Structured Summary of the Opinion (Rajesh Bindal J.)

Factual and Procedural Background

This order disposes of a large group of consolidated Regular First Appeals (RFAs Nos. 2373, 2375–2380, 2853, 3127–3146, 3148–3164, 3170–3186, 3191, 3223, 3383–3401, 3503–3525, 3540, 3541, 3790–3798, 3930–3946, 3959–3975, 4043–4062, 4168, 4186–4192, 4195, 4213–4220, 4278, 4312–4320, 4322, 4323–4368, 4514, 4585–4587, 4624, 4625, 4646, 4674, 4740, 4837, 4838, 4984, 5016–5022 and cross objections Nos. 177-CI, 182-CI, 184-CI–186-CI, 188-CI, 189-CI, 198-CI and 216-CI–219-CI of 2010 and 14-CI and 15-CI of 2011) on the ground that common questions of law and fact are involved.

Broadly, the appeals are by land owners seeking enhanced compensation for land acquired by the State of Haryana/HSIIDC for development of Industrial Model Township (IMT) Manesar Phases II and III; HSIIDC appeals seek reduction of compensation. The opinion extracts facts primarily from R.F.A. No. 2373 of 2010.

Key factual milestones (as stated in the opinion):

  • Notification under Section 4 of the Land Acquisition Act, 1894 issued on 6.3.2002 to acquire 1,380 kanals and 16 marlas (villages Kasan, Bas Kusla, Naharpur Kasan and Manesar) for IMT Phase-II; Section 6 notification dated 15.11.2002. Collector’s award dated 22.7.2003 giving various per acre assessments.
  • On objections and reference under Section 18, the court below assessed market value at Rs. 28,15,356/- per acre (for the Phase-II reference extracted).
  • A further notification under Section 4 dated 7.3.2002 for 598 acres 5 kanals 12 marlas for IMT Phase-III (villages Kasan, Bas Kusla, Bas Haria and Dhana); Section 6 notification dated 25.11.2002. Collector’s award dated 24.12.2003. On reference, the court below assessed market value at Rs. 28,15,849/- per acre.
  • Land owners challenged the awards seeking enhancement; HSIIDC sought reduction in certain appeals. Specific RFA No. 4646 of 2010 (M/s Kohli Holdings Pvt. Ltd.) raised a separate claim that part of its land abutted National Highway No. 8 and deserved separate valuation.

Legal Issues Presented

  1. What is the correct market value/compensation to be awarded for land acquired for IMT Manesar Phases II and III (notifications dated 6.3.2002 and 7.3.2002) — specifically whether the Collector’s awards should be enhanced or reduced?
  2. Whether the rate fixed by the Supreme Court in Haryana State Industrial Development Corporation v. Pran Sukh (Rs. 20,00,000/- per acre for lands acquired in 1994) can be used as a base for assessing compensation for the 2002 acquisitions and, if so, what rate of annual increase should be applied between 1994 and 2002.
  3. Whether post-acquisition allotment/sale transactions (including HSIIDC allotments and auction sales) and sale deeds can be relied upon as comparable evidence to determine market value, and if so, whether any downward adjustment ("cut") should be applied to such transactions.
  4. Whether the land parcel owned by M/s Kohli Holdings Pvt. Ltd. (RFA No. 4646 of 2010), which abuts National Highway No. 8 and enjoys special locational advantages, requires a separate valuation distinct from other acquired land blocks.

Arguments of the Parties

Land Owners' Arguments

  • The area has a history of phased acquisition beginning in 1988 and prominently in 1994 (Phase‑I). The 2002 acquisitions (Phases II & III) adjoin the already developed 1994 area and therefore enjoyed development potential and demand for plots.
  • Reliance on the Supreme Court’s decision in Haryana State Industrial Development Corporation v. Pran Sukh (17.8.2010) where a uniform compensation of Rs. 20,00,000/- per acre was awarded for a large chunk of 1994 acquisitions — submitted that the 1994 assessment should be the base for the 2002 acquisitions, with cumulative increase to reflect appreciation.
  • Placed reliance on several HSIIDC allotment letters and sale transactions (Exs. P4–P7, P38 etc.) showing high per-square-yard rates (noting some sales in 2000 and 2006) and argued these are genuine and indicative of market value; contended such transactions should guide the increase to be awarded.
  • Advanced an alternative claim for cumulative enhancement at not less than 20% per annum, considering rapid appreciation and development (supported by cross-examination of HSIIDC witness admitting high rate of plot sales and pace of construction).
  • Argued post-acquisition sale transactions (even if post-dating the notifications) can be considered for valuation when genuineness is not doubted, citing precedents (e.g., Shri Tara Singh, Mehta Ravindrarai Ajitrai, Subash Chander).

M/s Kohli Holdings Pvt. Ltd. (R.F.A. No. 4646 of 2010) — Appellant’s Arguments

  • Contended its land (65 kanals 7 marlas in Manesar and 4 kanals 8 marlas in Naharpur Kasan — total 69 kanals 15 marlas) formed a distinct block abutting National Highway No. 8 (frontage of two acres) and thus cannot be equated with other land acquired in the same notification that was 4–5 km away from NH‑8.
  • Pointed to nearby high-value allotments (Exs. P39–P41) and to an earlier allotment (Ex. P38) to a sister concern (Orient Craft Ltd.) on 2.2.2000 for 30,000 sq. meters at Rs. 1,254.72 per sq. yard, arguing there was significant appreciation and locational advantage that warranted separate and higher valuation for Kohli’s land.
  • Noted that some infrastructural development and neighboring commercial amenities (five-star hotel, resort, housing projects) enhanced the value of land abutting NH‑8.

HSIIDC's Arguments

  • HSIIDC counsel contended that the 1994 Pran Sukh assessment related to land abutting NH‑8 and is not directly comparable to much of the 2002 acquisitions which were 4–5 kilometers away from NH‑8; locational differences matter for valuation.
  • Submitted that sale-of-plots evidence referred to by land owners concerned land carved out of 1994 acquisitions after significant development and infrastructure investment; such sales are not directly comparable to agricultural land being acquired in 2002.
  • Argued that agricultural sale transactions (the true comparables) were not produced by land owners; thus no substantial appreciation could be shown and any increase over the 1994 rate should be modest — suggested not more than 5% per annum.
  • Relied on several Supreme Court authorities (R.P. Singh; Raj Kumar v. Haryana State; NTPC v. Om Prakash; Lal Chand; GM, ONGC v. Rameshbhai J. Patel) to support limited increases, rules on considering auction sale transactions, and the period for which a flat rate increase should be awarded.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Haryana State Industrial Development Corporation v. Pran Sukh (Civil Appeal No. 6515 of 2009) — Supreme Court, decided 17.8.2010 Provided a uniform compensation assessment of Rs. 20,00,000/- per acre for a large body of land acquired in 1994; treated a particular 1994 sale (Ex. P2 dated 16.9.1994) as a basis for valuation. The court used the Rs. 20,00,000/- per acre fixed in Pran Sukh as the base rate for valuing the 2002-acquired agricultural land and then applied a decided annual increase to account for appreciation between 1994 and 2002.
Shri Tara Singh (deceased) v. The State of Punjab, 1983 (85) PLR 286 Authority cited for considering post-acquisition sale transactions for valuation when genuineness is not doubted. Relied upon by land owners to support the contention that post-acquisition allotments/sales by HSIIDC can inform valuation; the court acknowledged such transactions as guiding factors (subject to adjustments).
Mehta Ravindrarai Ajitrai (Deceased) through his heirs v. State of Gujarat, (1989) 4 SCC 250 Authority supporting consideration of sale transactions for valuation purposes. Faced by the court as part of land owners' authorities to justify reliance on sale evidence; the court accepted that genuine sales/allotments are guiding factors for determining appropriate increase.
Subash Chander v. State of Haryana, (2004-2) 137 PLR 97 Cited for the proposition that genuine post-acquisition sale transactions can be considered in assessing fair value. Cited by land owners; the court treated post-acquisition allotments/sales as relevant guiding evidence while calibrating the increase to be applied to the 1994 base.
Executive Engineer, Karnataka Housing Board v. Land Acquisition Officer, Gadag, JT 2011 (1) SC 539 Authority indicating that in the absence of private-sale comparables, genuine auction sale transactions can be relied upon and that a reasonable cut (such as 20%) may be imposed. Cited in debates about how to treat auction/allotment sales; the court acknowledged auction/allotment evidence as relevant but noted the need to consider timing, purpose (commercial), and possibly apply reductions; the court applied its own percentage adjustments rather than a flat 20% cut across the board.
R.P. Singh v. Union of India, AIR 2005 SC 4189 Referenced for guidance on increase rates and principles for awarding enhancement over time. Cited by HSIIDC in support of a modest increase; the court considered such authorities when choosing an appropriate annual increase (ultimately adopting 12% p.a. for general acquired land and 15% p.a. for a specific comparable).
Raj Kumar v. Haryana State, AIR 2007 SC 3124 Referenced regarding the period and method for awarding increases and consideration of sale evidence. Utilized by HSIIDC in argument; the court reviewed these authorities in weighing competing positions on the appropriate annual increase.
National Thermal Power Corporation Limited v. Om Prakash (Faridabad Gas Power Project), (2009) 4 SCC 719 Authority on principles of compensation, evidence and award of increases. Cited by HSIIDC; considered by the court among other authorities in determining what annual increase to award.
Lal Chand v. Union of India, AIR 2010 SC 170 Authority used for principles on award of increase over time and evidentiary considerations. Placed before the court by HSIIDC; formed part of the precedent matrix the court consulted when fixing the percentage increases.
The General Manager, Oil and Natural Gas Corporation Ltd. v. Rameshbhai Jivanbhai Patel, JT 2008 (9) SC 480 Authority on reliance upon auction/sale transactions and awarding increases. Referred to by HSIIDC; the court took such authorities into account in deciding how much increase to award and how to treat allotment/auction evidence.

Court's Reasoning and Analysis

The court proceeded through a fact-sensitive analysis grounded in the documentary material on record, the site plans and the authorities relied upon by the parties. The principal steps in the court’s reasoning (as stated) are:

  1. Consolidation and focus: The appeals were consolidated because they raised common issues about valuation of land acquired for IMT Manesar Phases II and III (2002 notifications). The court extracted facts from R.F.A. No. 2373 and examined other related RFAs, including RFA No. 4646 (Kohli Holdings).
  2. Site plans and location: The court examined site plans (including a plan taken on record as mark 'A') showing that the 2002-acquired land formed a compact block adjoining land acquired in 1994 (Phase‑I). The court found this adjacency and the contiguous nature of acquisitions material to valuation because the 1994 acquisitions had been developed and there was clear demand for plots.
  3. Evidence of development and demand: The court noted admission in cross-examination of HSIIDC's witness that 80% of plots from the 1994 acquisition had been sold and 50% were built or under construction by the time of the 2002 notifications — evidencing substantial development in the interregnum and market demand.
  4. Documentary sale/allotment evidence: The court reviewed several allotment letters/sale transactions relied upon by land owners (e.g., Exs. P4–P7 showing high per‑sq‑yard rates in 2000 and 2006, and Ex. P38 — allotment dated 2.2.2000 to Orient Craft Ltd. at Rs. 1,254.72 per sq. yard). These transactions were largely carved out of land acquired in 1994; many were auction/allotment sales for commercial use and some post-dated the 2002 notifications.
  5. Evaluation of comparable evidence: The court observed that HSIIDC/State did not produce documentary evidence of agricultural land sales in the 2002 area to counter the land owners’ evidence. The court accepted that sales/allotments from the developed 1994 land are not direct comparables for agricultural parcels in 2002 but are persuasive guiding indicators of market trends and the extent of appreciation.
  6. Use of Pran Sukh as base: Given the above, the court considered the Supreme Court’s Rs. 20,00,000/- per acre determination in Pran Sukh (which itself relied on a 1994 sale) to be an appropriate base for valuing the 2002-acquired agricultural land that was in the vicinity of the 1994 development.
  7. Determination of annual increase: The court balanced competing submissions (land owners sought up to 20% p.a.; HSIIDC urged modest figures e.g., 5% p.a.) and, weighing the evidence of development, selected an annual appreciation rate of 12% per annum for the general body of acquired land. Applying 12% per annum for the period between the two acquisitions (7 years and 3 months), the court computed the enhanced rate as Rs. 37,40,000/- per acre.
  8. Alternative cross-check: The court noted that applying 12% p.a. to the Ex. P38 allotment (30,000 sq. meters at Rs. 1,254.72 per sq. yard in February 2000) and then reducing by 50% for relevant factors yields a value of the same order — thereby corroborating the reasonableness of the adopted approach.
  9. Separate valuation for Kohli Holdings (RFA 4646): The court accepted that Kohli's parcel (69 kanals 15 marlas) abutted National Highway No. 8, enjoyed special locational advantages (frontage, connectivity, nearby five-star hotel, developed housing opposite the highway), and thus should be valued separately. The court took Ex. P38 (2.2.2000 allotment to Orient Craft) as a comparable for location and, applying 15% p.a. increase to that 2000 allotment, obtained an enhanced per‑square‑yard figure (Rs.1,630 per sq. yard). Then, applying a further 30% addition to account for the special locational advantage of Kohli’s land, the court fixed the rate at Rs. 2,119 per sq. yard for Kohli’s parcel.
  10. Statutory benefits and procedural safeguards: The court held that land owners are entitled to statutory benefits under the Land Acquisition Act and, to prevent dissipation by middlemen, directed the Land Acquisition Collector to follow measures (deputing subordinate officers, prompting land owners to open bank accounts, collecting account numbers within three months, depositing cheques into bank accounts) consistent with directions issued by the Supreme Court in Pran Sukh.

Holding and Implications

Holding:

The appeals filed by the land owners are accepted. The court assessed compensation for the general body of acquired agricultural land at Rs. 37,40,000/- per acre. For R.F.A. No. 4646 (M/s Kohli Holdings Pvt. Ltd.), the court held the land owner entitled to compensation at Rs. 2,119/- per square yard for the parcel abutting National Highway No. 8. The land owners are also held entitled to the statutory benefits available under the Land Acquisition Act.

The appeals filed by HSIIDC are dismissed.

Immediate consequences for the parties

  • Land owners (generally) receive enhanced compensation fixed at Rs. 37,40,000/- per acre plus statutory benefits as per the Act.
  • M/s Kohli Holdings Pvt. Ltd. receives compensation assessed at Rs. 2,119/- per square yard for its NH‑8 abutting parcel plus statutory benefits.
  • HSIIDC’s appeals for reduction fail and remain dismissed.
  • The Land Acquisition Collector must implement safeguards to ensure direct payment into land owners’ bank accounts (specific directives reproduced from Pran Sukh are to be followed by the Collector).

Broader precedent setting: The opinion applies and interprets existing Supreme Court authorities (notably Pran Sukh) to the facts before it. The court did not purport to lay down a new general rule beyond its factual application of the precedents and the particular percentage increases it awarded in this matter.

Directions / Procedural Safeguards (as ordered)

The court reproduced and ordered the following directions—mirroring directions in Pran Sukh—to ensure land owners receive enhanced compensation directly and are not exploited by middlemen:

  1. The Land Acquisition Collector shall depute officers subordinate to him not below the rank of Naib Tehsildar to contact each land owner/their legal representatives and inform them of their entitlement to receive enhanced compensation.
  2. Those officers shall instruct land owners/legal representatives to open savings bank accounts if they do not already have one.
  3. Land owners shall provide their bank account numbers to the Land Acquisition Collector within three months.
  4. The Land Acquisition Collector shall deposit the cheques of compensation into the land owners' bank accounts.

This summary is confined to and derived exclusively from the content of the provided opinion. No facts or conclusions have been added beyond those present in the opinion.

    Madan Pal v. State Of Haryana And Another S

    Rajesh Bindal J.

    1. This order will dispose of R.F.A Nos. 2373, 2375 to 2380, 2853, 3127 to 3146, 3148 to 3164, 3170 to 3186, 3191, 3223, 3383 to 3401, 3503 to 3525, 3540, 3541, 3790 to 3798, 3930 to 3946, 3959 to 3975, 4043 to 4062, 4168, 4186 to 4192, 4195, 4213 to 4220, 4278, 4312 to 4320, 4322, 4323 to 4368, 4514, 4585 to 4587, 4624, 4625, 4646, 4674, 4740, 4837, 4838, 4984, 5016 to 5022 and cross objections No. 177-CI, 182-CI, 184-CI to 186-CI, 188-CI, 189-CI, 198-CI and 216-CI to 219-CI of 2010 and 14-CI and 15-CI of 2011, as common questions of law and facts are involved.

    2. In the appeals and cross-objections filed by the land owners, they are seeking further enhancement of compensation for the acquired land, whereas in the appeals filed by Haryana State Industrial & Infrastructure Development Corporation Ltd. (for short, ‘HSIIDC’), the prayer is for reduction thereof.

    3. The facts have been extracted from R.F.A No. 2373 of 2010. Briefly, the facts of the case are that vide notification dated 6.3.2002, issued under Section 4 of the Land Acquisition Act, 1894 (for short, ‘the Act’), State of Haryana sought to acquire 1,380 kanals and 16 marlas of land, situated in the revenue estate of villages Kasan, Bas Kusla, Naharpur Kasan and Manesar for setting up of Industrial Model Township, Phase-II, District Gurgaon. The same was followed by notification dated 15.11.2002, issued under Section 6 of the Act. The Land Acquisition Collector (for short, ‘the Collector’) vide award dated 22.7.2003, assessed the market value of the acquired land as under:

    Name of the village Chahi Bhood Banjar Gair Mumkin per acre per acre per acre per acre in ‘in’ in ‘in’

    ………………………………………………………………………………………………………….

    Kasan 5,25,000/- 5,00,000/- 5,00,000/- 7,50,000/- Bas Kusla 2,25,000/- 1,75,000/- 1,75,000/- 3,60,000/- Naharpur Kasan 5,25,000/- 4,00,000/- 4,00,000/- 7,20,000/- Manesar 7,00,000/- 7,00,000/- 7,00,000/- 10,00,000/-

    4. Dissatisfied with the award of the Collector, the land owners filed objections. On reference under Section 18 of the Act, the learned court below assessed the market value of the acquired land @ Rs. 28,15,356/- per acre.

    5. Vide another notification dated 7.3.2002, issued under Section 4 of the Act, State of Haryana sought to acquire 598 acres, 5 kanals and 12 marlas of land, situated within the revenue estate of village Kasan, Bas Kusla, Bas Haria and Dhana for setting up of Industrial Model Township, Manesar Phase III, Tehsil and District Gurgaon. The same was followed by notification dated 25.11.2002, issued under Section 6 of the Act. The Collector, vide award dated 24.12.2003, assessed the market value of the acquired land as under:

    Name of the village Chahi Gair Mumkin per acre in ‘per acre in’

    ……………………………………………………………………………………..

    Kasan 5,25,000/- 7,50,000/- Bas Kusla 2,25,000/- 3,60,000/- Bas Haria 2,25,000/- 3,60,000/- Dhana 2,25,000/- 3,60,000/-

    6. Dissatisfied with the award of the Collector, the land owners filed objections. On reference under Section 18 of the Act, the learned court below assessed the market value of the acquired land @ Rs. 28,15,849/- per acre.

    7. Learned counsel for the land owners submitted that there has been series of acquisition in the area, the first being in the year 1988, which was followed by notification under Section 4 of the Act on 30.4.1994 and thereafter on 15.11.1994 This was meant to be used for Ist Phase of Industrial Model Township, Manesar. The present acquisition is for development of Phase II and III in Manesar. The acquisition of land for Phase-I in the year 1994 was of villages Manesar, Naharpur Kasan and Khoh. As far as acquisition vide notification dated 6.3.2002 is concerned, the same is for villages Bas Kusla, Kasan, Naharpur Kasan and Manesar for Phase-II. The acquisition of land vide notification dated 7.3.2002 for Phase-III is pertaining to villages Kasan, Bas Kusla, Bas Haria and Dhana. He submitted that the acquisition process in the area started when the State also realised that there was great potentiality of its being developed as a commercial and industrial hub, as large number of big industries were already set up and were being set up in that area.

    8. Taking his case further, learned counsel argued that the issue regarding consideration of valuation of the land acquired vide notifications dated 30.4.1994 and 15.11.1994 came up for consideration before Hon'ble the Supreme Court in Civil Appeal No. 6515 of 2009 -Haryana State Industrial Development Corporation v. Pran Sukh, decided on 17.8.2010 and uniform compensation of Rs. 20,00,000/- per acre was awarded for a big chunk of land measuring 1747 acres and 9 marlas. It was submitted that the land in question for which notification under Section 4 of the Act was issued on 6.3.2002 is pertaining to Phase-II and dated 7.3.2002 is pertaining to acquisition for Phase-III, It is adjoining to the area, which already stood developed after the acquisition in the year 1994. Even as per the notified controlled area plan, it fell within the industrial zone. The mere fact that the State had to acquire land in this area repeatedly shows the pressure for development. He further submitted that appreciation in the value of land in the area is evident from the fact that HSIIDC vide allotment letters Ex. P4 to Ex.P7 sold plots at the following rates:

    Ex. Date Area in Amount of consideration Rate per sq. sq. meters in ‘yard in’

    ……………………………………………………………………………………………………………….

    P4 2.2.2000 30,000 4.50 crores 1,371.60

    P5 30.6.2006 6,804 95.10 crores 1,27,806.77 P6 30.6.2006 5,832 101.50 crores 1,74,039.78 P7 30.6.2006 6,804 93.00 crores 1,36,684.30

    9. No doubt, the aforesaid sales were made in February, 2000 and June, 2006, but the genuineness thereof cannot be doubted and the consideration paid therein. It would not be reasonable for the State to contend that the value of the land in the year 2002 was merely upto Rs. 10,00,000/- per acre, whereas in the year 2006, it was being sold in the price range of Rs. 1,27,806.77 to Rs. 1,74,039.78 per square yard. He further submitted that in Pran Sukh's case (supra) while assessing the compensation, Hon'ble the Supreme Court had relied upon an agreement to sell pertaining to sale deed dated 16.9.1994 for 96 kanals and 13 marlas of land. The same very land was re-sold on 28.4.2004 at an average price of Rs. 1,12,73,668/- per acre merely after 10 years. The submission was that on the same basis, the value of the acquired land should be assessed.

    10. In the alternative, it was submitted that earlier acquisition being in November, 1994 and the present being in March, 2002, for the time gap, in terms of the law laid down by Hon'ble the Supreme Court, cumulative increase deserved to be awarded on the value so determined for the acquisition carried out in the year 1994. The increase in the present case should not be less than 20% per annum considering the appreciation of prices in the area. Referring to the cross-examination of R.W.1-Dalbir Singh Bhati (LAC N. 513 of 2004), it was submitted that he admitted the fact that 80% of the plots carved out of the land acquired in the year 1994 had already been sold when the notification under Section 4 of the Act was issued in the present case and out of those, 50% had either been built or were under construction. This was the pace of development. He had further stated that the plots carved out of the land acquired for Phase-II were sold @ Rs. 2,200/- per square meter.

    11. Mr. Pawan Kumar, Senior Advocate, while adopting the contentions already raised by learned counsel for the land owners, referred to the statement of RW1-Dalbir Singh Bhati, Manager (Utility), HSIIDC, IMT, Manesar (LAC No. 44 of 2005) to submit that the entire land acquired for Phase-III was allotted to Maruti Udyog as such @ Rs. 19,00,000/- per acre without any development. He further submitted that Dalbir Singh Bhati (RW-1) had admitted that there were repeated acquisitions in the area for development of the industrial estate.

    Regarding R.F.A No. 4646 of 2010

    12. Mr. M. L. Sarin, Senior Advocate appearing for the appellant in the present case submitted that considering the strategic location of the land of the appellant, which was acquired vide notification dated 6.3.2002, its case cannot be equated with the cases of other land owners, whose land was also acquired vide same notification. It is a separate portion measuring 65 kanals and 7 marlas of village Manesar and 4 kanals and 8 marlas of village Naharpur Kasan in one block, which is located on National Highway No. 8. Otherwise for the acquisition, which was carried out in the year 2002, none of the portion of the acquired land abutted National Highway No. 8, as the land close to National Highway No. 8 had already been acquired in the year 1994 for development as Phase-I and the other land acquired for development as Phase-II was located behind Phase-I. He submitted that what to talk of the area adjoining to the acquired land owned by the appellant, even on other side of National Highway No. 8, the entire area had already been developed. The acquisition of land in the vicinity of the land owned by the appellant was carried out in the year 1994 and the entire area had already been developed. There was a five star hotel, health club etc. just adjoining to the acquired land.

    13. To show the value of the acquired land in the vicinity and that too, which was not located on National Highway No. 8, he referred to the sale of plots by HSIIDC vide allotment letters (Ex. P39 to Ex. P41) dated 30.6.2006 whereby plots were sold @ Rs. 1,16,887.33, Rs. 1,45,632.46 and Rs. 1,14,306.22 per square yard, respectively. He submitted that genuineness of the aforesaid sale transactions cannot be doubted. The only factor, which is required to be considered is that these sales being four years after the date of notification under Section 4 of the Act in the present case, a reasonable cut can be imposed. He also referred to allotment letter (Ex. P-38) dated 2.2.2000, whereby a big chunk of land measuring 30,000 square meters was purchased by Orient Craft Limited, sister concern of the appellant, at an average price of Rs. 1,254.72 per square yard. The aforesaid plot is also not abutting National Highway No. 8, rather is located about one kilometer away therefrom. It is forming part of Phase-I, Sector 5 thereof. He submitted that appreciation of prices in the area is evident from the fact that in the year 2000, the price was Rs. 1,254.72 per square yard, which appreciated in the range of Rs. 1,16,887.33 to Rs. 1,45,632.46 per square yard in the year 2006.

    14. He further submitted that there was need to purchase additional 30,000 square meters of land by the sister concern of the appellant in the year 2000 for the reason that the land already available with the group companies was not sufficient for its expansion plan, but the same had totally gone haywire, as large portion of the land, which was owned by the appellant close to National Highway No. 8, was acquired. For the left out portion measuring 5.9625 acres, the appellant has already been granted permission to develop the same as I.T Park vide Licence No. 27 of 2008.

    15. Another contention raised by him was that for the land owned by the land owners, no cut on the value of land sold by HSIIDC deserves to be applied on account of development for the reason that the sale transactions relied upon by the land owners are pertaining to big chunks of land and further all the possible infrastructural facilities were already available with them when their land in question was acquired and nothing more was required to be provided for which the land could be used. He relied upon Shri Tara Singh (deceased) v. The State of Punjab, 1983 (85) PLR 286; Mehta Ravindrarai Ajitrai (Deceased) through his heirs and LRs v. State of Gujarat, (1989) 4 SCC 250 and Subash Chander v. State of Haryana, (2004-2) 137 PLR 97 to submit that even the sale transactions which are post acquisition can be considered for the purpose of assessment of fair value of the acquired land, especially when genuineness thereof is not doubted. In the present case, the genuineness of none of the sale transactions can possibly be doubted, as the vendor therein was HSIIDC. He further submitted that there was no private sale transaction in the area, which could be produced by the land owners as entire land in the vicinity had been acquired already. Even the State also did not produce any sale transaction. As far as relevance of the auction sale transactions are concerned, reliance was placed upon Executive Engineer, Karnataka Housing Board v. Land Acquisition Officer, Gadag, JT 2011 (1) SC 539 to submit that in the absence of private sale transactions, genuine auction sale transactions, which are not in the kind of distress sales or otherwise in the circumstances where some higher value could have been paid, can also be relied upon. In the aforesaid case, Hon'ble the Supreme Court opined that a reasonable cut of 20% can be imposed therein. He submitted that though in the present case considering the locational advantage to the land owners as compared to the auction sale transactions sought to be relied upon, no cut should be applied. However, even if this court finds it appropriate to apply the cut, the same should be in terms of the judgment of Hon'ble the Supreme Court.

    16. On the other hand, Mr. Hawa Singh Hooda, Senior Advocate appearing for HSIIDC submitted that main argument raised by learned counsel for the land owners is based upon the judgment of Hon'ble the Supreme Court in Pran Sukh's case (supra), which was pertaining to the land where notifications under Section 4 of the Act were issued on 30.4.1994 and 15.11.1994 The aforesaid land was abutting National Highway No. 8, whereas the land in question is located 4-5 kilometers away from National Highway No. 8. The value of land, which is on a National Highway or a State Highway or on some other road is always different as compared to the land not having that advtange. At the time when the land in question was acquired, it was being put to agricultural use only. Sale of plots even in the vicinity of the acquired land in a developed area cannot be considered as such for the purpose of valuation thereof, as the area where those plots had been carved out was acquired 7 years earlier. During the interregnum, a lot of amount was spent on development activities and providing infrastructure there. The authorities selling the plots get the return only after 5-6 years of investment. The plots many a times are sold in instalments as well.

    17. However, on the asking of the court, learned counsel was fair enough to admit that the land in question is adjoining to the boundaries of the land acquired in the year 1994, for which the value was assessed @ Rs. 20,00,000/- per acre by Hon'ble the Supreme Court in Pran Sukh's case (supra), may be the depth thereof is 4-5 kilometers from National Highway No. 8. It was further submitted that though large chunk of land acquired vide notifications in question is located beyond the boundaries of the land already acquired in the year 1994, however, a small portion of 47 acres of land acquired at the same time is located on National Highway No. 8. Out of this chunk of land, 5.962 acres of land owned by Kohli Holdigs Pvt. Ltd. was released from acquisition. The acquisition pertaining to rest of the land is under challenge before this court except the part of the land owned by Kohli Holdings Pvt. Ltd., for the enhancement of compensation of which RFA No. 4646 of 2010 has been filed by it. The acquired land of M/s Kohli Holdings Pvt. Ltd. has a frontage of two acres on National Highway No. 8. It was further not disputed that in the development plan of the controlled area, the area in question had been ear-marked for industrial use.

    18. Continuing his submissions, learned counsel submitted that the sale transactions of agricultural land have not been produced by the land owners. Those could be said to be the comparable piece of evidence. They are not entitled to any increase as such on the value as was paid for the acquisition in the year 1994, as there is no material on record to show that there was any appreciation in the prices. However, still if this court finds that some increase has to be awarded, the same should not be more than 5% per annum. Reliance was placed upon R.P Singh v. Union of India, AIR 2005 SC 4189; Raj Kumar v. Haryana State, AIR 2007 SC 3124; Faridabad Gas Power Project, National Thermal Power Corporation Limited v. Om Prakash, (2009) 4 SCC 719; Lal Chand v. Union of India, AIR 2010 SC 170 and The General Manager, Oil and Natural Gas Corporation Ltd. v. Rameshbhai Jivanbhai Patel, JT 2008 (9) SC 480 in support of his arguments regarding increase, reliance on sale transactions in an auction, period for which the increase at the flat rate should be awarded and also consideration of evidence with regard to sale transactions of plots in a developed area. Learned counsel further submitted that value of the portion of land abutting the National Highway may have to be determined independently as compared to the other chunk of land, which is located away from National Highway No. 8. However, he did not address any specific argument to rebut additional contentions raised in RFA No. 4646 of 2010.

    19. Heard learned counsel for the parties and perused the relevant referred record.

    20. The site plans (Ex. PW1/1 and P8), which were referred to at the time of hearing, are showing the location of the acquired land and also the land pertaining to various allotment letters/sale deeds. As the said plans did not clearly depicted the location of the land acquired in the year 1994 and subsequently, learned counsel appearing for HSIIDC was requested to get a plan showing the location of the land acquired in the year 1994 and 2002, the valuation of which is under consideration in the set of appeals. A site plan was produced, which has been taken on record as mark ‘A’, as correctness thereof was not even disputed by the counsel for the land owners.

    21. At the time of hearing, referring to the aforesaid plans, it was submitted that first acquisition in this area was carried out vide notification dated 30.4.1994 This portion of land is located on left side of National Highway No. 8 in case we go from Delhi to Jaipur. Immediately thereafter, a big chunk of land was acquired vide notification dated 15.11.1994 on the right side of National Highway No. 8. The value of both chunks of land was determined by Hon'ble the Supreme Court @ Rs. 20,00,000/- per acre in Pran Sukh's case (supra). It was developed as Ist phase of IMT, Manesar.

    22. The issue under consideration in the present set of appeals is regarding determination of the value of land acquired for the purpose of development as Phase-II and Phase-III of Industrial Model Township, Manesar. The notification under Section 4 of the Act for Phase-II was issued on 6.3.2002, whereas for Phase-III, the same was issued on 7.3.2002 For Phase-II, the total acquired land was 1,380 kanals and 16 marlas, whereas for Phase-III, the same was 4,789 kanals and 12 marlas. The entire land is a compact block. It is adjoining to the land already acquired for development as Phase-I in the year 1994. The villages, of which the land was acquired, are common in the acquisition or are contiguous as after crossing the boundaries of one village, the abutting land of the next revenue estate was acquired. It was also contended at the time of hearing that almost at the same time, land for development as Phase-IV was also acquired adjoining to the land in question by notification under Section 4 of the Act issued on 26.2.2002, the area being 567 acres 4 kanals and 3 marlas. Even subsequent thereto, for development as Phase-V in the same area, 956 acres, 5 kanals and 18 marlas of land was acquired vide notification under Section 4 of the Act issued on 17.9.2004

    23. The aforesaid facts clearly establish that the area was developing. There was demand for plots. That is the reason that the State also sought to acquire substantial land after acquisition of land for development as Phase-I, regularly after some intervals. It had also come in the cross-examination of R.W.1-Dalbir Singh Bhati that 80% of the plots carved out of the land acquired in the year 1994 had already been sold when notification under Section 4 of the Act in the present case was issued. 50% thereof had either been built or were under construction. This was the pace of development, which clearly establish that the land in question had potentiality for being used for industrial/commercial purposes.

    24. As far as value of the land in the area is concerned, learned counsel for the land owners had referred to sale deed (Ex. P2) dated 16.9.1994 (LAC No. 513 of 2004) pertaining to 96 kanals and 13 marlas of land, which was sold at an average price of Rs. 20,03,104/- per acre. The aforesaid sale transaction was relied upon by Hon'ble the Supreme Court in Pran Sukh's case (supra) for determination of the value of land acquired in the year 1994. It was submitted that vide sale deed (Ex. PY) dated 28.4.2004, the same plot was sold at an average price of Rs. 1,12,73,668/- per acre. In the short span of less than 10 years, there was phenomenal increase in the prices of the land in the area. May be, this plot was located close to the already developed area, but still the trend of prices can very well be seen from this.

    25. In addition to that, reference was made to four allotment letters, namely, Ex. P4 to Ex. P7, the details of which are as under:

    Ex. Date Area in Amount of consideration Rate per sq. sq. meters in ‘yard in’

    ……………………………………………………………………………………………………………….

    P4 2.2.2000 30,000 4.50 crores 1,371.60

    P5 30.6.2006 6,804 95.10 crores 1,27,806.77 P6 30.6.2006 5,832 101.50 crores 1,74,039.78 P7 30.6.2006 6,804 93.00 crores 1,36,684.30

    26. The aforesaid plots were big chunks of land. The average sale consideration paid therein was stated to be Rs. 1,25,608.67 per square yard. However, the fact is that these plots were sold in open auction for commercial purpose and more than 4 years after the issuance of notification under Section 4 of the Act and that too carved out of the land, which had already been acquired in the year 1994 and located quite close to National Highway No. 8. Reference had also been made to allotment letter dated 2.2.2000 (Ex. P38) pertaining to plots No. 13, 14 and 15, Sector 5, IMT, Manesar, whereby 30,000 square meters of land was allotted for Rs. 4,50,00,000/- at an average price of Rs. 1,254.72 per square yard. The aforesaid allotment was two years prior to the acquisition in question. However, the fact remains that even the aforesaid plots were also carved out of the land acquired in the year 1994.

    27. With the aforesaid evidence, now the question before this court is as to what should be the value of the acquired land, which is located beyond the land out of which the aforesaid plots were sold. It is a fact that the acquired land is adjoining the land, which was already developed after acquisition in the year 1994. The potentiality thereof for industrial or commercial use cannot be disputed. Considering the aforesaid fact, to differentiate the value of the land on the basis of its classification would not be appropriate and the entire land should be assessed at the same rate. Even Hon'ble the Supreme Court in Pran Sukh's case (supra) while relying on a transaction pertaining to 96 kanals and 13 marlas of land had assessed the value of 1,490 acres, 3 kanals and 17 marlas of land at a flat rate of Rs. 20,00,000/- per acre.

    28. As against the evidence led by the land owners, the State or even HSIIDC did not lead any documentary evidence to justify the award of the Collector by showing any sale transaction pertaining to agricultural land in the area. This is not a case in isolation of the type. A lot of hue and cry is raised by the agencies of the State for whose benefit the land is acquired that they should be heard before assessment of compensation at every stage, but the experience is that it is very rare that in any case they lead evidence or raise any effective argument in the court below and many a times, even in this court.

    29. From the appreciation of evidence produced on record, in my opinion, the price of the agricultural land, which was acquired in the year 1994, as determined by Hon'ble the Supreme Court in Pran Sukh's case (supra), can very well be taken as base for assessment of value of the acquired land, which also on the date of notification was being put to agricultural use. The additional advantage available at the time of acquisition of the land in question was that the area in the vicinity had started developing during interregnum of 7-8 years after the first acquisition in the year 1994. The value of the land, which was being put to agricultural use and was in the vicinity of the land already acquired cannot be determined at the same rate at which the plots were being sold by way of allotment or auction in the already developed area but those prices are certainly the guiding factors for determination of rate at which the increase should be awarded, which in my opinion, should be @ 12% per annum. Taking the same into account and considering the time gap in the two acquisitions being 7 years and 3 months, the value of the land is determined at Rs. 37,40,000/- per acre. The land owners shall also be entitled to the statutory benefits available to them under the Act.

    30. The aforesaid value will be quite close if we consider the valuation of land from different angle, i.e, considering the allotment of 30,000 square meters of land vide allotment letter (Ex. P38) @ Rs. 1,254/- per square yard on 2.2.2000, granting increase thereon @ 12% per annum and reducing 50% therefrom on account of various factors.

    31. As far as value of the land owned by M/'s Kohli Holdings Pvt. Ltd. (R.F A. No. 4646 of 2010) is concerned, the same has to be determined separately. This fact was not even disputed by learned counsel for HSIIDC and rightly so for the reason that the aforesaid portion of 69 kanals and 15 marlas is located on National Highway No. 8 with frontage of two acres. Even from the back side also, it has connection from a link road. It was also not disputed that adjoining thereto is a five star hotel and a resort. The other area adjoining to it, which was earlier acquired by the State in the year 1994, had already been developed. Even on the other side of National Highway No. 8, opposite the acquired land, the area had already been developed as Housing Project for industrial workers. The value of this land cannot be assessed merely at the rates, which have been granted to the owners of land which is located 4-5 kilometers from National Highway No.

    32. Though learned counsel for the land owner had referred to allotment letters Ex. P39 to Ex. P41 pertaining to sale of commercial plots located close to the acquired land on the area which was acquired in the year 1994 but in my opinion the same cannot be made the basis for assessment of compensation, considering the fact that those plots were sold for commercial use. In case, the land owner has to use the land for any purpose other than agriculture, he is required to obtain permission on payment of prescribed fee and also fulfilment of certain conditions. In fact, for the land released out of acquisition measuring 5.9625 acres owned by the land owner, it has already obtained a licence for development as IT Park. Another fact is that the aforesaid sale transactions had taken place 4 years after the acquisition in question. In my opinion, even after application of a cut, whatever that rate may be, it will not be safe to place reliance upon those transactions. But the fact is that the plot of the land owned by the land owner, which was acquired, had all the infrastructural facilities available. In my opinion, it would be safe to place reliance upon allotment letter (Ex. P38) pertaining to 30,000 square meters of land allotted to the sister concern of the appellant, namely, Orient Craft Limited @ Rs. 1,254/- per square yard.

    33. The aforesaid sale transaction having taken place two years prior to the issuance of notification under Section 4 of the Act and looking at the pace of development close to the acquired land, in my opinion, increase @ 15% per annum can very well be added in the value, as is evident in Ex. P38. Adding the same, the value of land will come out to Rs. 1,630/- per square yard. The aforesaid plot is located about one kilometer inside from National Highway No. 8, though in the developed industrial estate, but as against that, the acquired land is abutting the National Highway with frontage of two acres out of 69 kanals and 15 marlas owned by the appellant-land owner. The value of the land on National Highway is always more as against the value of the land, which is located off the road. It has its own advantages. There are certain limitations for which the land located off the main road can be used, but as far as the land located on the National Highway or the State Highway is concerned, it can be put to many uses, to which the land located off the road may not be appropriately used.

    34. Considering the aforesaid facts, in my opinion, applying a thumb rule, an addition of 30% thereon can very well be added on account of special locational advantage available to the land in question. Adding the same, the value of the land owned by M/s Kohli Holdings Pvt. Ltd. (RFA No. 4646 of 2010) is assessed at Rs. 2,119/- per square yard. The land owner shall also be entitled to the statutory benefits available under the Act.

    35. In view of the above, the appeals filed by the land owners are accepted. The land owners are held entitled to compensation @ Rs. 37,40,000/- per acre, whereas in the appeal filed by M/s Kohli Holdings Pvt. Ltd. (RFA No. 4646 of 2010), the land owner is held entitled to compensation @ Rs. 2,119/- per square yard. The land owners shall also be entitled to the statutory benefits available to them under the Act.

    36. The appeals filed by the HSIIDC are dismissed.

    37. To ensure that the landowners are not fleeced by the middleman in the process of disbursement of enhanced compensation, Hon'ble the Supreme Court in Pran Sukh's case (supra) decided on 17.8.2010, issued certain directions. I deem it appropriate to issue same directions in the present set of appeals as well. The same are as under:

    “With a view to ensure that the land owners are not fleeced by the middleman, we deem it appropriate to issue following further directions:

    (i) The Land Acquisition Collector shall depute officers subordinate to him not below the rank of Naib Tehsildar, who shall get in touch with all the land owners and/or their legal representatives and inform them about their entitlement and right to receive enhanced compensation.

    (ii) The concerned officers shall also instruct the land owners and/or their legal representatives to open savings bank account in case they already do not have such account.

    (iii) The bank account numbers of the land owners should be given to the Land Acquisition Collector within three months.

    (iv) The Land Acquisition Collector shall deposit the cheques of compensation in the bank accounts of the land owners.”