  • Section 433(1)(a) of the Companies Act, 1956
  • The Insolvency and Bankruptcy Code (IBC)
  • The Companies Act, 1956
  • Section 5, Subsection 2 of the 1983 Income Tax Act
  • Section 9 of the IBC (Insolvency and Bankruptcy Code)
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Neutral Citations
2025 INSC 1410
Equivalent Citations
citation codes
Case Number
Disposition
Advocates
Judges
Acts
  • Section 433(1)(a) of the Companies Act, 1956
  • The Insolvency and Bankruptcy Code (IBC)
  • The Companies Act, 1956
  • Section 5, Subsection 2 of the 1983 Income Tax Act
  • Section 9 of the IBC (Insolvency and Bankruptcy Code)
Smart Summary

Factual and Procedural Background

M/s. Saraswati Wire and Cable Industries (the firm), a registered partnership and operational creditor, supplied pipes and cables on a running-account basis to Dhanlaxmi Electricals Private Limited (the corporate debtor, CD), a licensed engineering company executing contract works. The CD made payments from time to time against invoices raised by the firm.

On 31.07.2021, the firm emailed its ledger account to the CD for confirmation. In response, on 04.08.2021, the CD’s Accounts Manager pointed out three points of difference relating to two debit notes (₹6,490/- and ₹15,340/-) and one voucher (₹1,37,210/-), all from November 2018, and also sent the ledger account of the firm as maintained by the CD for 01.04.2017–01.04.2021. This ledger reflected a closing debit balance of ₹2,49,93,690.80 due to the firm. A subsequent ledger for 01.04.2020–30.03.2022 showed an opening balance of the same amount and recorded payments of ₹20 lakh each on 18.06.2020, 25.06.2020, 20.08.2020, and ₹10 lakh on 29.08.2020, leaving a closing debit balance of ₹1,79,93,690.80.

On 25.08.2021, the firm issued a demand notice under Section 8 of the Insolvency and Bankruptcy Code, 2016 (IBC), claiming ₹1,79,93,691/- as principal and ₹85,27,110/- as interest (total ₹2,65,20,800/-), supported by seven invoices dated between 29.05.2019 and 06.10.2019. After adjustment of payments, the claimed amount matched the debit balance in the CD’s ledger. In a reply dated 20.11.2021, the CD’s Technical Director disputed two invoices (Nos. 203 dated 29.09.2019 for ₹33,42,527/- and 205 dated 06.10.2019 for ₹23,81,417/-), alleging non-supply of goods against them, claiming that ₹50 lakh was paid as advance, and further alleging sub-standard and short supply of material, financial losses, and a client complaint with threat of blacklisting. He asserted counter-claims of ₹67,96,800/- (for 80 kilometres of faulty cable) and ₹50 lakh (for non-supply under Invoices 203 and 205).

By that time, however, a separate corporate insolvency resolution process (CIRP) had already been initiated against the CD by another operational creditor, M/s. Central Investigation and Security Services Limited, under an NCLT order dated 06.09.2021 in C.P.(IB)/244/MB-V/2020. An Interim Resolution Professional (IRP) had taken over management, and the CD’s directors, including the Technical Director, stood suspended. On 09.11.2021, the firm lodged its claim with this IRP. By letter dated 19.11.2021, the IRP stated that sub-standard and short supply of cables had been conveyed earlier by the CD’s email dated 24.12.2018, asked the firm to accept unspecified “debit charges” to process payment, but did not quantify them. The suspended Technical Director sent his separate reply to the Section 8 notice on 20.11.2021.

Subsequently, the IRP moved IA No. 2597 of 2021 under Section 12A of the IBC for withdrawal of C.P.(IB)/244/MB-V/2020 on the basis of a settlement with Central Investigation and Security Services Limited. By order dated 22.06.2023, the NCLT, Mumbai Bench-V, allowed the withdrawal. In the interim, on 10.02.2023—apparently after learning of the withdrawal application—the firm filed its own Section 9 application, C.P.(IB) No. 398/NCLT/MB/C-IV/2023, before the NCLT, Mumbai Bench-IV, seeking initiation of CIRP against the CD based on its operational debt.

The CD failed to file a reply in the firm’s company petition, and by order dated 11.09.2023, the NCLT forfeited its right to file a reply. On 06.12.2023, the NCLT admitted the firm’s Section 9 application, relying on the CD’s own ledger showing ₹1,79,93,690.80 as due and payable, and noting that the CD had paid ₹61 lakh to the firm after the Section 8 demand notice, which was treated as negating the existence of a pre-existing dispute.

The suspended director of the CD, Mohammad Moinuddin Khan, filed Company Appeal (AT) (Insolvency) No. 22 of 2024 before the National Company Law Appellate Tribunal (NCLAT), Principal Bench, New Delhi, under Section 61 of the IBC. By judgment dated 13.03.2024, the NCLAT allowed the appeal and set aside the NCLT’s admission, holding that there was a pre-existing dispute between the parties concerning the firm’s debt before the Section 9 application was filed. The NCLAT relied on 2018–2019 correspondence about alleged short supply and faulty cables and on the delay between the demand notice (25.08.2021) and the filing of the Section 9 application (10.02.2023) as indicating continuing disputes.

The firm appealed to the Supreme Court against the NCLAT’s judgment in Civil Appeal No. 12261 of 2024. The Supreme Court’s decision, delivered on 10.12.2025, resolves this challenge.

Legal Issues Presented

  1. Whether, on the facts, there existed a “pre-existing dispute” between the firm (operational creditor) and the corporate debtor, within the meaning of Section 8/9 of the IBC, sufficient to bar admission of the firm’s Section 9 application.
  2. Whether the defences raised on behalf of the corporate debtor—relating to non-supply under specific invoices, alleged sub-standard and short supply, and consequential losses—constituted a bona fide and substantial dispute or were merely “moonshine” or spurious defences under the legal standards laid down in Mobilox and related precedents.
  3. Whether the NCLAT erred in setting aside the NCLT’s order of admission by (a) misappreciating or overlooking material facts such as the CD’s ledger accounts and post-notice payments, (b) relying on an unauthorised reply by a suspended director, and (c) misattributing delay to the firm without considering the intervening CIRP.

Arguments of the Parties

Appellant – M/s. Saraswati Wire and Cable Industries (Operational Creditor)

  • The CD’s own ledger accounts (sent by email dated 04.08.2021 and covering 01.04.2017–01.04.2021 and 01.04.2020–30.03.2022) acknowledged a closing debit balance of ₹1,79,93,690.80 due and payable to the firm, after accounting for payments totalling ₹70 lakh in June–August 2020, indicating an undisputed operational debt.
  • After issuance of the Section 8 demand notice dated 25.08.2021, the CD continued to make payments aggregating ₹61 lakh towards the outstanding dues, behaviour inconsistent with the existence of any genuine pre-existing dispute or substantial counter-claims.
  • As to Invoice Nos. 203 and 205, the firm produced contemporaneous documentary evidence: a delivery challan dated 29.09.2019 and e-way bill for Invoice 203, reflecting the value of ₹33,42,527/-, and a tax invoice dated 06.10.2019 referring to Invoice 205 and a transport bill dated 06.10.2019 for delivery from Palghar to Uttar Pradesh, including the truck registration number and “full trailer” remark, to demonstrate that supplies were in fact made.
  • The alleged issues of short/faulty supply were unsupported by consistent or detailed quantification: an email dated 24.12.2018 did not specify actual short supply; a later email of 03.07.2019 mentioned approximately 20,000 meters of short supply, whereas replies in November 2021 alleged 80 kilometres without explanation for the escalation.
  • The alleged huge financial losses and threat of blacklisting from the client M/s. MSEDCL were not supported by any documentary material or explanation regarding quantification of the alleged counter-claim of ₹67,96,800/- for faulty cables.
  • The reply dated 20.11.2021 by the Technical Director was unauthorised because a CIRP against the CD had already commenced on 06.09.2021 and an IRP had taken over management, thereby suspending the authority of the directors to act for the CD.
  • The delay between the demand notice (25.08.2021) and the filing of the Section 9 application (10.02.2023) was attributable to the intervening CIRP initiated by another operational creditor, during which the firm correctly sought to file its claim before the IRP, and only moved under Section 9 after learning of the Section 12A withdrawal application in that CIRP; therefore, such delay could not be treated as indicative of unresolved disputes.

Respondents – Corporate Debtor and Suspended Director

  • In the reply dated 20.11.2021 to the Section 8 demand notice, the CD’s Technical Director disputed two invoices referred to in the notice: Invoice No. 203 dated 29.09.2019 for ₹33,42,527/- and Invoice No. 205 dated 06.10.2019 for ₹23,81,417/-, asserting that no supplies were made against these invoices and that ₹50 lakh had been paid as advance for them.
  • He alleged that the firm supplied sub-standard material and that there was short supply of cables, resulting in financial losses for the CD.
  • It was claimed that a client, M/s. MSEDCL, had made a complaint regarding the alleged sub-standard material and had threatened to blacklist the CD, contributing to the CD’s alleged losses.
  • The reply concluded with counter-claims of ₹67,96,800/- said to be for 80 kilometres of faulty cable, and ₹50 lakh said to be towards non-supply of material under Invoice Nos. 203 and 205.
  • The NCLAT placed reliance on earlier correspondence from 2018 and 2019 concerning short supply and faulty cables and emphasised the delay between the Section 8 notice (25.08.2021) and the Section 9 application (10.02.2023), treating it as indicative that disputes about the firm’s claim were subsisting.
  • In written submissions before the Supreme Court, an issue was raised for the first time regarding the maximum permissible weight that could have been loaded on the truck allegedly used to transport goods under the transport bill dated 06.10.2019, in an effort to cast doubt on the actual delivery of supplies under Invoice Nos. 203 and 205.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Mobilox Innovations Private Limited v. Kirusa Software Private Limited (2018) 1 SCC 353 The adjudicating authority under Section 9 of the IBC must determine: (i) whether there is an operational debt; (ii) whether evidence shows the debt is due and unpaid; and (iii) whether, on the date of receipt of the demand notice, there existed any dispute or any suit/arbitration in relation to such dispute. The authority should separate “grain from the chaff,” reject spurious defences which are mere bluster, need not evaluate if the defence is likely to succeed, and should not examine the merits in toto; as long as a dispute truly exists and is not spurious, hypothetical, or illusory, the application can be rejected. The Supreme Court applied this standard to assess the CD’s plea of pre-existing dispute and held that the CD’s defence was “mere moonshine” with no credible basis. It concluded that there was no dispute “worth the name” existing on the date of the demand notice to justify withholding payment of the operational debt, and thus the NCLAT erred in treating such a defence as a bar to admission.
Amalgamated Commercial Traders (P.) Ltd. v. A.C.K. Krishnaswami and another (1965) 35 Comp Cas 456 In the context of winding up under the Companies Act, 1956, a winding up petition is not a legitimate means to enforce payment of a debt that is bona fide disputed by the company. A petition presented ostensibly for winding up but actually to exert pressure is to be dismissed and may be characterised as a scandalous abuse of process. The Court invoked this principle, together with later decisions, to emphasise that only bona fide, substantial disputes can defeat a creditor’s petition. By analogy, in the IBC context, only genuine, non-moonshine disputes can bar a Section 9 application.
Madhusudan Gordhandas & Co. v. Madhu Woollen Industries Pvt. Ltd. (1971) 3 SCC 632 Cited as a decision following the principle that a winding up petition will not lie where the company’s dispute as to the creditor’s entitlement is bona fide and substantial, not a mere device to avoid payment. Referenced as part of the line of authorities reinforcing the requirement that a company’s defence must be genuine and not “mere moonshine,” a standard the Court transposed to evaluate alleged pre-existing disputes under the IBC.
Mediquip Systems (P) Ltd. v. Proxima Medical System Gmbh (2005) 7 SCC 42 Recognised for holding that, in winding up proceedings, the company’s defence must be substantial and not mere moonshine; if the debt is bona fide disputed, there is no “neglect to pay” within Section 433(1)(a) of the Companies Act, 1956, and a winding up petition would not lie. The Court cited this case, via IBA Health, to support the proposition that in insolvency-related proceedings, frivolous or insubstantial disputes cannot be relied upon to thwart creditor actions.
Vijay Industries v. NATL Technologies Limited (2009) 3 SCC 527 Cited as another decision following the principle that a winding up petition will be refused where the defence is bona fide and substantial, and that the remedy cannot be used as a tool of pressure when the debt is genuinely disputed. Used to reinforce the jurisprudential continuity from pre-IBC winding up law to the IBC regime: only genuine disputes can defeat a creditor’s move to initiate insolvency.
IBA Health (India) Private Limited v. Info-Drive Systems Sdn. Bhd. (2010) 10 SCC 553 Applying earlier cases (including Mediquip Systems), the Court held that the defence must be substantial and not moonshine; if a debt is bona fide disputed, there is no “neglect to pay” under Section 433(1)(a) of the Companies Act, 1956, and hence no basis for winding up. Invoked to underscore that the existence of a bona fide dispute is a jurisdictional bar to coercive insolvency-type remedies, and that spurious disputes should not be allowed to derail such proceedings—an approach carried into the IBC context.
Indus Biotech Private Limited v. Kotak India Venture (Offshore) Fund and others (2021) 6 SCC 436 In relation to Section 7 IBC applications by financial creditors, the adjudicating authority must: (i) examine the application and material placed by the financial creditor; (ii) record satisfaction whether there is a default; and (iii) take note of the corporate debtor’s contentions to determine whether there is substance in the defence. The Supreme Court relied on this to stress that the adjudicating authority must consider both creditor and debtor material, and assess whether the defence is substantive or merely a tactic to avoid or delay insolvency proceedings—a principle applied here to evaluate the CD’s “pre-existing dispute” defence.
Tata Consultancy Services Limited v. SK Wheels Private Limited, Resolution Professional, Vishal Ghisulal Jain (2022) 2 SCC 583 Reiterated that, in Section 7 IBC proceedings, the adjudicating authority is duty-bound to examine the creditor’s material indicating default alongside the corporate debtor’s version, so that the process—subject to strict timelines—cannot be defeated by moonshine defences raised merely to delay insolvency. The Court drew on this precedent to emphasise that adjudicating authorities in IBC matters must not allow unsubstantiated or illusory defences to derail or delay CIRP, and by parity of reasoning, concluded that the NCLAT erred in giving weight to the CD’s insubstantial “pre-existing dispute” claims.

Court's Reasoning and Analysis

The Supreme Court began by outlining the legal test from Mobilox and the pre-IBC winding up jurisprudence: when an operational creditor’s Section 9 application is considered, the adjudicating authority must verify the existence of an operational debt that is due and unpaid and determine whether, on the date of the demand notice, there existed a genuine dispute or pending suit/arbitration. Only bona fide, substantial disputes can bar admission; spurious, hypothetical, illusory, or “moonshine” defences must be rejected.

Applying these principles, the Court examined the factual matrix in detail:

  • Conduct of dealings and ledger accounts: Although there were exchanges in 2018–2019 concerning certain issues about the supplies, these did not disrupt the commercial relationship. The CD continued to receive supplies and make payments. Crucially, when the firm sought confirmation of its ledger by email dated 31.07.2021, the CD’s reply on 04.08.2021 raised only three minor issues (two debit notes and one voucher from November 2018) and, at the same time, sent its own signed ledger account showing a debit balance of ₹2,49,93,690.80. The subsequent ledger, reflecting payments totalling ₹70 lakh in June–August 2020, recorded a closing debit balance of ₹1,79,93,690.80. These documents, originating from the CD itself, clearly acknowledged a substantial sum due and payable to the firm.
  • Post-demand payments: It was an admitted fact that, even after the Section 8 demand notice (25.08.2021) and the replies in November 2021 (from the IRP and the suspended Technical Director), the CD paid a further ₹61 lakh to the firm. The Court reasoned that such post-notice payments were inconsistent with the existence of serious pre-existing disputes accompanied by counter-claims; had there been genuine disputes of the nature alleged, the CD would have been expected to withhold payment.
  • Effect of earlier CIRP and timing of Section 9 application: The Court highlighted that a separate CIRP against the CD had already been initiated on 06.09.2021 at the instance of another operational creditor, and an IRP had taken charge. As per procedure, the firm initially pursued its claim within that CIRP and only filed its own Section 9 application on 10.02.2023 after learning that a Section 12A withdrawal application had been filed in that earlier CIRP and before its final withdrawal order dated 22.06.2023. The Supreme Court held that the NCLAT had not been informed of these critical facts and wrongly treated the time gap between the demand notice and the Section 9 filing as indicative of continuing disputes. Properly viewed, the delay could not be held against the firm.
  • Authority and content of the Technical Director’s reply: By the time the Technical Director issued his reply on 20.11.2021 to the Section 8 notice, the CIRP had commenced, and an IRP had taken over the CD’s management, suspending the directors’ authority. The Court held that he had no authority to speak on behalf of the CD. Nonetheless, the NCLAT concentrated heavily on this unauthorised reply, rather than on the CD’s own ledger and authorised communications, thereby giving undue weight to that document.
  • Scrutiny of the alleged disputes:
    • Non-supply under Invoice Nos. 203 and 205: The Court noted that the firm had produced contemporaneous documents: a delivery challan dated 29.09.2019 and an e-way bill showing goods worth ₹33,42,527/- for Invoice 203, and a tax invoice dated 06.10.2019 referencing Invoice 205 with a transport bill from Palghar to Uttar Pradesh, including the truck registration number and a “full trailer” remark. A new argument, raised only in written submissions, questioned whether the truck could carry the weight of both consignments. The Court observed that the “full trailer” entry reasonably explained the supposed discrepancy and found it implausible that the firm would have fabricated all such documents in 2019 in anticipation of future litigation. It concluded that, prima facie, the CD’s plea that no supplies were made under these invoices could not be accepted.
    • Short/faulty supply of cables: The Court examined the CD’s own emails and replies. The email dated 24.12.2018 did not specify any clear quantum of short supply; a later email dated 03.07.2019 mentioned approximately 20,000 meters of short supply, while the November 2021 replies claimed 80 kilometres of short or faulty supply. No explanation was offered for this drastic escalation. There was also no detail about the amounts to be deducted from the firm’s bills for such allegedly insufficient or faulty cables. The Court treated this inconsistency and lack of quantification as undermining the credibility of the alleged dispute.
    • Alleged huge losses and threat of blacklisting: The CD produced no supporting material regarding the alleged complaint by M/s. MSEDCL, the threat of blacklisting, or how the claimed counter-claim amount of ₹67,96,800/- for faulty cables had been calculated. The Court emphasised the absence of explanation for how these figures were arrived at.
  • Failure to contest before NCLT: The CD did not file any reply to the firm’s Section 9 petition before the NCLT, and its right to do so was forfeited by order dated 11.09.2023. The Court remarked that this failure “speaks for itself,” indicating a lack of substantive contest at the adjudicatory stage.
  • Application of “moonshine defence” doctrine: Drawing from Mobilox, the pre-IBC winding up cases, Indus Biotech, and Tata Consultancy Services, the Court reiterated that adjudicating authorities must reject moonshine, illusory, or blusterous defences and cannot allow corporate debtors to delay CIRP by raising insubstantial disputes. It emphasised the need to consider both creditor and debtor materials critically and to record a reasoned satisfaction on default and the existence of any genuine dispute.

On this analysis, the Supreme Court concluded that the corporate debtor’s attempt to project a pre-existing dispute was unsupported by credible evidence, inconsistent in its assertions, and contradicted by its own ledger and payment conduct. The defence was therefore characterised as “mere moonshine” and “mere bluster,” insufficient to non-suit the operational creditor under Section 9 of the IBC.

The Court held that the NCLAT had overlooked critical facts—particularly the CD’s own ledger accounts, the post-demand payments of ₹61 lakh, the limited and minor nature of the issues raised in August 2021, and the intervening CIRP—and had placed undue reliance on an unauthorised reply by the suspended Technical Director. Consequently, the NCLAT’s finding of a pre-existing dispute was legally unsustainable.

Holding and Implications

Holding: The Supreme Court set aside the NCLAT’s judgment dated 13.03.2024 and restored the NCLT, Mumbai Bench-IV’s order dated 06.12.2023 admitting the firm’s Section 9 application, C.P.(IB) No. 398/NCLT/MB/C-IV/2023. It directed that further proceedings in the company petition should continue in accordance with law and due procedure from the date of communication of the judgment. The appeal was allowed, and the parties were directed to bear their own costs.

Implications: The immediate consequence is that the CIRP against Dhanlaxmi Electricals Private Limited, initiated on the firm’s Section 9 application, stands revived and will proceed under the IBC framework. The corporate debtor remains subject to insolvency resolution proceedings based on the acknowledged operational debt. The judgment reinforces, within the existing jurisprudential framework, that:

  • Alleged “pre-existing disputes” must be bona fide, substantiated, and consistent; moonshine or illusory defences, especially those contradicted by the debtor’s own records and conduct, cannot defeat a Section 9 application.
  • Adjudicating and appellate authorities must attach due weight to the corporate debtor’s own contemporaneous documents (such as ledger accounts and payment records) and must be cautious in relying on unauthorised communications from suspended management during CIRP.

The opinion applies and consolidates established principles rather than creating a new legal doctrine; its primary effect lies in its factual application of the “moonshine defence” standard to operational creditor-initiated CIRP.

To access the original judgment, please Sign In or Subscribe.

    M/S SARASWATI WIRE AND CABLE INDUSTRIES v. MOHAMMAD MOINUDDIN KHAN

    2025 INSC 1410

    1

    Non-reportable

    IN THE SUPREME COURT OF INDIA

    CIVIL APPELLATE JURISDICTION

    CIVIL APPEAL NO. 12261 OF 2024

    M/s. Saraswati Wire and Cable Industries … Appellant versus

    Mohammad Moinuddin Khan and others … Respondents

    J U D G M E N T

    SANJAY KUMAR, J

    1. Initiation of corporate insolvency resolution process1by an operational creditor under Section 9 of the Insolvency and Bankruptcy Code, 20162, is in issue. By order dated 06.12.2023, the National Company Law Tribunal, Mumbai Bench-IV3, admitted C.P.(IB)No. 398/NCLT/MB/C-IV/2023 filed by a registered partnership firm, viz., M/s. Saraswati Wire and Cable Industries4, under Section 9 of the IBC and initiated the CIRP against Dhanlaxmi Electricals Private Limited, the

    1 For short, 'CIRP'

    2 For short, 'the IBC'

    3 For short, 'the NCLT'

    4 For short, 'the firm'

    1

    2

    corporate debtor5, by appointing an Interim Resolution Professional. Aggrieved thereby, Mohammad Moinuddin Khan, a suspended director of the CD, filed Company Appeal (AT) (Insolvency) No. 22 of 2024 before the National Company Law Appellate Tribunal, Principal Bench6, New Delhi, under Section 61 of the IBC. By judgment dated 13.03.2024, the NCLAT allowed the said appeal and set aside the order of admission passed by the NCLT on the ground that there was a pre-existing dispute between the parties as to the firm's debt prior to institution of the application under Section 9 of the IBC. Hence, this appeal by the firm.

    2. The CD is a licensed engineering company that carries out works on contract basis. It placed purchase orders on the firm for supply of pipes and cables for its projects. The CD maintained a running account and used to make payments to the firm on the strength of the invoices raised by it from time to time. While so, the firm communicated its ledger account to the CD under email dated 31.07.2021 and sought confirmation thereof. In response, the CD addressed email dated 04.08.2021, through its Accounts Manager, informing the firm of three points of difference in the account maintained by it when compared with the ledger account sent by the firm. The points of difference were in relation to two debit notes of ₹6,490/- and ₹15,340/- respectively and a voucher of ₹1,37,210/-. All three

    5 For short, 'the CD'

    6 For short, 'the NCLAT'

    3

    pertained to November, 2018. The ledger account of the firm maintained by the CD from 01.04.2017 to 01.04.2021 was communicated by the CD under its email dated 04.08.2021. A closing debit balance was shown therein of ₹2,49,93,690.80, i.e., the sum due and payable to the firm. The ledger account of the firm maintained by the CD from 01.04.2020 to 30.03.2022 is also placed on record and it reflects an opening balance of ₹2,49,93,690.80, i.e., the closing balance of the earlier account. Three payments of ₹20 lakh each were made to the firm on 18.06.2020, 25.06.2020 and 20.08.2020 respectively and, thereafter, payment of ₹10 lakh was made on 29.08.2020, resulting in a closing debit balance of ₹1,79,93,690.80.

    3. On 25.08.2021, the firm issued a demand notice under Section 8 of the IBC claiming the aforestated principal amount of ₹1,79,93,691/- along with interest thereon, quantified at ₹85,27,110/-, aggregating to ₹2,65,20,800/-. Seven invoices, from 29.05.2019 to 06.10.2019, found mention therein and the amount payable thereunder added up to ₹2,07,69,341/-. After adjusting the amounts paid, the claimed amount tallied with the debit balance shown by the CD in its ledger account pertaining to the firm. However, in his reply dated 20.11.2021 to this demand notice, the Technical Director of the CD raised an issue with regard to two invoices that found mention in the demand notice, i.e., Invoice No. 203 dated 29.09.2019 for a sum of ₹33,42,527/- and Invoice

    4

    No. 205 dated 06.10.2019 for a sum of ₹23,81,417/-. According to him, no supplies were made as against these two invoices, but a sum of ₹50 lakh was stated to have been paid as advance against them. It was further stated that the material supplied by the firm was sub-standard and there was also an issue of short supply. He stated that the CD had incurred financial losses owing to the sub-standard material supplied by the firm and a complaint was also made in that regard by a client, M/s. MSEDCL, under threat of blacklisting the CD. The reply ended with counter-claims for a sum of ₹67,96,800/- for 80 kilometres of faulty cable and ₹50 lakh towards non-supply of material under Invoice Nos. 203 and 205.

    4. At this stage, we may note certain crucial facts: A separate CIRP had already been initiated against the CD, vide order dated 06.09.2021 passed in C.P.(IB)/244/MB-V/2020, an application filed under Section 9 of the IBC by M/s. Central Investigation and Security Services Limited, another operational creditor. Therefore, at the time the reply was furnished by the Technical Director of the CD to the firm's demand notice, that CIRP against the CD had commenced and an Interim Resolution Professional had taken over its management. In such a situation, the Technical Director of the CD, who stood suspended, had no authority to reply on its behalf. Further, it is an admitted fact that, even after issuance of the demand notice by the firm under Section 8 of the IBC, the CD continued to make payments to the firm and, in all, a sum of ₹61 lakh was paid.

    5

    5. Upon initiation of the CIRP against the CD, the firm submitted its claim before the Interim Resolution Professional on 09.11.2021. In reply, the Interim Resolution Professional addressed letter dated 19.11.2021 stating that the firm had supplied sub-standard cables and there was also short supply, as was conveyed under the CD's email dated 24.12.2018. The firm was, therefore, requested to accept the debit charges in order to process the payment further. The debit charges were, however, not detailed. Significantly, it was one day later that the suspended Technical Director of the CD separately sent his reply, i.e., on 20.11.2021.

    6. While so, IA No. 2597 of 2021 was filed by the said Interim Resolution Professional under Section 12A of the IBC seeking withdrawal of C.P.(IB)/244(MB)2020 in view of a settlement with Central Investigation and Security Services Limited. The application was allowed by the National Company Law Tribunal, Mumbai Bench-V, vide order dated 22.06.2023. Perhaps having come to know of the filing of the withdrawal application, the firm instituted its own application under Section 9 of the IBC, i.e., C.P.(IB) No. 398/NCLT/MB/C-IV/2023, before the NCLT on 10.02.2023. Admittedly, the CD failed to file its reply in the company petition and its right to do so stood forfeited, vide order dated 11.09.2023 passed by the NCLT. This failure on the part of the CD speaks for itself. On 06.12.2023, the NCLT admitted the firm's application under Section 9 of the IBC. Reliance was placed on the ledger account maintained by the

    6

    CD itself, which showed that ₹1,79,93,690.80 was due and payable to the firm. The NCLT also noted the fact that the CD had paid ₹61 lakh towards the firm's outstanding dues after issuance of the demand notice under Section 8 of the IBC, which clearly negated a pre-existing dispute.

    7. However, on appeal by the suspended director of the CD, the NCLAT accepted the plea that there was a pre-existing dispute, warranting dismissal of the firm's application under Section 9 of the IBC. Reference, in that regard, was made to the correspondence between the firm and the CD in the years 2018 and 2019. Apropos Invoice Nos. 203 and 205, the NCLAT was of the opinion that was only one facet of the dispute, as there was also an issue with regard to short supply and faulty cables. Further, the NCLAT laid much stress upon the fact that the firm issued a demand notice under Section 8 of the IBC on 25.08.2021 but did not choose to file its application under Section 9 of the IBC till 10.02.2023. According to the NCLAT, this delay on its part was a clear indication that disputes persisted between the parties regarding the claim put forth by the firm.

    8. Surprisingly, the NCLAT seems to have been kept in the dark about a separate CIRP having been initiated against the CD, vide order dated 06.09.2021, and the fact that there was no possibility of the firm initiating its own CIRP at that stage. As per procedure, the firm attempted to lodge its claim with the Interim Resolution Professional appointed in that CIRP and it was only upon coming to know of the filing of a withdrawal

    7

    application in that CIRP that the firm filed its own application under Section 9 of the IBC. The delay on its part, therefore, could not be held against it.

    9. Further, we find that though there were some exchanges between the parties in the years 2018 and 2019 on some issues regarding the supply of pipes and cables made by the firm, the same did not have the effect of stopping further supplies or further payments. This is clear from the ledger account of the firm maintained by the CD itself, which manifests continuous payments being made to the firm during the course of and even after the exchange of such correspondence. It is also an admitted fact that, after issuance of the demand notice under Section 8 of the IBC and the replies thereto both by the former Interim Resolution Professional as well as the suspended Technical Director of the CD in November, 2021, a sum of ₹61 lakh was paid to the firm, which would not have been the case if there were pre-existing disputes, giving rise to counter claims by the CD, as the CD would have then withheld such payment.

    10. More importantly, having received the ledger account forwarded by the firm for confirmation, with its email dated 04.08.2021, the CD raised only three issues, i.e., vis-à-vis two debit notes and one voucher, and forwarded by email its own ledger account, signed on 04.08.2021, certifying that the debit balance stood at ₹2,49,93,690.80. The later account took note of the payments of ₹70 lakh made during June and August, 2020, and closed with a debit balance of ₹1,79,93,690.80.

    8

    11. These documents ought not to have been brushed aside lightly by the NCLAT while concentrating on the reply dated 20.11.2021 addressed to the firm by the suspended Technical Director of the CD. As already noted hereinbefore, he stood suspended as on that date and had no authority to address that reply on its behalf. Further, the issues sought to be raised by him were on three counts: i) that no supplies had been made against Invoice No. 203 dated 29.09.2019 and Invoice No. 205 dated 06.10.2019; ii) that there was short/faulty supply of cable by the firm as was conveyed under email dated 24.12.2018 ( no details were mentioned as to the amounts to be deducted from the bills of the firm for the insufficient/faulty cables); and iii) that due to the sub-standard material supplied by the firm, the CD incurred huge financial losses and was also put under the threat of being blacklisted by its client, M/s. MSEDCL.

    12. As regards, the first issue of non-supply of material against Invoice Nos. 203 and 205, the firm placed on record Delivery Challan dated 29.09.2019 in relation to Invoice No. 203 along with the e-way bill pertaining thereto. The value of the goods delivered thereunder was shown in the e-way bill as ₹33,42,527/-. As regards Invoice No. 205, the firm produced tax invoice dated 06.10.2019, mentioning Invoice No. 205 dated 06.10.2019, indicating that the delivery of the goods was to be made to the CD at Uttar Pradesh. The transport bill dated 06.10.2019 in relation to the supply of pipes under Invoice No. 205 from Palghar to Uttar

    9

    Pradesh, duly indicating the registration number of the truck in which the pipes were loaded, is also produced. An issue is sought to be raised by the CD for the first time, by way of the written submissions now filed, as to the maximum weight that could be loaded in the truck, which seems to have been used to transport both consignments, but the transport bill dated 06.10.2019 reflects the entry 'full trailer' in the remarks column, which explains the so-called discrepancy sought to be projected by the CD at this belated stage. Further, it is hardly believable that the firm would have cooked up all these documents in the year 2019 in anticipation of this litigation years later. Thus, the plea of the CD that no supplies were made against these two invoices, prima facie, cannot be accepted.

    13. As regards the issue of short/faulty supply of cables, it may be noted that under the CD's email dated 24.12.2018, there was no clear mention of the actual short supply, but a later email dated 03.07.2019 indicated that the short supply was approximately 20,000 meters. Thereafter, in the replies issued in November 2021, the short/faulty supply was shown as 80 kilometres. No explanation is forthcoming from the CD as to how this inflated figure was arrived at.

    14. As regards the issue of suffering huge losses due to substandard quality of the material supplied by the firm, resulting in a complaint from a client coupled with a threat of blacklisting, the CD did not place any material or document in support thereof. Further, there is no explanation

    10

    as to how the suspended Technical Director of the CD increased the length of the faulty cables allegedly supplied by the firm to 80 kilometres or how he quantified the counter claim at ₹67,96,800/- in that regard.

    15. This being the factual scenario, we may now note the settled legal position on the issue. In Mobilox Innovations Private Limited v. Kirusa Software Private Limited7, this Court held that the adjudicating authority dealing with an application filed under Section 9 of the IBC is required to determine whether there is an operational debt; whether evidence has been furnished to show that the said debt was due and payable but had not been paid; and whether there was any dispute in existence between the parties or any suit or arbitration was pending in relation to such dispute on the date of receipt of the demand notice of the unpaid operational debt. It was further observed that it would be important to separate the grain from the chaff and to reject a spurious defence which was mere bluster and that, while doing so, the Court did not need to be satisfied that the defence was even likely to succeed. It was clarified that, at that stage, the Court would not examine the merits of the dispute in toto and as long as the dispute truly existed in fact and was not spurious, hypothetical or illusory, the adjudicating authority would be entitled to reject the application.

    7 (2018) 1 SCC 353

    11

    16. Even in the pre-IBC era, in the context of a defence of a pre-existing dispute in a creditor's petition for winding up of a company in the regime obtaining under the Companies Act, 1956, this Court always stressed upon a dispute as to the entitlement of the creditor being a bonafide one and not mere moonshine. In Amalgamated Commercial Traders (P.) Ltd. v. A.C.K. Krishnaswami and another8, a 3-Judge Bench of this Court held that a winding up petition is not a legitimate means of seeking to enforce payment of a debt which is bonafide disputed by the company and a petition presented ostensibly for a winding up order but really to exercise pressure would be dismissed, and under circumstances may be stigmatized as a scandalous abuse of the process of the Court. This principle was followed thereafter in Madhusudan Gordhandas & Co. v. Madhu Woollen Industries Pvt. Ltd.9, Mediquip Systems (P) Ltd. v. Proxima Medical System Gmbh10and again in Vijay Industries v. NATL Technologies Limited11. Applying the same principle in IBA Health (India) Private Limited v. Info-Drive Systems Sdn. Bhd.12, this Court observed that, in Mediquip Systems (P) Ltd. (supra), it was held that the defence must be substantial and not mere moonshine and held that if the debt is bonafide disputed, there cannot be 'neglect to pay' within

    8 (1965) 35 Comp Cas 456

    9 (19 71) 3 SCC 632

    10 (2005) 7 SCC 42

    11 (2009) 3 SCC 527

    12 (2010) 10 SCC 553

    12

    the meaning of Section 433(1)(a) of the Companies Act, 1956, and the petition for winding up would not lie.

    17. Coming back to the IBC regime, in Indus Biotech Private Limited v. Kotak India Venture (Offshore) Fund and others13, while dealing with a financial creditor's application under Section 7 of the IBC, a 3-Judge Bench of this Court observed that the adjudicating authority has a duty to advert to the contentions put forth in the application, examine the material placed before it by the financial creditor and record satisfaction as to whether there is default or not. It was further observed that, while doing so, the contention put forth by the corporate debtor shall also be noted to determine as to whether there is substance in the defence and to arrive at the conclusion whether there is default.

    18. Referring to the aforestated decision in Tata Consultancy Services Limited vs. SK Wheels Private Limited, Resolution Professional, Vishal Ghisulal Jain14, this Court reiterated that the adjudicating authority is duty-bound to advert to the material before him, as made available along with the application filed under Section 7 of the IBC by the financial creditor to indicate default along with the version of the corporate debtor. It was noted that this is for the reason that, keeping in perspective the scope of the proceedings under the IBC and there being a timeline for the

    13 (2021) 6 SCC 436

    14 (2022) 2 SCC 583

    13

    consideration to be made by the adjudicating authority, the process cannot be defeated by a corporate debtor by raising moonshine defence only to delay the process. Therefore, per this Court, the adjudicating authority must advert to the contentions put forth on the application filed under Section 7 of the IBC, examine the material placed before it by the financial creditor and record satisfaction as to whether there is default or not and, while doing so, the contention put forth by the corporate debtor shall also be noted to determine as to whether there is substance in the defence and to arrive at the conclusion whether there is default.

    19. Applying this legal standard to the case on hand we have no hesitation in holding that the defence of pre-existing disputes sought to be put forth by the CD was mere moonshine and had no credible basis or foundation. There was no dispute worth the name existing as on the date of issuance of the demand notice by the firm warranting the withholding of the operational debt due and payable by the CD. The attempt to project such pre-existing disputes was mere bluster and did not have the effect of non-suiting the firm.

    20. The NCLAT, however, lost sight of these critical facts while dislodging the order of admission passed by the NCLT on the application filed by the firm under Section 9 of the IBC. The NCLAT, not being informed of the full facts, attributed delay to the firm and failed to attach value and consequence to the CD's own ledger account which clearly

    14

    negated the claim of pre-existing disputes, as the minor issues raised by the CD obviously did not have the effect of either stopping further supplies by the firm or further payments to the firm by the CD. The NCLAT also failed to attach requisite importance to the email dated 04.08.2021 sent by the CD along with the said ledger account, that clearly evidenced that more than the threshold amount was due and payable to the firm even after adjustment of the amounts mentioned in the debit notes and voucher.

    21. The judgment dated 13.03.2024 passed by the National Company Law Appellate Tribunal, Principal Bench, New Delhi, is accordingly set aside and the order of admission dated 06.12.2023 passed by the National Company Law Tribunal, Mumbai Bench-IV, in C.P.(IB)No. 398/NCLT/MB/C-IV/2023, is restored. Further proceedings in the said company petition shall be initiated in accordance with law and due procedure from the date of communication of this judgment. The appeal is allowed in the aforestated terms.

    Parties shall bear their respective costs.

    ..............................., J.

    [SANJAY KUMAR]

    ..............................., J.

    [ALOK ARADHE]

    December 10, 2025 New Delhi.

    Use AI to get other relevant cases.

    Comments

    M/S SARASWATI WIRE AND CABLE INDUSTRIES v. MOHAMMAD MOINUDDIN KHAN
    (Dec 10, 2025)