Case Number
Advocates
Judges
Acts
  • provisions of the Madras District Municipalities Act (Madras Act
  • provisions of the Railway Clauses Consolidation Act, 1845,
  • provisions of S. 70, Contract Act (IX [9] of 1872),
  • sections of the Railways Act (IX [9] of 1890),
  • cl. (b) of sub. s. (3) of S. 11, Railways Act"
  • S. 11 (1) (b), Railways Act.
  • Indian Railways Act,
  • S. 70, Contract Act.
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Equivalent Citations
citation codes
Case Number
Advocates
Judges
Acts
  • provisions of the Madras District Municipalities Act (Madras Act
  • provisions of the Railway Clauses Consolidation Act, 1845,
  • provisions of S. 70, Contract Act (IX [9] of 1872),
  • sections of the Railways Act (IX [9] of 1890),
  • cl. (b) of sub. s. (3) of S. 11, Railways Act"
  • S. 11 (1) (b), Railways Act.
  • Indian Railways Act,
  • S. 70, Contract Act.
Smart Summary

Structured Summary of the Opinion (as provided)

Factual and Procedural Background

The proceedings concern an appeal from a judgment of the High Court of Judicature at Madras affirming a judgment of the Principal Subordinate Judge at Madura. The original plaintiff in the suit was the South Indian Railway Company ("the Railway"); while the appeal was pending in the High Court the Governor-General in Council was substituted as the appellant. The respondent is the Municipal Council of Madura, a statutory body governed by the Madras District Municipalities Act (Madras Act V of 1920). The Act vests public streets, sewers, drains, drainage works, tunnels and culverts within municipal limits and public water courses in the respondent (see Ss. 61, 125) and imposes duties to provide and maintain drains and to maintain streets and bridges (Ss. 137 and 162).

In or about 1902 the Railway constructed a branch line between Madura and Manamadura. At that time the Railway provided, as an accommodation work under S.11(1)(b) of the Railways Act (IX of 1890), a culvert 6 feet wide over the Anuppanadi surplus channel. The surrounding land was then agricultural but later became part of the town of Madura.

In November 1936 heavy floods exposed the insufficiency of the channel and culvert; surrounding lands were flooded and damage occurred to roads and huts. The respondent made representations to the Collector requesting protective works. After correspondence among the respondent, the Railway, the Collector and the Provincial Government, the Provincial Government of Madras issued a requisition dated 26 November 1938, purporting to act "in exercise of the special powers vested in them under cl. (b) of sub. s. (3) of S. 11, Railways Act", requiring the Railway to widen the culvert ventway to a depth of five feet and a width of twenty feet at the Railway's cost within six months.

The Railway consistently denied liability, protested that the requisition was illegal and ultra vires, and stated it would perform the work only without prejudice to a claim for repayment (either from the Government or the respondent). The Railway nonetheless executed the widening works under protest and subsequently sued the respondent in the Court of the Subordinate Judge at Madura, claiming Rs. 16,222-5-0 as the cost of the work. No claim appears to have been made against the Government.

The Subordinate Judge dismissed the suit, holding the requisition was not ultra vires and that the Railway could not rely on S.70 of the Indian Contract Act. The High Court (Sir Lionel Leach C.J. and Lakshmana Rao J.) affirmed that decision. The present opinion is that of Lord Simonds accompanying the appeal to their Lordships.

Legal Issues Presented

  1. Whether, on a true construction of the Railways Act (IX of 1890), and particularly the proviso in S.11(3)(b), the Provincial Government of Madras had power to issue a requisition requiring the South Indian Railway Company to enlarge at its own cost an existing culvert from 6 feet to 20 feet as a "further or additional accommodation work" for the use (as alleged by the appellant) of the Municipal Council of Madura.
  2. If the Provincial Government had no such power, whether the Railway is entitled, by virtue of S.70 of the Indian Contract Act (IX of 1872), to recover from the respondent the costs of the enlargement (i.e., whether the Railway performed the work for the respondent and the respondent enjoyed the benefit so as to support recovery under S.70).

Arguments of the Parties

Appellant's (as presented in the opinion)

  • The appellant advanced a construction of the Railways Act (specifically S.11(3)(b)) that, according to the opinion, the appellant contended was correct. The opinion expressly states: "Their Lordships therefore come to the conclusion that the construction of the Railway Act, for which the appellant contends, is correct."
  • During argument the appellant relied substantially on English decisions under the Railway Clauses Consolidation Act, 1845 (notably Rhondda and Swansea Railway Co. v. Talbot and G.W.R. v. Talbot) as guidance for interpretation of the Indian statutory provisions.

Railway's Position (as described in the opinion)

  • The Railway denied any obligation to bear the cost of the enlargement, protesting that the requisition was illegal and ultra vires.
  • The Railway was prepared to execute the works only "under protest" and repeatedly informed the respondent that the expense was not intended to be gratuitous or voluntary and that proceedings would be taken to recover the cost from the respondent or the Government or both.

Respondent's Position (Municipal Council)

  • The respondent repudiated any liability to meet the expense of widening the culvert and made representations requesting protective works to prevent flood damage.
  • The respondent consistently denied that it ought to pay for the enlargement when the Railway performed the work under the Government requisition.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
West Derby Union v. Metropolitan Life Assurance Society, (1897) A.C. 647 (Lord Watson) The well‑established rule of construction that one cannot derive substantive provisions by implication from a proviso: "if the language of the enacting part of the statute does not contain the provisions which are said to occur in it, you cannot derive these provisions by implication from a proviso." The court invoked this authority to stress that S.11(3) being expressed as provisos cannot be read as supplying affirmative obligations unless the enacting sections plainly support them; this guided a restrictive interpretation of S.11(3)(b).
Rhondda and Swansea Railway Co. v. Talbot, (1897) 2 Ch. 131; 66 LJ Ch. 570 English authority on analogous railway statutory provisions (Railway Clauses Consolidation Act, 1845) providing guidance on construction of railway accommodation obligations. The court regarded the decision as offering valuable guidance but warned that differences in statutory language and conditions made it dangerous to rely on it as authoritative for the Indian Act; the court preferred to base its ruling on the Indian statute itself.
Great Western Railway v. Talbot, (1902) 2 Ch. 759; 71 LJ Ch. 835 Another English decision under analogous statutory provisions relied on in argument. Again taken as useful guidance but not followed slavishly because of differences between the English statutes and the Indian Railways Act; the court based its conclusion on its interpretation of the Indian Act.

Court's Reasoning and Analysis

The court divided its reasoning into analysis of the two main issues. The reasoning as stated in the opinion is summarized below, following the court's sequence.

Analysis under S.70, Indian Contract Act (second issue)

  • The court considered whether the Railway could recover the cost of the enlargement from the respondent under S.70 (i.e., whether the Railway lawfully did the work for the respondent not intending to do so gratuitously and whether the respondent enjoyed the benefit).
  • The court accepted that the Railway lawfully did the work and did not intend to do it gratuitously, but concluded that the work was not done for the respondent within the meaning of S.70. The Railway carried out the work because it was ordered to do so by the Government and chose to obey rather than challenge the order; it expressly protested liability and warned that recovery proceedings would be pursued.
  • The court held that to construe S.70 to permit recovery against the respondent in such circumstances would be an extravagant construction of the section. The respondent did not accept liability and did not obtain the work in the sense required by S.70; any benefit was indirect and primarily accrued to owners and occupiers of nearby land.
  • The court expressly agreed with the High Court on this point and found the Railway's claim under S.70 unsustainable.

Statutory construction of S.11 and S.12, Railways Act (first issue)

  • The court examined S.11(1)(b), S.11(3)(b) and S.12 of the Railways Act (IX of 1890). It emphasized that sub‑section (3) contains provisos only and recalled the principle (from West Derby) that one should not derive substantive obligations by implication from a proviso where the enacting part does not contain them.
  • The court read S.11(1)(b) as creating an obligation measured by the conditions existing at the time of the making of the railway: the railway must provide accommodation works "of such dimensions as will, in the opinion of the Provincial Government, be sufficient at all times to convey water as freely from or to the lands lying near or affected by the railway as before the making of the railway, or as nearly so as may be." The standard is therefore the status quo at construction.
  • Given that sub‑section (3) are provisos (negative in form), the court stressed that the implication of a new affirmative obligation upon the Railway (to defray costs of further or additional works for changed conditions arising after construction) would be a significant step that should not be taken lightly or by strained implication from the proviso.
  • The court offered a narrower and purposive reading of S.11(3)(b): "further or additional accommodation works" mentioned there may be required not because the original works became insufficient due to later changed conditions, but because an adjoining owner had miscalculated the works required at the time of construction and is given a limited time to make a fresh demand. Thus the proviso can be given meaning without implying a perpetual obligation on the Railway to meet later changed conditions at its own cost.
  • The court found support for this narrower reading in S.12, which contemplates works to be made at the expense of the adjoining owner or the Government; if S.11(3)(b) were read to permit the Government to requisition further works for all time at the Railway's expense, S.12 would have little scope.
  • The court noted that the High Court had held the 20‑foot widening was a work that was as necessary in 1902 as in 1938; their Lordships rejected that finding, noting the evidence and admission that the enlargement became necessary only because of changed conditions (town expansion) after 1902. The 1902 culvert had operated to carry water "as freely from or to the lands lying near or affected by the railway as before the making of the railway," and therefore, had conditions remained unchanged, no enlargement would have been required.
  • Although the court accepted that English authorities cited (Rhondda and Swansea, G.W.R. v. Talbot) provided helpful guidance, it preferred to base its interpretation on the Indian Act itself given differences in language and local conditions. Ultimately, the court stated the construction of the Railways Act for which the appellant contended was the correct one (i.e., a restricted reading of S.11(3)(b) rather than the wide reading adopted by the High Court).

Holding and Implications

Holding:

APPEAL DISMISSED. The court advised His Majesty to dismiss the appeal with costs. The court upheld the High Court's decision on the second issue (relief under S.70 of the Contract Act), holding that the Railway could not recover the cost of the works from the respondent under S.70. On the first issue (construction of S.11(3)(b) of the Railways Act), the court differed from the High Court and adopted the narrower construction for which the appellant contended.

Implications:

  • Direct effect on the parties: The Railway's claim for Rs. 16,222-5-0 against the Municipal Council failed; the appeal was dismissed and the respondent (Municipal Council) succeeded on the critical second point and was entitled to costs.
  • Statutory interpretation: The court provided a restrictive construction of S.11(3)(b) of the Railways Act — reading the proviso in a way that does not, by implication, impose a perpetual obligation on the Railway to pay for additional accommodation works required solely by changed conditions arising after construction. The court relied on the language of S.11 and the complementary role of S.12 to arrive at that interpretation, and preferred to base its view on the Indian statute rather than treating English authorities as controlling.
  • Scope: The opinion explains how the statutory text and structure (enacting parts and provisos) constrain the implication of new positive obligations from provisos; it rejects an expansive implication that would assign to the Railway a continuing duty to defray cost of additional works caused by later changes in local conditions.

Note: This summary is strictly limited to the material and reasoning contained in the provided opinion. No additional facts, legal authorities, or consequences beyond those expressly stated in the opinion have been added.

    Governor-General In Council, Represented By The General Manager, South Indian Railway v. Municipal Council, Madura, Through Its Commissioner

    Lord Simonds.-

    In this appeal, which is brought from a judgment of the High Court of Judicature at Madras affirming a judgment of the principal Subordinate Judge at Madura, two main questions arise for consideration. The first, which turns upon the true meaning and effect of certain sections of the Railways Act (IX [9] of 1890), is whether in the circumstances of the case and upon a true construction of that Act and particularly of the proviso contained in S. 11 (3) (b) thereof the Provincial Government of Madras had power to issue a requisition to the South Indian Railway Company, which will be referred to as "the Railway," to enlarge at its own cost one of its culverts from a water way of 6 feet to one of 20 feet as a further or additional accommodation work for the use (as the appellant alleges) of the respondent, the Municipal Council of Madura. The second question, which only arises if the Provincial Government had no such power, is whether the Railway is under and by virtue of the provisions of S. 70, Contract Act (IX [9] of 1872), entitled to recover from the respondent the costs of such enlargement.

    [2] The original plaintiff in the suit was the Railway but by an order made on 31st August 1944, while the appeal was pending in the High Court the Governor-General in Council was substituted as the appellant. The respondent is a statutory body governed by the provisions of the Madras District Municipalities Act (Madras Act v [5] of 1920) and under that Act (by S. 61) all public streets, sewers, drains, drainage works, tunnels and culverts within the municipal limits and (by S. 125), all public water courses as therein defined are vested in the respondent. By S. 137 it is required to provide and maintain a sufficient system of public drains and by S. 162 to maintain and repair public streets and bridges.

    [3] In or about 1902 the Railway constructed a branch railway line between Madura and Manamadura. This line meets at right angles at a point called in the proceedings Mile J 309/16 a water channel known as the Anuppanadi surplus channel which flows through the south part of the Madura municipality from the Anuppanadi tank carrying the surplus water of the tank and the storm and sewage water of several municipal drains which run into the channel.

    [4] At the time of making the branch line the Railway provided a culvert 6 feet wide over this channel as an accommodation work under S. 11 (1) (b), Railways Act. The surrounding land was then agricultural land and was only at a later date absorbed into the growing town of Madura. It cannot, as their Lordships think, be doubted that the culvert was at the time of its construction approved by the local Collector on behalf of the Madras Government, and that it was then considered adequate appears to be conclusively established by the letter written by the Collector of Madura to the Agent of the Railway on 14th December 1937, in which he says,

    "The culvert which was found sufficient in 1902 when the line ran through agriculturist land is not sufficient now that the town has extended to the railway."

    5. But in November 1936, when the River Vagai, with which the channel is connected, was in heavy flood, the channel and the railway culvert were unable to discharge the surplus water as it came down, the surrounding lands were flooded and some damage was caused to roads and huts. Accordingly the respondent made representations to the Collector of Madura referring (inter alia) to the insufficiency of the channel and culvert in question in this case and stating that, unless sufficient protective works were carried out by the Public Works Department, flood damage within the town could not be prevented.

    [6] Upon this there followed a correspondence between the respondent, the Railway, the Collector and the Provincial Government, which their Lordships think it unnecessary to discuss in detail. It culminated in an order of 26th November 1938, by which the Provincial Government of Madras purporting to act

    "in exercise of the special powers vested in them under cl. (b) of sub. s. (3) of S. 11, Railways Act"
    issued to the Railway the requisition already referred to requiring the Railway to widen the ventway in the culvert to a depth of five feet and to a width of twenty feet at the cost of the Railway within six months form the date of the requisition. It must, however, be stated, as relevant to the second question that arises on this appeal, that at all times both before and after the requisition the Railway denied its liability, protested that the requisition was illegal and ultra vires, and asserted that it was only prepared to carry out the work without prejudice to its claim to be repaid the cost either by the Government or by the respondent or both. To the respondent also the Railway wrote that the expense of the work was being incurred under protest, that it was not intended to be and was not being done gratuitously or voluntarily and that proceedings would be taken against the respondent or the Government or both for recovery of the cost. It was, nevertheless, made clear to the Railway that both the respondent and the Government repudiated all liability for such expense. It was in these circumstances that the Railway executed the necessary work of widening the culvert and, having done so, instituted its suit in the Court on the Subordinate Judge at Madura against the respondent, claiming the sum of Rs. 16,222-5-0 as the cost of that work. It does not appear that any claim was made against the Government.

    [7] The suit was dismissed by the learned Subordinate Judge, who held that the requisition was not ultra vires and that, even if it was, the Railway could not rely on S. 70, Contract Act. This decision was on both points affirmed by the High Court consisting of Sir Lionel Leach C. J. and Lakshmana Rao J.

    8. Their Lordships are of opinion that the decision upon the second point is clearly right. The appellant can only succeed on this point if he establishes that the Railway lawfully did the work for the respondent not intending to do so gratuitously, and that the respondent enjoys the benefit thereof. It may be conceded that the work was lawfully done and that the Railway did not intend to do it gratuitously. But their Lordships agree with the learned Judges of the High Court in thinking that the work was not done for the respondent nor does the respondent enjoy the benefit of it within the meaning of the section. The Railway executed the work for no other reason than that it was ordered to do so by the Government and presumably thought it politic to obey the order rather than challenge its validity. The respondent throughout denied its liability to meet any expense. It is true that the first suggestion of further protective works, which ultimately took the form (inter alia) of an enlargement of the culvert, came from the respondent, but the Railway was left in no doubt that, if it executed this work at the requisition of the Government, the respondent would not pay for it. It would in their Lordships' opinion, put an extravagant construction upon S. 70, Contract Act, to hold that in such circumstances the work was done by the Railway for the respondent. Nor does the respondent enjoy the benefit of the work except in an indirect sense: substantially the persons who derive a benefit are the owners and occupiers of the buildings and land in the locality. Upon this point their Lordships cannot usefully add anything to the judgment of the High Court with which they are fully in accord.

    [9] A decision upon this point is sufficient to dispose of the appeal. But the question of general importance which arises upon the first point was fully argued and their Lordships think it proper since here they have come to a different conclusion from that reached by the High Court, to state their opinion upon it.

    [10] It is necessary to refer to two sections only of the Indian Railways Act, which can conveniently be set out here.

    " 11.-(1) A railway administration shall make and maintain the following works for the accommodation of the owners and occupiers of lands adjoining the railway, namely: -

    (a) such and so many convenient crossings, bridges, arches, culverts and passages over, under or by the sides of, or leading to or from, the railway as may, in the opinion of the Provincial Government, be necessary for the purpose of making good any interruptions caused by the railway to the use of the lands through which the railway is made ; and

    (b) all necessary arches, tunnels, culverts, drains, water-courses or other passages, over or under or by the sides of the railway, of such dimensions as will, in the opinion of the Provincial Government, be sufficient at all times to convey water as freely from or to the lands lying near or affected by the railway, as before the making of the railway, or as nearly so as may be.

    (2) Subject to the other provisions of this Act, the works specified in cls. (a) and (b) of sub-s. (1) shall be made during or immediately after the laying out or formation of the railway over the lands traversed thereby and in such manner as to cause as little damage or inconvenience as possible to persons interested in the lands or affected by the works.

    (3) The foregoing provisions of this section are subject to the following provisos, namely ;-

    (a) a railway administration shall not be required to make any accommodation works in such a manner as would prevent or obstruct the working or using of the railway, or to make any accommodation works with respect to which the owners and occupiers of the lands have agreed to receive and have been paid compensation in consideration of their not requiring the works to be made;

    (b) save as hereinafter in this Chapter provided, a railway administration shall not, except on the requisition of the Provincial Government, be compelled to defray the cost of executing any further or additional accommodation works for the use of the owners or occupiers of the lands after the expiration of ten years from the date on which the railway passing through the lands was first opened for public traffic;

    (c) where a railway administration has provided suitable accommodation for the crossing of a road or stream, and the road or stream is afterwards diverted by the act or neglect of the person having the control thereof, the administration shall not be compelled to provide other accommodation for the crossing of the road or stream.

    (4) The Provincial Government may appoint a time for the commencement of any work to be executed under sub-s. (1), and if for fourteen days next after that time the railway administration fails to commence the work or, having commenced it, fails to proceed diligently to execute it in a sufficient manner, the Provincial Government may execute it and recover from the railway administration the cost incurred by it in the execution thereof.

    12.-If an owner or occupier of any land affected by a railway considers the works made under the last foregoing section to be insufficient for the commodious use of the land, or if the Provincial Government or a local authority desires to construct a public road or other work across, under or over a railway, he or it, as the case may be, may at any time require the railway administration to make at his or its expense such further accommodation works as he or it thinks necessary and are agreed to by the railway administration or as, in case of difference of opinion, may be authorised by the general controlling authority."

    11. The provisions which for the purpose of this case appear to demand particular examination are in S. 11 (1) (b), S. 11 (3) (b) and S. 12. But it is important to observe upon the general structure of S. 11 that sub-s. (3) of S. 11 contains nothing more than provisos on the two preceding sub-sections, and in this connection the well established rule of construction must be borne in mind which was thus stated by Lord Watson in West Derby Union v. Metropolitan Life Assurance Society, (1897) A. C. 647 at 652 : (66 LJ ch. 726) " I am perfectly clear that, if the language of the enacting part of the statute does not contain the provisions which are said to occur in it, you cannot derive these provisions by implication from a proviso." What then do sub-ss. (l) and (2) of S. 11, upon which sub-s. (3) contains provisos, enact? They appear to be unambiguous. The obligation imposed upon the Railway, so far as relevant for the present purpose, is to make and maintain a culvert which will in the opinion of the Provincial Government be sufficient at all times to convey water "as freely from or to the lands lying near or affected by the railway as before the making of the railway" or as nearly so as may be. It is clear that the obligation under sub-s. (l) is to be measured by the conditions existing at the time of the making of the railway. The words "as freely, etc." set the standard and define the obligation. The adjoining owner is not to be injuriously affected by the construction of the railway: the status quo is to be preserved. The nature of the works having been prescribed by sub-s. (1), the time within which they are to be carried out is laid down by sub-s. (2). Then come the provisos in sub-s. (3). The proviso in (a) is a qualification upon the statutory obligation for the benefit of the railway. So also is the proviso in (c). It is the proviso in (b) that is immediately relevant and it must first be observed that it is in form negative. It does not purport to vest any new rights in any person or to impose any new duty upon the railway. Whence then arises the obligation of the railway, for which the respondent contends to make accommodation works, the standard of which is determined not by the conditions existing at the making of the railway but by those which come into existence at a later date? It must be conceded that it can only arise, if at all, from an affirmative which is to be implied from the negative. And this affirmative must amount to no less than a new obligation upon the Railway, at the instance of the adjoining owner within ten years or of the Provincial Government for all time, at its own cost to make accommodation works rendered necessary or convenient by a change of conditions which has taken place after the railway has been constructed. Their Lordships cannot accept such an implication as a fair interpretation of the proviso, unless it is otherwise meaningless. But it is by no means impossible to give meaning and effect to the proviso without doing violence to its language and to the canon of construction to which reference has been made. For the "further or additional accommodation works" mentioned in the sub-section may be required not because those originally constructed have become insufficient owing to a change of conditions, but because the adjoining landowner has miscalculated what the conditions originally existing would demand for the commodious use of his land, and is given an opportunity within a limited time of making a fresh demand. Nor would it be unreasonable in the circumstances which prevail in large parts of India that an unlimited time should be given to the Government to require that the same standard should be established and maintained. Therefore, as it appears to their Lordships, S. 11 (3) (b) ought not, even if it stood alone, to be given the wide meaning ascribed to it by the High Court.

    12. But it further appears to them that some assistance is given to this view by the language of S. 12. That section clearly is intended to cover works which the Railway is not bound to construct under S. 11. For they are works which are to be erected at the expense of the adjoining owner or the Government. It is difficult to see what scope the section can have, if under S. 11 (3) (b) the Government can for all time requisition such further or additional accommodation works as the commodious use of adjoining land may from time to time with altering conditions require. There is, however, a clear reconciliation between the sections if the former relates only to such works as the physical conditions and use of the land at the time of construction of the railway required.

    13. Their Lordships therefore come to the conclusion that the construction of the Railway Act, for which the appellant contends, is correct. In coming to this conclusion they have had strict regard to the language of that Act. In the course of the argument before the Board and in the Courts of India the appellant has relied largely on decisions in the English Courts upon the similar but by no means identical provisions of the Railway Clauses Consolidation Act, 1845, and particularly upon Rhondda and Swansea Railway Coy. v. Talbot, (1897) 2 Ch. 131 : 66 LJ Ch. 570 and G. W. R. v. Talbot, (1902) 2 Ch 759 : 71 LJ ch. 835. From these decisions valuable guidance is to be obtained, but their Lordships agree with the learned Chief Justice in thinking that the difference in the language of the relevant statutes and in the conditions in which they are to be applied makes it dangerous to rely on them as authorities and they prefer to base their opinion upon the interpretation of the Indian Act alone.

    14. Upon this part of the case one further point must be mentioned; the High Court, affirming in this matter also the decision of the Subordinate Judge, held that the widening of the culvert to 20 feet was a work which was as necessary in 1902 as it was in 1938 and that therefore upon any construction of the Act the requisition of the Government in the latter year was valid. It appears to their Lordships that this finding ignores the fact and indeed the admission, to which reference has been made, that it was only the change of conditions which made the enlargement of the culvert necessary. It may well be that, if in 1902 the town of Madura had reached its present size, the result would be different. But the evidence is conclusive that the culvert made in 1902 enabled the water to be carried

    "as freely from or to the lands lying near or affected by the railway as before the making of the railway"
    and that, had the conditions remained unchanged, no enlargement would have been wanted.

    [15] For the reasons which have already been stated, the respondent succeeding on the second point, though failing on the first, is entitled to have the appeal dismissed with costs and their Lordships will humbly advise His Majesty accordingly.

    Appeal dismissed.