Per: P.R. Chandrasekharan: The appeal is against the Order-in- Original No. 15-16/2006/CAC/CC(I)/AKP dated 31/01/2006 passed by the Commissioner of Customs (Import), New Custom House, Mumbai.
2. The appellant, M/s. Bharat Bijlee Ltd., are manufacturers of electric transformers. The appellant import CRGO electrical steel sheets and electrolytic copper rods for the manufacture of such transformers. They imported the said materials under Project Import Regulations, 1986 under heading No. 98.01 of the Ist Schedule to the Customs Tariff Act. The appellant also procured the same materials without payment of Customs duty under duty exemption entitlement scheme and also on payment of appropriate Customs duty. The appellant had undertaken 16 projects under which they imported the aforesaid raw materials on concessional rate of duty under heading 98.01of the Customs Tariff as per the Project Import Scheme during 1995-99. In respect of imports under 4 project, the assessment had been finalised. However, in respect of 12 projects, the assessments were provisional and were pending finalisation. 2.1. An investigation was undertaken into the project imports underaken, which revealed that the appellant had imported raw materials in excess of the quantity required by them for manufacture of transformers for the specified project. In certain cases it was observed that the import under the Project Import Scheme had taken place after the transformers had been manufactured and despatched to the project site by the importer. Statement of the Dy. General Manager (Materials) of the appellant-firm was recorded on 13/09/2000 wherein he was asked about the project undertaken in respect of M/s. Haldia Petro. In his statement the said official confirmed that in respect of the said project, transformer had been manufactured and dispatched from the factory even before the imported material had been cleared by the Customs and when he was questioned about what was done with the imported material, he evaded a direct answer and stated that the duty element saved on has bee passed on to the project authority. From the investigation conducted it came to light that the appellant imported CRGO steel and copper in excess of the requirement of the specific project and the imported material had not been used for the project for which it was intended but was diverted. Thus, it appeared that the appellant had violated the provisions of Project Import Regulations, 1986 by misusing the benefit under the said scheme. 2.2. Accordingly, a show cause notice dated 30/07/2001 was issued proposing to finally assess the goods imported under 12 contracts with a total assessable value of ` 4,22,07,432/- under Project Import Regulations (assessed provisionally earlier) on merits without extending the concessional rate of duty applicable to project imports under CTH 98.01 and demanding differential duty of ` 98,57,918/- as per the terms of the bond/bank guarantee executed by them at the time of clearance of the goods under project imports. It was also proposed to confiscate the said goods under Section 111(o) of the Customs Act, 1962 and to impose penalty under Section 112(a) of the Customs Act. In respect of four contracts, where the assessments had already been finalised, another show cause notice dated 23/01/2002 was issued proposing to re-determine the Customs duty on merits without extending the benefit of concessional rate of duty available to project imports and demanding differential duty of ` 16,12,401/- under the provisions of Section 28(1) of the Customs Act along with interest thereon under Section 28AA. The notice also proposed to impose penalties on the appellant under Section 114A and also to impose fine on the goods already cleared. The case was adjudicated vide the impugned order and the learned Commissioner finalised the assessment in respect of 12 projects on merits rate without extending the benefit of project imports and confirmed the differential duty demand of ` 98,57,918/-. In respect of four projects which had already been finalised, he confirmed the duty demand of ` 16,12,401/- under the provisions of Section 28 of the Customs Act and held that the appellants are liable to pay interest thereon under Section 28AA of the said Act. He also confiscated the goods imported under 16 contracts. As the goods were not physically not available for confiscation, he imposed a fine in lieu of confiscation amounting to ` 1.25 crore. He also imposed a penalty of ` 50 lakhs on the appellant under Section 112(a) in respect of notice dated 30/07/2001 and a penalty of ` 16,12,401/- under section 114a of the customs act, in respect of show cause notice dated 23/01/2002. It is against these orders, the appellant is before us.
3. The learned counsel for the appellant made the following submissions. 3.1. The contracts for the projects which they entered into, provided for a strict delivery schedule and a penalty if the delivery was not made on time. The total time required from the date of purchase order to actual import of raw materials under the Project Import Regulations is about 15 months and the time taken for manufacturing a transformer is at least three months. Therefore, if they had waited for 18 months to import the raw materials and manufactured the transformers for the specified project, they would not have been able to deliver the transformers on time and they would have been liable to pay liquidated damages for the delay. Therefore, in order to meet the delivery schedule, they did not wait for the imports under Project Import Regulations but utilised similar raw materials lying in stock with them, which was either duty-paid imported raw materials or raw materials imported under DEEC scheme in respect of which they had discharged the export obligation. However, they had passed on the benefit of concessional rate of duty under the Project Import Regulations to the customers even though they had utilised duty-paid materials to manufacture the transformers. 3.2. During 1995-99 they had registered 16 contracts under Project Import Regulations. In respect of four contracts, the assessments were finalised between 10/06/1998 to 25/01/2000. In respect of balance contracts the same were provisionally assessed. In respect of the contracts which had already been finalised, a show cause notice dated 23/01/2002 has been issued demanding duty of ` 16,12,401/- and in respect of 12 provisionally assessed contracts, a show cause notice dated 30/07/2001 has been issued demanding differential duty of ` 98,57,918/-. It is his submission that they have not contravened any law. They have not changed the location of the project and there is no allegation that any material imported under concessional rate of duty under Project Import Scheme had been diverted to the open market. The material they imported in respect of a particular project might have been used in the manufacture of transformers which were supplied for another project. Therefore, a purposeful interpretation must be given to the Project Import Regulations rather than a mechanical interpretation based on the one-to-one co-relation between the project and the goods imported under the Project Import. Once it is not disputed that the appellants were entitled to import under the Project Import Regulations and the project so registered were completed with similar materials, the benefit should be granted. He relied on the decision of the honble apex Court in the case of Commissioner of Customs vs. Tullow India Operations Ltd. 2005 (189) ELT 401 (SC) in support of the above contention and ONGC vs. Commissioner of Customs 2006 (201) 321 (SC). The learned counsel further argues that the appellant had acted bona fidely and in accordance with the substance and spirit of the Project Import Regulations. Chapter Note 2 to Chapter 98 requires the goods to have been imported in accordance with the Regulations and they have complied with this condition. All the units to whom the transformers have been supplied are units as defined under Regulation 3. Regulation 4 provides that the assessments under heading 98.01 is available to these goods which are imported against one or more specified contracts which have been registered. The said Regulation does not speak of any end use or one-to-one correlation and therefore, there is no necessity for any one-to-one correlation between the raw materials imported and the goods manufactured and supplied to a specific project. Inasmuch as they have substantially complied with the provisions of these Regulations, the ratio of the decision of this Tribunal in the case of BSES Kerala Power Ltd. vs. Commissioner of Customs, Cochin 2006 (196) ELT 246 (T) would apply. They have not indulged in evasion of Customs duty whatsoever and the imported goods were used in the manufacture of transformers for other projects and all such contracts have been fulfilled and there is no allegation that they have diverted the imported materials in the open market. There is no bar or restriction in the use of imported inputs which have been assessed at concessional rate of duty under heading 98.01 to other projects. As regards the extended period of time invoked in respect of the notice dated 23/01/2002, it is their contention that the have not mis-declared or mis-stated any facts willfully and, therefore, the extended period of time should not have been invoked and they rely on the decision of the honble apex Court in the case of Cosmic Dye Chemical vs. Collector 1995 (75) ELT 721 (SC) and Pahwa Chemicals Pvt. Ltd. vs. Commissioner 2005 (189) ELT 257 (SC). In any event, the issue relates to interpretation of statute and the appellant bonafidely believed that they were entitled to use as they had done and, therefore, interpretation of a statute cannot empower the Customs authorities to invoke larger period of time. It is also argued that the in respect of 12 projects which were finalised by the impugned order, imposition of penalty under Section 112(a) of the Customs Act of ` 50 lakhs is illegal and unwarranted. Inasmuch as the goods are not available, the question of imposing any fine in lie of confiscation is also not warranted and they relied on the decision of the Tribunal in the case of Associate Marketing Services vs. Commissioner of Customs 2006 (195) ELT 287. 3.3. The learned counsel also relies on the decision of the apex Court in the case of Zuari Industries Ltd. vs. Commissioner of Central Excise & Customs 2007 (210) ELT 648 (SC) wherein it has been held that heading No. 98.01 needs to be liberally interpreted as it deals with industrialisation. 3.4. Accordingly, he prays for setting aside the impugned order.
4. The learned Commissioner (AR) appearing for the Revenue strongly refutes the arguments made by the learned advocate for the appellants. He submits that the goods imported for a particular project have been diverted and used in the manufacture of transformers which were supplied to some other projects. The Project Import Regulations envisages that the goods imported for a particular project should be used only in that project and there is no provision under heading 98.01 or under the Project Import Regulations which permits the use of such goods intended for one project in another. He also relies on the decision of the honble apex Court in the case of Jacsons Thevara vs. Collector of Customs and Central Excise 1992 (61) ELT 343 (SC) and Commissioner of Customs, Mumbai vs. NRB Bearing Ltd. 2003 (159) ELT 755. He also relies on the decision of the Tribunal in the case of Photophone Ltd. vs. Collector of Customs, Bombay 1997 (92) ELT 596 in support of the above contentions. He submits that the procedural conditions stipulated in the Project Import Regulations have to be strictly followed and the procedures are not mere formalities and relies on the decisions of the Tribunal in the case of Eagle Flask Industries Ltd. vs. Commissioner of Central Excise, Pune 2004 (171) ELT 296 (SC) and Collector of Central Excise, Meerut vs. Modi Rubber Ltd. 2001 (133) ELT 515 (SC). Accordingly, he prays for upholding the impugned order.
5. We have considered the rival submissions. 5.1. It will be relevant at this juncture to consider the wordings of Chapter 98 relating to Projects Imports so that the issue arising for consideration can be appreciated better. Note 2 to Chapter 98 and Tariff description of heading 98.01 are reproduced below: 2. Heading 9801 is to be taken to apply to all goods which are imported in accordance with the regulations made under section 157 of the Customs Act, 1962 (52 of 1962) and expressions used in this heading shall have the meaning assigned to them in the said regulations. Heading 98.01 9801 All items of machinery including prime movers, instruments, apparatus and appliances, control gear and transmission equipment, auxiliary equipment (including those required for research and development purposes, testing and quality control), as well as all components (whether finished or not) or raw materials for the manufacture of the aforesaid items and their components, required for the initial setting up of a unit, or the substantial expansion of an existing unit, of a specified: (1) Industrial plant, (2) Irrigation project, (3) Power project, (4) Mining project, (5) Project for the exploration for oil or other minerals, and (6) Such other projects as the central government may, having regard to the economic development of the country, notify in the official gazette in this behalf. 5.2. The relevant extracts of Project Import Regulations, 1986 are also reproduced below: 4. Eligibility:- The assessment under the said heading No. 98.01 shall be available only to those goods which are imported (whether in one or more than one consignment) against one or more specific contracts, which have been registered with the appropriate Custom House in the manner specified in regulation 5 and such contracts or contracts has or have been so registered,
(i) before any order is made by the proper officer of customs permitting the clearance of the goods for home consumption;
(ii) in the case of goods cleared for home consumption without payment of duty subject to re-export in respect of fairs, exhibitions, demonstrations, seminars, congresses and conferences, duly sponsored or approved by the Government of India or Trade Fair Authority of India, as the case may be, before the - Customs payment of duty.
5. Registration of Contracts:- (1) Every importer claiming assessment of the goods falling under the said heading No. 98.01, on or before their importation shall apply in writing to the proper officer at the port where the goods are to be imported or where the duty is to be paid for registration of the contract or contracts, as the case may be: Provided that in the case of consignments sought to be cleared through a Custom House other than the Custom House at which the contract is registered, the importer shall produce from the Customs House of registration such information as the proper officer may require. (2) The importer shall apply, as soon as may be, after he has obtained the Import trade control licence wherever required for the import of articles covered by the contract and in case of imports covered by the Open General Licence or imports made by Central Government, any State Government, statutory corporation, public body or Government undertaking run as a joint stock company (hereinafter referred to as "Government Agency") as soon as clearance from the concerned Administrative Ministry or Department, as the case may be, has been obtained. (3) The application shall specify - (a) the location of the plant or project; (b) the description of the articles to be manufactured, produced, mined or explored; (c) the installed or designed capacity of the plant or project and in the case of substantial expansion of an existing plant or project the installed capacity and the proposed addition thereto; (d) such other particulars as may be considered necessary by the proper officer for purposes of assessment under the said heading. (4) The application shall be accompanied by the original deed of contract together with a true copy thereof, the import trade control licence, wherever required, and an approved list of items from the Directorate General of Technical Development or the concerned sponsoring authority. (5) The importer shall also furnish such other documents or other particulars as may be required by the proper officer in connection with the registration of contract. (6) The proper officer shall, on being satisfied that the application in the order register the contract by entering the particulars thereof in a book kept for the purpose, assign a number in token of the registration and communicate that number of the importer and shall also return to the importer all the original documents which are no longer required by him. 5.3. From the Tariff heading 98.01 it is clear that the benefit under the said entry would be available in respect of all items of machinery as well as components, raw materials for the manufacture of the aforesaid items, required for the initial setting up of a unit or for the substantial expansion of an existing unit of a specified project. The expression used is of a specified project. In other words, imported materials should be used either for the initial setting up of a unit or a substantial expansion of a unit of a specified project. This condition implies that materials imported for one unit of a specified project cannot be used elsewhere in any other unit or in any other project. Similarly, the application for the project imports should clearly specify the particulars mentioned under clauses (a) to (d) of sub-regulation (3) of the Regulation 5 and these particulars are required to be registered unitwise and projectwise. The purpose of requiring all these details in advance is to ensure that there is one-to-one co-relation between the goods imported and the projects where they would be used and, therefore, it cannot be said that there is no requirement of one-to-one co-relation between the materials imported and the units/projects where they are going to be used. Similarly, importation under contracts mentioned in Regulation 4 refers to contracts for a specific project. For a given project, there can be more than one contract under which the goods are required to be supplied after importation. After the project is completed the contracts have to be finalised under Regulation 7 so that the Revenue can be satisfy that the terms and conditions of the project imports have been complied with by the importer. If one-to-one co-relation is not maintained, fulfilling of the condition regarding usage of the imported product in a particular project cannot be established. That is the reason why the Project Import Regulations envisage registration of the contract for a specified project. In the case before us it is an admitted position that the materials have been imported after the machinery have been already supplied to a project. If the machinery has already been supplied to a particular project, usage of the imported raw materials for the manufacture of machinery which is required to be supplied to a specific project cannot happen at all and, therefore, it is clear that the appellants have not complied with the terms and conditions of the Project Import Regulations. 5.4. The issue has been examined in detail by the adjudicating authority who in para 7 of the impugned order has recorded a categorical findings as follows: 30. From the chart of consumption of CRGO sheets and copper filed with their reply dt. 26/10/2004 it is evident that during the years 95-96 to 99-2000 (period covered by the two Show Cause Notices), imports under Project Import Scheme ranged from 2.7% to 28.9% of the total of the CRGO and copper sheets procured by them from all sources and used in the manufacture of transformers. Therefore, even the contention of the importer that imports under one project import contract was utilized in the manufacture of transformers covered by another contract is factually not correct. Use of these two raw materials in the manufacture of transformer which were not at all covered by the project import scheme, thus, ranged from about 97% to 70% cases. 5.5. Coming to the Tullow India case (cited supra), relied upon by the appellant, the said decision pertains to Notification 121/99 where the issue involved was delay in submission of essentiality certificate. The appellant was unable to produce the essentiality certificate from the Director General of Hydrocarbons at the time of importation of goods but was able to procure the same subsequently and submitted to the Customs authorities after the imports. In that context it was held that in a statute where there is a provision for provisional assessment and/or provisional clearance subject to compliance to certain conditions such conditions may be fulfilled at a later stage, namely, at the time of final clearance or final assessment. We do not understand how the ratio of the said judgment can be applied to the facts of the present case. The issue involved herein is diversion of materials imported for a particular project to some other project and this was not certainly the issue before the honble apex Court in the Tullow India case. Accordingly, we do not find any relevance of the case law to the facts at hand before us. 5.6. Similarly, in the case of ONGC, cited supra, the issue involved pertains to similar circumstances where the licence was not renewed at the time of importation but was renewed subsequently retrospectively and, therefore, the benefit of exemption was denied. In that context it was held that since the licence was renewed retrospectively and the essentiality certificate was given by the competent authority, the conditions precedent for obtaining exemption stood fully satisfied. It should be remembered that, in these cases, the goods were used for the purpose for which they were imported and only the requisite permission from the appropriate authorities were obtained later. Hence the ratio of these judgments cannot apply to the present case. 5.7. Coming to the decision in the case of BSES Kerala Power Ltd., cited supra, the issue before the Tribunal was the applicability of the concessional project import rate for the replacement imports. The facts of the case were that the appellant therein, M/s. BSES Kerala Power Ltd., had an agreement with Kerala State Electricity Board for the initial setting up and generation of power plant at Udyogmandal and after completing the formalities they imported certain parts. During the execution of the project, it was noticed that three numbers of rotable hot section assemblies which are very essential for power generation had to be replaced and the replacements were received and cleared at concessional rate of duty applicable to project imports. The Revenue contended that the replaced items did not form pat of the original contract but was part of an independent contract. The Tribunal held that once the contract is registered, items imported under the contract are entitled to project import benefit. Inasmuch as the contract was registered, the Tribunal extended the benefit to replacement parts also as they were for the same specified project. In other words, in that case also there was no usage of the imported goods for project other than the specified one. Similarly the reliance placed on Zuari Industries Ltd. case (cited supra) does not help as the facts are distinguishable. There was no diversion of material involved in that case. In the case before, us that is not the issue. In the case before us, it is an admitted position that there is a clear diversion of the goods imported under a specific contract for a specific project to another contract for another project. In other words, the condition of using the imported goods for a specified project stands completely violated and, therefore, the appellant is not eligible for the benefit of the Project Import Regulations. 5.8. It is in this context, the decision of the Tribunal in the case of NRB Bearing Ltd., cited supra, becomes relevant. In the said decision this Tribunal held that the benefit under the Project Import Regulations is specific to a unit and location as per the Project Import Regulations and in case the imported goods are utilised in some other units, the goods are liable to confiscation under Section 111(o) of the Customs Act. The said decision of the Tribunal was affirmed by the honble apex Court reported in 2006 (197) ELT A157 (SC). A similar issue came up before the honble apex Court in the case of Jackson Thevara (cited supra). In that case the imported goods cleared at concessional rate of duty by declaring them as project imports meant for substantial expansion of an existing unit was actually transferred to another company for setting up of new unit. It was held by the honble Court that since the appellant did not install the said machinery for the expansion of an existing unit but transferred to the company for setting up of a new unit, they are not eligible for the benefit of concessional rate of duty under heading 84.66 of the Customs Tariff Act (predecessor to 98.01) and the appellant is liable to pay duty at the normal rates prescribed in the Tariff. It was further held that the goods are liable to confiscation under Section 111(o) of the Customs Act and penalties are imposable under Section 112. 5.9. Therefore, we do not find any merit in the argument of the appellant that so long as the goods have been used in some projects which are also registered and not in the specified project in respect of which the goods were imported, the benefit under 98.01 would be available and accordingly we reject this contention. 5.10. The appellant has also raised a point that in view of the huge time lag involved in obtaining permission under the Project Imports, they were forced to utilise the materials imported earlier in lieu of the materials to be imported under the Project Imports Regulations. In other words, they are pleading hardship or inconvenience in following the terms and conditions of the Project Import Regulations. This argument of the appellant has no merits. The honble apex Court in Shankar Raju vs. Union of India 2011 (271) ELT 492 (SC) observed as follows: Where the Legislature clearly declares the intent in the scheme of a language of a statute, it is the duty of the Court to give full effect to the same without scanning its wisdom or policy and without engrafting, adding or implying anything which is not congenial or consistent with such express intent of legislature. Hardship or inconvenience cannot alter the meaning employed by the legislature, if such meaning is clear on the face of the statute. If the statutory provisions do not go far enough to relieve the hardship of the member, the remedy lies with the Legislature and not in the hands of the Court. Therefore, the argument of hardship or inconvenience in following the terms and conditions of the Project Import Regulations has no merit at all and accordingly the same is rejected. A similar view was taken by the honble apex Court in the case of Mihir Textiles Ltd. [1997 (92) ELT 9 (SC)] relating to project imports wherein the appellant had attributed the delay in registration of project import contract to bureaucratic delays. 5.11. The appellant submits that there is no requirement of one-to-one correlation between the imports made and the projects in which they are used and so long as the goods have been used in some approved projects, then the requirement would be satisfied. We do not agree with this proposition. Heading 98.01 clearly states that only materials required for the initial setting up of a unit or the substantial expansion of an existing unit of a specified project which has been registered with the department is eligible for the project import concession. In the tariff entry, the expression used is required for the initial setting up of a unit, or the substantial expansion of an existing unit of a specified project. If goods imported in respect of a particular unit of a specified project are used in another unit of another project, the expression used in the tariff entry becomes redundant. 5.12. The Tariff entry has to be read on the basis of language used therein as has been held in a number of judicial pronouncements. The judiciary cannot legislate and their only job is to interpret the law as it is worded. They cannot add or subtract any words into the legislation. It is a well settled position in law that in interpretation of fiscal statutes, the principles of strict interpretation should be followed. The same has been enunciated by Rowlatt J in his Classic Statement: In a taxing statute, one has to look merely at what is clearly said. There is no room for any intendment. There is no equity about a tax. There is no presumption as to a tax. Nothing is to be read in, nothing is to be implied. One can only look fairly at the language used. Therefore, we do not agree with the contention raised by the appellant in this regard. 5.13. This argument is also not acceptable for another reason. There are various schemes under the Customs law wherein one-to-tone co-relation is not required between the imported materials and their usage in a particular project. For e.g. under the DEEC scheme, the export obligation can be fulfilled in advance and raw materials required for the manufacture of the export products can be imported subsequently by availing the benefit of exemption. Similarly, in the case of duty-free replenishment scheme, imports can be made duty-free for replenishing the materials already used in the manufacture of the exported products and in those cases also one-to-one co-relation is not required. In other words, wherever the legislature wanted flexibility with regard to use of materials without any nexus between the imported materials and the exported product, the legislature devised a scheme to that effect. If the intention of the legislature was to provide such flexibility in the project import scheme, they would have specifically provided for the same either in the Tariff entry itself or in the Project Import Regulations. In the absence of such a provision, it cannot be presumed that the legislature did not envisage one-to-one co-relation between the imported goods and the projects in which they would be used. 5.14. Coming to the issue of confiscation in the case of goods already cleared and where the assessments had already been finalised, the question of confiscation would not arise as the bonds had already been discharged in those cases. Therefore, the imposition of fine of ` 25 lakhs on the goods which are not available for confiscation is not in accordance with the law and the same is set aside. At no point of time the appellant disclosed the fact that the goods imported for a particular project were not used in the project but was used elsewhere. Thus there is clear suppression of facts on the part of the appellant. At the time of reconciliation as per Regulation 7 also the appellant did not disclose the information and in fact gave a wrong declaration. If that be so, the appellant cannot escape the consequences of such mis-declaration and, therefore, we do not find any merit in the argument of the appellant that they are not liable to penalty or the goods are not liable to confiscation. Inasmuch as duty has been evaded in respect of such projects, the demand of duty under Section 28 of the Customs Act invoking the extended period of time is justified and imposition of equivalent amount of penalty under Section 114A is also justified. . 5.15. The argument of the bona fide belief raised by the appellant does not seem to be convincing. If the appellant is claiming bona fide belief, it is for them to establish that they were entitled to hold such a belief based on interpretation of law as pronounced by any judicial fora. In the case before us we do not find any reason for entertaining such a belief nor any judicial pronouncement to hold such belief has been cited before us. Bona fide belief is not blind belief. In the case of Andhra Pradesh Electricity Board [1984 (16) ELT 579 (Trib.)], this Tribunal held that bonafide belief does not mean blind belief or a self-opinionated belief. It would imply a belief which has been reached after a sincere attempt to understand the issue and examining it reasonably. Similarly, in the case of Inter Scape [2006 (198) ELT 275 (Tri.)] this Tribunal held that belief can be said to be bonafide only when it is formed after all reasonable consideration are taken into account. It is not the case of the appellant that they sought legal advice in the matter or were so advised by any one. On the contrary, we find that there are a number of judicial pronouncements which prohibited diversion of goods from one project to another and, therefore, the plea of bona fide belief does not sustain. 5.16. The next issue for consideration is whether the goods are liable to confiscation and whether fine can be imposed in lieu of confiscation and whether penalties can be imposed on the appellant. In this context it should be remembered that in respect of 12 contracts where the assessments were provisional, the goods were released to the appellant on the strength of a bond and bank guarantee submitted by the appellant. In other words, it was only a provisional clearance. At the time of final assessment, when the violations were noticed of the Project Import Regulations, Section 111(o) of the Act comes into play for violating the end-use terms and conditions of the exemption. Therefore, as has been held by the honble apex Court in the case of Jacsons Thevara, cited supra, the goods are liable to confiscation and the appellants are also liable to penalty and, therefore, imposition of fine on the goods and imposition of penalty on the appellant is not prohibited in law. The honble apex Court in the case of Weston Components vs. Commissioner 2000 (115) ELT 278 (SC) upheld the confiscation and imposition of fine on the confiscated goods when the goods had been released on the execution of a bond and bank guarantee. The situation is identical in respect of project imports also and, therefore, goods are liable to confiscation and imposition of redemption fine is in accordance with law. Therefore, we do not find any infirmity in the imposition of fine by the adjudicating authority or the imposition of penalty on the appellant under Section 112(a) of the Customs Act. In the Weston Components Ltd. case [2000 (115) ELT 278 (SC)] the honble apex Court held that: "if subsequently it is found that the import was not valid or that there was any irregularity which would entitle the Customs authorities to confiscate the said goods, then the mere fact that the goods were released on the bond being executed, would not take away the power of the Customs authorities to levy redemption fine." The fine of ` 1 crore imposed is not unreasonable as the duty sought to be evaded is also of the same order and that would have been the profit accruing to the appellant in case they had succeeded in their efforts. However, the penalty of ` 50 lakhs imposed on the appellant is quite high. Considering the fact that the issue related to interpretation of the scope of a tariff entry, a nominal penalty should suffice and therefore we reduce the penalty from ` 50 lakhs to ` 10 lakhs.
6. In view of the foregoing, we do not find any merits in the appeal and the same is accordingly dismissed. However, the fine is reduced from ` 1.25 crore to ` 1 crore and penalty is reduced from ` 50 lakhs to ` 10 lakhs, for the reasons enumerated above. (Pronounced in Court on 20/012/2013) (Anil Choudhary) Member (Judicial) (P.R. Chandrasekharan) Member (Technical) */as