Factual and Procedural Background

The complainants, Mr. Devanshu Bhatt and Mrs. Ruchi Gupta, booked Flat No. C-161 on the 16th floor in "Raheja Revanta", Sector-78, Gurugram, developed by M/s Raheja Developers Ltd. The sale agreement was executed on 27.12.2012 for a total cost of ₹1,36,89,449, with possession promised within 48 months plus a 6-month grace period (by mid-2017). The complainants paid ₹1,29,64,869 (95% of the total cost), partly financed by a loan from ICICI Bank. The Opposite Party (OP) failed to deliver possession within the stipulated timeline, citing reasons including presence of high-tension lines and lack of governmental approvals. The OP also issued demand notices despite the project’s incomplete status and advertised timely possession without requisite approvals. The complainants sent a legal notice on 17.07.2017 demanding a refund with interest, which was not replied to, leading to the filing of this consumer complaint seeking refund with interest, compensation for unfair trade practices and deficiency in service, and litigation costs.

The OP contested the complaint, denying consumer status of the complainants, invoking an arbitration clause, and claiming the complaint was time-barred. They admitted delay but attributed it to force majeure and governmental delays, denied unfair trade practices, and justified demand notices. They asserted the complainants defaulted on payments and that the allotment cancellation was justified. The complainants filed a rejoinder reiterating their claims.

Legal Issues Presented

  1. Whether the cancellation of allotment by the Opposite Party on 03.05.2017 was tenable.
  2. Whether the OP's failure to deliver possession within the agreed timeframe constitutes deficiency in service under the Consumer Protection Act.
  3. Whether the reasons cited for delay (high-tension lines, delayed approvals, government non-performance) absolve the OP of liability.
  4. Whether the OP’s demand for additional payments despite delays or failure to provide possession amounts to unfair trade practices.
  5. Whether the grounds relied upon by the OP constitute force majeure and whether the OP substantiated these claims with evidence.
  6. Whether the complainants are entitled to refund with interest or compensation for delay.

Arguments of the Parties

Complainants' Arguments

  • The complainants fall within the definition of "consumer" as original allottees of a residential flat.
  • They entered into a binding Agreement to Sale and paid substantial amounts, including bank loans.
  • The OP failed to deliver possession within the agreed time, citing invalid reasons like high-tension lines and delayed approvals.
  • The OP’s actions constitute unfair trade practices and gross deficiency in service.
  • The Agreement to Sale is biased in favor of the OP, giving them undue discretion.
  • They seek refund with interest at 9% and compensation for unfair trade practices and deficiency in service.
  • They relied on precedents including Nidhi Tamrakar & Ors. vs. Raheja Developers Ltd., Kavita Ahuja vs. Shipra Estate Ltd., and DLF Universal Ltd. vs Nirmala Devi Gupta.

Opposite Party's Arguments

  • The complainants are not "consumers" under the Act as the flat was booked for commercial investment.
  • The agreement contains an arbitration clause barring consumer forum jurisdiction.
  • The claim is time-barred under the Consumer Protection Act.
  • The agreement terms were mutually agreed and cannot be challenged now.
  • The reliefs sought exceed the forum’s jurisdiction.
  • Delay is due to unavoidable circumstances including shifting of high-tension lines and governmental delays.
  • Construction was 75% complete with the 16th floor finished within the agreed period.
  • The complainants defaulted on payments, justifying allotment cancellation.
  • The OP is not liable for delays caused by government agencies.
  • They relied on precedents including Consumer Unity & Trust Society vs. Bank of Baroda, BB. Patel & Ors. vs. DLF Universal Ltd., Mukesh Sharma vs. State of Haryana, and Prateek Realtors Pvt. Ltd. vs. Vivek Kumar Gupta.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Emmar MGF Land Ltd. & Ors. Vs. Amit Puri, II 2015 CPJ 568 (NC) Right of buyers to seek refund with interest and compensation if possession is delayed beyond agreed date. Applied to affirm complainants’ right to refund and compensation for delay in possession.
Pioneer Urban Land & Infrastructure Ltd. Vs. Govindan Raghvan, 2019 CPJ 34 (SC) Builders’ failure to obtain Occupancy Certificate and offer possession within reasonable time entitles buyer to refund with interest. Held OP liable for refund with interest as possession was not timely delivered.
Ireo Grace Realtech Pvt. Ltd. Vs. Abhishek Khanna & Ors., I (2021) CPJ 60 (SC) Delay compensation clauses offering inadequate amounts are not binding; buyers entitled to adequate compensation. Rejected OP’s claim of limited compensation as inadequate and unfair.
Amitava Shankar Guha Vs. Emaar MGF Land Ltd., IV (2019) CPJ 522 (NC) 8% simple interest awarded as reasonable compensation for delay in possession. Followed for awarding 8% interest in the present case.
Experion Developers Pvt. Ltd. Vs. Sushma Ashok Shiroor, Civil Appeal No.6044 of 2019 Interest on refund must be paid from the date of deposit to be restitutionary and compensatory. Directed interest from dates of deposit at 9% per annum; upheld interest rate as fair.
DLF Homes Panchkula Pvt. Ltd. Vs. D.S. Dhanda, CA Nos. 4910-4941 of 2019 Multiple compensations for a singular deficiency are not justifiable; one-sided clauses favoring developers are unfair trade practices. Applied to hold the Agreement’s one-sided clauses unenforceable and to restrict compensation claims.
Sanjay Manidhar & Anr. vs. M/s Emaar MGF Land Ltd., CC 3525 of 2017 Delays due to governmental infrastructure and external development are not force majeure excuses absolving developers. Rejected OP’s force majeure plea based on governmental delays, holding OP liable for delay.

Court's Reasoning and Analysis

The court examined the pleadings, documents, and arguments of both parties. It found that the OP failed to deliver possession within the agreed period despite receiving 95% of the payment. The OP’s reasons for delay, including high-tension lines and governmental delays, were held insufficient to absolve liability, as these do not qualify as force majeure under established precedents. The cancellation of allotment by the OP was also found unjustified, as no substantive proof of complainants’ default was presented.

The court noted that the Agreement contained one-sided clauses favoring the OP, which are unenforceable and constitute unfair trade practices. Delay compensation stipulated in the Agreement was deemed inadequate. Following judicial precedents, the court awarded a reasonable interest rate of 9% per annum on amounts paid from the respective dates of deposit until realization, with a penal rate of 12% in case of delayed refund. The court also awarded litigation costs to the complainants.

Holding and Implications

CC No. 2451 of 2017 is partly allowed. The Opposite Party is directed to refund ₹1,29,64,869/- to the complainants with simple interest at 9% per annum from the respective dates of deposit until full realization, within one month of the order. In case of delay, interest shall accrue at 12% per annum. The OP is also directed to pay ₹50,000 as litigation costs. All pending applications stand disposed of.

The decision directly affects the parties by mandating refund and interest, reinforcing the principle that developers are liable for delays not attributable to force majeure and that one-sided contractual terms favoring developers are unenforceable. No new precedent was established beyond applying extant jurisprudence.

To access the original judgment, please Sign In or Subscribe.

    DEVANSHU BHATT & ANR. v. M/S. RAHEJA DEVELOPERS LTD.

    NATIONAL CONSUMER DISPUTES REDRESSAL COMMISSION

    NEW DELHI

    CONSUMER CASE NO. 2451 OF 2017

    1. DEVANSHU BHATT & ANR. S/O KAMLAPATI BHATT R/O FLAT NO.I-1005, PARK VIEW ANANDA, SECTOR-81,

    GURUGRAM

    HARYANA

    2. RUCHI GUPTA

    W/O DEVANSHU BHATT R/O FLAT NO.I-1005, PARK VIEW ANANDA , SECTOR-81

    GURUGRAM

    HARYANA ...........Complainant(s) Versus

    1. M/S. RAHEJA DEVELOPERS LTD.

    THROUGH MR. NAYAN RAHEJA, EXECUTIVE

    DIRECTOR REGISTERED OFFICE W4D, 204/5

    KESHAV KUNJ, CARIPPA MARG, WESTERN

    AVENUE, SAINIK FARMS

    NEW DELHI-110062 DELHI ...........Opp.Party(s)

    BEFORE:

    HON'BLE MR. SUBHASH CHANDRA,PRESIDING MEMBER HON'BLE AVM J. RAJENDRA, AVSM VSM (Retd.),MEMBER

    FOR THE COMPLAINANT : FOR COMPLAINANTS : MR.SIDDHARTH SHUKLA,

    ADVOCATE (THROUGH VC)

    FOR THE OPP. PARTY : FOR OPPOSITE PARTY : MR. SIDDHARTH

    BANTHIA, ADVOCATE

    MR. SARIM KHAN, ADVOCATE

    Dated : 23 January 2025

    ORDER

    AVM J. RAJENDRA, AVSM VSM (Retd.), MEMBER

    1. The present Consumer Complaint has been filed under Section 21 (a) (i) of the Consumer Protection Act, 1986 (for short "the Act") against the Opposite Party seeking to direct the OP:

    (i). Pass an order directing the Opposite Party, its agents, assigns and/or any person

    1

    purporting to act in its behalf to refund the amount Rs.1,29,64,869/- paid by the Complainant for the Apartment in pursuance of the Agreement to Sale dated 27.12.2012 along with 18% interest from the date of deposit of each installment till the date of realization by the Complainants.

    (ii) Pass an interim relief/order directing the Opposite Party, its agents, assigns and/or any person purporting to act in its behalf herein to deposit the amount Rs. 1,29,64,859 paid by the Complainant for the Apartment in pursuance of the Agreement to Sale dated 27.12.2012 with the Hon'ble Forum so as to secure the rights of the complainants.

    (iii) Pass an order directing the Opposite Party to pay a sum of Rs.10,00,000/- to Complainant towards compensation for 'unfair trade practices' and 'deficiency in service' done by the Opposite Party which has caused physical and mental torture, agony, discomfort and undue hardship to the complainant and a sum of Rs.5,00,000/-to Complainant towards Litigation Cost.

    (iv) Pass any other further order(s) as this Hon'ble Court may deem fit and proper in the facts and circumstances of the case and in the interest of justice.

    2. Brief facts of the case, as per the complainants, are that Mr. Devanshu Bhatt and Mrs. Ruchi Gupta have booked Flat No. C-161 on the 16th floor, measuring 1714.67 sq. ft in

    "Raheja Revanta", Sector-78, Gurugram, developed by M/s Raheja Developers Ltd. for a total cost of ₹1,36,89,449. Sale Agreement was executed between the parties on 27.12.2012. Possession was promised within 48 months + 6 months grace period from the execution date i.e. by mid-2017. Payment plan was as per the Construction Linked Plan. They paid ₹1,29,64,869/- (95% of the total cost), availing loan of ₹1,06,10,000/- from ICICI Bank for meeting payment demands. The Opposite Party (OP) builder failed to deliver possession within the timeline, citing frivolous reasons such as presence of high-tension lines and continued to issue false and frivolous demand notices for full payment, despite non-completion of the project. The OP published advertisements promising timely possession to attract buyers, without requisite approvals in place. The delay was due to lack of timely clearances. Clauses in the Agreement granting unfettered discretion to the developer abused, causing financial and emotional distress. High-Tension lines cited as a reason for delays, although they were present before the project's initiation. They sent a legal notice on 17.07.2017 demanding the refund of Rs.1,29,64,869/- along with interest to the OP due to all the illegal acts. But, the OP did not give any

    2

    reply. Being aggrieved, they filed a consumer complainant seeking refund of ₹1,29,64,869/- with 18% interest from the date of each instalment deposit until realization along with compensation of ₹10,00,000/- for unfair trade practices and deficiency in service and Litigation costs of ₹5,00,000/-.

    3. This complaint was contested by the OP by filing a written version and the preliminary objections claimed that the complainants are not "consumers" under the Consumer Protection Act, 1986, as the flat was booked as an investment for commercial purposes. The agreement contained an arbitration clause, barring the jurisdiction of the consumer forum. The claim was averred to be time-barred under the provisions of the Consumer Protection Act. The OP emphasized that the agreement's terms were mutually agreed upon, and the complainants cannot challenge them now. The OP further averred that the reliefs sought exceeded the forum's jurisdiction under Section 14 of the Consumer Protection Act. On merits, the OP acknowledged the delay but attributed it to unavoidable circumstances such as High-Tension lines shifting and factors beyond their control. They asserted that the revised schedule anticipated completion by 2018. The OP denied allegations of illegal or premature demands and maintained that all demands were raised per the agreement. The construction was reportedly 75% complete, with significant progress made up to the 48th floor. The OP highlighted that the complainants had taken a loan from ICICI Bank, and the unit was under a mortgage. They prayed that the complaint be dismissed.

    4. The complainant filed a rejoinder to the written version filed by the Opposite Party and reiterated the facts of the complaint.

    5. In his arguments, Mr. Sidharth Shukla, the learned counsel for the complainant through reiterated the background, facts of the complaint and asserted that the complainants fall within the definition of a "consumer" under the Act as an original allottees of a residential flat in a housing scheme launched by the OP. They entered into a binding Agreement to Sale with the OP, paying substantial amounts towards the purchase of the flat based on the representations made by the OP. They detailed the amounts paid, including those raised via a bank loan, to fulfil payment obligations under the Agreement. He further contended that the OP failed to deliver the apartment within the agreed timeframe (48 months plus a 6-month grace period), citing reasons such as HT lines and delayed approvals. He argued that the OP collected 95% of the payment but failed to meet construction milestones or obtain the occupancy certificate. The OP's actions are "unfair trade practices" and "gross deficiency in service." The Agreement to Sale is heavily biased in favour of the OP, giving them undue discretion. They sought refund of the amount paid along with simple interest at 9% for the delay and deficiency in service. He has relied upon the following judgments:

    A. Nidhi Tamrakar & Ors. vs. Raheja Developers Ltd. along with other connected matters, C.C. No.618/2020, decided on 09.02.2022 by the NCDRC; B. Kavita Ahuja vs. Shipra Estate Ltd. and Jai Krishna Estate Developer Pvt. Ltd.,

    3

    2016 (1) CPJ 31; C. DLF Universal Ltd. vs Nirmala Devi Gupta, 2016 (2) CPJ 316.

    6. Per contra, Mr. Siddharth Banthia, the learned counsel for OP reiterated the objections taken in the written version and disputed the complainants' timeline interpretation, emphasizing that possession was subject to external factors, including governmental approvals and infrastructural development. He asserted that the construction of 16thfloor, where the complainants' unit is located, was completed within the agreed period. Due to Force Majeure and Governmental Delays, the External development charges of ₹51.07 crores was paid to HUDA, but infrastructural development was not completed by the government. The liability for such delays rests with governmental agencies, not the OP. He averred that the relevant clauses in the Agreement explicitly stated that the delays due to external factors would not be compensable. He further argued that the complainants failed to make timely payments despite multiple reminders. The allotment cancellation on 03.05.2017 is justified due to the complainants' payment default. The OP asserted that the complainants bear the burden of proving deficiency in service or unfair trade practices. The CP Act limits compensation to cases where actual loss or injury is proven. The role of government agencies in external development was known and the complainant failed to implead them as parties in the case. The Agreement's clauses explicitly shield the OP from liability for delays caused by force majeure or external development. He relied upon the following judgments:

    A. Consumer Unity & Trust Society, Jaipur vs. Chairman & MD, Bank of Baroda, Calcutta and Ors., MANU/SC/0591/1995;

    B. The Branch Manager, Indigo Airlines, Kolkata and Ors. vs. Kalpana Rani Debbarma and Ors., MANU/SC/0095/2020;

    C. BB. Patel & Ors. vs. DLF Universal Ltd., Civil Appeal No.1106 of 2009, decided on 25.01.2022 by the Hon'ble Supreme Court;

    C. Jagad Bandhu Chatterjee vs. Nilima Rani & Ors., CA No.2170 of 1967, decided on 17.10.1969 by Hon'ble Supreme Court;

    D. Mukesh Sharma vs. State of Haryana and Ors., CWP-23839 of 2014 (O& M); E. Rajasthan Housing Board vs. Parvati Devi (Smt) along with connected matter, (2000) 6 Supreme Court Cases 104;

    F. Prateek Realtors Pvt. Ltd. vs. Vivek Kumar Gupta & Arn., FA No.584/2018, decided on 08.10.2018 by the NCDRC.

    4

    7. We have examined the pleadings and associated documents placed on record and rendered thoughtful consideration to the arguments advanced by the learned Counsel for both the Parties.

    8. The main issues to be determined are whether:

    The cancellation of allotment by OP on 03.05.2017 was tenable.A. OP's failure to deliver possession of the unit within the agreed timeframe (48 months + 6 months grace period) constitutes a deficiency in service under the Consumer Protection Act.

    B.

    Whether the cited reasons for the delay, including High-Tension lines, delayed approvals, and non-performance by government agencies, absolve the OP of its obligations.

    C.

    Whether OP's demand for additional payments despite delays or failure to provide possession amounts to an unfair trade practice.

    D.

    The grounds relied upon by the OP constitute force majeure with respect to liability for the delay in delivering possession and whether OP substantiated claims of force majeure, governmental delays, and non-payment by the complainants with evidence.

    E.

    The complainants are entitled to refund of the amount paid, along with interest or compensation for delay.

    F.

    9. It is admitted position that the complainants booked an apartment in "Raheja Revanta"

    project developed by OP M/s Raheja Developers Ltd. represented through Mr. Nayan Raheja, located in Sector-78, Gurugram, Flat No. C-161 on the 16th floor, measuring 1714.67 sq. ft., for a total cost of ₹1,36,89,449/-. Agreement to Sale dated 27.12.2012 was executed between the parties. Possession was promised within 48 months + 6 months grace period from the execution i.e. by mid- 2017. Payment plan was as per Construction Linked Plan. The complainants paid ₹1,29,64,869/- (95% of the total cost). The availed the loan of ₹1,06,10,000/- from ICICI Bank for meeting payment demands. OP failed to deliver the possession within the stipulated timeline, citing frivolous reasons such as presence of high-tension lines. In catena of judgements Hon'ble Supreme Court and this Commission decided on favour of right of the buyers to get a refund of their money in case of delay by the Developer in giving possession as per the terms of Agreement. In Emmar MGF Land Ltd. & Ors. Vs. Amit Puri- {(II 2015 CPJ 568 (NC)}, decided on 30.03.2015, NCDRC has held:

    "After the promised date of delivery, it is the discretion of the Complainant whether to accept the offer of possession, if any, or to seek refund of the amounts paid by him with some reasonable compensation and it is well within his right to seek for refund of the principal amount with interest and compensation."

    10. The Hon'ble Supreme Court in Pioneer Urban Land & Infrastructure Ltd. Vs. Govindan Raghvan, ll (2019) CPJ 34 (SC), decided on 02.04.2019 as under:

    5

    "We see no illegality in the Impugned Order dated 23.10.2018 passed by the National Commission. The Appellant - Builder failed to fulfil his contractual obligation of obtaining the Occupancy Certificate and offering possession of the flat to the Respondent - Purchaser within the time stipulated in the Agreement, or within a reasonable time thereafter. The Respondent - Flat Purchaser could not be compelled to take possession of the flat, even though it was offered almost 2 years after the grace period under the Agreement expired. During this period, the Respondent - Flat Purchaser had to service a loan that he had obtained for purchasing the flat, by paying Interest @10% to the Bank. In the meanwhile, the Respondent - Flat Purchaser also located an alternate property in Gurugram. In these circumstances, the 22 Respondent - Flat Purchaser was entitled to be granted the relief prayed for i.e. refund of the entire amount deposited by him with Interest".

    Further, para 6.7 of the Order reads as :

    "A term of a contract will not be final and binding if it is shown that the flat purchasers had no option to sign on the dotted line, on a contract framed by the builder. The contractual terms of the Agreement of 08.05.2012 are ex-facie one sided, unfair and unreasonable. The incorporation of such one-sided clauses in an Agreement constitutes an unfair trade practice as per Section 2(r) of the Consumer Protection Act, 1986 since it adopts unfair methods or practices for the purpose of selling flats by the Builder.

    Further, para 7 of the Order reads as under :

    "In view of above discussion, we have no hesitation in holding that the terms of the Apartment Buyer's Agreement dated 08.05.2012 were wholly one-sided and unfair to the Respondent - Flat Purchaser. The Appellant-Builder cannot seek to bind the Respondent with such one-sided contractual terms."

    11. In view of the foregoing deliberations, OP is deficient in handing over the possession of the flat in question as per agreement executed between the Parties and the complainants are entitled to a refund of the amounts paid, along with reasonable compensation for the delay.

    12. The main defence of OP Developer with regard to delay in completion and handing over of possession is twofold. First, the delay, if any, in construction was due to reasons beyond its control and are attributable to the 'force majeure conditions'. The second is that the complainant and the OP in Clause 4.4 of the Agreement have agreed that the date of handing over of the possession can be extended if the delay is caused because of Force Majeure conditions and no specific date for completion of construction and delivery of

    6

    possession has been committed in the Agreement and further the time is not the essence of the Contract in this case.

    13. The contention of the learned counsel for OP Developer that the delay is attributable to 'force majeure conditions', and therefore no deficiency of service can be attributed is entirely unsustainable. These grounds mentioned for delay, such as failure to provide infrastructural facilities which is road, water, power, sewer lines to be provided by the Government for carrying development activities, has already been dealt with by this Commission in catena of decisions wherein it has been held that these reasons are not attributable to 'force majeure conditions' being CC 3525 of 2017, namely, Sanjay Manidhar & Anr. vs. M/s Emaar MGF Land Ltd. decided on 15.02.2022, wherein while rejecting the aforesaid grounds for delay this Commission has observed as under:

    "13. As far as challenge to the maintainability of the Complaint on the grounds mentioned in Para-8, referred to above, is concerned, in our considered view, none of the grounds are tenable. In support of the plea that the Complainants are permanent residents of Gurgaon and have purchased the Unit in question for commercial purposes and, therefore, do not fall within the purview of Section 2(1)(d) of the Consumer Protection Act, 1986, the Opposite Party has not filed any documentary evidence. The Opposite Party has not been able to establish that the Complainants are ordinarily indulged into purchasing and selling activities of flats/apartments in order to earn profit. Merely stating that the Complainants have purchased the Unit in question for commercial purposes is not sufficient to hold so. As the Unit in question has been purchased by both the Complainants in their joint name and the Agreement has also been executed between both the Complainants on First Part and the Opposite Party on the other, the Complaint can be filed either by any one of the Complainants, if the facts and circumstances so warrant, or by both the Complainants and, therefore, there is no requirement on the part of Complainant No.1 to authorize Complainant No.2, who is his wife and co-buyer/allotee, to file the Complaint. In view of the Reliefs/ Prayers claimed in the Complaint, quoted above, it cannot be accepted that the claim of the Complainants is not more than Rs.1.00 Crore and they are bound to approach the Courts at Gurgaon. The Complaint is maintainable before this Commission. Further, in view of admission by Opposite Party in its Written Statement/Reply that the Project is near completion and as soon as the Occupation Certificate is received by the Opposite Party, the offer shall be made to the Complainants, as also the information dated 01.11.2017 uploaded by the Opposite Party on its Website relating to construction update, which shows that the construction is still incomplete and houses are lying in unfinished state (see page 87-88 of the Complaint), it cannot be said that the Complaint has been filed beyond the prescribed period under Section 24A of the Consumer Protection Act, 1986 vis-à-vis the cause of action. The Complainants, who have not been handed over possession of the Unit in question, are entitled to file the Complaint at any time before the possession is handed over to them.

    7

    14. The contention of the Opposite Party that the Complaint is devoid of a valid cause of action is also misconceived. The Project, having the Unit in question, being incomplete has not been denied by the Opposite Party and, therefore, the Complainants, who have not been handed over possession of the Unit despite lapse of considerable period over and above the period prescribed therefor and payment of huge money, are within their rights to approach this Commission by filing the present Complaint.

    15. Even if at the time of booking the Complainants were explained all the terms and conditions of the Agreement and they had signed the same with their own freewill and consent, it is not in dispute that till date possession has not been given to the Complainants, which was required to be handed over by June, 2012, going by the period of 30 months from the date of execution of the Agreement (28.12.2009), including the 3 months' grace period available to the Opposite Party for applying and obtaining the Occupation Certificate, and there is inordinate delay of over 9 years in doing so.

    16. Further, it is contended by the Opposite Party that Clause 13(a) of the Agreement, which deals with the period of handing over possession, extracted above, cannot be read in isolation and has to be read with other Sub-Clauses/Clauses of the Agreement, which contemplates for Force Majeure events/ conditions or any other reason beyond the control of the Opposite Party. We find that no such events/conditions/reasons have been given by the Opposite Party in its Written Statement/ Reply and, therefore, it cannot take shelter of the stated plea.

    17. As per Clause-15 of the Agreement, the Opposite Party is required to pay delay compensation for the period of delay in handing over possession @ Rs.10/- per sq. ft. per month. In our considered opinion, this compensation is too meagre and cannot be accepted as adequate compensation. It is well settled by a catena of decisions that such Clauses are not applicable and the Complainants are to be adequately compensated. In the Case of Ireo Grace Realtech Pvt. Ltd. Vs. Abhishek Khanna & Ors., I (2021) CPJ 60 (SC), wherein delay compensation of Rs.7.50 per sq. ft. per month had been offered to be paid as delay compensation, the Hon'ble Supreme Court has been pleased to hold the compensation offered as inadequate. We are of the conscious of the fact that in present case, delay compensation of Rs.10/- per sq. ft. per month, which as stated by the Complainants comes out to 1.4% per annum, has been stipulated in the Agreement but too cannot be treated as adequate. Accordingly, the submission of the Opposite Party that the Complainants are entitled to the delay compensation of Rs.10/- per sq. ft. per month and cannot claim beyond the agreed terms and conditions of the Agreement cannot be accepted. While it is well settled that one sided terms and conditions incorporated in the Agreement to Sale favouring the Seller only are not applicable and binding on the Purchaser, we also feel that in the

    8

    present real estate market conditions as a result of Covid-19 Pandemic the claim of the Complainants for penal interest @ 12% per annum is also on the higher side.

    18. Insofar as contention of the Opposite Party that there was slow development and extraordinary delay in the Project on account of some Allottees of the Project not making the payments is concerned, this Commission recently in the Case of Kshitij Jain & Anr. Vs. Emaar MGF Land Ltd. (Consumer Complaint No. 386 of 2020), decided on 04.02.2020, while negating the said contention, has held as under:

    "19. Further, for the slowdown in the real estate market and resultant non- making of payments by some allottees of the Project, the Complainants cannot be blamed. It is true that the Project is dependent upon the availability of funds and for this reason the construction work of the Project may be hampered but for that reason the Complainants cannot be made to wait indefinitely for taking the possession of the Unit booked. It is for the Developer, which has floated the Project, to look for alternative arrangements so that the Project is completed within the stipulated period."

    19. As regards the contention of the Opposite Party that it has already provided the Allottees with the target completion schedule for the Project and shall also keep them updated of the progress regularly, we may note that it is not in dispute that even till today the possession has not been offered to the Complainants, perhaps for want of Occupation Certificate, which as stated by the Opposite Party is yet to be applied for. In this view of the matter, the Opposite Party has not been able to establish that the Project is complete and Occupation Certificate has also been obtained by it.

    20. It is not the case of the Opposite Party that there was any default on the part of the Complainants in making the payments demanded by it, inasmuch as it is stated by the Opposite Party that there was default on the part of the Allottees in making the payments. Though it was a Construction Linked Payment Plan and the Complainants have already paid the aforesaid huge amount, which has not been denied by the Opposite Party, in the Written Statement/Reply no instance relating to any amount not paid by the Complainants has been given by the Opposite Party. In such a situation, even if there was any default on the part of the Complainants in making some payment demanded by the OP, they cannot be blamed as the Project was not complete and it was a Construction Linked Payment Plan.

    21. In view of the foregoing discussion, we have no hesitation in holding that there is deficiency in service on the part of the OP in not handing over possession to the Complainants by June, 2012, by which time the period prescribed under Clause 13(a) of the Agreement for handing over possession of the Unit in question had expired. Still, possession has not been offered to the Complainants and there is inordinate delay of over 9 years in handing over possession to the Complainants. They are entitled to a reasonable compensation therefor. In our considered opinion, delay compensation @ 8% simple interest per annum on the amounts deposited by the Complainants from July, 2012 till the date of handing over possession would meet the ends of justice. Needless to

    9

    state that in the Case of Amitava Shankar Guha Vs. Emaar MGF Land Ltd., IV(2019) CPJ 522 (NC), which involves similar facts and circumstances as also the Project in question, namely, "Emerald Hills", 8% simple interest has been awarded by a Coordinate Bench of this Commission and, accordingly, respectfully following the said decision, same interest is being awarded in this case."

    14. Therefore, in light of the judicial precedents discussed, it is evident that the reasons cited by the Opposite Party (OP) do not constitute valid grounds for delays under the force majeure clause. The OP's cancellation of the allotment is also unjustified, as no substantive proof of default by the complainants has been presented.

    15. The next step is determining the quantum of compensation to be awarded to the Complainant for deficiency in service and delay in refund. In this regard, the liability of parties and tenability of multiple reliefs while making such refunds, the Hon'ble Supreme Court in Experion Developers Pvt. Ltd. Vs. Sushma Ashok Shiroor, in Civil Appeal No.6044 of 2019 decided on 07.04.2022 has held:-

    "We are of the opinion that for the interest payable on the amount deposited to be restitutionary and also compensatory, interest has to be paid from the date of the deposit of the amounts. The Commission in the Order impugned has granted interest from the date of last deposit. We find that this does not amount to restitution. Following the decision in DLF Homes Panchkula Pvt. Ltd. Vs. DS Dhanda and in modification of the direction issued by the Commission, we direct that the interest on the refund shall be payable from the dates of deposit. Therefore, the Appeal filed by purchaser deserves to be partly allowed. The interest shall be payable from the dates of such deposits.

    At the same time, we are of the opinion that the interest of 9% granted by the Commission is fair and just and we find no reason to interfere in the appeal filed by the consumer for enhancement of interest."

    16. Also, the Hon'ble Supreme Court in DLF Homes Panchkula Pvt. Ltd. Vs. D.S. Dhanda, in CA Nos. 4910-4941 of 2019 decided on 10.05.2019 has held that multiple compensations for singular deficiency is not justifiable. It is well established by this Commission and the Hon'ble Supreme Court that one-sided clauses in builder-buyer agreements, particularly those favouring developers disproportionately, are deemed unfair trade practices. The terms in the Agreement to Sale are thus unenforceable to the extent of their inequity.

    10

    17. In view of the deliberations above, CC No.2451 of 2017 is partly allowed. The Opposite Party Builder is directed to refund the amount of Rs.1,29,64,869/- to the Complainants along with simple interest @ 9% per annum from the respective dates of deposit till complete realization, within one month from the date of this order. In the event of delay, the simple interest payable for the entire period shall be @ 12% per annum.

    18. The OP shall pay the complainant Rs.50,000 as litigation costs.

    19. All pending Applications if any, also stands disposed of.

    ......................................

    SUBHASH CHANDRA

    PRESIDING MEMBER

    ...................................................................................

    AVM J. RAJENDRA, AVSM VSM (Retd.)

    MEMBER

    11

    Use AI to get other relevant cases.

    Comments

    DEVANSHU BHATT & ANR. v. M/S. RAHEJA DEVELOPERS LTD.
    (Feb 2, 2025)