JUDGMENT PRONOUNCED ON: 22.01.2021 COMPLAINT NO. 37/2017 IN THE MATTER OF MRIDULA GHOSH & ANR. ....COMPLAINANTS VERSUS ANSAL HI TECH TOWNSHIPS LTD. ...OPPOSITE PARTY CORAM: HONBLE DR. JUSTICE SANGITA DHINGRA SEHGAL (PRESIDENT) HONBLE SH. ANIL SRIVASTAVA, (MEMBER) Present: Ms. SHILPA PRAKASH, Counsel for Complainant. Ms. SUDITI BATRA, Counsel for the Opposite Party. PER: HONBLE DR. JUSTICE SANGITA DHINGRA SEHGAL, PRESIDENT JUDGMENT [Via Video Conferencing]
1. Present Consumer Complaint has been filed under Section 17 of the Consumer Protection Act, 1986 by Smt. Mridula Ghosh and Shri. Gourishankar Ghosh (hereinafter referred to as Complainants) against M/s Ansal Hi-Tech Townships Ltd. (hereinafter referred to as Opposite Party) seeking the following reliefs:
a) Handover the physical and legal possession of Plot No.
143 ad-measuring 162.00 sq (approx. 193.75 sq. Yards) CC 37/2017 MRIDULA GHOSH & ANR. VS. ANSAL HI-TECH TOWNSHIP LTD. Page 2 of 14 situated Sector 3B, Pocket Lake Olympus in Megapolis to the Complainants complete in all respects with immediate effect.
b) Pay to the complainants a sum of Rs. 3,89,745/- (Rupees Three Lakhs Eighty Nine Thousand Seven Hundred and Forty Five only) towards interest calculated @ 18% per annum from the date of actual handover of the plot w.e.f. 14th August, 2013 till the date of filing of the present complaint on various amounts from respective dates on which the Complainants have paid to the Opposite Party by way of installments and further interest till the date the plot is handed over to the Complainants, complete in all aspects.
c) Pay to the Complainants a sum of Rs. 5,00,000/- ( Rupees Five Lakhs) towards compensation for mental pain and agony suffered by them.
d) Pay to the complainants costs of present proceedings and also a sum of Rs. 35,000/-(Rupees Thirty Five Thousand)
e) Pay to the Complainants interest pendente lite @ 24% per annum from the date of filing of the complaint till the date of passing of the final judgment and decree/award by this Honble Commission in this case; and to further pay to the Complainants future interest @ 24% per annum on the awarded/decreetal amount from the date of passing of the final judgment and decree/award till the date of actual payment of the awarded/decreetal amount.
f) Such other and further order as this Honble Commission deems fit and proper in the facts and circumstances of this case be also passed in favor of the Complainants and against the respondent.
2. Brief facts of the case necessary for the adjudication of the present complaint are that the complainants booked a residential plot with the Opposite Party in its project MEGAPOLIS adjoining Greater Noida, Uttar Pradesh. On 01.08.2010, the complainants made a payment of Rs. 3,00,000/- to the Opposite Party which was acknowledged by the Opposite Party vide receipt no. 8400 dated 02.08.2010. Thereafter, on 14.08.2010, the complainants and the opposite party entered into a Plot Allottee(s) Agreement for the purchase/allotment of a plot CC 37/2017 MRIDULA GHOSH & ANR. VS. ANSAL HI-TECH TOWNSHIP LTD. Page 3 of 14 ad-measuring 162.00 sq. mtrs (approx 193.74 sq yards), bearing no. 143, situated at Sector-3B, Pocket Lake Olympus, for a total consideration of Rs. 16,78,488/-. The complainants, over the time had paid a sum of Rs. 7, 21,750/- to the Opposite Party as and when demanded by them, which have also been duly acknowledged by the Opposite Party.
3. Vide letter dated 22.07.2011, Complainants were informed by the Opposite Party that the project was moving at a steady pace and the development work was expected to be completed by the Diwali of 2011. On 19.01.2012, the Opposite Party took a unilateral decision of revising the prices of the plot, which was informed to the Complainants via e-mail.
4. On 18.12.2015, the Opposite Party informed the complainants that they have been re-allotted Plot No. 3B/063 ad-measuring 162 sq. meters instead of the originally allotted Plot No. 143 in Sector-3B, Pocket Lake Olympus in Megapolis. The complainants, aggrieved by the said acts of the Opposite Party sent a Legal Notice dated 05.05.2016 to the Opposite Party seeking withdrawal of the change in the location of the plot and also to furnish proof regarding the stage of completion of the project. It was noted in the legal notice that the sole reason for preferring/choosing the project of the Opposite Party was the location of the originally allotted plot.
5. On 06.05.2016, the Opposite Party issued a call notice upon the complainants demanding a sum of Rs. 3,69,267.18/- along with interest @ 18% p.a. amounting to Rs. 5,53,259/- on account of laying of sewer lines charges. Aggrieved by the actions of the Opposite Party, the Complainants again got served a legal notice upon the Opposite Party requesting for compliance of the former legal notice dated CC 37/2017 MRIDULA GHOSH & ANR. VS. ANSAL HI-TECH TOWNSHIP LTD. Page 4 of 14 05.05.2016, withdrawal of the call letter dated 22.04.2016 and also to furnish proof of any delay on the part of the Complainants along with proof regarding the stage of completion of the project, however, the Opposite Party failed to reply even to the second legal notice till the time of filing of the present consumer complaint.
6. Furthermore, till date, possession of the plot has not been handed over by the Opposite Party, even though the complainants were entitled to get the possession of the aforesaid plot within a period of 3 years from the date of execution of the agreement i.e. 14.08.2010.
7. Alleging unfair trade practice on the part of the Opposite Party, the complainants approached this commission.
8. During the course of the proceedings, notice was issued to the Opposite Party on 03.02.2017, the counsel for the Opposite Party appeared on 04.08.2017 and the copy of complaint was supplied to him. Subsequent to the acceptance of the copy of the complaint, the Opposite Party filed its written statement along with an application for condonation of delay of 150 days in filing the written statement.
9. The application was opposed by the counsel for the complainant, yet, at a later stage, the counsel for the complainant agreed to let the written statement to be taken on record subject to the Opposite Party paying a cost of Rs. 10,000/- on the next date of hearing. However, since the Opposite Party failed to appear on the next date of hearing
i.e. 04.09.2018, the written statement was taken off from the record. Subsequently, the Opposite Party again failed to appear on 27.02.2019 and was proceeded ex-parte.
10. The Complainants filed their Evidence by way of affidavit along with the written arguments and the case was finally heard on 05.01.2021. CC 37/2017 MRIDULA GHOSH & ANR. VS. ANSAL HI-TECH TOWNSHIP LTD. Page 5 of 14
11. We have heard the counsel for the complainants as well as the counsel for the Opposite Party and perused through the material on record. Before delving into the merits of the case, we deem it appropriate to adjudicate preliminary issues of law as to the maintainability of the consumer complaint. WHETHER THIS COMMISSION HAS JURISDICTION TO ADJUDICATE THE PRESENT COMPLAINT?
12. The first question for consideration is whether this commission has the jurisdiction to adjudicate the present complaint. We deem it appropriate to refer to Section 17 of the Consumer Protection Act, 1986 which provides as under: (1) Subject to the other provisions of this Act, the State Commission shall have jurisdiction (a) to entertain-
(i) complaints where the value of the goods or services and compensation, if any, claimed [exceeds rupees twenty lakhs but does not exceed rupees one crore]; and
(ii) appeals against the orders of any District Forum within the State; and (b) to call for the records and pass appropriate orders in any consumer dispute which is pending before or has been decided by any District Forum within the State, where it appears to the State Commission that such District Forum has exercised a jurisdiction not vested in it by law, or has failed to exercise a jurisdiction so vested or has acted in exercise of its jurisdiction illegally or with material irregularity. (2) A complaint shall be instituted in a State Commission within the limits of whose jurisdiction- (a) the opposite party or each of the opposite parties, where there are more than one, at the time of the institution of the complaint, actually and voluntarily CC 37/2017 MRIDULA GHOSH & ANR. VS. ANSAL HI-TECH TOWNSHIP LTD. Page 6 of 14 resides or carries on business or has a branch office or personally works for gain; or (b) any of the opposite parties, where there are more than one, at the time of the institution of the complaint, actually and voluntarily resides, or carries on business or has a branch office or personally works for gain, provided that in such case either the permission of the State Commission is given or the opposite parties who do not reside or carry on business or have a branch office or personally works for gain, as the case may be, acquiesce in such institution; or (c) the cause of action, wholly or in part, arises.
13. Analysis of Section 17 of the Consumer Protection Act, 1986 leads us to the conclusion that this commission shall have the pecuniary jurisdiction in cases where the total claim including the compensation is more than twenty lakhs and less than One Crore. Moreover, clause 17(2) of the Act provides the extent of territorial jurisdiction, wherein it has been provided that the state commission shall have the jurisdiction to entertain cases where opposite party at the time of the institution of the complaint, actually and voluntarily resides or carries on business or has a branch office or personally works for gain or the cause of action arose.
14. Having discussed the statutory position, the facts of the present case reflect that the value of the apartment and the compensation prayed for by the complainants is beyond Rs. 20 Lakhs but does not exceed Rs. 1 Crore, accordingly, the commission has the pecuniary jurisdiction to deal with the present complaint. So far as the territorial jurisdiction is concerned, the registered office of the Opposite Party is at 115 Ansal Bhawan, 16 Kasturba Gandhi Marg, New Delhi-110001. Since the registered office falls within the territory of Delhi, this commission has CC 37/2017 MRIDULA GHOSH & ANR. VS. ANSAL HI-TECH TOWNSHIP LTD. Page 7 of 14 the territorial jurisdiction to adjudicate the case. To strength the aforesaid findings, we tend to rely on Rohit Srivastava v. Paramount Villas Pvt. Ltd. reported at 2017 SCC OnLine NCDRC 1198, wherein it has been held as under: It is not in dispute that the Registered Office of Opposite Party No. 1 Company is situated in Delhi, i.e., within the territorial jurisdiction of the State Commission at Delhi and therefore, in the light of clear provision contained in Section 17(2)(a), which stipulates that a Complaint can be instituted in a State Commission, within the limits of whose jurisdiction, the Opposite Party actually carries on business. In view of the said provision, we have no hesitation in coming to the conclusion that since the Registered Office of the first Opposite Party is situated in Delhi, the State Commission did have the territorial jurisdiction to entertain the Complaint.
15. Relying on the above settled law, we are of the view that this commission has both the territorial and pecuniary jurisdiction to decide the present complaint. WHETHER THE PRESENT COMPLAINT IS BEYOND THE PERIOD OF LIMITATION?
16. The next issue to be adjudicated is whether the complaint is within the period of limitation as prescribed in the Consumer Protection Act, 1986. It is imperative to refer to Section 24A of the Consumer Protection Act, 1986 wherein it is provided as under:- 24A. Limitation period.- (1) The District Forum, the State Commission or the National Commission shall not admit a complaint unless it is filed within two years from the date on which the cause of action has arisen. (2) Notwithstanding anything contained in sub-section (1), a complaint may be entertained after the period specified in CC 37/2017 MRIDULA GHOSH & ANR. VS. ANSAL HI-TECH TOWNSHIP LTD. Page 8 of 14 sub-section (1), if the complainant satisfies the District Forum, the State Commission or the National Commission, as the case may be, that he had sufficient cause for not filing the complaint as this such period: Provided that no such complaint shall be entertained unless the National Commission, the State Commission or the District Forum, as the case may be, records its reasons for condoning such delay.
17. Analysis of Section 24A of the Consumer Protection Act, 1986 shows that this commission is empowered to admit a complaint if it is filed within a period of 2 years from the date on which cause of action has arisen. We deem it appropriate to refer to Mehnga Singh Khera and Ors. Vs. Unitech Ltd. reported at I (2020) CPJ 93 (NC) wherein the Honble National Commission has held as under:
13. The Opposite Party contested the complaint as being barred by limitation prescribed under section 24(a) of the Consumer Protection Act, 1986 since the last date stipulated in the buyers' agreement for giving possession of the flat expired more than 2 years ago. It is a settled legal proposition that failure to give possession of flat is continuous wrong and constitutes a recurrent cause of action and as long as the possession is not delivered to the buyers, they have every cause, grievance and right to approach the consumer courts. It is only when the seller virtually refused to give possession that the period of limitation prescribed under section 24(A) of the Consumer Protection Act, 1986 would start. The Complainant has to file a case within two years from the date of refusal of delivery of possession to the buyer. In the present case, the Opposite Party has not refused possession of the flat to the complainants at any point of time. Therefore, the cause of action continues to subsist in favour of the Complainant. CC 37/2017 MRIDULA GHOSH & ANR. VS. ANSAL HI-TECH TOWNSHIP LTD. Page 9 of 14
18. Applying the aforesaid law, since in the present case also, the Opposite Party has not expressly refused to give possession of the plot to the complainant at any point of time, the cause of action continues to subsist in favour of the complainant and the present complaint is within the period of limitation. DEFICIENCY OF SERVICE
19. Having discussed the maintainability of the present complaint, the question left to adjudicate is whether the Opposite Party is actually deficient in providing its services to the complainant or not. The expression Deficiency of Service has been dealt with by the Honble Apex Court in Arifur Rahman Khan and Ors. vs. DLF Southern Homes Pvt. Ltd. and Ors. reported at 2020 (3) RCR (Civil) 544, wherein it has been held as follows:
24. A failure of the developer to comply with the contractual obligation to provide the flat to a flat purchaser within a contractually stipulated period amounts to a deficiency. There is a fault, shortcoming or inadequacy in the nature and manner of performance which has been undertaken to be performed in pursuance of the contract in relation to the service. The expression 'service' in Section 2(1) (o) means a service of any description which is made available to potential users including the provision of facilities in connection with (among other things) housing construction. Under Section 14(1)(e), the jurisdiction of the consumer forum extends to directing the opposite party inter alia to remove the deficiency in the service in question. Intrinsic to the jurisdiction which has been conferred to direct the removal of a deficiency in service is the provision of compensation as a measure of restitution to a flat buyer for the delay which has been occasioned by the developer beyond the period within which possession was to be handed over to the purchaser. Flat purchasers suffer agony and harassment, as a result of the default of the developer. Flat purchasers make legitimate assessments in regard to the future course of their lives based on the flat which has CC 37/2017 MRIDULA GHOSH & ANR. VS. ANSAL HI-TECH TOWNSHIP LTD. Page 10 of 14 been purchased being available for use and occupation. These legitimate expectations are belied when the developer as in the present case is guilty of a delay of years in the fulfilment of a contractual obligation.
20. As per the above dicta of the Honble Apex Court, where the builder defaults in handing over of the possession to the consumer within a stipulated time period, it is a clear case of deficiency of service as defined in the Consumer Protection Act, 1986. In the present case, even though the complainant has contended that the plot was to be handed over within 3 years from the date of execution of the Plot Buyers Agreement, the perusal of the Plot Buyers Agreement reflects that no such time limit has been given for handing over the possession of the plot in question.
21. However, the law has been well settled that in case the Plot Buyers Agreement does not mention a specific time period, the plot is to be handed over within a reasonable time. What constitutes reasonable time has been discussed by the Honble National Commission in First Appeal No. 348 of 2016 titled Ajay Enterprises Pvt. Ltd. and Ors. vs. Shobha Arora and Ors. dated 10.05.2019 wherein it has been held as under: under Section 46 of the Indian Contract Act, 1872, the following provision is there:
46. Time for performance of promise, where no application is to be made and no time is specified - Where, by the contract, a promisor is to perform his promise without application by the promisee, and no time for performance is specified, the engagement must be performed within a reasonable time. Explanation - The question "what is a reasonable time" is, in each particular case, a question of fact".
19. From the above provision it is clear that if there is no time limit for the performance of a particular promise given by one party, it is to be performed within a CC 37/2017 MRIDULA GHOSH & ANR. VS. ANSAL HI-TECH TOWNSHIP LTD. Page 11 of 14 reasonable time. In most of the builder buyer agreements, the period ranges from 24 to 48 months and the most common agreement seems to be for 36 months plus grace period of six months for completion of construction and delivery of possession. If the possession is delivered beyond 42 months or beyond 48 months, the deficiency in service on the part of the opposite party shall stand proved.
22. Returning to the facts of the present case, the fact that the complainants had booked a plot with the Opposite Party and made a payment to the extent of Rs. 7,21,750/- is well established from the evidence on record. The Plot Buyers Agreement was executed in the year 2010 and at the most, the builder was bound to handover the flat by 2014, inclusive of the grace period which is usually allowed by the Plot Buyers Agreement. However, till 2017 i.e. the year in which the present complaint case was filed, there was nothing on the part of the Opposite Party to show that it was in a position to hand over the possession of the plot in question. The complainant cannot be expected to wait for an indefinite time period to get the benefits of the hard earned money which they have spent in order to purchase the property in question. (Ref: Fortune Infrastructure v. Trevor D'Lima reported at (2018) 5 SCC 442).
23. Relying on the above settled law, we are of the view that the Opposite Party had given false assurance to the complainant with respect to the time for delivery of possession of the apartment and kept the hard earned money of the complainant for about 10 years now. Moreover, the Opposite Party has failed to handover the possession of the said plot to the complainant within a reasonable time period, thus the Opposite Party is deficient in providing its services to the Complainants. CC 37/2017 MRIDULA GHOSH & ANR. VS. ANSAL HI-TECH TOWNSHIP LTD. Page 12 of 14
24. Having discussed the liability of the Opposite Party, the only question left to adjudicate is as to how the complainants are to be compensated for the deficient acts of the Opposite Party. The primary relief prayed for by the complainants is the possession of the plot, however, during the course of the arguments, the counsel for the complainant has brought to our notice the judgment of this commission in CC-22/2014 titled Surender Singh vs. Ansal Hi-Tech Township Ltd. dated 28.04.2017, wherein a direction for the completion of the same project which is the subject matter of this complaint also, was passed by this commission, despite which, as has been argued by the counsel for the complainant, the opposite party has failed to complete the project till date.
25. Therefore, it will not be in the interest of justice to allow the prayer for possession. However, even though the prayer of refund has not been expressly made, it is always open to this Commission to grant a relief which is justified and warranted in the facts and circumstances of the case. (Refer: Parsvnath Exotica Resident Association Vs Parsvnath Developers Ltd. & Ors. reported at IV (2016) CPJ 328 (NC))
26. Consequently, we are of the view, that the ends of justice will be met only if the entire amount deposited by the Complainants with the Opposite Party is refunded along with substantial interest as compensation.
27. It is imperative to refer to the recent pronouncement of the Honble Supreme Court in terms of Interest which is being allowed on the refunded amount. In Arifur Rahman Khan and Ors. (supra) which is the latest pronouncement (24.08.2020) on the cause, the Honble Apex Court has allowed an interest @ 6% p.a. on the amount received by CC 37/2017 MRIDULA GHOSH & ANR. VS. ANSAL HI-TECH TOWNSHIP LTD. Page 13 of 14 the Opposite Party, payable within one month and in case of default to pay within the stipulated period, an interest @ 9% p.a. was payable on the said amount.
28. Keeping in view the facts of the present case and the extensive law as discussed above, we direct the Opposite Party to refund the entire amount paid by the complainant i.e. Rs. 7,21,750/- along with interest as per the following arrangement: A. An interest @ 6% p.a. calculated from the date on which each installment/payment was received by the Opposite Party till 22.01.2021 (being the date of the present judgment); B. The rate of interest payable as per the aforesaid clause (A) is subject to the condition that the Opposite Party pays the entire amount on or before 22.04.2021; C. Being guided by the principles as discussed above, in case the Opposite Party fails to refund the amount as per the aforesaid clause (A) on or before 22.04.2021, the entire amount is to be refunded along with an interest @ 9% p.a. calculated from the date on which each installment/payment was received by the Opposite Party till the actual realization of the amount.
29. In addition to the aforesaid and taking into consideration the facts of the present case, the Opposite Party is directed to pay a sum of A. Rs. 1,00,000/- as cost for mental agony and harassment to the complainant; and B. The litigation cost to the extent of Rs. 35,000/-.
30. Applications pending, if any, stands disposed of in terms of the aforesaid judgment. CC 37/2017 MRIDULA GHOSH & ANR. VS. ANSAL HI-TECH TOWNSHIP LTD. Page 14 of 14
31. A copy of this judgment be provided to all the parties free of cost as mandated by the Consumer Protection Act, 1986. The judgment be uploaded forthwith on the website of the commission for the perusal of the parties.
32. File be consigned to record room along with a copy of this Judgment. (DR. JUSTICE SANGITA DHINGRA SEHGAL) PRESIDENT (ANIL SRIVASTAVA) MEMBER Pronounced On: 22.01.2021