AMICUS AI
Citation Codes
Neutral Citations
2022 INSC 1284
Equivalent Citations
citation codes
Case Number
Disposition
Advocates
Judges
Acts
  • Section 4 of the Land Acquisition Act, 1894
  • Section 6 of the Land Acquisition Act, 1894
  • Section 18 of the Land Acquisition Act, 1894
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Neutral Citations
2022 INSC 1284
Equivalent Citations
citation codes
Case Number
Disposition
Advocates
Judges
Acts
  • Section 4 of the Land Acquisition Act, 1894
  • Section 6 of the Land Acquisition Act, 1894
  • Section 18 of the Land Acquisition Act, 1894
Smart Summary

Supreme Court of India: Summary of Decision

Factual and Procedural Background

The case concerns land acquired for planned development by NOIDA from Village Gheja Tilapatabad, Tehsil and Pargana Dadri, District Ghaziabad (now District Gautam Budh Nagar). A notification under Section 4 of the Land Acquisition Act, 1894 was issued on 22.11.1982, followed by a Section 6 declaration on 23.11.1982. Possession was taken on 22.02.1983. The Land Acquisition Officer passed an award on 05.09.1983 determining compensation at Rs. 30,000 per bigha based on a sale deed dated 02.11.1982. The father of the contesting respondents accepted the compensation but sought a reference under Section 18, claiming Rs. 60,000 per bigha.

The Reference Court dismissed the reference (along with others) by a detailed judgment dated 04.05.1989. Review applications were dismissed in 1998. Approximately 16 years later (2014/2015), the respondents filed a first appeal before the High Court, relying on other first appeals where compensation was enhanced to Rs. 297 per sq. yard.

By judgment dated 28.01.2020 in First Appeal Defective No. 308 of 2015, the Allahabad High Court condoned the delay (denying interest for the period of delay) and enhanced compensation to Rs. 297 per sq. yard. NOIDA appealed to the Supreme Court challenging both the condonation of delay and the enhancement on merits.

Legal Issues Presented

  1. Whether the High Court erred in condoning a delay of approximately 16 years (from dismissal of the review in 1998 to the filing of the first appeal in 2014/2015) in an appeal concerning land acquisition compensation.
  2. Whether, on merits, compensation for land acquired in 1982 should be assessed at Rs. 297 per sq. yard (as in later acquisitions from 1986/1988) or at Rs. 120 per sq. yard as determined by the Supreme Court in a subsequent decision concerning 1982 acquisitions.
  3. What statutory benefits and interest are payable, particularly whether interest and other benefits are payable for the period of delay in filing the appeal.

Arguments of the Parties

Appellant (NOIDA)

  • The High Court materially erred in entertaining and allowing an appeal filed after a delay of 16/26 years.
  • On merits, in light of the Supreme Court’s decision in Asha Ram (Dead) through LRs v. U.P. Awas Avam Vikas Parishad, (2022) 2 SCC 567, which dealt with 1982 acquisitions, compensation should be Rs. 120 per sq. yard, not Rs. 297 per sq. yard.
  • The Supreme Court in U.P. Awas Avam Vikas Parishad (Asha Ram) considered and distinguished Narendra v. State of Uttar Pradesh, (2017) 9 SCC 426 (which awarded Rs. 297 per sq. yard for 1986/1988 acquisitions), noting development between 1982 and 1986/1988 and rejecting the use of later notifications as a yardstick for earlier acquisitions.

Respondents (Original Claimants)

  • The High Court rightly exercised discretion to condone the delay to secure just compensation for land losers.
  • Comparable cases concerning nearby villages and similar development projects resulted in compensation at Rs. 297 per sq. yard, which the High Court correctly followed.
  • Relied on a series of High Court and Supreme Court judgments (including those concerning Makanpur and adjoining areas) where Rs. 297 per sq. yard was awarded for acquisitions notified in 1986/1988, and where challenges (including SLPs, reviews, and curatives) were dismissed.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Asha Ram (Dead) through LRs v. U.P. Awas Avam Vikas Parishad, (2022) 2 SCC 567 For acquisitions of 1982, compensation determined at Rs. 120 per sq. yard; compensation based on notifications issued five years later cannot be used as a yardstick for earlier acquisitions; noted intervening development between 1982 and 1987/1988. Applied as the governing precedent to hold that the High Court’s award of Rs. 297 per sq. yard (based on 1986/1988 acquisitions) was unsustainable; compensation fixed at Rs. 120 per sq. yard.
Narendra v. State of Uttar Pradesh, (2017) 9 SCC 426 Awarded Rs. 297 per sq. yard for acquisitions from 1986/1988 in Village Makanpur and nearby villages for the same development projects. Distinguished. The Court held that Narendra concerned later notifications (1986/1988) and, per Asha Ram, cannot be used to assess compensation for 1982 acquisitions.
Pradeep Kumar v. State of U.P., (2016) 6 SCC 308 Remanded High Court’s determination concerning Makanpur (1988 notification); later, High Court awarded Rs. 297 per sq. yard on remand. Not followed for 1982 acquisitions; noted as part of respondents’ reliance on 1986/1988 acquisition cases.
GDA v. Kashi Ram (Allahabad High Court, F.A. No. 910/2000; SLP (C) No. 5815/2015 dismissed; review and curative dismissed) Instances where Rs. 297 per sq. yard was upheld for 1986/1987 acquisitions in Makanpur/Vaishali. Not applied; the Court emphasized the temporal distinction—1982 acquisitions cannot be benchmarked against 1986/1988 awards.
Jaiprakash (D) v. State of U.P., (2020) 11 SCC 770 Increased compensation to Rs. 297 per sq. yard for 16.08.1988 acquisitions in Makanpur (Indirapuram), following Narendra. Not applied to 1982 acquisitions; cited by respondents to support the Rs. 297 rate for later notifications.
Om Prakash v. State of U.P. (Civil Appeal No. 16961 of 2017) Increased compensation to Rs. 297 per sq. yard for 1988 acquisitions in Makanpur, per the same reasoning as Jai Prakash. Not applied; concerned 1988 notifications, unlike the present 1982 acquisition.
Mangu Singh v. State of U.P. (Civil Appeal Nos. 9208–9211 of 2018) Increased compensation to Rs. 297 per sq. yard for 1988 acquisitions in Makanpur. Not applied; similarly distinguished due to different notification year.
Ghaziabad Development Authority v. Trilok Chand (related SLP (C) No. 12547/2017 dismissed) Challenge to non-deduction of development charges from the Rs. 297 per sq. yard rate in cases arising out of Kashi Ram; SLP dismissed. Not determinative here; concerned 1986/1987 acquisitions and issues distinct from the present 1982 acquisition valuation.

Court's Reasoning and Analysis

On limitation and delay: The Supreme Court upheld the High Court’s exercise of discretion in condoning the long delay. The Court noted the “peculiar facts and circumstances” and the High Court’s balancing measure of denying interest for the period of delay. Given this equitable approach to secure just compensation while addressing the prejudice from delay, the Supreme Court found no reason to interfere with the condonation order.

On merits and valuation: The Court focused on the year of acquisition as the pivotal factor. It emphasized that the present acquisition was initiated in 1982 (Section 4 notification dated 22.11.1982), whereas the judgments relied upon by the claimants pertained to acquisitions in 1986/1988 (notably in Village Makanpur and surrounding villages). The Court applied its decision in Asha Ram (U.P. Awas Avam Vikas Parishad), which specifically addressed 1982 acquisitions and set compensation at Rs. 120 per sq. yard. In Asha Ram, the Court had rejected the application of a Rs. 297 per sq. yard benchmark taken from Narendra (which concerned 1988 acquisitions), holding that:

  • Compensation based on a notification issued five years later cannot serve as a yardstick for earlier acquisitions; and
  • Significant development activities occurred between 1982 and 1987/1988, altering market conditions.

Applying these principles, the Court held that the High Court’s reliance on later-year awards to fix compensation at Rs. 297 per sq. yard for a 1982 acquisition was legally unsustainable. Consequently, the Court fixed compensation at Rs. 120 per sq. yard, aligning with Asha Ram.

Holding and Implications

Holding: The appeal was ALLOWED IN PART. The High Court’s judgment enhancing compensation to Rs. 297 per sq. yard was modified. The original claimants are entitled to compensation at Rs. 120 per sq. yard, along with all other statutory benefits and interest allowable under the Land Acquisition Act, 1894. However, the claimants are not entitled to statutory benefits, including interest, on the enhanced amount of compensation for the period of delay (from the date of rejection of the review application until the filing of the first appeal before the High Court). No costs.

Implications: The decision directly reduces the compensation payable in this case from Rs. 297 to Rs. 120 per sq. yard for the 1982 acquisition, while preserving statutory benefits except for the delayed period. It confirms that compensation for earlier acquisitions (1982) cannot be benchmarked against later awards (1986/1988) due to temporal and developmental differences, and it endorses the approach in Asha Ram. The ruling applies established precedent to the specific facts and does not set a new legal precedent.

To access the original judgment, please Sign In or Subscribe.

    NEW OKHLA INDUSTRIAL DEVELOPMENT AUTHORITY v. OMVIR SINGH

    M.R. Shah, J.:— Feeling aggrieved and dissatisfied with the impugned judgment and order dated 28.01.2020, passed by the High Court of Judicature at Allahabad in First Appeal Defective No. 308 of 2015, by which the High Court has rejected the said appeal after a period of approximately 16 years (as per the appellant, there was a delay of 26 years) by which the High Court has enhanced the compensation payable to the land owners to Rs. 297/- per sq.yard, NOIDA has preferred the present appeal.

    2. The facts leading to the present appeal in a nutshell, are as under:

    3. That the land in question situated in Village Gheja Tilapatabad, Tehsil and Pargana Dadri, District Ghaziabad (now District Gautam Budh Nagar) was acquired for the planned development by the NOIDA, vide Notification issued under Section 4, dated 22.11.1982. A declaration under the provisions of Section 6 of the Land Acquisition Act, 1894 was issued on 23.11.1982. The possession of the acquired land was taken over by the State on 22.02.1983. The Land Acquisition Officer/Collector declared the Award dated 05.09.1983 and awarded/determined the compensation at Rs. 30,000/- per bigha, relying upon the sale deed dated 02.11.1982 of certain parcels of land in the village itself. The father of the contesting respondents accepted the compensation. At the instance of the original owners - father of the contesting respondents, a Reference under Section 18 of the Land Acquisition Act, 1894 raising objections against the Award was made. The original claimants claimed compensation @ Rs. 60,000/- per bigha. On contest, by a detailed judgment and order dated 04.05.1989, the Reference Court dismissed the said Reference along with other references. Review applications were filed which came to be dismissed in the year 1998. That after a period of 16 years from the date of rejection of the review applications in the year 2014/2015, the respondents filed the present first appeal before the High Court and relied upon the judgment in some other first appeals by which the compensation was enhanced to Rs. 297/- per sq.yard. By the impugned judgment and order, the High Court has condoned the delay of 16 years, however it has denied the interest during the period of delay, and has enhanced the amount of compensation to Rs. 297/- per yard. Hence, the present appeal at the instance of the NOIDA.

    4. Learned Counsel appearing on behalf of the NOIDA has vehemently submitted that the High Court has materially erred in entertaining the appeal after a period of 16 years from the date of dismissal of the review application and after a period of 26 years from the date of the decision by the Reference Court.

    5. It is submitted that even otherwise, on merits also in view of the subsequent decision of this Court in the case of Asha Ram (Dead) through LRs v. U.P. Awas Avam Vikas Parishad, (2022) 2 SCC 567 with respect to the land acquisition of 1982, this Hon'ble Court has reduced the amount of compensation to Rs. 120/- per sq.yard, the claimants shall not be entitled to compensation at the rate of Rs. 297/- per sq.yard, as awarded by the High Court.

    6. It is submitted that as such, in the subsequent decision in the case of U.P. Awas Avam Vikas Parishad (supra), this Court did consider its earlier decision in the case of Narendra v. State of Uttar Pradesh, (2017) 9 SCC 426, by which this Court for the acquisition with respect to the nearby villages of the year 1988, has allowed compensation @ Rs. 297/- per sq.yard. However, it is submitted that considering the development which took place between the year 1982-1986/1988 this Court in the case of U.P. Awas Avam Vikas Parishad (supra), did not accept the case on behalf of the claimants for awarding Rs. 297/- per sq.yard and determined the compensation for the lands acquired in the year 1982, at Rs. 120/- per sq.yard.

    7. While opposing the present appeal, learned counsel appearing on behalf of the original claimants has vehemently submitted that in the facts and circumstances of the case, the High Court has not committed any error in condoning the delay of 16/26 years by observing that the claimants are entitled to just compensation.

    8. It is submitted that considering the case of the other land owners decided vide judgment and order passed in the year 2014 with respect to similar acquisition with respect to the nearby villages, the amount of compensation had been enhanced to Rs. 297/- per sq.yard. Following the same, in the present case the amount of compensation has been awarded @ Rs. 297/- per sq.yard, which cannot be said to be unreasonable and the High Court has not committed any error.

    9. Learned counsel appearing on behalf of the original claimants has heavily relied upon the following decisions of the High Court, confirmed by this Court by which the compensation has been determined at Rs. 297/- per sq.yard.

    PARTICULARS LIST OF JUDGMENTS OF LAND ACQUISITION IN MAKANPUR VILLAGE Sl. No. Village Date of Notifications & Compensatio n (per sq. yd.) Judgment of the Court Page Nos. 1. Makanpur, (Vaishali) Distt. Ghaziabad, Tehsil Dadri 12.09.1986/28.02.1987 [Rs. 297/-] F.A. No. 910/2000 in re: GDA v. Kashi Ram. [DoJ : 13.11.2014]. SLP (C) No. 5815 of 2015, GDA v. Kashi Ram dismissed on 05.05.2015 Review Petition (C) No. 2632 of 2015 dismissed on 06.10.2015 Curative Petition (C) No. 94 of 2016 was dismissed on 15.03.2016 6-26 27-32 33-34 35-37 2. Makanpur, (Sector 62, Noida) Distt. Gautam Budh Nagar, Tehsil Dadri 15.03.1988 [Rs. 297/-] Judgment dt. 15.04.2015 of the High Court in F.A. No. 737 in re : NOIDA v. Surendra Singh, awarding compensation @ Rs. 135/- for Makanpur, was set-aside by this Court vide judgment dt. 16.02.2016, rendered in Civil Appeal No. 1506-1517 of 2016 in re : Pradeep Kumar v. State of U.P., reported as (2016) 6 SCC 308 and the case was remanded for consideration afresh. Pursuant to remand, the High Court dismissed F.A. No. 737 in re : NOIDA v. Surendra Singh along with other First Appeals of Noida and allowed the First Appeals filed by the farmers (F.A. No. 522 of 2009 Pradeep Kumar v. State of UP, being the lead case) and awarded compensation of Rs. 297 per sq. yd. vide final judgment dt. 21.04.2016. This has attained finality. [Note : In the present bunch of cases, listed before this Court, the compensation has been awarded @ Rs. 297/- sq. yard based on this judgment dated 21.04.2016 only as they pertain to the same notification and the same village (Makanpur) and have arisen out of the same Reference Court order.] 38-95 96-98 99-124 3. Makanpur, (Vaishali) Distt. Ghaziabad, Tehsil Dadri 12.09.1986/24.02.1988 [Rs. 297/-] This Court in Civil Appeal No. 10429-10430 of 2017, Narendra v. State of UP, reported as (2017) 9 SCC 426 has awarded compensation @ Rs. 297/- 125-135 4. Makanpur, (Indirapuram) Distt. Ghaziabad, Tehsil Dadri 16.08.1988 [Rs. 297/-] This Court in Civil Appeal No. 16960 of 2017, Jaiprakash (D) v. State of U.P. vide judgment dated 24.11.2017, reported as (2020) 11 SCC 770, increased compensation to Rs. 297/- (Followed In re : Narendra) 136-137 5. Makanpur, (Indirapuram) Distt. Ghaziabad, Tehsil Dadri 16.08.1988 [Rs. 297/-] This Hon'ble Court in Civil Appeal No. 16961 of 2017, Om Prakash v. State of UP vide the same judgment dated 24.10.2017 in Jai Prakash (supra) increased the compensation to Rs. 297/- 6. Makanpur, (Vaishali) Distt. Ghaziabad, Tehsil Dadri 12.09.1986/28.02.1987 [Rs. 297/-] This case had also arisen out of the above-mentioned Kashi Ram judgment (supra). After the judgment in Kashi Ram, an application bearing CMAN no. 194412 of 2016 was filed in one of the First Appeals bearing FA No. 484 of 2019, Ghaziabad Development Authority v. Trilok Chand, which was also decided along with the bunch of Kashi Ram (supra) for 33% deduction as development charges from the compensation determined at the rate of Rs. 297/- sq. yard, but the same was rejected. SLP bearing SLP (C) No. 12547/2017, Ghaziabad Development Authority v. Trilok Chand was filed against the said dismissal, wherein while issuing notice, vide order dated 28.04.2017, it was especially recorded that the GDA was aggrieved by the non-deduction of 33% as development charges. However, the said SLP was dismissed vide order dated 03.08.2017. 138-139 140-141 7. Makanpur, (Indirapuram) Distt. Ghaziabad, Tehsil Dadri 16.08.1988 [Rs. 297/-] This Court in Civil Appeal No. 9208-9211 of 2018, Mangu Singh v. State of UP, vide judgment dated 10.09.2018, increased compensation to Rs. 297/-. 142-144

    10. Making the above submissions and relying upon the above decisions/orders passed by the High Court as well as this Court, it is prayed that the present appeal be dismissed.

    11. We have heard learned counsel appearing on behalf of the respective parties at length.

    12. So far as the submissions made on behalf of the appellant that the High Court has erred in condoning the delay of 16/26 years in preferring the appeal is concerned, in the peculiar facts and circumstances of the case and considering the fact that even while enhancing the amount of compensation and entertaining the appeal, the High Court has denied the interest for the period of delay and has exercised its discretion in favour of the claimants, we see no reason to interfere with the order passed by the High Court condoning the delay in preferring the appeal.

    13. Now so far as merits of the appeal and the impugned judgment and order passed by the High Court enhancing the amount of compensation at Rs. 297/- per sq.yard is concerned and the reliance placed upon the decisions of the High Court and this Court referred to hereinabove and relied upon on behalf of the claimants is concerned, at the outset it is required to be noted that in the present case, the acquisition is of the year 1982 and in all other relied upon cases the acquisition(s) is/are of the year 1986/88. In all those cases, where the amount of compensation has been determined @ Rs. 297/- per sq.yard, the acquisition(s) is/are of the years 1986/1988 with respect to the Village Makanpur and other nearby villages acquired for the development of NOIDA/Ghaziabad. In the case of Narendra (supra), this Court had enhanced the amount of compensation to Rs. 297/- per sq.yard with respect to the land acquired in Village Makanpur and other surrounding villages acquired for the very same project, but with respect to the acquisition of the years 1986/1988. However, subsequently in the case of U.P. Awas Avam Vikas Parishad (supra) and after considering the decision of this Court in the case of Narendra (supra) with respect to the village Makanpur and other surrounding villages situated at Village Prahladgarh, Village Jhandapur, Village Sahibabad, Village Arthala with respect to the acquisition of the year 1982, this Court has determined the compensation at Rs. 120/- per sq.yard. In the said decision, while refusing to accept the claim of Rs. 297/- per sq.yard as awarded in the case of Narendra (supra) which was with respect to the acquisition of 1988, this Court has observed that the compensation determined on the basis of the Notification 5 years later, cannot be a yardstick for determining the compensation for the land which is acquired five years before. This Court has also taken note of the fact that between the year 1982 and 1987/1988, development activities had been undertaken. Applying the law laid down by this Court in the case of U.P. Awas Avam Vikas Parishad (supra) to the present case, the claimants shall not be entitled to the same compensation as awarded with respect to the lands acquired after 5 years from the date of acquisition in the present case. As observed hereinabove, in the present case, Section 4 Notification had been issued on 22.11.1982 and the relied upon decisions with respect to Village Makanpur and other villages are of the year 1986/88, which as observed by this Court in the aforesaid decision in the case of U.P. Awas Avam Vikas Parishad (supra), cannot be the basis. Under the above circumstances, the impugned judgment and order passed by the High Court awarding compensation @ Rs. 297/- per sq.yard is unsustainable and it is held that the original claimants shall be entitled to compensation at the rate of Rs. 120/- per sq.yard.

    14. In view of the above and for the reason stated above, the present appeal succeeds in part. The impugned judgment and order passed by the High Court is hereby modified. It is ordered and directed that the original claimants shall be entitled to compensation at the rate of Rs. 120/- per sq.yard along with all other statutory benefits and interest allowable under the provisions of Land Acquisition Act, 1894. However, the claimants shall not be entitled to the statutory benefits including the interest under the Act, 1894 on the enhanced amount of compensation for the delayed period in preferring the appeal before the High Court i.e. from the date of rejection of the review application till the first appeal was filed before the High Court.

    15. Present appeal is accordingly allowed to the aforesaid extent. No costs.

    Use AI to get other relevant cases.

    Comments

    NEW OKHLA INDUSTRIAL DEVELOPMENT AUTHORITY v. OMVIR SINGH
    (Dec 15, 2022)