislation permits scheme-level balancing across years rather than demanding a precise match between each year’s applicants and that year’s expenditure.

G. External materials confirmed, rather than created, the power

The Court reached its conclusion from the regulations’ language, structure and purpose. It then considered the explanatory materials and statutory guidance as additional support.

The contemporaneous Explanatory Memorandum and attached Regulatory Impact Assessment were particularly significant. Paragraph 43 expressly anticipated adjustments in subsequent years to offset surpluses or deficits. Paragraph 14 also recorded the Department for Transport’s intention not to impose unfunded costs on local government as a whole.

The 2022 statutory guidance similarly contemplated balancing over several years and carrying surplus income forward. However, the Court stressed that guidance is not law and cannot change the meaning of legislation. Its status as a mandatory consideration for scheme preparation did not make it determinative of the Council’s legal powers.

This distinction also qualified the relevance of departmental intention: external documents could illuminate context and intended operation, but could not substitute their wording for the enacted regulations.

6. Precedents Cited and Their Significance

Re (O) v Home Secretary [2023] AC 255, [2022] UKSC 3

This was the principal authority on statutory interpretation. The Court reproduced Lord Hodge’s explanation that the task is to identify the meaning of Parliament’s words in their statutory context. Purpose matters, but the enacted text remains the primary source of meaning.

The authority also explains that external materials may assist whether or not ambiguity has first been identified. Their role remains secondary: they cannot displace clear statutory meaning. That approach supported considering the explanatory materials while preventing them from becoming an independent source of charging power.

Black-Clawson International Ltd v Papierwerke Waldhof-Aschaffenburg AG [1975] AC 591

Cited within the passage from Re (O) v Home Secretary, this decision supplied the foundational proposition that interpretation seeks the meaning of the words Parliament used. Its influence was methodological rather than permit-specific. It anchored the Court’s analysis in regulations 29 and 32 rather than competing assertions about the fairest funding arrangement.

R v Secretary of State for the Environment, Transport and the Regions, Ex p Spath Holme Ltd [2001] 2 AC 349

Also cited through the Supreme Court’s discussion, this authority explains that statutory meaning is contextual and parliamentary intention is objective, not the subjective intention of ministers, officials or draftspeople.

It is especially relevant to the treatment of departmental documents. The Explanatory Memorandum helped explain the scheme, but the legal question remained what the regulations objectively meant. The authority also underlined the constitutional importance of legislation being understandable and reliable for those regulating their conduct.

Attorney General v Wilts United Dairies Ltd (1921) 37 TLR 884

This decision supported the principle that delegated legislation cannot impose taxation, fees or other charges without clear authority. The Court treated section 37(9)’s cost limitation as consistent with that principle.

The case supplied an important boundary, not a requirement for annual balancing. The Council could recover authorised costs; it could not use the permit regime as an unauthorised revenue-raising mechanism. Permitting recovery of historic prescribed costs did not remove that restriction.

Credit Suisse v Allerdale DC [1997] QB 307

Thames Water relied, as a fallback, on the ancillary power in section 111 of the Local Government Act 1972 to address the consequences of its interpretation. The Court rejected that route, invoking this authority for the proposition that section 111 cannot operate as an “escape route” from a statutory scheme.

The significance is that a general incidental power cannot be used to bypass the specific rules controlling permit income. The scheme had to work through the powers and restrictions established by the relevant legislation.

Wathen-Fayed v Secretary of State for Housing Communities and Local Government [2025] UKSC 32, [2025] 1 WLR 3693

This authority established the relevant limit on statutory guidance: guidance is not a source of law and cannot alter legislation’s meaning. It supported the Court’s careful separation of the duty to have regard to guidance from the judicial task of determining whether a power exists.

The guidance’s support for multi-year balancing was therefore confirmatory. It could not have made an otherwise unauthorised charge lawful.

City of London Corporation v Bussandra [2025] EWCA Civ 1580, [2026] HLR 13

The Court relied on paragraph 55 to distinguish challenges to discretionary decision-making from questions of statutory power. Guidance will generally carry greater weight when assessing the legality of a discretionary decision to which it applies.

Here, the central question was one of vires: whether the regulations authorised recovery of earlier deficits at all. That distinction explained why the Court gave the statutory language priority despite the authority’s obligation to consider the guidance.

7. Impact and Limits of the Judgment

Implications for permit authorities

The decision provides greater financial certainty. Authorities need not treat an annual deficit as irrecoverable merely because the year has closed. This is particularly important where early fee estimates prove inaccurate or permit activity differs from projections.

It also reduces the practical pressure to overestimate initial fees as protection against unrecoverable shortfalls. Authorities can instead operate a transparent adjustment process that recognises both deficits and surpluses.

In practice, authorities should maintain clear records identifying:

  • the prescribed costs incurred in each financial year;
  • the fee income applied against those costs;
  • outstanding deficits and carried-forward surpluses; and
  • the assumptions supporting future fee adjustments.

Those are practical consequences of demonstrating lawful cost recovery, rather than additional accounting rules expressly created by the judgment.

Implications for undertakers

An undertaker cannot establish unlawfulness merely by showing that a year’s fees exceed that year’s costs. The relevant explanation may include earlier unrecovered prescribed expenditure.

Nevertheless, significant protections remain. Authorities must respect applicable fee maxima, restrict fee income to prescribed costs, account appropriately for surpluses, and comply with relevant consultation and evaluation obligations. Historical recovery cannot justify charging twice for the same expenditure or financing unrelated services.

What the judgment does not decide

  • No unrestricted revenue power: the decision authorises cost recovery, not taxation or sustained profit-making.
  • No universal rule for public fees: other charging regimes require interpretation in their own statutory contexts.
  • No fixed recovery deadline: the Court did not establish a general maximum period for eliminating deficits.
  • No automatic approval of every fee increase: the appeal addressed the existence of the power, not every possible objection to its exercise.
  • No ruling validating the consultation: permission on that ground had been refused before the substantive judicial review.

The guidance’s references to three-year balancing should also be distinguished from the statutory evaluation timetable. The Court did not convert those guidance passages into an inflexible statutory deadline or announce that every proposed recovery period would necessarily be lawful.

8. Complex Concepts Simplified

Ultra vires
Acting beyond a legal power. The question was whether the Council had authority to include historic deficits when setting fees.
Prescribed costs
The legally defined operating costs recoverable through permit fees. They are not all highway expenditure or necessarily all costs of the scheme.
Annual accounting versus annual recovery
Costs can be measured separately for each year without requiring all of them to be recovered during that year.
Multi-year cost neutrality
Balancing eligible expenditure and fee income over time, allowing adjustments for earlier shortfalls or excess income without generating an unauthorised profit.
Statutory guidance
Guidance that an authority is legally required to consider. It does not itself amend legislation or create a missing power.
External aids to interpretation
Materials outside the legislation, such as explanatory documents, which help explain context and purpose but cannot override the enacted wording.

9. Conclusion

The judgment confirms that annual identification of prescribed permit costs does not confine their recovery to the same financial year. Authorities may adjust future fees to address historic deficits, just as earlier surpluses must inform later charging.

Its broader significance lies in combining workable scheme funding with firm legal limits: multi-year balancing is permissible, but fee income remains tied to prescribed costs, statutory charging limits and the prohibition on unauthorised revenue generation.