AMICUS AI
Citation Codes
Equivalent Citations
citation codes
Case Number
Disposition
Advocates
Judges
Acts
  • Draft Wetlands (Conservation and Management) Rules, 2016
  • Rules for Manufacture, Use, Import, Export and Storage of Hazardous Micro-organisms/Genetically Engineered Organisms or Cells
  • sub-section (3) of Section 3 of the Environment (Protection) Act, 1986
  • Ramsar Convention, 1971
  • Hazardous Wastes (Management, Handling and Transboundary Movement) Rules, 2008
  • Manufacture, Storage and Import of Hazardous Chemical Rules, 1989
  • Rule 5 of the Wetlands (Conservation and Management) Rules, 2010
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Equivalent Citations
citation codes
Case Number
Disposition
Advocates
Judges
Acts
  • Draft Wetlands (Conservation and Management) Rules, 2016
  • Rules for Manufacture, Use, Import, Export and Storage of Hazardous Micro-organisms/Genetically Engineered Organisms or Cells
  • sub-section (3) of Section 3 of the Environment (Protection) Act, 1986
  • Ramsar Convention, 1971
  • Hazardous Wastes (Management, Handling and Transboundary Movement) Rules, 2008
  • Manufacture, Storage and Import of Hazardous Chemical Rules, 1989
  • Rule 5 of the Wetlands (Conservation and Management) Rules, 2010
Smart Summary

Factual and Procedural Background

The writ petition, filed in 2001, concerns the conservation and management of wetlands across India. The extract provided begins with a series of interlocutory orders issued between 10 September 2014 and 3 April 2017 by different Benches of the Supreme Court. The Court has been monitoring:

  • Whether the Central Wetlands Regulatory Authority (CWRA), constituted under Rule 5 of the Wetlands (Conservation and Management) Rules, 2010, was functional and properly composed.
  • The status of a National Wetland Inventory and Assessment Project undertaken by ISRO for mapping wetlands at a 1:50,000 scale, which identified 2,01,503 wetlands larger than 2.25 ha.
  • The Union Government’s progress in finalising and notifying the Draft Wetlands (Conservation and Management) Rules, 2016.
  • Measures taken to protect 26 wetlands designated under the Ramsar Convention, 1971.

Across several adjournments and compliance hearings, the Court issued mandatory directions and sought multiple affidavits from the Union of India and State Governments. On 3 April 2017 the Court transferred limited monitoring of Ramsar sites to the jurisdictional High Courts while retaining seisin of the larger issues.

Legal Issues Presented

  1. Whether the Central Wetlands Regulatory Authority is presently functional and duly constituted in accordance with Rule 5 of the 2010 Rules.
  2. Whether, in light of the completed wetland inventory, a separate exercise of identification and classification under Rules 6(2) and 6(4) of the 2010 Rules remains necessary.
  3. Whether the Union of India is obliged to notify the Draft Wetlands (Conservation and Management) Rules, 2016 within a fixed timeframe.
  4. What specific steps have been taken, and must further be taken, to protect the 26 Ramsar Convention wetlands.
  5. Whether interim protective measures under Rule 4 of the 2010 Rules should apply to all 2,01,503 inventoried wetlands pending final notifications.

Arguments of the Parties

Petitioners’ Arguments

  • The ISRO-based inventory renders a fresh identification/classification exercise under Rules 6(2) and 6(4) unnecessary (10-9-2014 submission).
  • Urgent measures are needed to prevent disappearance of wetlands; therefore Rule 4 restrictions should immediately apply to the inventoried 2,01,503 wetlands (raised on 8-2-2017).
  • An interlocutory application sought a moratorium on construction permissions near wetlands and replacement of the existing committee with a multi-disciplinary court-nominated committee.

Union of India’s Submissions

  • Sought repeated adjournments to obtain instructions regarding the status and composition of CWRA (orders dated 10-9-2014 and 1-12-2016).
  • Filed an affidavit (7-2-2017) explaining that 175 comments on the Draft 2016 Rules were under consideration by a committee whose tenure might need extension.
  • Filed a subsequent affidavit (28-3-2017) detailing expenditure of ₹945.95 crore on wetland conservation and showing that CWRA had been re-constituted on 14-2-2017, though two Ministries were yet to nominate their representatives.

Table of Precedents Cited

No precedents were cited in the provided opinion.

Court's Reasoning and Analysis

The Court treated wetland conservation as an issue of “immense ecological importance” warranting continuing mandamus. Its key analytical steps were:

  • Functionality of CWRA: Repeated non-compliance by the Union prompted the Court to grant “final” extensions and ultimately record the Authority’s reconstitution on 14-2-2017, while directing pending ministerial nominations to be expedited (orders of 31-1-2017 and 3-4-2017).
  • Notification of Draft 2016 Rules: Observing a year-long delay and significant public interest (175 comments received), the Court compelled the Union to notify the Rules on or before 30-6-2017 (order of 8-2-2017). The direction was justified on the need for “finality” and statutory compliance.
  • Interim Protection of Wetlands: Accepting petitioners’ apprehension about degradation, the Court applied the prohibitions listed in Rule 4 of the 2010 Rules to the entire set of 2,01,503 inventoried wetlands and directed Union and States to treat them accordingly (order of 8-2-2017).
  • Rectification of Brief Documents: The Court instructed CWRA to secure complete, deficiency-free proposals for 1,683 wetlands already submitted under Rule 6 and to decide on their notification by 31-3-2017.
  • Ramsar Sites Oversight: Noting inadequate particulars on conservation efforts despite significant expenditure, the Court forwarded the Union’s affidavit and its own orders to 15 High Courts, requesting them to treat the matter as suo motu PILs for local monitoring of Ramsar sites (order of 3-4-2017).

Holding and Implications

Interim Mandatory Directions issued.

Key operative directives include:

  • Union of India must notify the Wetlands (Conservation and Management) Rules, 2016 on or before 30 June 2017.
  • CWRA to be (and has been) reconstituted; remaining ministerial nominations to be made “at the earliest.”
  • Rule 4 prohibitions apply forthwith to all 2,01,503 inventoried wetlands; Union and States to ensure identification and compliance.
  • CWRA to finalise decisions on 1,683 wetlands already processed under Rule 6 by 31 March 2017.
  • Affidavit on audited utilisation of wetland funds to be filed within six weeks.
  • Affidavit and prior Supreme Court orders to be treated as suo motu PILs by 15 High Courts for monitoring Ramsar sites.

The orders create binding timelines for executive action, expand interim statutory protections nationwide, and decentralise judicial oversight of international wetlands to High Courts. No new precedent of law was set, but the directions significantly influence environmental governance and inter-institutional accountability.

    M.K Balakrishnan And Others v. Union Of India And Others

    (2017) 7 SCC 808

    Order dated 10-9-2014

    (Before R.M Lodha, C.J and Kurian Joseph and Rohinton Fali Nariman, JJ.)

    Writ Petition (C) No. 230 of 2001

    1. Under Rule 5 of the Wetlands (Conservation and Management) Rules, 2010 (for short “the 2010 Rules”), the Central Government, in exercise of the powers conferred by sub-section (3) of Section 3 of the Environment (Protection) Act, 1986 constituted the Central Wetlands Regulatory Authority (for short “the Authority”) consisting of the Chairperson and Members as mentioned therein. Some of the Members are by name. Nothing is available on record as to whether the Authority under the 2010 Rules is functional as on date because under sub-rule (2) of Rule 5, the tenure of the Authority has been prescribed as of three years. Sub-rule (3) of Rule 5 confers upon such Authority powers and functions.

    2. We are informed that National Wetland Inventory and Assessment Project sponsored by the Ministry of Environment & Forests, Government of India through Space Applications Centre, ISRO, Ahmedabad has undertaken the task in 2010 of making an inventory of all the wetlands in the country at scales of 1:50,000.

    3. Mr Gopal Sankaranarayanan, learned counsel for the petitioner, submits that in view of the extensive and comprehensive inventory of the wetlands in the country having been prepared, it is not necessary to have the exercise for identification and classification of wetlands done under Rules 6(2) and (4) of the 2010 Rules.

    4. We would like to know the views of the Central Government in this regard and also whether the Authority under Rule 5 stands presently functional and, if yes, details of its composition. Mr J.S Attri, learned Senior Counsel for the Union of India, prays for time to seek instructions in this regard for informing the Court on the above aspects on the next date. List the matter after four weeks.

    Interlocutory Application No. 16 of 2014

    5. An application being Interlocutory Application No. 16 of 2014 has also been made by the petitioner praying for diverse reliefs, inter alia, for direction to the Union Government and the respondent States to bar any permission given for construction and infrastructure purposes in and around known wetland areas, replace the existing Committee with a Committee consisting of environmentalists, lawyers, experts and Petitioner 1 to be regularly nominated by the Court and direct the Committee to demarcate priority areas and wetlands.

    6. Let notice be issued on the interlocutory application to the Union of India and the State Governments. Dasti, in addition to the ordinary process, is permitted. Notice may be served on the Standing Counsel for the Union of India and so also the Standing Counsel representing the various State Governments.

    7. List the interlocutory application after four weeks with the main matter.

    (2017) 7 SCC 809(1)

    Order dated 1-12-2016

    (Before Dr T.S Thakur, C.J and Dr D.Y Chandrachud, J.)

    Writ Petition (C) No. 230 of 2001

    8. The learned counsel for the respondent Union of India was, by this Court's order dated 10-9-2014, directed to take instructions whether the authority under Rule 5 of the Wetlands (Conservation and Management) Rules, 2010 was functional and, if so, what was its composition. The learned counsel for the respondent has not done the needful in spite of repeated opportunities given.

    9. The Central Government was also directed to place on record its views whether it was necessary to undertake an exercise for identification and clarification of wetlands in view of the fact that a comprehensive inventory of wetlands already said to have been prepared. The learned counsel for the Union of India has not done the needful in that regard also. Six weeks' time finally is granted to do the needful. Post after six weeks.

    (2017) 7 SCC 809(2)

    Order dated 17-1-2017

    (Before J.S Khehar, C.J and Dr D.Y Chandrachud, J.)

    Writ Petition (C) No. 230 of 2001

    10. The learned counsel for the petitioners seeks a week's time, so as to enable him to peruse the different orders passed by the National Green Tribunal, Principal Bench, New Delhi, and so as to determine whether the instant petition should also be considered by the National Green Tribunal with the other pending matters. List again on 24-1-2017.

    (2017) 7 SCC 810(1)

    Order dated 31-1-2017

    (Before Madan B. Lokur and Prafulla C. Pant, JJ.)

    Writ Petition (C) No. 230 of 2001

    11. On the request of the learned Senior Counsel appearing for the Union of India, list the matter on 7-2-2017.

    12. In the meanwhile, we would like him to take definite instructions on whether the Draft Wetlands (Conservation and Management) Rules, 2016 which were said to have been circulated sometime in March 2016 have been finalised or not and, if not, reasons for the delay. We would also like to know specifically whether the Central Wetlands Regulatory Authority, whose term expires on or about 14-2-2017, has been reconstituted and, if not, reasons for the delay. We would also like the Union of India to tell us what specific steps have been taken to preserve the 26 wetlands covered by the Ramsar Convention, 1971.

    13. We make it clear that the petition is required to be taken seriously by the Union of India.

    (2017) 7 SCC 810(2)

    Order dated 8-2-2017

    (Before Madan B. Lokur and Prafulla C. Pant, JJ.)

    Writ Petition (C) No. 230 of 2001

    14. We have, at length, heard the learned counsel for the parties including the learned counsel for the Union of India.

    15. An affidavit dated 7-2-2017 filed by the Union of India has been shown to us. Annexed to the affidavit is an office memorandum issued on 6-1-2017 with reference to the Draft Wetlands (Conservation and Management) Rules, 2016. The Draft Rules were made available to the public for inviting objections/suggestions sometime in March 2016. As many as 175 comments were received. For the examination of these comments, a Committee has been constituted. The Committee was given 45 days to look into the suggestions and submit its report to the Union of India.

    16. We are told orally by the learned counsel appearing for the Union of India that perhaps the term of the Committee may need to be extended. This is stated by him on the basis of information received pursuant to a meeting held yesterday i.e 7-2-2017 by the said Committee.

    17. Be that as it may, for the reasons given below, we are compelled to direct that the Wetlands (Conservation and Management) Rules, 2016 should be notified on or before 30-6-2017. We are compelled to issue this direction since the matter has been pending with the Union of India for the last almost a year and there has to be some finality to the publication of the Rules. The comments/suggestions have been given by all stakeholders such as the State Governments including its organisations, individuals and civil society organisations. That being the position, there is obviously a great deal of interest in the Rules being formulated and notified. Under these circumstances, there is no justification why the Union of India should not have taken prompt action and constituted the Committee much earlier for the purposes of finalising the Rules. Finally, the conservation of wetlands is of immense ecological importance.

    18. The learned counsel for the Union of India says that all efforts will be made to ensure compliance with this direction and to ensure that the Rules are notified on or before 30-6-2017. We are sure that both the Committee as well as the Union of India will take into consideration the comments and suggestions offered by the State Governments and its organisations, individuals and civil society organisations before taking a final decision.

    19. With regard to the Central Wetlands Regulatory Authority, we are told that its term is expiring on 14-2-2017. We have been informed by the learned counsel for the Union of India that the Central Wetlands Regulatory Authority will be notified on 13-2-2017. The Union of India is bound by the statement made by the learned counsel for the Union of India, which statement has been made on instructions received by him from an officer of the Ministry of Environment, Forest and Climate Change.

    20. In our order dated 31-1-2017, we had required the Union of India to tell us the steps taken to preserve the 26 wetlands covered by Ramsar Convention, 1971. The affidavit that has now been filed by the Union of India merely gives the disbursal of amount made by the Union of India from time to time. What specific steps have been taken including how the funds made available have been utilised and what is the impact of those steps have not been adverted to. We must have specific details. We direct the Union of India to file an affidavit within four weeks positively giving required specific details.

    21. The learned counsel for the petitioners has drawn our attention to an additional affidavit filed by the Union of India on or about 9-9-2014. The additional affidavit contains an information brochure “National Wetland Inventory & Assessment”. This brochure indicates on p. 11 thereof that 2,01,503 wetlands have been mapped at 1:50,000 scale. All these wetlands have an area of more than 2.25 ha. As a first step, the “brief documents” with regard to these 2,01,503 wetlands should be obtained by the Union of India from the respective State Governments in terms of Rule 6 of the Wetlands (Conservation and Management) Rules, 2010. We are told that obtaining these “brief documents” may take some time. We are inclined to grant adequate time for this purpose. The Union of India should follow this up with the State Governments and inform us of the time-frame on the next date of hearing.

    22. The apprehension expressed by the learned counsel for the petitioners is that with the passage of time there is a possibility that some of the wetlands may disappear. On a reading of the information brochure, this apprehension is not unfounded.

    23. Accordingly, we direct the application of the principles of Rule 4 of the Wetlands (Conservation and Management) Rules, 2010 to these 2,01,503 wetlands that have been mapped by the Union of India. The Union of India will identify and inventorise all these 2,01,503 wetlands with the assistance of the State Governments and will also communicate our order to the State Governments which will also bind the State Governments to the effect that these identified 2,01,503 wetlands are subject to the principles of Rule 4 of the Wetlands (Conservation and Management) Rules, 2010, that is to say:

    “4. (1)(i) reclamation of wetlands;
    (ii) setting up of new industries and expansion of existing industries;
    (iii) manufacture or handling or storage or disposal of hazardous substances covered under the Manufacture, Storage and Import of Hazardous Chemical Rules, 1989 notified vide S.O No. 966(E), dated 27-11-1989 or the Rules for Manufacture, Use, Import, Export and Storage of Hazardous Micro-organisms/Genetically Engineered Organisms or Cells notified vide GSR No. 1037(E), dated 5-12-1989 or the Hazardous Wastes (Management, Handling and Transboundary Movement) Rules, 2008 notified vide S.O No. 2265(E), dated 24-9-2008;
    (iv) solid waste dumping:
    Provided that the existing practices, if any, existed before the commencement of these Rules shall be phased out within a period not exceeding six months from the date of commencement of these Rules;
    (v) discharge of untreated wastes and effluents from industries, cities or towns and other human settlements:
    Provided that the practices, if any, existed before the commencement of these Rules shall be phased out within a period not exceeding one year from the date of commencement of these Rules;
    (vi) any construction of a permanent nature except for boat jetties within fifty metres from the mean high flood level observed in the past ten years calculated from the date of commencement of these Rules;
    (vii) any other activity likely to have an adverse impact on the ecosystem of the wetland to be specified in writing by the Authority constituted in accordance with these Rules.”

    24. The learned counsel for the Union of India has shown us a chart of proposals/brief documents that have already been received by the Union of India under Rule 6 of the Wetlands (Conservation and Management) Rules, 2010. The total number of wetlands covered in this document are 1683. Many of these proposals/brief documents received by the Union of India contain deficiencies which have already been identified in the document handed over to us. The Central Wetland Regulatory Authority will take up the rectification of deficiencies with the State Governments with promptitude and ensure that all these deficiencies are removed and complete proposals/brief documents are furnished within the next about one month so that the Central Wetlands Regulatory Authority is in a position to take a final decision with regard to these 1683 wetlands and their notification, if required, on or before 31-3-2017.

    25. List the matter on 3-4-2017.

    (2017) 7 SCC 813

    Order dated 3-4-2017

    (Before Madan B. Lokur and Deepak Gupta, JJ.)

    Writ Petition (C) No. 230 of 2001

    26. Pursuant to our last order dated 8-2-2017, it has been brought to our notice by the learned counsel appearing for the Union of India that Central Wetlands Regulatory Authority (CWRA) has since been constituted on 14-2-2017. The Ministry of Tourism and the Ministry of Social Justice and Empowerment have not nominated an officer not below the rank of Joint Secretary to the Authority. We expect these two Ministries to make the nominations at the earliest so that the Central Wetlands Regulatory Authority can comprehensively carry on its mandate under the law.

    27. We have also been shown a statement of expenditure that has been filed by the Union of India along with an affidavit dated 28-3-2017. While huge amounts appear to have been spent to the extent of Rs 945.95 crores, it appears from a reading of the affidavit that not much improvement seems to have been made at least on the ground. That apart, the activities or the steps undertaken and the expenditure incurred in respect of those activities are extremely general in nature. We are also not sure whether the accounts have been audited or not.

    28. The learned counsel for the Union of India says that he will ascertain whether the accounts of the amounts that have been disbursed to the State Governments have been audited and file an affidavit in this regard.

    29. We have put it to the learned counsel for the petitioner that insofar as the Ramsar Convention sites are concerned, since they are matters of international heritage, it might be more appropriate if the High Courts concerned monitor the management of these sites at least till there is some visible improvement. The learned counsel for the petitioner says that he has no objection to this.

    30. Under the circumstances, we direct the Registry of this Court to make photocopies of the affidavit filed by the Union of India by Dr A. Duraisamy, Scientist ‘F’ and Member-Secretary, Central Wetlands Regulatory Authority and send it to the following High Courts:

    (1) High Court of Judicature at Hyderabad for the States of Telangana and Andhra Pradesh;
    (2) Gauhati High Court,
    (3) Gujarat High Court,
    (4) Himachal Pradesh High Court,
    (5) J&K High Court,
    (6) Kerala High Court,
    (7) Madhya Pradesh High Court,
    (8) Manipur High Court,
    (9) Orissa High Court,
    (10) Punjab and Haryana High Court,
    (11) Rajasthan High Court,
    (12) Madras High Court,
    (13) Tripura High Court,
    (14) Allahabad High Court; and
    (15) High Court at Calcutta.

    31. The affidavit be sent to the Registrar General of all the aforementioned High Courts within two weeks from today. A copy of all the orders passed by this Court from 10-9-2014 till today shall also be sent to the High Courts concerned along with the affidavit.

    32. We request the Hon'ble the Chief Justices of the High Courts concerned to treat the affidavit as a suo motu public interest petition and, if necessary, appoint an Amicus Curiae to assist the Court so as to ensure that the Ramsar Convention sites within their jurisdiction are properly maintained.

    33. The affidavit by the Union of India should be filed within six weeks. List the matter on 12-7-2017.

    Court Master