Rural Residents Wind Aware and Environmental Group & Ors v An Coimisiun Pleanala & Ors (Approved)

Smart Summary

Summary of Judgment — High Court (Planning & Environment)

Case reference: [2025] IEHC 600 (Planning & Environment)

Judge: Judge Humphreys

Factual and Procedural Background

This judgment concerns judicial review proceedings brought by a group of local opponents and two individual applicants (collectively referred to below as "the Applicants") challenging a decision of the planning authority (referred to below as "the Defendant" or "the Commission") dated 21 November 2023 which granted planning permission for a seven turbine wind energy development and associated works at a rural site (the "Site"). The planning application was submitted by an agent on behalf of the notice party ("Company A"). The application included an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) and was the subject of public consultation and submissions by prescribed bodies.

The Commission appointed an inspector who inspected the site, produced a report recommending permission subject to conditions, and the Commission then decided to grant permission subject to conditions. The Applicants issued two sets of proceedings: the present proceedings (challenging the parent permission) and a second set challenging an amendment (the second proceedings). The present judgment deals with the Module I phase of a modularised judicial review process (Module I addressing a number of core grounds other than the balance of core grounds 1 and 8A which were reserved for Module II).

Procedurally: the first proceedings were issued on 24 January 2024; leave to apply for judicial review was granted and an amended statement of grounds filed. The case was modularised and progressed on an expedited timetable. The hearings for the proceedings (both cases together) were held on 30 September and 1 October 2025. Judgment was reserved and a draft judgment circulated to parties on 15 October 2025. The present written judgment was delivered on 6 November 2025.

Legal Issues Presented

  1. Whether the impugned decision was invalid because the decision‑maker accepted the application without, or despite absence of, required landowner consents for parts of the Site (Core Ground 1).
  2. Whether the decision was invalid for failure to consider or for inadequate consideration of noise (including amplitude modulation) and shadow flicker, and for relying on outdated guidance rather than more recent scientific standards, with alleged failure to have regard to submissions from parents/guardians of vulnerable persons (Core Ground 2).
  3. Whether the application contained inadequate plans and particulars for certain components (battery storage/substation and haul route works) such that the decision was invalid (Core Ground 4).
  4. Whether the decision was invalid for procedural failure to make relevant documents publicly accessible through appropriate electronic portals and timeframes, contrary to transposed provisions of the EIA Directive and implementing legislation (Core Ground 5).
  5. Whether the Environmental Impact Assessment (EIA) was defective because it failed properly to identify, describe or assess direct and indirect significant effects on population and human health (particularly noise) (Core Ground 6, derived from Core Ground 2).
  6. Whether the decision amounted to unlawful project‑splitting by excluding from EIA assessment elements of the whole project (battery/substation/energy storage) (Core Ground 7).
  7. Whether the EIAR failed to include an adequate outline of reasonable alternatives and reasons for the choice, as required by Article 5(3)(d) of the EIA Directive and CJEU authority (Core Ground 8).
  8. Whether Article 214(1) of the Planning and Development Regulations 2001 (as amended) is invalid because it does not require written landowner consent for Strategic Infrastructure Development applications made by parties who are not landowners (Validity Ground / Core Ground 8A) — this was modularised to Module II.

Arguments of the Parties

Plaintiffs' Arguments

  • The planning application should not have been accepted in respect of turbines said to be located on land of particular individual applicants because letters of landowner consent were not given; the Commission knew or ought to have known this and should have refused to deal with the application (Core Ground 1).
  • The Commission failed to properly consider issues of wind turbine noise (including amplitude modulation) and shadow flicker, and relied on outdated (2006) wind energy guidance rather than best current scientific practice and the draft 2019 guidance; the Commission did not adequately address submissions from parents/guardians of vulnerable persons who fear health impacts (Core Ground 2 and related EIA complaint Core Ground 6).
  • The EIAR and application lacked adequate or legible plans and particulars for the battery storage facility, substation and haul route works, contrary to article 214(1) (Core Ground 4).
  • The public were not provided with relevant information via a central electronic portal within reasonable timeframes; documents were not all available on the developer's website or appropriately signposted (Core Ground 5).
  • The EIAR did not adequately describe or assess direct and indirect effects on population and human health (Core Ground 6), or the environmental effects of reasonable alternatives in sufficient detail (Core Ground 8).
  • Article 214(1) of the Regulations is constitutionally invalid for failing to require written landowner consent for SID applications (Core Ground 8A — reserved to Module II).

Defendant's (Commission's) Arguments

  • If absence of landowner consent were legally material, the issue is rendered academic or addressed by the amendment decision in the separate proceedings (section 146B amendment): discretionary relief (certiorari) would be disproportionate in any event (response to Core Ground 1).
  • The Commission had regard to the submissions (including those from consultees and the draft 2019 guidelines) and the inspector's report shows that the matters were considered; the complaints about noise, amplitude modulation (AM) and shadow flicker are either merits challenges or are not pleaded with the necessary evidential particularity (response to Core Ground 2 and 6).
  • The application documentation (including EIAR annexes) contained adequate particulars about the battery/substation and haul route; some elements were identified as indicative or to be the subject of subsequent application but were assessed in the EIAR (response to Core Ground 4 and 7).
  • Complaints about the central EIA portal implicate the Minister (State) rather than the Commission; no relief was sought against the Minister and there is no pleaded basis to quash the Commission's decision on that ground (response to Core Ground 5).
  • Regarding alternatives (Core Ground 8), the EIAR contained the required outline of main alternatives and adequate reasons for the choice consistent with CJEU authority (Holohan): any allegation of inadequacy was not made out evidentially.

Notice Party (Company A) / Developer Arguments

  • The developer acted in good faith and believed it had the necessary consents; absence of landowner consent (if relevant) does not automatically render the application invalid ab initio and the issue was rendered academic by the amendment decision removing turbines from the contested land.
  • The EIAR and the inspector's assessment comprehensively addressed noise, AM and shadow flicker; the developer committed to mitigation measures including a zero‑shadow flicker operational approach and to monitoring and mitigation post‑commissioning.
  • Details of haul route works, foundations and the indicative location of substation/battery storage were provided in the EIAR and annexes and were assessed by the inspector; the substation/ESS were not components for which consent was sought in the parent application but were assessed cumulatively in the EIAR.
  • Claims that documents were missing from public portals were unparticularised and the notice party pointed out no evidence of prejudice to the Applicants' ability to participate in the process.

The State / Minister

  • The State's role in maintaining the central EIA portal was noted; the Commission may not be the appropriate respondent on any complaint about the central portal and the Minister was not joined on that ground (as recorded in the judgment).

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court in This Judgment
O'Sullivan v. HSE [2023] IESC 11 Limits on re‑argument in draft judgment procedure; caution about treating JR as a trial. Cited for procedural guidance on draft judgment engagement and to warn against re‑litigation in comments on draft judgment.
O'Sullivan v. Sea Fisheries Protection Authority [2017] IESC 75 Warning about approaching administrative review as if a criminal trial. Used as supporting authority for the court's approach to draft judgment procedure and proportionality of post‑draft submissions.
Friends of the Irish Environment v. Government of Ireland [2020] IESC 49 Recognition of binding legal obligations to address climate change (contextual climate law principles). Placed the windfarm decision in the broader climate context informing planning policy considerations cited in the decision.
Toole v. Minister for Housing (II) [2024] IEHC 610 Domestic jurisprudence concerning climate context. Referenced to support the broader discussion of the climate legal framework relevant to planning policy in the judgment.
Verein KlimaSeniorinnen Schweiz and Others v Switzerland (ECtHR/other international authorities) International recognition of states' obligations on climate change. Used as part of the judgment's exposition of the climate context and obligations informing national planning policy.
Sweeney v. Fahy [2014] IESC 50 Judicial review concerns legality not merits. Applied to emphasise that the Court reviews lawfulness not correctness and should not substitute its view for decision‑taker's merits judgments.
State (Keegan) v. Stardust Compensation Tribunal [1986] I.R. 642 Separation of functions between decision‑maker and court. Reinforced the point that JR is not an appeal on merits.
Meadows v. Minister for Justice, Equality and Law Reform [2010] IESC 3 Judicial review standards and onus of proof (applicant bears onus). Used to restate onus remains on applicant unless limited exceptions apply.
R (Cart) v. Upper Tribunal [2011] UKSC 28 Limits to dressing up merits as law points; caution against recharacterisation. Adopted as part of general principle distinguishing law from merits in JR.
R (Hoareau and Bancoult) v. Secretary of State [2019] EWHC 221 Judicial review should not be "politics by another means." Quoted to underline separation of powers and proper scope of JR.
Sinnott v. Minister for Education [2001] IESC 63 Separation of powers and judicial restraint. Applied as general principle of deference to administrative/political choices.
T.D. v. Minister for Education [2001] IESC 101 Similar principle on separation of powers. Used to support the court's approach to reviewing planning policy choices.
B. v. Child & Family Agency & Ors. [2025] IESC 2 Separation of powers in administrative law context. Reinforced the court's caution about entering policy territory.
M.E. v. Refugee Appeals Tribunal [2008] IEHC 192 Weight of evidence and evaluative conclusions are primarily for decision‑maker. Referenced to explain that evaluative judgments are for the Commission and reviewable on an irrationality standard.
Sherwin v. An Bord Pleanála [2024] IESC 13 Evaluative planning judgments and standard of review. Applied to show that many of the Applicants' complaints are merits‑based and do not disclose justiciable error.
Graymount House Action Group v. An Bord Pleanála [2024] IEHC 327 Evaluative judgments and leave to appeal considerations. Used to demonstrate the court will not re‑weigh merits that are within planning discretion.
M.R. (Bangladesh) v. International Protection Appeals Tribunal [2020] IEHC 41 Decision should be read in a way that makes sense; avoid hyper‑technical parsing. Applied to read the Commission's decision as a whole and not to quash it based on micro‑textual criticism.
Rostas v. DPP [2021] IEHC 60 Similar principle on interpreting decisions sensibly. Applied as authority for permissive, contextual reading of administrative decisions.
St. Margaret's Recycling v. An Bord Pleanála [2024] IEHC 94 Contextual reading of decisions and avoiding strained constructions. Used to support reading the decision in a way that avoids unnecessary invalidation.
E.M. v. Minister for Justice and Equality [2024] IESC 3 Reading of decisions fairly and in context. Referenced in support of reasonableness in interpreting administrative decisions.
R (Blewett) v. Derbyshire County Council [2003] EWHC 2775 Avoid legalistic over‑parsing of decisions. Quoted to caution against over‑technical attacks on reasons where a valid reading exists.
R. (Friends of the Earth Ltd & others) v. Heathrow Airport Ltd [2020] UKSC 52 Caution about over‑formalism in environmental and planning judicial review. Used to reinforce court's approach to reasonableness and public law review scope.
Walsh v. Jones Lang Lasalle Ltd [2017] IESC 38 Limits on micro‑analysis of administrative texts. Applied to resist parsing that would create illegitimate bases for certiorari.
G.T. v. Minister for Justice, Equality and Law Reform [2007] IEHC 287 Pleas about procedural fairness and the required standard of reasons. Quoted for the proposition that reasons must address main issues and be understood in context.
X.E. v. International Protection Appeals Tribunal [2018] IEHC 402 Procedural and evidential points regarding review. Used as contextual authority on evidentiary expectations in JR.
B.D.C. (Nigeria) v. International Protection Appeals Tribunal [2018] IEHC 460 Procedural standards in JR. Cited in the court's survey of JR principles.
Okunade v. Minister for Justice [2018] IESC 56 JR is not an exercise in pointless formalism. Applied to the court's balanced assessment when evaluating alleged procedural or factual failings.
RAS Medical Ltd v. Royal College of Surgeons in Ireland [2019] IESC 4 Where conflict of admissible evidence exists without cross‑examination, resolve against party with onus. Applied in discussing onus of proof and resolution of conflicts in evidence in JR proceedings.
Koulibaly v. Minister for Justice [2004] IESC 50 Court may prefer written affidavit evidence in appropriate circumstances. Noted as an example of the court evaluating evidence credibility where needed.
Doorly v. Corrigan [2022] IECA 6 Failure to explain relevant questions may undermine credibility of averments. Used to highlight limits on accepting unparticularised assertions in affidavits.
DPP v. Barnes [2006] IECCA 165 Court as fact‑finder is not bound to accept "only account available". Referenced to underline court's fact‑evaluation powers where evidence is internally defective.
Connelly v. An Bord Pleanála [2018] IESC 31 Reasons standard: must provide main reasons on main issues; reasons may be found in inspector's report. Applied to hold that the Commission's reasons, taken with the inspector's report, satisfied the required standard.
Balscadden Road SAA Residents Association Ltd v. An Bord Pleanála (No.1) [2020] IEHC 586 Standards for reasons in planning decisions. Used to support the court's position on sufficiency of reasons.
Atlantic Diamond v. An Bord Pleanála [2021] IEHC 322 Obligation to give main reasons rather than discursive narrative. Applied to show no need for an issue‑by‑issue textual response to every submission.
Grassridge v. Dun Laoghaire Rathdown County Council [2024] IEHC 669 Reasons and standards of adequacy. Used to support the court's approach to why the Commission's reasons were adequate.
Pat O'Donnell v. Dublin City Council [2024] IEHC 671 Reading reasons in the round; reasons may be in inspector's report. Applied to justify reliance on inspector's report when assessing sufficiency of reasons.
Sherwin v. An Bord Pleanála [2023] IEHC 26 Where a decision‑maker disagrees with a council, that is a main issue requiring reasons. Referenced for the proposition of main issues objectively identifiable.
Clonres CLG v. An Bord Pleanála & Ors. [2021] IEHC 303 Inspector report adoption and when disagreement with subordinate body is main issue. Used when discussing what counts as a main issue requiring reasons.
Oguekwe v. Minister for Justice [2008] IESC 25 No obligation for micro, submission‑by‑submission reasoning. Applied to counter argument that every submission must be responded to in decision text.
Rawson v. Minister for Defence [2012] IESC 26 Need for a reasoned but not discursive ruling. Used to temper expectations on level of detail required in reasons.
Killegland Estates v. Meath County Council [2022] IEHC 393 (and [2023] IESC 39) No obligation to state reasons for what is obvious; consistency of conditions reading. Applied to explain harmonious reading of conditions and absence of need to state obvious reasons.
Shadowmill v. An Bord Pleanála [2023] IEHC 157 Reasons may be found outside the decision itself. Used to support reliance on inspector's report for reasons.
Rana v. Minister for Justice [2024] IESC 46 Reasons may be implicit from context. Applied to justify implicit reasoning by the Commission.
Industrial Development Agency v. Information Commissioner [2024] IEHC 649 On reasons and administrative explanation standards. Cited in relation to when reasons must be provided.
Ironborn v. Dun Laoghaire Rathdown County Council [2023] IEHC 477 No obligation to give reasons for rejecting legally incorrect points; severability of reasons. Applied to argue there was no need for reasons where a point was legally incorrect; to consider severability.
Murtagh v. An Bord Pleanála [2023] IEHC 345 Severability: good reasons may sustain a decision. Used to consider whether any bad reasons could be severed from good ones.
Element Power [2017] IEHC 550 Severability of reasons and link between reasons. Referenced when considering whether multiple reasons are severable.
K v. Minister for Justice [2022] IEHC 582 Reasons should not be created ex post facto. Quoted to caution against post‑hoc justification absent contemporaneous reasons.
RPS Consulting Engineers Ltd v. Kildare County Council [2015] IEHC 113 Reasons that existed at the relevant time can be evidenced after the event. Referenced to balance the court's approach to evidence of reasons.
Commission v Ireland (C‑50/09) EIA standard: EIA must be as complete as possible; AA standard to use best scientific knowledge. Used to explain standard required for environmental assessments.
R. (Champion) v. North Norfolk District Council [2015] UKSC 52 AA and EIA principles; role of decision‑taker in evaluative conclusions. Applied to show AA/EIA evaluation is primarily for the decision‑taker.
Smyth v. RPA [2010] IEHC 290 Relevant to consideration of noise nuisance and statutory defences. Referenced by Applicants; the court treated this as a merits point, not a basis for certiorari.
Holohan v. An Bord Pleanála (C‑461/17) Requirements on outlining reasonable alternatives (Article 5(3)(d))—outline required, not full assessment of alternatives; reasons for choice required. Applied directly to Core Ground 8: the court held that the EIAR met the outline requirement and that the Applicants had not shown inadequacy evidentially.
Coöperatie Mobilisation for the Environment UA & Vereniging Leefmilieu v. College van gedeputeerde staten (joined C‑293/17 & C‑294/17) Role of national courts to carry out in‑depth examination of AA scientific soundness. Referred to when explaining AA standards and the court's supervisory role.
Commission v Ireland (C‑392/96) Project as whole principle in EIA to prevent splitting. Applied to describe tests for when sub‑projects must be treated as part of larger project for threshold purposes.
Commission v Spain (C‑227/01) EIA principles on project splitting and thresholds. Used in the summary of EU law on project splitting.
Brussels Hoofdstedlijk Gewest & Others v Vlaamse Gewest (C‑275/09) Project as whole and EIA thresholds. Cited in the court's EIA law survey.
Salzburger Flughafen GmbH v Umweltsenat (C‑244/12) Project as whole and EIA assessment. Referenced in the project splitting discussion.
Marktgemeinde Straßwalchen and Others v Bundesminister (C‑531/13) Project as whole; cumulative effects considerations. Used in the court's exposition of cumulative & in‑combination effects.
WertInvest Hotelbetriebs GmbH v Magistrat der Stadt Wien (C‑575/21) Project as whole and EIA thresholds (recent CJEU authority). Applied to confirm project‑as‑a‑whole principles for thresholding.
Ecologistas en Acción‑CODA v Ayuntamiento de Madrid (C‑142/07) Geographical proximity, similarities and interactions relevant to project as a whole. Cited to explain factors relevant to determining whether sub‑projects are part of larger project.
Byrne v. Fingal County Council [2025] IEHC 204 Recent domestic case on EIA/project splitting. Referenced in connection with project‑as‑a‑whole principles.
R. (Wyatt) v Fareham Borough Council [2022] EWCA Civ 983 AA/EIA principles in UK appellate authority. Used in the EIA principles discussion.
H.A. v. Minister for Justice [2022] IECA 166 On the shift of onus where an error is demonstrated. Applied to explain that once an error is shown the onus shifts to other parties to show harmlessness.
Reid v. An Bord Pleanála (No.1) [2021] IEHC 230 Onus in EIA/AA challenges; need for evidence to demonstrate flaws. Used to support the court's articulation of applicants' evidential onus in EIA/AA challenges.
An Taisce v. An Bord Pleanála & Ors [2022] IESC 8 Onus and evidence in EIA/AA judicial review. Applied to reinforce the requirement that applicants must displace decision‑maker's conclusions with evidence.
Carrownagowan Concern Group v. An Bord Pleanála [2024] IEHC 300 Onus and evidential burden in environmental assessment challenges. Relied upon to show applicants must establish scientific/factual shortcomings by evidence.
Salmon Watch Ireland, Inland Fisheries Ireland, Sweetman & Ors. v. Aquaculture Licences Appeals Board [2024] IEHC 421 Onus to adduce evidence in environmental judicial review. Used to emphasize evidential requirements for applicants.
Minoa Ltd v. An Bord Pleanála [2024] IEHC 704 Onus to adduce evidence in environmental cases. Referenced in the court's survey of authorities requiring applicants to present admissible evidence.
Nagle View Turbine Aware Group v. An Bord Pleanála [2024] IEHC 603 Onus and evidence on noise/AM in EIA; similar failed points. Adopted as closely analogous authority — plaintiffs' claims on noise/AM previously failed for want of evidential foundation.
Eco Advocacy v. An Bord Pleanála [2025] IESCDET 74 Failure to displace decision‑maker's lawful conclusion (non‑precedential determination). Referenced to demonstrate that failure to adduce evidence to displace decision‑maker is fatal to challenge.
Joyce Kemper v. An Bord Pleanála [2020] IEHC 601 A mere assertion without evidence cannot discharge onus. Applied to dismiss complaints that were unparticularised and unsubstantiated.
Murphy v. An Bord Pleanála [2024] IEHC 59 Mere assertion does not create scientific doubt for AA purposes. Applied to the Applicants' shadow flicker and noise complaints.
Harrington v. An Bord Pleanála [2014] IEHC 232 Non‑expert assertions do not substitute for expert evidence. Used to underline that technical points require admissible expert evidence.
Duffy v. An Bord Pleanála [2024] IEHC 558 On proof required for scientific aspects of environmental assessment. Cited for consistency with requirement of evidential showing of shortcomings.
Massey v. An Bord Pleanála (No.2) [2025] IEHC 206 Project splitting and EIA; harmless error doctrine affirmed by Supreme Court (determination). Referenced for project‑splitting principles and harmless error doctrine; Supreme Court determination affirmed harmless error doctrine (cited).
Gemeinde Altrip and Others v Land Rheinland‑Pfalz (C‑72/12) Harmless error doctrine in EIA context. Applied at length to explain when procedural defects do not require quashing of decisions.
Walton v. Scottish Ministers [2012] UKSC 44 Harmless error doctrine. Used as authority for court's power to refuse to quash where error was harmless to outcome.
Canterbury City Council v. Secretary of State [2019] EWHC 1211 Harmless error analysis and court's assessment role. Adopted in explanation of harmless error approach.
R. (Hudson) v. Windsor and Maidenhead Royal Borough Council [2021] EWCA Civ 592 Harmless error and materiality tests in JR. Referenced in the discussion of harmlessness.
UH v. An tAire Talmhaíochta Bia agus Mara and Others (C‑64/20) — AG opinion (Bobek) Commentary on harmless error and procedural default (advocate general's view). Used to support harmless error jurisprudence cited by the court.
Commission v Ireland (Derrybrien Wind Farm) (C‑261/18) Where error would have had material effect, certiorari is normally required. Referenced to show that when an error would materially affect outcome, remedy is certiorari (exceptional approach to after‑the‑event assessments).
Independent Newspapers v. I.A. [2020] IECA 19 Discretionary remedies where domestic law breaches occur. Cited to note court's wider discretion in purely domestic law errors.
Frescati Estates v. Walker [1975] I.R. 177 Concepts around vexatious/unnecessary applications and property rights. Discussed as background for the argument that applications by those without property rights may be impermissible — court explained correct test involves whether intrusion into property rights is warranted by the common good.
Baile Eamoinn Teoranta v. An Bord Pleanála [2020] IEHC 642 Contextual statements about conceivability versus reasonableness in harmlessness inquiries. Used to explain the court's position that "any conceivable possibility" is not determinative; the court excludes unreasonable or remote possibilities.
Webster v. Meenacloghspar (Wind) Ltd [2025] IEHC 587 Procedural comment on modularisation risks. Referred to in the judgment's discussion of modularisation and parties' conduct between modules.
Fahybeg Windfarm Opposition Group v. An Bord Pleanála [2025] IEHC 310 On interpretation of conditions where one is a standard and another a fallback; approach to shadow flicker conditions. Applied in explaining harmonious reading of conditions 1 and 9 (standard and fallback) in the present decision.

Court's Reasoning and Analysis

The court set out a structured legal framework before addressing the pleaded grounds. Key elements of the court's approach included:

  • Restatement of core judicial review principles: JR examines legality not merits; evaluative planning judgments are generally for the decision‑maker and are reviewable only on limited grounds (irrationality, procedural unfairness, legal error).
  • Onus of proof: applicants bear the onus to demonstrate unlawfulness; where an error is established the onus may shift to opposing parties to show harmlessness. Allegations that depend on scientific or technical shortcomings generally require admissible expert evidence.
  • Reasons: the standard is that main reasons on main issues must be provided; reasons may be implicit, found in adopted inspector reports, and need not be discursive or submission‑by‑submission.
  • EIA/AA law: the court summarised EU law on EIA and Appropriate Assessment (AA), including project‑as‑a‑whole principles, cumulative/in‑combination effects, the standard that AA must dispel reasonable scientific doubt, and the Holohan principle that only an outline of alternatives and reasons for selection is required (not full assessment for each alternative).
  • Harmless error doctrine: the court reviewed EU and domestic authorities (including Altrip and related case law) and explained that a decision should not be quashed if an identified error was harmless (i.e., the court can exclude a reasonable possibility that the error affected the outcome), and that the court may receive evidence (including from developers) to assess harmlessness.

Applying those principles to the pleaded grounds, the court reached the following central analytical conclusions:

  • Core Ground 1 (landowner consent): The court analysed the applicants' contention that the Commission should have refused to deal with the application because of an absence of landowner consents for turbines said to be on certain land. The court accepted that, if relevant, the consent issue could be material but found that (a) the point may be academic in light of an amendment decision (section 146B) in the related proceedings which moved the turbines off the contested land (an outcome that would remove the live issue), and (b) the final disposition of the point should await Module II where the s.146B amendment and related matters would be determined. Accordingly, the challenge on this ground was dismissed subject to the outcome of Module II.
  • Core Ground 2 (noise, amplitude modulation, shadow flicker, reasoned consideration): The court treated most of the complaints as merits‑based and a "scattergun" attack on the planning judgment. The Commission had expressly considered submissions (and the inspector's report records consideration and site inspection); the Applicants had not discharged the evidential onus to show failure of consideration or scientific inadequacy. Claims about reliance on outdated guidance were countered by the Commission's acknowledgement that it had regard to the draft 2019 guidance as well as the 2006 guidelines. On shadow flicker and AM, the Court observed that the EIAR addressed these matters, the inspector analysed them and conditions and mitigation (including the developer's commitment to zero shadow flicker measures and requirement for monitoring/mitigation) were imposed. The complaint that the Commission failed to engage the HSE or third parties on responses was held to be unparticularised and effectively a merits complaint or an unlawful attempt to impose procedural obligations not required by EU law.
  • Core Ground 4 (inadequate plans/particulars for battery/substation/haul route): The court found the pleading was insufficiently particularised and did not identify a material shortcoming. The EIAR and annexes described the substation/battery and haul route provisions and the inspector had addressed these matters; in any event some components were identified as to be applied for subsequently and had been assessed cumulatively in the EIAR.
  • Core Ground 5 (EIA portal / public access to documents): The court held that the complaint conflated responsibilities — the Minister, not the Commission, bears responsibility for the central EIA portal under the domestic scheme; the Applicants had not joined the Minister and their pleadings lacked specifics about any prejudice arising from alleged non‑publication. The ground therefore failed on pleading and on the merits in relation to the Commission.
  • Core Ground 6 (EIA dimension of Core Ground 2): The Court treated this as derivative of Core Ground 2 and concluded that nothing additional was established by recasting the noise/shadow flicker complaint as an EIA breach; the same evidential deficiencies applied.
  • Core Ground 7 (project splitting): The court applied EU jurisprudence on the "project as a whole" and cumulative/in‑combination effects. It concluded that the EIAR had addressed cumulative effects and that the Applicants had not shown project‑splitting or a material omission in the EIA assessments.
  • Core Ground 8 (reasonable alternatives): The court cited Holohan and explained that the developer is required to supply an outline of the main alternatives and an indication of reasons for the choice. The court found that the EIAR and annexes contained adequate material on alternatives and that the Applicants had not discharged their evidential burden to show inadequacy.
  • Core Ground 8A / Validity Ground (regulations): The constitutional/validity challenge to article 214(1) of the Regulations (landowner consent requirement) was modularised to Module II and therefore not finally determined in Module I.

Holding and Implications

Holding: The court ordered that the proceedings be dismissed insofar as they concerned Module I (i.e. all grounds other than the balance of core grounds 1 and 8A). In the court's words, the proceedings were dismissed "insofar as concerns Module I (grounds other than the balance of core grounds 1 and 8A)".

Key implications and immediate effects:

  • Module I Disposal: Core Grounds 2, 4, 5, 6, 7 and 8 were dismissed for the reasons summarised above. Core Ground 3 was withdrawn by the Applicants. The court found that these grounds were either merits complaints, inadequately pleaded, or not supported by the required evidential material (especially expert evidence on technical/scientific matters).
  • Core Ground 1 and Core Ground 8A (Module II): Core Ground 1 (landowner consent) and the validity challenge to article 214(1) (Core Ground 8A) were modularised to Module II and will be decided in tandem with the related issues in the second set of proceedings (the s.146B amendment). The court expressly preserved and deferred those matters for the Module II hearing (scheduled for continued consideration and final disposition together with consequential directions).
  • Costs: The court made provisional directions on costs: subject to any contrary written legal submission in due course, there was to be no order as to the Applicants' costs in Module I, and the opposing parties' costs were reserved. The judgment clarified that any existing costs protection the Applicants had would not be diluted by the court's provisional approach and that further debate on costs would await the outcome of Module II.
  • No new precedential expansion on environmental law beyond applying established principles: The court applied established domestic and EU jurisprudence (including Holohan and Altrip jurisprudence on harmless error and EIA) but did not create new legal tests. The decision illustrates the court's insistence on evidential particularity for technical environmental complaints and on the utility of modularisation for complex planning litigation.

Final Disposition

ORDER:

  • The proceedings are dismissed as to Module I (all grounds other than the balance of core grounds 1 and 8A).
  • Core Ground 1 and Core Ground 8A are to proceed to Module II for final determination (the court referenced related proceedings and a section 146B amendment in that context).
  • Subject to any further written submissions on costs, there is to be no order as to the Applicants' costs for Module I and the costs of the opposing parties are reserved; perfection of the order is postponed pending outcome of the final module.

Note: This summary is strictly confined to the material and reasoning contained in the court's written judgment as provided. Where the judgment deferred or modularised issues, this summary records that procedural outcome and does not speculate on matters reserved for subsequent determination.

To access the original judgment, please Sign In or Subscribe.

Rural Residents Wind Aware and Environmental Group & Ors v An Coimisiun Pleanala & Ors (Approved)

Contains public sector information licensed under the Open Justice Licence v1.0.

Use AI to get other relevant cases.

Comments

Rural Residents Wind Aware and Environmental Group & Ors v An Coimisiun Pleanala & Ors (Approved)
(Nov 6, 2025)