  • ARTICLE 226 A CONSTITUTION OF INDIA
  • ARTICLE 226 CONSTITUTION OF INDIA
  • SECTION 56 ELECTRICITY ACT 2003
  • ARBITRATION AND CONCILIATION ACT 1996
  • Section 20 of the 1948 Act,
  • Section 56 of the 2003 Act. 25. Since Section 56(2) of the 2003 Act
  • Section 56 of the 2003 Act
  • WBERC. 21. Section 79 of the 2003 Act
  • 2, 1948. Section 20 of the DVC Act
  • Corporation Act, 1948 (for short, the DVC Act),
  • Sections 62, 79 and 86 of the 2003 Act
  • Section 56(2) of the 2003 Act,
  • provisions of Sections 62, 79 and 86 of the 2003 Act,
  • sub-section (8) of Section 42 of the 2003 Act
  • Sections 42(5), 42(6) and 52(5) of the 2003 Act, read with Regulation 3.5
  • sub-sections (5) and (6) of Section 42
  • sub-Section (1) of Section 56. 50.
  • Section 56(2) of the 2003 Act. 80.
  • 54. Section 64 of the 2003 Act
  • Section 56(2) of the 2003 Act: i. (2012) 5 CHN 213 (Cal)
  • Section 56 of the 2003 Act. 53.
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Equivalent Citations
citation codes
Case Number
Disposition
Advocates
Judges
Acts
  • ARTICLE 226 A CONSTITUTION OF INDIA
  • ARTICLE 226 CONSTITUTION OF INDIA
  • SECTION 56 ELECTRICITY ACT 2003
  • ARBITRATION AND CONCILIATION ACT 1996
  • Section 20 of the 1948 Act,
  • Section 56 of the 2003 Act. 25. Since Section 56(2) of the 2003 Act
  • Section 56 of the 2003 Act
  • WBERC. 21. Section 79 of the 2003 Act
  • 2, 1948. Section 20 of the DVC Act
  • Corporation Act, 1948 (for short, the DVC Act),
  • Sections 62, 79 and 86 of the 2003 Act
  • Section 56(2) of the 2003 Act,
  • provisions of Sections 62, 79 and 86 of the 2003 Act,
  • sub-section (8) of Section 42 of the 2003 Act
  • Sections 42(5), 42(6) and 52(5) of the 2003 Act, read with Regulation 3.5
  • sub-sections (5) and (6) of Section 42
  • sub-Section (1) of Section 56. 50.
  • Section 56(2) of the 2003 Act. 80.
  • 54. Section 64 of the 2003 Act
  • Section 56(2) of the 2003 Act: i. (2012) 5 CHN 213 (Cal)
  • Section 56 of the 2003 Act. 53.
Smart Summary

Concise Analytical Summary of the Opinion

Factual and Procedural Background

Ten writ petitions were heard together because they raised similar questions concerning claims made by the Damodar Valley Corporation (DVC) against consumers and the role of the West Bengal Electricity Regulatory Commission (WBERC). Three petitions specifically asked whether the DVC could, in 2020-21, claim dues based on bills raised in 2009, 2010, 2011 and 2013. The common issues across all petitions included whether Delayed Payment Surcharge (DPS) could be charged by DVC on the basis of the CERC input tariff and/or otherwise before the WBERC finally settled retail tariff for the periods 2006–2009 and 2009–2013, and whether subsequent disconnection notices issued by DVC were lawful, particularly with reference to Section 56(2) of the Electricity Act, 2003.

The DVC and WBERC raised preliminary objections about maintainability, contending that statutory grievance forums (GRO, RGRO, CGRO) under the Electricity Act and the WBERC Regulations ought to be exhausted before approaching the High Court under Article 226. The petitioners (consumers) argued that the disputes involved legality of DVC claims and could not simply be relegated to “billing disputes” before GROs, and they challenged the charging of DPS and validity of disconnection notices.

Procedurally, the WBERC ultimately fixed final retail tariffs for West Bengal on March 19, 2020 (for 2009–2013) and June 19, 2020 (for 2006–2009). DVC raised bills based on those final tariffs only in 2021. The Court was called upon to decide (i) whether DVC could claim differential dues in 2021 based on earlier-period bills; (ii) whether DPS could be charged for periods prior to final retail tariff fixation; and (iii) whether disconnection notices were valid under Section 56(2).

Legal Issues Presented

  1. Whether the DVC could, in 2020–21, claim dues on the basis of bills raised during 2009, 2010, 2011 and 2013 (as framed in three writ petitions).
  2. Whether Delayed Payment Surcharge (DPS) could be charged by the DVC from its consumers on the basis of the CERC input tariff and/or otherwise, before the final retail tariff was settled by the WBERC, for the periods 2006–2009 and 2009–2013.
  3. Whether subsequent disconnection notices given by the DVC to its consumers were unlawful, in particular having regard to Section 56(2) of the Electricity Act, 2003.

Arguments of the Parties

DVC (as represented in the opinion)

  • The DVC maintained that it had raised bills during 2009–2013 and that consumers failed to pay; to recover some amounts it permitted payment in 24 instalments and did not relinquish its right to claim DPS.
  • The DVC argued that different retail rates prevailed at different times and that charges relate back to the periods when defaults occurred; acceptance of instalments did not amount to acquiescence or waiver of the right to claim DPS.
  • The DVC and its counsel relied on authorities (as listed in the opinion) in support of the maintainability of certain contentions and/ or the interpretation of statutory provisions relating to limitation and recovery.

WBERC (as represented in the opinion)

  • WBERC and its counsel raised a preliminary objection as to maintainability: the definition of “Consumer Grievance” under WBERC Regulations brings such disputes within the remit of GRO/RGRO/CGRO, and statutory forums must be exhausted before approaching the High Court.
  • WBERC argued that disputes relating to DVC bills must be raised before GRO/CGRO as contemplated by Sections 42(5), 42(6) and 52(5) of the Electricity Act, 2003 and Regulation 3.5 of the 2013 WBERC Regulations, and relied on precedent supporting the dispute-resolution mechanism under the Electricity Act.
  • WBERC disputed any analogy between arbitration law bars and the Electricity Act scheme for grievance redressal, noting the legislature left electricity charge disputes to GROs and regulatory mechanisms.

Petitioners / Consumers

  • Petitioners argued that the DVC could not in 2021 claim dues based on bills from 2009–2013, especially where instalments had been accepted under a final settlement — Section 56(2) barred recoverability after two years unless shown continuously as arrears.
  • Petitioners contended that Section 62 designates that tariff must be determined by the Appropriate Commission (WBERC for retail), and since final retail tariff was only fixed in 2020, there was no occasion to charge DPS prior to that fixation.
  • They argued sub-section (8) of Section 42 showed sub-sections (5) and (6) provide additional remedies and do not oust other judicial remedies; availability of statutory remedies does not automatically bar constitutional remedy under Article 226 in all circumstances.
  • Petitioners also raised concerns of possible bias and natural justice because GROs are officers of the DVC.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Titaghur Paper Mills Co. Ltd. v. State of Orissa (1983) 2 SCC 433 Cited in the context of maintainability / exhaustion of statutory remedies (relied upon by parties). The opinion records this case as cited by counsel in support of preliminary objections; the Court referenced it when addressing maintainability but did not rely on it as the sole basis for its decision.
U.P. State Spinning Co. Ltd. v. R.S. Pandey (2005) 8 SCC 264 Cited regarding alternative statutory remedies and maintainability. Recorded as relied upon by parties; the Court noted the citation in the discussion on whether statutory grievance forums must be exhausted.
Commissioner of Income Tax v. Chhabil Dass Agarwal (2014) 1 SCC 603 Cited in relation to maintainability / exhaustion of remedies. The opinion notes this precedent was placed for the same purpose; the Court referred to it in its consideration of the preliminary objection.
Transport and Dock Workers Union v. Mumbai Port Trust (2011) 2 SCC 575 Cited for the proposition about alternative remedies/maintainability (relied by parties). The opinion records that this case was relied upon; the Court noted it among authorities on the point of alternative remedies.
Rajasthan State Industrial Development & Investment Corporation v. Diamond & Gem Development Corp. Ltd. (2013) 5 SCC 470 Cited in the context of alternative remedies and maintainability. Recorded as relied upon by counsel; the Court included it in the catalogue of authority addressing statutory forums and maintainability.
Maharashtra Electricity Regulatory Commission v. Reliance Energy Ltd. (2007) 8 SCC 381 Upheld and approved the dispute resolution mechanism within the Electricity Act and Regulations. The Court expressly referred to this decision as supportive of the statutory dispute-resolution scheme under the Electricity Act when noting WBERC's submissions.
Kamini Jaiswal v. Union of India (2018) 1 SCC 156 Cited for the narrow principle when an exceptional case may permit bypassing statutory alternative remedies to seek judicial review under Article 226. The opinion records that parties invoked this case; the Court noted that no exceptional case under Kamini Jaiswal was made out here.
Assistant Engineer (D1), Ajmer Vidyut Vitran Nigam Ltd. v. Rahamatullah Khan Alias Rahamjulla (2020) 4 SCC 650 Cited on the question of limitation as stipulated in Section 56(2) of the Electricity Act, 2003. The Court recorded this case as relied upon by counsel in submissions about limitation; it featured in the limitation discussion.
M.G. Abrol, Additional Collector of Customs, Bombay v. Shantilal Chhotelal & Co. AIR 1966 SC 197 Cited in support of the proposition that availability of alternative remedies is not always an absolute bar to constitutional relief. Recorded by the Court as among authorities relied upon by petitioners; used to illustrate circumstances where Article 226 may still be available.
State of U.P. v. Indian Hume Pipe Co. Ltd. (1977) 2 SCC 724 Cited in the same context as M.G. Abrol—availability of constitutional remedy despite alternative remedies. Recorded as a precedent invoked by petitioners; the Court listed it among relevant authorities on that proposition.
Ram and Shyam Company v. State of Haryana (1985) 3 SCC 267 Cited regarding availability of writ remedies despite alternative remedies and also later in relation to bias/natural justice submissions. The opinion notes this case was relied upon by petitioners on both points; the Court recorded the citation in the analysis.
Whirlpool Corporation v. Registrar of Trade Marks, Mumbai (1998) 8 SCC 1 Cited for the principle that alternative remedies do not automatically bar constitutional relief. Recorded as part of petitioners' reliance; the Court included it among the authorities considered.
Union of India v. Tantia Construction Pvt. Ltd. (2011) 5 SCC 697 Cited in the context of the same principle regarding alternative remedies and Article 226. Recorded by the Court as one of several precedents relied upon by petitioners on maintainability of writs despite alternative remedies.
Bisra Lime Stone Co. Ltd. v. Orissa State Electricity Board (1976) 2 SCC 167 Cited for a definition/contextual meaning of “surcharge” in electricity law (surcharge as something over and above normal charge). The Court recorded this authority as relied upon by petitioners when discussing the nature of DPS and its interpretation.
Cesc Limited v. Shiva Glass Company Limited & Ors. (2012) 5 CHN 213 Cited regarding disconnection notices being hit by limitation under Section 56(2). Recorded as a precedent relied upon by petitioners in arguing limitation would bar disconnection notices; the Court noted it in the limitation discussion.
Perkins Eastman Architects Dpc v. HSCC (India) Ltd. 2019 SCC OnLine SC 1517 Cited by petitioners to stress likelihood of bias/violation of natural justice where the grievance officer is an officer of the same utility. The Court recorded that petitioners relied on this case to argue potential bias of GROs; the opinion notes the citation in that context.
Shri Surendra Kumar Ray Chowdhury v. The Collector of Calcutta (1985) 1 CLJ 332 Cited by petitioners aiming to show bias/natural justice concerns in institutional grievance mechanisms. The opinion records that petitioners relied on this authority; the Court included it among materials on bias and natural justice submissions.

Court's Reasoning and Analysis

The Court's analysis proceeds from a statutory construction of the Electricity Act, 2003 read with the regulatory context and established factual timeline in these matters.

Statutory structure and allocation of tariff-determination authority

  • The Court examined Sections 62, 79 and 86 of the Electricity Act, 2003 to identify which body determines tariffs. It observed that the “Appropriate Commission” (State Commission) determines retail tariff for supply within the State (WBERC in this case), while CERC determines tariffs for central government-owned generating companies and inter-State generation/transmission as specified in Section 79.
  • Given this statutory allocation, the Court concluded retail tariffs for West Bengal must be determined by the WBERC, and any notion of a charge for electricity must be read in that light for purposes of Section 56 (disconnection and limitation).

Chronology and causation for chargeability

  • The Court recorded that the WBERC finally fixed retail tariffs for the periods in question on June 19, 2020 (2006–2009) and March 19, 2020 (2009–2013).
  • The DVC raised bills based on those final retail rates in 2021; the Court emphasized that these bills were the first occasion on which retail-arrears based on the final tariffs were asserted to the consumers.
  • Because final retail tariffs crystallized only in 2020 and the bills based on those tariffs were first raised in 2021, the Court reasoned that the consumers' liability to pay retail charges (as defined by the final WBERC orders) arose only from the due dates in these 2021 bills and not earlier.

Nature and scope of Delayed Payment Surcharge (DPS)

  • The Court observed that DPS is not defined in the 2003 Act but is addressed in Clause 4.14 of the WBERC (Terms & Conditions of Tariff) Regulations, 2011, which prescribes escalating monthly rates for delay.
  • Interpreting that clause, the Court concluded DPS is penal in nature: it is an amount in excess of electricity charges imposed for non-payment of those charges. Consequently, DPS can only arise where there is a valid and existing charge which has become due and in default.
  • Because the final retail tariff (which defines the “charges”) was fixed only in 2020 and bills based on those rates were raised only in 2021, the Court held there was no prior occasion on which DPS could lawfully be levied for the periods 2006–2009 and 2009–2013.

Application of Section 56(2) (limitation and disconnection)

  • Section 56(2) bars recoverability of any sum due under Section 56 after two years from the date such sum first became due unless shown continuously as recoverable arrears. The Court read Section 56(2) in consonance with Sections 62, 79 and 86 and the regulatory framework to conclude that no uniform or certain basis existed to treat earlier tentative/ad hoc tariffs as final for the purposes of Section 56.
  • As final retail tariffs were fixed in 2020 and bills based on them were first raised in 2021, the limitation clock for recoverability and for Section 56 purposes ran from the due dates of the 2021 bills, not from earlier ad hoc rates or provisional bills.

Merger of varying yardsticks into final retail tariff

  • The Court explained that varying interim or provisional yardsticks (CERC provisional rates, Appellate Tribunal directions, high-court divergences) ultimately merged into the final retail tariffs determined by WBERC in 2020; hence the varying earlier standards could not operate to sustain DPS claims or disconnection notices once the final tariff was fixed and bills based thereon were first raised in 2021.

On maintainability / grievance forums

  • The Court recorded submissions about GRO/CGRO remedies and the parties' reliance on authorities. It noted the statutory grievance mechanism under the Electricity Act and Regulations, and referenced authorities upholding that scheme; however, the Court’s operative reasoning focused on the substance of liability, limitation and the dates when the charges crystallized rather than simply rejecting the petitions on maintainability grounds alone.

Holding and Implications

Holding:

The Court issued a bifurcated holding:

  • Affirmative on claimability: The DVC could, in 2021, claim dues representing the differential between amounts actually paid by the consumers and the amounts due as per the final retail tariff fixed by the WBERC on June 19, 2020 (for 2006–2009) and March 19, 2020 (for 2009–2013). The dates of final tariff fixation were the relevant starting points for limitation under Section 56(2).
  • Negative on DPS and disconnection: The DVC was not entitled to charge any Delayed Payment Surcharge for alleged defaults that (if at all) occurred prior to the fixation of final retail tariffs in 2020; consequently, disconnection notices issued on the basis of such DPS claims and fluctuating yardsticks were held to be illegal and invalid. Issue regarding disconnection (Issue iii) was therefore negated.

Direct consequences / practical effects on the parties:

  • The batch of ten writ petitions listed in the order were disposed of in light of the above conclusions.
  • The DVC was directed to restore electric supply to each writ petitioner (either phase-wise or all at once) expeditiously but in any event by February 28, 2022 (outer limit specified by the Court).
  • All bills raised by DVC on the writ petitioners on account of Delayed Payment Surcharge were cancelled and revoked.
  • The DVC was permitted, by duly raising bills, to claim as arrears the differential amounts between what each petitioner actually paid as electricity charges and the total amounts due computed on the basis of the final WBERC rates (with due credit for amounts already paid under the 24-installment arrangements for 2010–2013).
  • There was no order as to costs. Certified copies of the order were to be made available on compliance with formalities, and copies were to be placed in each file for future reference.

Broader implications: The opinion confines itself to statutory construction and factual chronology in these cases. It does not expressly claim to lay down a novel precedent beyond applying the statutory scheme (Sections 62, 79, 86 and 56) and existing regulatory provisions to the facts; the direct effect is the relief and directions given to the petitioners and on the DVC’s entitlement to recover differential arrears (subject to credits).

To access the original judgment, please Sign In or Subscribe.

    DEBEANJANA HARD COKE PRIVATE LIMITED AND ANR v. WEST BENGAL ELECTRICITY REGULATORY COMMISSION AND ORS

    Sabyasachi Bhattacharyya, J.:— The above-captioned ten writ petitions are heard and adjudicated together since the questions involved therein are similar in nature.

    2. A common question which has arisen for consideration in three of the writ petitions, bearing WPA No. 4168 of 2021 (Debanjana Hard Coke Private Limited v. West Bengal Electricity Regulatory Commission), WPA No. 15432 of 2021 (Jay Ambey Metals Pvt. Ltd. v. West Bengal Electricity Regulatory Commission) and WPA 16040 of 2021 (Surya Alloy Industries Ltd. v. West Bengal Electricity Regulatory Commission), which is different from those arising in the other seven, is:—

    i. Whether the Damodar Valley Corporation (DVC) can, in 2020-21, claim dues on the basis of bills raised during the years 2009, 2010, 2011 and 2013.

    3. The other cardinal questions involved in all the ten writ petitions are the same, being:—

    ii. Whether Delayed Payment Surcharge (DPS) could be charged by the DVC from its consumers on the basis of the Central Electricity Regulatory Commission (CERC) input tariff and/or otherwise, before the final retail tariff is settled by the West Bengal Electricity Regulatory Commission (WBERC), for the periods 2006-2009 and 2009-2013;

    iii. Whether the subsequent disconnection notices given by the DVC to its consumers are de hors the law, in particular, Section 56(2) of the Electricity Act, 2003 (hereinafter referred to as ‘the 2003 Act’).

    4. At the outset, the DVC as well as the WBERC raise a preliminary objection as to maintainability of the writ petitions. The definition of “Consumer Grievance”, as given in the prevalent Regulations issued under the 2003 Act by the WBERC, as amended under the 2020 Regulation, it is argued, includes every possible dispute contemplated under the 2003 Act. Such grievances are referable to the Forum created under the Regulations, being the respective Grievance Redressal Officer (GRO) and the Regional Grievance Redressal Officer (RGRO). As such, it is argued that, in the absence of any challenge to the vires of the Regulations, the same prevails.

    5. Since a special statute with a special forum is required to be exhausted before a party can approach a writ Court under Article 226 of the Constitution of India, the writ court, it is submitted, ought to restrain its hands in the matters and relegate those to the GRO and/or RGRO concerned.

    6. In this context, learned Senior Counsel appearing for the DVC relies upon (1983) 2 SCC 433 [Titaghur Paper Mills Co. Ltd. v. State of Orissa], (2005) 8 SCC 264 [U.P. State Spinning Co. Ltd. v. R.S. Pandey], (2014) 1 SCC 603 [Commissioner of Income Tax v. Chhabil Dass Agarwal].

    7. Learned Senior Counsel appearing for the WBERC contends that the disputes relating to the bills for electric charges raised by the DVC have to be raised before the concerned GRO and/or Central Grievance Redressal Officer (CGRO), as contemplated under Sections 42(5), 42(6) and 52(5) of the 2003 Act, read with Regulation 3.5 of the 2013 WBERC Regulations.

    8. It is argued that, in view of availability of such alternative efficacious remedy, the writ Court cannot be moved and the appeals are not maintainable under Article 226 of the Constitution of India.

    9. For such proposition, learned Counsel places reliance on (2005) 8 SCC 264 [U.P. State Spinning Co. Ltd. v. R.S. Pandey], (2011) 2 SCC 575 [Transport and Dock Workers Union v. Mumbai Port Trust], (2013) 5 SCC 470 [Rajasthan State Industrial Development and Investment Corporation v. Diamond & Gem Development Corporation Limited].

    10. The dispute resolution mechanism within the purview of the 2003 Act and the Regulations have been upheld and approved by the Supreme Court in (2007) 8 SCC 381 [Maharashtra Electricity Regulatory Commission v. Reliance Energy Ltd.].

    11. No exceptional case for seeking judicial review under Article 226, bypassing the statutory alternative remedy as envisaged in (2018) 1 SCC 156 [Kamini Jaiswal v. Union of India] has not been made out in the present case, it is argued.

    12. Learned Senior Counsel for the WBERC submits that, it being a matter of public policy, the disputes arising under the 2003 Act must be adjudicated in the forum specified by the statute and before such forums are exhausted, no petitioner is permitted to move this Court under Article 226 of the Constitution of India.

    13. (1983) 2 SCC 433 [Titaghur Paper Mills Co. Ltd. v. State of Orissa] and (2014) 1 SCC 603 [Commissioner of Income Tax v. Chhabil Dass Agarwal] are cited in that regard.

    14. By placing reliance on (2020) 4 SCC 650 [Assistant Engineer (D1), Ajmer Vidyut Vitran Nigam Limited v. Rahamatullah Khan Alias Rahamjulla], on the question of limitation as stipulated in Section 56(2) of the 2003 Act, learned counsel argues that the said provision has no manner of application in the facts and circumstance of the case.

    15. That apart, it is argued, the outstanding due for the period 2010-2013 was paid by 24 installments, the last of which was paid on March 30, 2019. In view of the claim for DPS having been raised within two years thereafter, the question of limitation does not arise, in any event.

    16. Mere acceptance of the instalments by the DVC do not amount to acquiescence and/or waiver, since the DVC, at no point of time, relinquished its claim for DPS, either explicitly or implicitly.

    17. The same line of arguments are adopted by learned Senior Counsel appearing for the DVC as well.

    18. On merits, learned counsel for the petitioners in the bunch of three matters, where the first question for consideration arose, argue that, as late as in the year 2021, the DVC could not claim dues on the basis of bills raised during June, 2009, May, 2010, 2011 and/or 2013.

    19. Apart from such claims being barred under Section 56(2) of the 2003 Act in view of the acceptance of the 24 instalments which were agreed upon between the consumers and the DVC in final settlement of the previous dues, the DVC could not claim any further dues, let alone DPS, on the basis of previous bills.

    20. It is argued that Section 62 of the 2003 Act provides specifically for determination of tariff by the “Appropriate Commission”. The Appropriate Commissions respectively are the CERC and the State Electricity Regulatory Commission, in the present case, WBERC.

    21. Section 79 of the 2003 Act categorically provides, in Clause (a) thereof, that the CERC shall regulate tariff of generating companies owned or controlled by the Central Government. In other cases, Clause (b) of Section 79 provides that the CERC shall regulate the tariff of generating Companies, other than those owned and controlled by the Central Government, if such companies entered into or otherwise have a composite scheme for generation and sale of electricity in more than one State. Clause (d) of Section 79 specifies that the CERC shall also determine tariff for inter-State transmission of electricity. On the other hand, Section 86 of the 2003 Act deals with the functions of the State Commissions. Clause (a) thereof provides for determination of the tariff for generation, supply, transmission and wheeling of electricity, wholly, bulk or retail, as the case may be, within the State.

    22. As such, it is argued that, insofar as the retail tariff is concerned, it is the WBERC which has to settle such tariff.

    23. It is further argued that Section 56 of the 2003 Act specifically provides for disconnection of supply in default of payment. Sub-section (2) thereof specifically stipulates that no sum from any consumer, under Section 56, shall be recoverable after the period of two years from the date when such sum became due, unless such sum has been shown continuously as recoverable as arrear of charges for electricity supplied and the licensee shall not cut off the supply of the electricity.

    24. It is argued that since the WBERC settled retail tariff only in the year 2020, no dues can be claimed for prior periods. The first occasion when the amounts-in-question became payable was after the bills were raised for the respective periods of 2006-2009 and 2009-2013 and the rate of retail charges were fixed finally on June 19, 2020 and March 19, 2020 respectively. Before that, it is contended, there could not be any electric charge payable by the consumers, as contemplated under Section 56 of the 2003 Act.

    25. Since Section 56(2) of the 2003 Act specifically debars the disconnection of electric supply on the ground of recoverability of any dues after the period of two years and the claims in that regard made by the DVC were crystallized only after such bills were finally raised on the final tariff, prior thereto, there could not arise any occasion for the consumers to pay electric charges and, as such, there could not have been occasioned any “default” as such. Thus, the question of charging DPS does not arise at all.

    26. Learned counsel for the petitioners argue that a perusal of sub-section (8) of Section 42 of the 2003 Act makes it abundantly clear that sub-sections (5) and (6) of Section 42 provide for additional remedy in the given circumstances and not an alternative remedy. The other rights of the consumers are expressly reserved under the said subsection. Moreover, the mere availability of alternative remedies is not an absolute bar to litigants approaching the High Courts under Article 226 of the Constitution of India.

    27. The present disputes, it is argued, have been raised on the legality of the DVC claim for past dues and DPS, on the basis of earlier retail tariff, even before the retail tariff was finally determined by the WBERC. Thus, the disputes in the present matters cannot be relegated to the category of mere “billing disputes”, to be decided by GROs and/or CGROs.

    28. On the proposition that alternative remedies, even if available, do not operate as an absolute bar in filing a petition under Article 226 of the Constitution, learned counsel places reliance on the following judgments:

    i. AIR 1966 SC 197 [M.G. Abrol, Additional Collector of Customs, Bombay v. Shantilal Chhotelal & Co.];

    ii. (1977) 2 SCC 724 [State of U.P. v. Indian Hume Pipe Co. Ltd.];

    iii. (1985) 3 SCC 267 [Ram and Shyam Company v. State of Haryana];

    iv. (1998) 8 SCC 1 [Whirlpool Corporation v. Registrar of Trade Marks, Mumbai]; and

    v. (2011) 5 SCC 697 [Union of India v. Tantia Construction Private Limited].

    29. It is iterated by learned counsel appearing for the petitioners that ‘surcharge’ means something over and in excess of the normal dues or charge, in the context of electricity laws. Reference is made to (1976) 2 SCC 167 [Bisra Lime Stone Company Ltd. v. Orissa State Electricity Board] in such context.

    30. The concept of “default” has a notable element of willfulness or an element of mens rea or actus rheus. Even on the anvil of a civil liability, the levy of surcharge is not automatic, unless there is a finality attached to such civil liability and the payment had actually become due to be discharged. In view of the admitted position that the final rate of retail tariff was only determined in the year 2020 by the WBERC for both the periods 2006-2009 and 2009-2013, there could not arise any occasion to charge dues and/or DPS from the consumers prior thereto.

    31. Learned counsel for the petitioners rely on the following judgments regarding disconnection notices being hit by the limitation period prescribed in Section 56(2) of the 2003 Act:

    i. (2012) 5 CHN 213 (Cesc Limited v. Shiva Glass Company Limited & Ors.],

    ii. (2020) 4 SCC 650 [Assistant Engineer (D1), Ajmer Vidyut Vitran Nigam Limited v. Rahamatullah Khan Alias Rahamjulla].

    32. Learned counsel also places reliance on the following judgments to stress that the GRO being an officer of the DVC itself, there is all likelihood of bias and violation of natural justice:

    i. 2019 SCC OnLine SC 1517 [Perkins Eastman Architects Dpc v. Hscc (India) Ltd.],

    ii. (1985) 3 SCC 267 [Ram and Shyam Company v. State of Haryana],

    iii. (1985) 1 CLJ 332 [Shri Surendra Kumar Ray Chowdhury v. The Collector of Calcutta].

    33. Learned counsel also drew the analogy of the bars stipulated in the Arbitration and Conciliation Act, 1996 to appointment of Arbitrators in the above regard.

    34. On merits, the DVC argues that there were different retail rates at various points of time. Bills were raised for the period 2006-2009 as well as 2009-2013 during the period 2009-2013. In spite of getting such bills, the consumers failed to clear the amounts stipulated therein. Ultimately, in order to recover at least some amount, the DVC acceded to the consumers paying in 24 installments. However, the right to claim DPS was not relinquished by the DVC at any point of time.

    35. The consumers were never absolved from their liability to make due payments in time, in default of which they remained obligated to pay DPS as claimed by the DVC for the respective periods of late payment/non-payment.

    36. It is further contended by the DVC as well as the WBERC, that within the scheme of the 2003 Act and the Regulations framed thereunder, the disputes raised in all the writ petitions can be broadly termed as ‘billing disputes’ and ought to have been referred to and decided by the respective GROs.

    37. Bypassing such legal remedy, which is equally efficacious, if not more, the writ petitions ought to be dismissed, it is contended.

    38. It is further argued by the DVC that there was no occasion to claim DPS prior to the final settlement of the retail charges by the WBERC in the year 2020. However, the charges so payable relate back to the period during which each of the defaults were committed.

    39. Learned Senior Counsel appearing for the WBERC, in particular, argues that no analogy can be drawn between the provisions of the Arbitration and Conciliation Act, 1996 and the 2003 Act, which are entirely different in scope and operation.

    40. The legislature, in its wisdom, created specific bars in the appointment of Arbitrators for adjudicating disputes as contemplated under the 1996 Act. However, the technical decisions to be taken in dealing with disputes relating to electricity charges were left by the legislature, also in its wisdom, to the GROs.

    41. Upon hearing learned counsel appearing for the parties, I would be failing in my duty if I do not acknowledge and appreciate the cooperation rendered by counsel appearing for all the parties in preparing succinct and lucid notes of arguments which largely enabled the Court to reach its conclusions.

    42. To consider the short backdrop of the present case, several ad hoc phases of transition were undergone by the DVC and its consumers, vis-à-vis electricity charges.

    43. The Damodar Valley Corporation Act, 1948 (for short, “the DVC Act”), which was enacted to provide for the establishment and regulation of a corporation for the development of the Damodar Valley in the Provinces of Bihar and West Bengal, came into force on and from April 2, 1948. Section 20 of the DVC Act specifically empowered the DVC to fix the schedule of charges for the supply of electrical energy by the DVC, including the rates for bulk supply and retail distribution, and to specify the manner of recovery of such charges. As such, the DVC had, since then, been validly raising bills as per its own assessment of the tariffs.

    44. However, the 2003 Act was subsequently promulgated, inter alia, with the object and purpose of independent determination of tariffs by Electricity Regulatory Commissions, the policy of encouraging private sector participation in generation, transmission and distribution of electricity and harmonization of the provisions of the previous Acts. The 2003 Act came into force with effect from June 10, 2003.

    45. Section 62 of the said Act stipulates that the “Appropriate Commission” shall determine the tariff in accordance with the provisions of the Act.

    46. Section 79(1), Clauses (a), (b) and (d) provide that the Central Commission shall determine the tariff of the generating companies owned or controlled by the Central Government and inter-State operators in the field of generation and transmission of electricity. Section 86(1)(a) provides that the State Commission shall, inter alia, determine the tariff for generation, supply, transmission and wheeling of electricity, wholesale, bulk or retail, as the case may be, within the State.

    47. Read together, it is evident that the retail tariffs for the respective States have to be determined by the concerned State Commissions and not the Central Commissions.

    48. Although, obviously, such assessment of retail tariff depends largely on the bulk rates for generation and transmission of electricity, and could not be ascertained finally unless the said bulk rates were determined by the CERC, the ultimate tariff for retail supply in the States is that, which has been determined by the respective State Commissions.

    49. As such, the expression “any charge for electricity or any sum other than a charge for electricity”, as contained in Sections 56 of the 2003 Act, which provides for disconnection of electric supply in default of payment of due charges, has to be read in the proper perspective, as being consonant with the rates of tariff determined for retail supply by the State Commissions (the WBERC, in the present case).Section 56(2) of the 2003 Act stipulates that, notwithstanding anything contained in other law for the time being in force, no sum due from any consumer under Section 56 shall be recoverable after the period of two years from the date when such sum became first due, unless such sum has been shown continuously as recoverable as arrear of charges for electricity supplied, and that the licensee shall not cut-off the supply of the electricity as contemplated in sub-Section (1) of Section 56.

    50. In the present case, the retail tariff for West Bengal was finally fixed by the WBERC on June 19, 2020 (for the period 2006-2009) and on March 19, 2020 (for the period 2009-2013).

    51. The bills of arrears, based on such charges, were sent for the first time in each of the present cases, only in the year 2021 (although on different dates of 2021).

    52. It cannot be said that before 2021, when the bills were sent on the final tariff rates, there was any occasion or instance of prior dues in payment of electricity charges on the part of the consumers for the purpose of disconnection of electric supply under Section 56 of the 2003 Act. A joint reading of Sections 62, 79 and 86 of the 2003 Act would unerringly indicate towards such conclusion. In the event it was to be adjudicated that the charges for the purpose of attracting Section 56 were different for different periods, there would be no uniformity and/or certainty, which are essential characteristics of a penal provision such as disconnection under Section 56 of the 2003 Act.

    53. Although the DVC's rights to disconnect arose from the expiry dates of the different periods for which the respective bills were raised, that is, on different valid yardsticks, all such liabilities to pay electric charges on the part of the consumers merged in the final determination of tariff on June 19, 2020 (for the period 2006-2009) and March 19, 2020 (for the period 2009-2013). Since the bills based on such final rates were raised only in the year 2021 in all the cases, the liability of the consumers with regard to payment of such dues only arose after the respective due dates as stipulated in the 2021 bills; more so, since the DVC had not previously disconnected the supply of the consumers-in-question, in view of uncertainty and chaos prevailing due to the inaction of the DVC itself in not applying of its own for tariff fixation.

    54. Section 64 of the 2003 Act specifically lays down the procedure for tariff orders and casts an obligation on the generator/distributor/supplier, as the case may be, to file an application for determination of tariff under Section 62. Since the DVC functions in all such capacities, it was for the DVC to make such an application for the purpose of determination of tariff. However, despite having lost authority to determine its own electricity tariff, as conferred by the DVC Act, after the coming into force of the 2003 Act on June 10, 2003, the DVC merrily continued to charge electricity supply (retail) at its own rates instead of approaching the WBERC in that regard. First, the CERC fixed provisional tariff for generation and transmission and thereafter determined the final tariff for such purposes, for the period 2009-2014, only on June 23, 2011 and September 30, 2013. Since the generation and transmission components of the tariff were necessary pre-requisites for the State Commissions to fix the retail rates, the WBERC and the other State Commissions were handicapped in the absence of any application on behalf of the DVC on such score. Only on the initiative of the WBERC and the instigation of this Court by a judicial order did the DVC make an application for determination of retail tariff to the WBERC. Since the final retail tariff was fixed only on June 19, 2020 (for the period 2006-2009) and on March 19, 2020 (for the period 2009-2013), the rates of retail tariff crystallized for the said period on the aforesaid dates respectively.

    55. In the impugned summary statements raised by the DVC, DPS was charged for the first time by the DVC, although there were no prior instances of prior defaults on the final rates.

    56. Undoubtedly, we cannot lose sight of the fact that different yardsticks of fixation of retail tariff were prevalent at various periods of time, it is only for the DVC itself to blame for not having approached the CERC and/or respective State Commissions for the final determination of tariff for the purpose of generation, transmission and retail supply at an inter-State level.

    57. The initial concrete yardstick for fixation of retail tariff materialized from April 2, 1948, when the DVC was empowered under Section 20 of the 1948 Act, to determine its own tariff. Thereafter, such tariff witnessed several phases. Initially the CERC determined input tariffs for 2006-2009 on October 3, 2006, giving a transitory period of two years from April 1, 2004 to March 31, 2006 to the DVC.

    58. Thereafter, on May 10, 2010 the Appellate Tribunal decided the DVC challenge thereto, affirming the CERC rates and directing that in case of excess bill amounts refund with interest would be given under Section 62(6) of the 2003 Act, alternatively to adjust excess payments in 24 installments. The latter was done in the present case, which was a valid clearance of the dues by the consumers as per the Appellate Tribunal's order dated May 10, 2010.

    59. The Supreme Court, in turn, stayed only the direction to refund, given by the Appellate Tribunal, on July 9, 2010. However, there was no stay of the direction to approach the respective State Commissions.

    60. The Supreme Court ultimately dismissed the challenge on December 3, 2018, whereafter the Calcutta High Court, on the application of a consumer, directed the DVC to apply before the WBERC for determination of retail tariff.

    61. Only thereafter, the retail tariffs were fixed finally, respectively on June 19, 2020 for the period 2006-2009 and March 19, 2020 for the period 2009-2013.

    62. In the interregnum, the CERC had issued provisional tariff for generation and transmission on June 23, 2011, which was set aside by the Calcutta High Court on December 7, 2012, holding the provisional tariff regulations ultra vires and setting aside the power bills based on the provisional tariff.

    63. On the other hand, the Jharkhand High Court, in another challenge, upheld the provisional tariff as intra vires.

    64. Hence, during the ensuing period a Schrodinger's Cat dichotomy prevailed, inasmuch as the consumers of West Bengal were not bound to honour the power bills based on such provisional tariff, while the Jharkhand consumers were so bound, both during the self-same period.

    65. Ultimately on September 30, 2013 the CERC determined final tariff for generation and transmission for the period 2009-2014.

    66. Accordingly, the Supreme Court decided two appeals pending before it, against the Calcutta High Court and the Jharkhand High Court judgments respectively, on January 18, 2017, thereby setting aside both the said judgments. Soon thereafter, the DVC raised a bill asking the consumers to pay differential amount on the basis of final tariff for generation and transmission.

    67. Surprisingly, even thereafter, the DVC waited for a specific direction from this Court dated December 3, 2018 to apply before the WBERC for final determination of the retail tariff. Such determination was made by the WBERC for the periods 2006-2009 and 2009-2013 on June 19 and March 19, 2020 respectively.

    68. Albeit the WBERC was somewhat handicapped from ascertaining the final retail tariff till the tariffs for generation and transmission were finally decided, the WBERC took no active suo motu initiative in that regard, at least as far as visible from the records, thereby shirking the duty cast on it under Sections 62, 79 and 86 of the 2003 Act. The DVC also avoided discharging its statutory obligation to make applications under Section 64 of the 2003 Act for determination of tariffs under Section 62 of the Act. The consumers, under no stretch of imagination, can be faulted for such delay, both on the part of the DVC and the WBERC, in any event.

    69. Thus, only upon crystallization of the retail tariffs for the respective periods-in-question did the liability of the consumers to pay the retail tariff arose. In fact, such dues came into the picture only after the bills were raised by the DVC in 2021 for the respective consumers. There is no allegation of subsequent default of the consumers. Hence, DPS could not be raised for the first time in 2021, in the utter absence of any prior dues and/or consequent default.

    70. As far as “Delayed Payment Surcharge (DPS)” is concerned, no definition thereof has been provided either in the 2003 Act or the Regulations framed thereunder.

    71. The only guiding light on that score is thrown by Clause 4.14 of the West Bengal Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2011, which is quoted herein below:

    “The rates of the applicable delayed payment surcharge arising from non-payment of electricity charges as also other charges by a consumer shall be 1.25% per month of delay or pro-rated for part thereof upto 3 months of delay, at 1.5% per month of delay or pro-rated for part thereof for any period beyond 3 months of delay but upto the next 3 months and at 2% per month of delay or pro-rated for part thereof beyond first 6 months of delay. Delay in payment shall be counted from the due date for payment. This delayed payment surcharge is without prejudice to the provisions of disconnection under the Act and the Regulations made thereunder.”

    72. Taking a cue from the said provision, the DPS is in the nature of a penalty, levied in addition to other charges, arising only on nonpayment of such other electricity charges. The expression “charges” has to be read in consonance with the definition of tariff within the contemplation of Sections 62, 79 and 86 of the 2003 Act and the extant Regulations. Construing so, there could not have arisen any occasion to charge DPS prior to the finalization of the retail rates in the year 2020 and the raising of bills by the DVC thereon, in 2021. After 2021, there is no allegation as regards any default. As such, the Delayed Payment Surcharge levied by the DVC for the period 2006-2009 as well as 2009-2013 for alleged previous defaults are illegal and baseless.

    73. The varying touchstones of retail charges at different periods of time all merged into the retail tariff finally determined by the WBERC and on the DVC claiming bills thereon only, the liability of the consumers for payment of electricity charges arose in that regard. In fact, prior to such final fixation of retail charges, the DVC had not claimed DPS at any point of time.

    74. Any other interpretation than such merger would give rise to absurd consequences, since, in that event, the ad hoc arrangements as regards such tariff, either by virtue of orders passed by the High Courts or the Supreme Court or the different Regulatory Commissions, being the CERC, the State Commissions or the Appellate Tribunal, or the tentative tariffs prevalent as valid at various points of time, would have to be taken as the bases for ascertainment of the retail tariff, de hors the provisions of Sections 62, 79 and 86 of the 2003 Act, which in terms specifically empower the Appropriate Commission to determine such tariff.

    75. Hence, the subsequent disconnection notices given by the DVC on the basis of such fluctuating yardsticks, even after final retail tariff had been determined, were also illegal.

    76. The DPS could not be charged at the first instance, without there being any default regarding bills raised on the final tariff at any previous point of time.

    77. Even if any DPS was to be retrospectively claimed on the basis of previous bills during the period 2009-2013, the same would be barred by the two-year limitation as stipulated in Section 56(2) of the 2003 Act. In the present case, however, such question does not arise since the DPS was claimed for the first time in 2021.

    78. In view of the above discussions, the first question which fell for consideration is answered in the affirmative. The DVC could, in the year 2021, claim dues on the basis of differential amounts of charges, between the total amounts actually paid by the consumers for the relevant periods and the due amounts as per the retail tariff fixed on June 19, 2020 (for the period 2006-2009) and March 19, 2020 (for the period 2009-2013) respectively.

    79. Such claims are justified in 2021, since the final tariffs were fixed only in June and March, 2020, respectively for the periods 2006-2009 and 2009-2013 and bills for the differential amount between actuals and payables, even for the period during 2009-2013, were raised on the basis of such final tariffs. Thus, the dates of fixation of final tariff became the starting points of limitation within the contemplation of Section 56(2) of the 2003 Act.

    80. However, the second question which has come up for consideration in the present case has to be decided in the negative. The DVC is not entitled to charge any DPS for any of the defaults allegedly committed prior to the fixation of final retail tariff on June 19, 2020 and March 19, 2020 respectively for the periods 2006-2009 and 2009-2013 which were committed, if at all, in respect of the then fluid ad hoc tariffs which all merged ultimately into the final tariffs as fixed in 2020.

    81. Issue No. iii is, consequently, also negated, since no question of any disconnection would arise, as there were no defaults in the first place on the part of the consumers, regarding payment of electricity charges on the basis of the final retail tariff.

    82. W.P.A. No. 15428 of 2021, W.P.A. No. 14166 of 2021, W.P.A. No. 15432 of 2021, W.P.A. No. 16040 of 2021, W.P.A. No. 4168 of 2021 with CAN 1 of 2021, W.P.A. No. 5985 of 2021, W.P.A. No. 6047 of 2021, W.P.A. No. 6068 of 2021, W.P.A. No. 6075 of 2021 and W.P.A. No. 6077 of 2021 are thus disposed of in the light of the above observations.

    83. The DVC shall restore the electric supplies of each of the writ petitioners, phase-wise or at one go, as expeditiously as feasible but, in any event, within an outer limit of February 28, 2022.

    84. All bills raised by the DVC on the writ petitioners on account of Delayed Payment Surcharge stand hereby cancelled and revoked.

    85. However, the DVC shall be entitled, by duly raising bills, to claim from the writ petitioners/consumers, as arrears, the differential amounts between the total actual amounts paid as electricity charges by the writ petitioners respectively and the total amounts due, as calculated on the basis of the final rates fixed by the WBERC on June 19, 2020 and on March 19, 2020, for the periods 2006-2009 and 2009-2013 respectively, after giving due credit to the petitioners for the amounts, if any, already paid by them by way of the 24 instalments granted by the DVC for the period between 2010 and 2013.

    86. There will be no order as to costs.

    87. Urgent photostat certified copies, if applied for, be issued to the parties on compliance of due formalities in that regard.

    88. Copies of this common order be kept separately in the files of each of the above ten writ petitions for future reference.