  • SECTION 4 LAND ACQUISITION ACT
  • LAND ACQUISITION ACT
  • SECTION 6 LAND ACQUISITION ACT
  • SECTION 4 STATE LAND ACQUISITION ACT
  • Section 11-B
  • Sections 6, 7 and 17 of the Land Acquisition Act.
  • Section 9 & 9A of the Land Acquisition Act,
  • Section 4(1) of the State Act,
  • Section 6, 7, & 17 of the Land Acquisition Act,
  • principal Act. Section 11-B
  • Section 6, 7 and 17 of the Land Acquisition Act,
  • Section 4 of J&K land Acquisition Act
  • State Land Acquisition (Amendment) Act, 1997, The State Land Acquisition Act, Samvat, 1990,
  • State Land Acquisition Act 1990 (1934 14 AD).
  • Land Acquisition, Rehabilitation and Resettlement Act, 2013',
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Equivalent Citations
citation codes
Case Number
Disposition
Advocates
Judges
Acts
  • SECTION 4 LAND ACQUISITION ACT
  • LAND ACQUISITION ACT
  • SECTION 6 LAND ACQUISITION ACT
  • SECTION 4 STATE LAND ACQUISITION ACT
  • Section 11-B
  • Sections 6, 7 and 17 of the Land Acquisition Act.
  • Section 9 & 9A of the Land Acquisition Act,
  • Section 4(1) of the State Act,
  • Section 6, 7, & 17 of the Land Acquisition Act,
  • principal Act. Section 11-B
  • Section 6, 7 and 17 of the Land Acquisition Act,
  • Section 4 of J&K land Acquisition Act
  • State Land Acquisition (Amendment) Act, 1997, The State Land Acquisition Act, Samvat, 1990,
  • State Land Acquisition Act 1990 (1934 14 AD).
  • Land Acquisition, Rehabilitation and Resettlement Act, 2013',
To access the original judgment, please Sign In or Subscribe.

    GHULAM MOHI-UD-DIN AHANGER AND OTHERS v. STATE AND OTHERS (REVENUE)

    P a g e | 1 HIGH COURT OF JAMMU & KASHMIR AND LADAKH

    AT SRINAGAR

    OWP No. 152/2012 Reserved on: 16.11.2023 Pronounced on: 05.12.2023

    1. Ghulam Mohi-u-din Ahanger

    2. Ghulam Mohammad Ahanger

    3. Abdul Hamid Ahanger

    4. Mushtaq Ahmad Ahanger All Sons of Mohammad Ramzan Ahanger

    5. Mst. Mehbooba Banoo D/O Mohammad Ramzan Ahanger

    6. Mst. Asha Wd/O Mohammad Ramzan Ahanger

    7. Peer Ghulam Qadir Bhat

    8. Ghulam Jeelani Bhat

    9. Abdul Qayoom Bhat Sons of Ali Mohammad Bhat All residents of Haftchinar (Nurshingh Garh) Indira Gandhi Road Srinagar

    10. Mst. Zaina Bibi D/O Ali Mohammad Bhat R/O Batamaloo Colony Srinagar

    11. Mst. Saja Bibi D/O Ali Mohammad Bhat R/O Batamallo Colony Srinagar

    12. Mst. Mehtaba Bibi D/O Ali Mohammad Bhat R/O Kursoo Rajbagh Srinagar

    13. Fayaz Ahmad Bhat

    14. Mohammad Yaqoob Bhat Sons of Mohammad Yausuf Bhat

    15. Mst. Maimoona Wd/O Mohammad Yousuf Bhat

    1

    Petitioners 13 to 15 are residents of Haftchinar (Nurshingh Garh) Indira Gandhi Road Srinagar.

    …Appellant/Petitioner(s)

    Through: Mr. M.I.Qadri, Sr. Advocate. Mr. G.A.Lone, Advocate.

    Vs.

    1. State of J&K through Commissioner/Secretary to Govt. Revenue & Rehabilitation Department Civil Secretariat Jammu/Srinagar

    2. Divisional Commissioner Kashmir (Chairman High Level Committee)

    3. Deputy Commissioner Srinagar

    4. Commissioner Srinagar Municipal Corporation Srinagar

    5. Superintending Engineer (R&B) Circular Road Project Srinagar (Member Secretary)

    6. Collector Circular Road Project Srinagar. …Respondent(s)

    Through: Mr. Zahid Noor, GA vice Mr. Mohsin Qadri, Sr.AAG.

    CORAM: HON'BLE MR. JUSTICE M. A. CHOWDHARY, JUDGE

    JUDGMENT

    1. Public Works (R&B) Department took up the widening of Indira Gandhi Road Srinagar at Haftchinar (Nursingh Garh) in the year 2004 and as a corollary thereto the Executive Engineer Construction Division 3rdGanderbal vide indent Nos. 15238 and 15297 dated 10.09.2004, submitted requisition for acquisition of land measuring 2 kanals 237.16 SFT comprising of khasra Nos. 1707/830 min, 1742/830 min, 828 min, 829 min and 830 min and the structures

    2

    bearing engineering marks No. 1 to 18 situate in estate Nursingh Garh Tehsil and District Srinagar to the Collector.

    2. The concerned Collector under Section 4 of J&K land Acquisition Act issued notification vide No. C/CRP/766-79 dated 14.09.2004 and published the same in daily newspapers as well as through Tehsildar Srinagar for calling objections from the interested persons. The acquisition case was taken up by the High Level Committee (HLC) headed by Divisional Commissioner Kashmir in which out of 18 numbers of structures notified, the owners of 14 numbers of structures accepted the HLC decision and surrendered the possession of their structures to the intending department, however, owners of four numbers of structures viz. 2, 4, 13 and 14 did not surrender the possession to the indenting department. Given the objections of the owners and the decision of the HLC, the Collector, Circular Road Project, Srinagar (respondent no.6) proceeded to acquire the aforementioned structures and the land under the 'compulsory actions mode'. The matter was taken up with the Financial Commissioner (Revenue) J&K, vide no.C/CRP/1586-92 dated 17.03.2008, for issuance of the notification/declaration under Sections 6, 7 and 17 of the Land Acquisition Act. The Government issued the Notification No. 323 of 2008, under Section 6, 7 and 17 of the Land Acquisition Act, with a direction to finalize the case immediately and take over the possession of the land.

    3. Notification under Section 9 & 9A of the Land Acquisition Act, was issued by the Collector- respondent no.6, vide no. C/CRP/LA/532/39 dated 03.11.2008 to the interested persons as well as the concerned indenting department, to file the objections qua the rate,

    3

    measurement claims and their interests etc., within 15 days. The objections were submitted by the owners of structure nos. 2, 4, 13 and 14. The indenting department, vide communications bearing nos. EE/1670-72 dated 20.04.2009 and EE/1673-75 dated 20.04.2009, requested for de-notification of the area of the land because of the change of the road alignment. The respondent no.6, vide Notification no.13/DCS of 2010 dated 11.01.2010, was authorized to take the order for the acquisition of the land declared as requirement for the public purpose under Section 6 of the Act.

    4. The land acquisition cases of Haft Chinar Indira Gandhi Road, Srinagar, vis-à-vis the land/ structure bearing nos. 2, 4, 13 and 14, were processed afresh right from issuing of the notification under Section 4 to Section 9 & 9A of the Act. The land/structure owners again put-forth their objections for the payment of the compensation as per the market rate. The objections made by the structure owners were examined by the Collector-respondent no.6 and were rejected vide Final Award bearing no.C/CRP/632-40 dated 10.12.2010, the Collector-respondent no.6 assessed the compensation of Rs.10,81,591/- for the land measuring 2179.21 square feet; Rs.31,94,400/- for the four number of structures; and Rs.1,62,237/- as Jabirana @ 15%. In total a compensation of Rs. 44,38,228/- was awarded by the Collector- respondent no.6. The said Award is the subject matter of this petition filed by the petitioners.

    5. The petitioners 1 to 6 claim to be the owners of the land situate at Haft Chinar (Nursingh Garh), Indira Gandhi Road, Srinagar, measuring 01 Marla 72 square feet, together with a three storeyed structure with eight rooms and attic having one shop in the ground

    4

    floor, in which they were running a restaurant for earning their livelihood. The petitioners 7 to 15 claim that they are owners of the land measuring 02 Marla 176 square feet together with three storeyed structures with attic comprising of 12 rooms and two shops in the ground floor of the building, situate at Haft Chinar (Nursingh Garh) Indira Gandhi Road, Srinagar. The structures were located on the front of the Indira Gandhi Road, which had become a commercial hub in the area. The petitioners, it is averred, were residing in the upper portions of the structures while conducting the business in the ground floor.

    6. For widening of the Indira Gandhi Road at Haft Chinar (Nursingh Garh) Srinagar, the process of the acquisition was initiated by the respondent no.6, vide Notification No. C/CRP/LA/766-79 dated 14.09.2004, issued under subsection (1) of Section 4 of the State Land Acquisition Act, notifying, inter alia, the petitioners' landed property as also structures standing thereupon. Notification no.323 of 2008 under Section 6, 7, & 17 of the Land Acquisition Act, was issued with a direction to finalize the case for taking over the possession of the land. This was followed by the Notice bearing no.DIPK-7074 dated 04.11.2008, issued by the Collector-respondent no.6, in terms of Section 9 & 9A of the Land Acquisition Act, intimating the interested persons to attend the office of the Collector- respondent no.6 to state the nature of their respective interests in the land and the amount and particulars of their claims to compensation for such interests.

    7. The petitioners have claimed in their petition that High Level Committee meetings were held on 15.03.2006 and 03.04.2006 and in

    5

    respect of the structure no.13 and the land underneath thereto, pertaining to the petitioners 1 to 6, it was settled that a package deal for a total consideration of Rs.6.079 lacs including cost of land as per requirement of the Department, would be paid; one number of the SDA plot at Bemina was promised to be allotted subject to the availability of the plots and in lieu of the remaining two number of plots, as recommended by the Task Force Team, the cash incentive @ Rs. 5.00 lacs each was decided to be paid to the dislocated family; one number of the shop was also promised to be allotted to the shopkeeper likely to get dislocated and the dismantled material would go to the party. Qua, the structure no.14 and the land underneath, the package offered by the High Level Committee was Rs.13.988 lacs including cost of land as per the requirements of the department; one SDA plot at Bemina was also promised to be allotted subject to the availability of the plots and in lieu of the remaining two number of plots, instead of five numbers, as recommended by the Task Force Team, the cash incentive @ Rs.2.50 lacs each was promised to be paid to the dislocated family. The two shops were also promised to be allotted to the shopkeepers, likely to get dislocated and the dismantled material would go to the party.

    8. The package offered, according to the petitioners, was not only inadequate but amounted to gross injustice to them because the four families were residing in structure no.13, and the five families were residing in structure no.14 & 14A, and there were three shops in the ground floor in all the three structures, in which the business was being run by the petitioners. It was also stated that the amount of the

    6

    compensation was also far below the prevalent market rate, which was more than Rs.70.00 lacs per Kanal at the relevant time and in the package the value of the land was fixed @ Rs.27.00 lacs per Kanal. It is averred that the Tehsildar has reported the market rate at Rs.50.00 lacs per Kanal, but the same has been ignored when the package was offered to the petitioners.

    9. The High Level Committee, it is claimed, was also represented for rehabilitating the petitioners on the fundamentals of the Government Order no.254-HD of 1977 dated 08.11.1977. The petitioners maintain that the petitioners 1 to 6, owning the structure no.13, are entitled to three plots and the petitioners 7 to 15, owners of the structures no.14 and 14A, are also entitled to three plots of the reasonable size, in and around Srinagar, where they can rehabilitate themselves.

    10. During the acquisition process, the indenting department vide communication no.CD/III/23957-61 dated 01.08.2008, issued by the Executive Engineer (R&B) Construction Division III, asked for modification of the notice dated 14.09.2009 and thereupon the part of the land owned by the petitioners was de-notified and in terms of the communication, the part of the area owned by the petitioners was de-notified and only land measuring 344.25 square feet belonging to the petitioners 1 to 6 and the land measuring 720 square feet, belonging to the remaining petitioners comprised of structures 14 and 14A, remained subject matter of acquisition. No fresh notification under Section 4 of the Land Acquisition Act was issued and the aforesaid notifications were made in continuance of the earlier notification issued in the year 2004.

    7

    11. The Deputy Commissioner thereafter issued the Notification no.13/DCS of 2010 dated 11.01.2010 declaring that the land measuring 08 Marlas 03 square feet, was required for the public purpose and the respondent no.6 was directed under Section 7 of the Act to take order for acquisition of the aforesaid land. The respondent no.6, vide Notice No. C/CRP/2263-70 dated 18.01.2010, intimated that the land measuring 08 Marlas 03 square feet was about to be taken for the public purposes, namely, for widening of Indira Gandhi Road at Haft Chinar, Srinagar, and all the persons interested in the said land/property were called upon to attend personally or by agent his office on 30.01.2010 to state the nature of their respective interests in the land and the amount and the particulars of their claims to compensation for such interests. The petitioners claim that the notification, apart from being an exercise in nullity, also falls short of the statutory period of 15 days to be provided to the interested persons for submitting their claims and objections concerning the measurement and the claim of the compensation etc.

    12. Respondent no.6, finally passed the Award on 10.12.2010, which, as maintained by the petitioners, has been passed beyond the prescribed statutory period of two years, when by force of the Statute the proceedings had lapsed. The respondents were alleged to have demolished the structures of the petitioners on 15.01.2012, by use of force, and that the petitioners have not been paid compensation for the loss of their business and the houses, which are two essential components for human survival - 'right to residence and right to business being fundamental rights'.

    8

    13. The petitioners, on the edifice of the case set up, pressed for the following reliefs:

    i. Writ of certiorari, quashing the award dated 10.12.2010 bearing endorsement no.C/CRP/632-40 issued by the Collector, Circular Road Project, Srinagar.

    ii. Writ of certiorari, quashing the notification issued by the Deputy Commissioner, Srinagar, under Section 6 of the Land Acquisition Act, bearing endorsement no.258- 64/LAC/187 dated 11.01.2012, together with the notice purportedly issued under Section 9 and 9A as the same are void ab initio.

    iii. Writ of mandamus, commanding the respondents to provide the suitable house sites numbering six to the petitioners for constructing the residential house and three shop sites, for constructing the shops or shop structures, available in the vicinity of the structures demolished by the respondents, to enable the petitioners to start their business.

    iv. Writ of mandamus, commanding the respondents to pay the amount of the damages for destroying the structures and the household goods, which structures and the household goods at the market value would cost more than Rs.1.00 crore.

    14. The Collector-respondent No.6 in his reply pleaded that the impugned Award has been passed by the Competent Authority with complete application of mind to the facts and circumstances of the case and also in accordance with the law and the rules governing the field; that the indent was received from the Executive Engineer, Construction Division 3rdGanderbal, vide no.15238-15297 dated 10.09.2004, for acquisition of the land for road widening of Indira Gandhi Road, followed by Notification under Section 4(1) of the land Acquisition Act bearing No.C/CRP/LA/766-79 dated

    9

    14.09.2004. As per the directions of the High Level Committee, the case was processed for the compulsory acquisition and Notification under Section 6 & 7 of the Act was approved by the District Collector vide No.C/CRP/LA/832-39 and Notification under Section 17 of the Act and after considering the objections under Section 9 and 9A, the tentative award was approved by the District Collector vide No.DCS/ LAC/1870/312-14 dated 14.06.2010 and the final Award in favour of the said structure holders was announced by the Collector-respondent no.6, vide No.C/CRP/632- 40 dated 10.12.2010 for an amount of Rs.16,85,790/- including 15% Jabirana under the Land Acquisition Act, and that the rehabilitation package, offered by High Level Committee, had not been accepted by the petitioners. The respondents 1 to 3 & 5 have also taken similar assertions in their reply.

    15. A coordinate Bench of this Court vide judgment dated 20.03.2018 disposed of the petition and quashed the impugned Award dated 10.12.2010 issued by the Collector Circular Road Project Srinagar, with a direction to the respondents 3 to 7 to submit the case of the petitioners to the High Level Committee, headed by the Divisional Commissioner Kashmir, for fixation and payment of adequate compensation for the building structures and in terms of the package related to such structure in the form of providing residential plots for dislocated families. The respondents were further commanded to pay compensation in lieu of the shops acquired from the petitioners on the analogy of similarly situated shopkeepers, with further direction that the petitioners' case shall be submitted by respondents 3 to 7 to the High Level Committee

    10

    within three weeks from the date copy of the order was served upon the Deputy Commissioner Srinagar and the Collector, Circular Road Project Srinagar, and that the Divisional Commissioner Kashmir - respondent no.2, shall take a decision in light of the directions for payment of adequate compensation and for providing plots of land in favour of the petitioners within a period of two months, thereafter.

    16. Having been aggrieved of the judgment dated 20.03.2018 passed by the coordinate Bench, whereby this writ petition was disposed of, the respondents filed an intra court Appeal which was registered as LPA No. 5/2020 which was decided by the Division Bench of this Court vide judgment dated 17.05.2022, wherein it has been held that the Writ Court had not addressed the main issue on the basis of which the writ petition was filed and the Court appears to have not delved into the impact of non-payment of compensation assessed by the Collector, though the structures of the petitioners came to be demolished only after more than one year of passing of the Award by the Collector and the claimants-petitioners are also stated to have received the compensation in pursuance of the Award passed on 10.12.2010 though, as claimed by them, under protest. The Division Bench further observed that the Writ Court had not dealt with the issue of Section 4 of the Act as agitated by the petitioners in the writ petition and no finding was recorded as to whether there was any requirement for issuance of fresh notice in terms of Section 4 of the Act in the facts and circumstances of the case, after de-notification and the consequences, which ought to follow in case compliance of Section 4 was to be held compulsory,

    11

    and while setting aside the judgment passed by the writ court, the case was remanded back for fresh consideration keeping in view the contentions raised in the writ petition. This is how the instant petition has come up again for consideration.

    17. Mr. M.I.Qadri, learned senior counsel appearing for the petitioners, submits that the petitioners 1 to 6 are owners of the land measuring

    01 Marla and 72 SFT together with structure thereon, whereas petitioners 7 to 15 are the owners of the land measuring 02 marlas and 176 SFT together with three storeyed structure thereon, and that the Engineering Department had identified these structures as

    14 A and 14 B. He has argued that the Award has not been passed within the stipulated period of two years from the issuance of notification under Section 6 of the Act, as is required under Section 11-B of the Act. He submitted that the declaration was made on 16.10.2008, as such, the proceedings were to be completed and Award was to be passed before 16.10.2010, whereas the fact of the matter is that the Award had been passed by the Collector on 10.12.2010 after elapse of two years, therefore, on this count, the impugned Award passed by the Collector is not tenable and is required to be quashed.

    18. Learned senior counsel has further argued that the Collector committed illegality by making declaration under Section 6 of the Act without making any payment of compensation to the petitioners, though such recourse is available only after whole or part payment of compensation is made. Mr. Qadri, further argued that neither HLC headed by Divisional Commissioner Kashmir or the Collector granted compensation, nor made provision for

    12

    rehabilitation of the petitioners in terms of the Government Order No.254-HD of 1977 dated 08.11.1977. It has also been argued that when the indenting department took up the matter for re-alienment of the road, the Collector had notified/de-notified the earlier notification dated 20.11.2009 issued for acquisition, therefore, after de-notification fresh notifications were required to be issued. Further, the Collector had chosen not to issue notification under subsection (1) of Section 4 of the State Land Acquisition Act, which was required to be issued afresh, therefore, all other proceedings carried thereon were illegal and are not sustainable, therefore, the impugned Award, whereby the land was ordered to be acquired vide final Award dated 10.12.2010 issued by the Collector in terms of the compensation was illegal ab initio.

    19. Finally, Mr. Qadri, submitted that in view of the contraventions of the mandatory provisions of the Land Acquisition Act, particularly in the face of the fact that no notification was published, as required under subsection (1) of Section 4 of the State Land Acquisition Act after de-notification of the process initiated, initially, the impugned Award is liable to be quashed. In support of his contentions, Mr. Qadri, learned counsel for the petitioners 1 to 6 has relied upon the judgments reported as (2011) 10 SCC 714; AIR 2016 SC 626; and

    AIR 2007 SC 2625.

    20. Mr. G.A.Lone, learned counsel for the petitioners, while supplementing, argued that after de-notification on the fresh indent moved by the indenting department, the Collector had not issued fresh notification as required under Section 4 of the Land Acquisition Act, which is mandatory provision to initiate the

    13

    acquisition process. He has submitted that on the fresh indent, issued by the indenting department on 20.04.2009, the Collector was under obligation to issue notification under Section 4 of the Act, which he has skipped and issued notification under Section 6 of the Act and proceeded further to pass the impugned order finally. He further submitted that, in case of fresh requisition by the indenting department, there was requirement of fresh notification under Section 4 of the Act, which is fundamental for proceeding ahead to acquire the land/property of the owner.

    21. Mr. Lone further argued that the petitioners were not only entitled to just and fair compensation as per the prevalent market rate but they were also entitled to rehabilitation, in view of the Scheme notified by the Government of Jammu & Kashmir vide Government Order No. 254-HD of 1977 dated 08.11.1977. He has also argued that in a case titled Mohd Ashraf Sofi Vs. State oif J&K & Ors. (OWP No. 47/2013) decided on 09.12.2013, a coordinate Bench of this Court in almost similar facts and circumstances of acquisition of property for Circular Road, had allowed the petition, which was not further challenged by the respondents and attained finality. He has finally prayed that this Court may be pleased to either decide the case in terms of the judgment passed in Mohd Ashraf Sofi (supra) or in alternative quash the impugned Award, which is not sustainable and order for denova acquisition of the property in terms of the new applicable legislation on the subject for grant of just and fair compensation to the land/property of the owners.

    22. The petitioners' property was acquired vide impugned Award under the provisions of The State Land Acquisition Act 1990 (1934

    14

    AD). The Scheme of the Act provides that when it appears to the Government that a particular piece of land in any locality is required or likely to be required for any public purpose, a notification to the said effect is to be issued under Section 4 of the Act. The Collector, as envisaged under Section 4 of the Act, is required to notify through a public notice to be affixed at the convenient places in the locality, where the land is needed or is likely to be needed for any public purpose and shall cause it to be known by beat of the drum and through the local Panchayats and Patwaries. The Collector is also required to notify the same in the Government Gazette. The Collector is under bounden duty to notify the intention as to need of the land in the two daily newspapers having the largest circulation in the said locality of which, at least, one shall be in the regional language. If any person, interested in any land, notified under Section 4(1) of the Act, objects the acquisition of the land, he may object it in writing to the Collector within fifteen days after issuance of the notification. The Collector is to afford an opportunity of being heard to the objector in person or his pleader or a person authorized by him. The Collector, after hearing all such objections and after making such further inquiry, if any, as he thinks necessary, shall submit the case for the decision of the Government together with the record of the proceedings held by him and a report containing his recommendations on the objections. The decision of the Government, as envisioned in sub-section (2) of Section 5-A of the Act, shall be final.

    23. On the satisfaction of the Government after consideration of the report, if any, made under subsection (2) of Section 5-A of the Act,

    15

    that any particular land is needed for the public purpose, a declaration, as envisaged by Section 6 of the Act, shall be made to that effect under the signature of the Revenue Minister or of some officer duly authorized in this behalf. However, no such declaration shall be made unless the compensation to be awarded for such property is to be paid, wholly or partly, out of the public revenues or some fund controlled or managed by a local authority. The declaration, as stipulated by subsection (2) of Section 6 of the Act, is to be published in the official Gazette, and shall indicate the District or other territorial division in which the land is situated, the purpose for which it is needed, its approximate areas and where a plan shall have been made of the land, the place where such plan may be inspected. Whenever any land shall have been so declared to be needed for a public purpose, the Revenue Minister or some officer duly authorized by the Government in this behalf, in terms of Section 7 of the Act, shall direct the Collector to take order for the acquisition of the land. The public notice, under sub-section (1) of Section 9 of the Act, shall be caused to be given by the Collector at the convenient places on or near the land to be taken, informing that the Government intends to take the possession of the land and that the claims to compensation from all the interested persons in such land, be made to him. Such notice shall enumerate particulars of the land so needed and the persons interested in the land shall require to appear in person or by agent before the Collector at a time and place mentioned in the notice and such time should not be earlier than fifteen days after publication of the notice.

    24. The persons, to appear before the Collector, have to state the

    16

    nature of their respective interests in the land and the amount and the particulars of their claim to compensation for such interests and their objections, if any, to the measurement. Such statements should be made in writing and signed by the party or his agent. A notice shall also be served by the Collector on the occupier, if any, of such land and on all such persons known or believed to be interested therein, or to be entitled to act for persons so interested, as reside, or have agents authorized to receive service on their behalf, within the revenue district in which the land is situated.

    25. On the day so fixed or on any other day to which the enquiry has been adjourned, the Collector shall proceed to enquire into the objections, if any, which any person has stated pursuant to a notice given under Section 9 of the Act to the measurement made under Section 8 of the Act and into the value of the land at the date of the publication of the notification under subsection (1) of Section 4 of the Act and into the respective interest the persons claiming the compensation. Where the amount of compensation tentatively assessed under subsection (1) of Section 11 of the Act exceeds the amount specified by the Government by notification, the Collector, in terms of subsection (2) of Section 11 of the Act, shall refer the record of the case along with the statement of the tentative assessment of compensation for approval of the Revenue Minister or an officer specially empowered by him in this behalf.

    26. The Revenue Minister or an officer empowered by him, in a case referred by the Collector under subsection (2) of the Section 11 of the Act, shall, after considering the report of the Collector and after making such further enquiry as may be necessary, determine the

    17

    proper value of the property to be acquired and communicate it to the Collector and the value so determined shall form the basis of compensation to be allowed for the land. Under subsection (4) of Section 11 of the Act, the Collector shall thereupon make an award under his hand of the true area of the land; the compensation payable for the land; and the apportionment of the said compensation among all the persons known or believed to be interested in the land, of whom or whose claims, he has information, whether or not they have respectively appeared before him.

    27. By virtue of the State Land Acquisition (Amendment) Act, 1997, The State Land Acquisition Act, Samvat, 1990, was amended, and clause (b) of subsection (1) of Section 4 of the Act has been omitted from the Statute and Section 11-B was inserted in the principal Act. Section 11-B provides that the Collector shall make an Award under Section 11 of the Act within a period of two years from the date of publication of the declaration and, if no Award is made within that period, the entire proceedings for the acquisition of the land shall lapse.

    28. The Land Acquisition Act prior to omission of clause (b) from Section 4(1) of the Act had visualized three different modes of the publication of the notification under Section 4 of the Act including its publication in Government Gazette. As a consequence of the deletion of clause (b) of section 4(1), the publication of the notification can be done through a public notice to be fixed at the convenient place in the said locality or to be caused it to known by beat of drum and through the local Panahcyats and Patwaris; and

    18

    (b) the publication in the two daily newspapers having largest circulation in the regional language. The deletion of clause (b) requiring the publication in Government Gazette aims at streamlining the procedure and to ensure the expeditious disposal of the cases at initial stage. This Act, given the amendment and insertion of Section 11-B, visualises issuance of the award within a period of two years, in contradistinction to the earlier procedure where no specified time limit was indicated. The amendment, therefore, has introduced greater regularity and time specificity within which the award has to be finalized. The implication of this amendment is that where the land acquisition proceedings cannot be completed within the stipulated timeframe of two years, it would entail de novo proceedings thereby implying fresh determination and assessment of the amount of the compensation with reference to the parameters as indicated in Section 23 of the Act. Thus, the amendment in the Land Acquisition Act not only has indicated the timeframe but it has also made it incumbent on the Collectors to ensure fetish adherence to the timeframe, failing which it would induce serious financial implications by way of revision of award with reference to the market prices prevalent at the date of the publication of the declaration.

    29. With regard to de novo proceedings, the Government, vide Circular No. FC-LS/LA-753/96 dated 2ndFebruary 1998, desired that such a recourse shall be construed adversely against the Collector concerned, who shall have to explain the reasons for the same and also could be held responsible for the additional financial burden accruing on this account on the State exchequer. Time factor

    19

    is the most critical element of entire land acquisition process, which would require circumspect handling at the level of the Collector. The Collector has to proceed, in a systematic and in a proper manner, in order to ensure that under no circumstances the time schedule as stipulated in the Act is violated. In case of urgency, the Collector, under Section 17 of the Act, may, on the expiration of fifteen days, from the publication of the notice mentioned in Section 9 subsection (1) of the Act, take the possession of any land needed for the public purposes. Such land will thereupon vest absolutely in the Government. The Collector, however, has been enjoined upon under Section 17-A of the Act to tender payment of 80% of compensation, prior to taking the possession of the land under Section 17 of the Act, to the persons interested and entitled thereto.

    30. The contention of learned counsel for the petitioners is that the follow up of the land acquisition proceedings under Sections 5(a) and 6, including 9 and 9(a) and 17, as well as passing of the Award, is nullity in the eyes of law. In this behalf, he referred to and relied upon a judgment of the Apex Court in case 'J&K Housing Board & Anr. Vs. Kunwar Sanjay Krishan Kaul & Ors.' reported as

    (2011) 10 SCC 714, wherein it has been observed in Paras 32 & 33 as under:-

    "32. It is settled law that when any statutory provision provides a particular manner for doing a particular act, the said thing or act must be done in accordance with the manner prescribed therefor in the Act. Merely because the parties concerned were aware of the acquisition proceedings or served with individual notices does not make the position alter when the statute makes it very clear that all the procedures/modes

    20

    have to be strictly complied with in the manner provided therein. Merely because the land owners failed to submit their objections within 15 days after the publication of notification under Section 4(1) of the State Act, the authorities cannot be permitted to claim that it need not be strictly resorted to.

    33. In the case on hand, admittedly, the notification was published in two daily newspapers i.e. in the Himalayan Mail and in the Greater Kashmir but one of them was not a newspaper published in regional language i.e. Kashmiri which is the requirement of Section 4(1)(c) of the Act. We have already held that all the requirements provided in Section 4(1)(a)(b) and (c) are mandatory and have to be strictly adhered to. In addition to the same, though on 11.06.2003 a corrigendum was issued for enlarging the area of acquisition, admittedly, this corrigendum was not published in any newspaper."

    31. Further contention of learned counsel for the petitioners is that the respondents could not issue a corrigendum to gain the time of conclusion of the acquisition proceedings within a period of two years, as contemplated by Section 11-B of the Act, whereby the proceedings are to be completed after declaration in terms of Section 6, within a period of two years, as in the instant case initial declaration passed by the Government was issued on 16.10.2008, therefore, in view of Section 11-B, the Award ought to have been passed before 16.10.2010, when the Award in the instant case was issued on 10.12.2010 almost two months late, as such, the jurisdiction of the Collector to issue Award has come to an end on 15.10.2010, as such, the Award was passed in nullity and cannot resort to corrigendum in this behalf, which cannot extend the time in any way, as such, the Award on the basis of such corrigendum is nullity in view of law laid down by the Apex Court in a case

    21

    reported as AIR 2007 SC 2625 titled 'Mohan & Anr. Vs. State of Maharashtra & Ors.' and 'Vipinchandra Vadilal Bavishi (D) by Lrs. & Anr. Vs. State of Gujarat & Ors.', reported as AIR 2016

    SC 626.

    32. Para 9 of Mohan's case (supra), the Apex Court has held that :-

    "9. In our opinion under Section 11A what has to be seen is the date of last publication of the declaration under Section 6, and not any subsequent corrigendum to the said declaration. The only circumstance under which the period between the declaration under Section 6 and the award can be extended is mentioned in the explanation to Section 11A which states: 'In computing the period of two years referred to in Section 11A, the period during which any action or proceeding to be taken in pursuance of the said declaration is stayed by an order of a Court is excluded'. "

    Apex Court in another judgment rendered in Vipinchandra's case (supra), has observed in Para 26 which is reproduced as under:-

    "26. An arithmetical mistake is a mistake in calculation, while a clerical mistake is a mistake of writing or typing error occurring due to accidental slip or omissions or error due to careless mistake or omission. In our considered opinion, substituting different lands in place of the lands which have been notified by a statutory Notification under Section 10(1), 10(3) and 10(5) cannot and shall not be done by issuing a corrigendum unless the mandatory requirements contained in the aforementioned sections is complied with. A land holder cannot be divested from his land on the plea of clerical or arithmetical mistake liable to be corrected by issuing corrigendum."

    33. After de-notification by the Collector for the property of the petitioners to be acquired earlier, it was incumbent upon the Collector to start proceedings in the matter afresh with issuance of notice in terms of Section 4(1) of the Land Acquisition Act, however, learned counsel for the respondents have failed to show,

    22

    and so is borne out from the records, that no such notification as required under Section 4(1) of the Act, was issued by the Collector. Further proceedings, however, were initiated by the Collector which led to passing of the impugned Award, after the statutory period of two years.

    34. Since, notification under Section 4(1) of the Act is foundation for starting acquisition proceedings for the land / property, all the proceedings carried out thereafter without this foundational notification in terms of Section 4(1) of the Act, are nonest and cannot be said to have been carried out in accordance with the Land Acquisition Act. The notifications, in terms of Section 6 of the Act, were also not published in the local dailies, one being in vernacular language of Kashmiri, therefore, in view of the law laid down by the Apex Court in J&K Housing Board's judgment (supra), it cannot be said that publication had been duly made. This is also the reason which vitiated further proceedings leading to passing of the impugned Award.

    35. Another important fact of the case is that even if the notification under Section 6 of the Act issued on 16.10.2008 is considered to be issued validly, the Award was required to be passed in terms of Section 11-B of the Act on or before 15.10.2010, whereas same was passed on 10.12.2010, much after two years rendering the Award as illegal, as the proceedings, if not completed within two years in terms of Section 11-B of the Act, are to be lapsed.

    36. There is also another factor in the case which is important, as the declaration under Section 6 of the Act can be made only after, whole or part payment of the compensation is made. Here in this

    23

    case no such action was taken by the respondents and the demolition notice was issued and the structures of the petitioners, being acquired, were demolished on 10.01.2011. Since, the indenting department had forwarded fresh requisition on 22.04.2009 to the Collector, who thereafter issued de-notification on 20.11.2009, as such, all the earlier proceedings were annulled. The Collector, however, had not issued notice in terms of Section 4(1) of the Act, which was required to be issued after fresh requisition by indent.

    37. The Apex Court in AIR 2016 SC 626 (supra) has even directed that in case of issuance of corrigendum, mandatory provisions are required to be complied with, and in the instant case respondents have failed to comply with the mandatory provisions even after de- notification, not to talk of any corrigendum.

    38. In view of not observing the mandatory provisions of the Land Acquisition Act, impugned Award passed by the Collector is, thus, illegal having not been passed in accordance with law, particularly the Collector having skipped to issue notification in terms of Section 4(1) of the Act on receiving of fresh indent on 20.04.2009, non-payment of part or whole of the compensation before demolition of the structures of the petitioners, and non-publication of notice in daily newspapers being published in Kashmiri.

    39. Viewed, thus, the impugned Award passed by the respondent- Collector is not maintainable and is, thus, quashed. After quashing of the impugned Award, what can be the course before this Court for further directions in the matter; one option is that the Collector be directed to proceed afresh in the matter by starting de novo

    24

    acquisition proceedings in accordance with 'Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013', and secondly, the respondents be directed to decide the matter with regard to compensation and rehabilitation of the petitioners through private negotiation mode.

    40. In the considered opinion of this Court, since the structures of the petitioners have already been demolished since long, no useful purpose shall be served by directing for de novo acquisition proceedings by the Collector. It will be in the interest of both the parties that the petitioners are compensated through negotiation by the official respondents with the intervention of a Senior Government functionary. Divisional Commissioner Kashmir, had already headed the High Level Committee in this case during the earlier proceedings and held some rounds of negotiations with the petitioners and offered them the package with regard to compensation and rehabilitation on behalf of the Government. Respondents, instead of compulsory proceedings, started private negotiations through High Level Committee (HLC), under the Chairmanship of Divisional Commissioner Kashmir, which in its 116thand 117thmeeting held on 15.03.2006 and 03.04.2006 respectively, decided at S.No. 13 and 14 with regard to the petitioners as under:-

    "13. Gh.Mohi ud din Ahanger & Ors. 1. Settled as a package deal for a total Str No. 13 & 13-A consideration of Rs.6.079 lakhs (Rupees Land 552.16 (entire property), Six Lakhs Seven Thousand and Nine Hundred Only) including cost of

    land as per requirements of the Deptt.

    2. One No. SDA plot at Bemina was promised to be allotted subject to availability of plots. In lieu of remaining

    25

    two no's plot as recommended by task force team, cash incentive @ Rs. 2.50 lacs each shall be paid to the dislocated family.

    3. One no. shop was also promised to be allotted to the shopkeeper likely to get dislocated.

    4. Dismantled material will go to the party.

    14. Peer Gh. Qadir & Ors 1. Settled as a package deal for a total Str No. 14,14-A, 14-B consideration of Rs.13.898 lakhs (Rupees Land; 1542.96 (entire property) Thirteen lacs eighty nine thousand and eight hundred Only) including cost of land as per

    requirement of the Deptt.

    2. One No. SDA plot at Bemina was promised to be allotted subject to availability of plots. In lieu of remaining two no's plot (maximum) instead of five no. as recommended by task force team, cash incentive @ Rs. 2.50 lacs each shall be paid to the dislocated family.

    3. Two no. shops were also promised to be allotted to the shopkeeper likely to get dislocated.

    4. Dismantled material will go to the party."

    41. It will be appropriate if Divisional Commissioner Kashmir is again asked to initiate process of negotiations between the official respondents and the petitioners and finalize the compensation and rehabilitation by following the market rate at the time of taking over the property of the petitioners in the year 2009 and also their rehabilitation in terms of the Government Order No. 254-HD of 1977 dated 08.11.1977 issued by the Government for rehabilitation of the effected land / property owners.

    42. A coordinate Bench of this Court, comprising of Hon'ble Mr. Justice Ali Mohammad Magrey (as his Lordship then was), in case titled Mohd. Ashraf Sofi & Ors. Vs. State of J&K & Ors. (OWP No. 47/2013), vide judgment dated 09.12.2013, decided a similar matter involving land acquisition for road widening from Fateh Kadal to Khankahi Moula Srinagar. While quashing the Award, instead of ordering of fresh acquisition proceedings, the Court had directed the official respondents to submit the case of the petitioners to High Level Committee headed by Divisional

    26

    Commissioner Kashmir for fixation and payment of adequate compensation for building structures in terms of the package related to such structures.

    43. For the reasons stated hereinabove, the instant petition is allowed and the impugned Award is quashed with the following directions:

    (a) By writ of mandamus, official respondents are directed to submit the case of the petitioners to High Level Committee headed by respondent No.2- Divisional Commissioner Kashmir for fixation of payment of adequate compensation in terms of market rate and package rehabilitation vide Government order No. 254-HD of 1977 dated 08.11.1977.

    (b) The respondents shall submit the case of the petitioners to the Divisional Commissioner Kashmir within a period of one month, from the date copy of this order is served upon Deputy Commissioner Srinagar and Collector Circular Road Project Srinagar, and thereafter the Divisional Commissioner Kashmir shall take a decision for payment of adequate compensation in terms of Land Acquisition Act and rehabilitation of the petitioners in the light of the directions contained in the Government Order No. 254-HD of 1977 dated 08.11.1977, within a period of three months thereafter.

    44. Disposed of as indicated above.

    ( M. A. CHOWDHARY )

    JUDGE

    Srinagar

    05.12.2023

    Muzammil. Q Whether the Judgment / Order is Reportable: Yes / No Whether the Judgment / Order is Speaking: Yes / No

    27

    Use AI to get other relevant cases.

    Comments

    GHULAM MOHI-UD-DIN AHANGER AND OTHERS v. STATE AND OTHERS (REVENUE)
    (Dec 5, 2023)