Structured Summary of the Opinion — Rajesh Bindal J.

Factual and Procedural Background

This group of appeals arises from the acquisition of land totalling 130 acres, 5 kanals and 7 marlas in villages Balloke and Baranhara, Tehsil and District Ludhiana, for construction of a Sewerage Disposal Work. The acquisition invoked emergency provisions under Section 17 of the Land Acquisition Act, 1894. Notification under Section 4 read with Section 17 was issued on 23.4.1997 and a subsequent notification under Section 6 read with Section 17 was issued on 11.6.1997. The Collector assessed market value at Rs. 3,00,000 per acre for Balloke and Rs. 3,25,000 per acre for Baranhara.

Aggrieved land owners filed objections which were referred to the Additional District Judge, Ludhiana. The court below dismissed the references filed by the land owners both on grounds of delay (time-bar) and on the merits (no case made out for enhancement). The present appeals challenge those findings.

Legal Issues Presented

  1. Whether the period for filing objections under different eventualities as provided under Section 18(2) of the Land Acquisition Act, 1894 is mandatory or whether delay can be condoned.
  2. Whether the period provided for filing objections under proviso (b) in Section 18(2) is to be counted from the date of the Collector's award or from the date of knowledge of the award.
  3. If objections are within limitation, whether the assessment of compensation for the acquired land is just and fair (i.e., whether enhancement is warranted).

Arguments of the Parties

Appellants' Arguments

  • The objections filed on 5.11.2001 were within the six-month period under Section 18(2) because, the appellants say, they only got knowledge of the award when compensation was paid to them on 19.9.2001. The appellants were not present when the award was announced and no Section 12(2) notice was served.
  • Even if some sale deeds are post-acquisition, they can be relied upon (with a reasonable cut) for determining market value because there was no comparable sale prior to acquisition. Several sale deeds were relied upon to show higher prevailing prices — including Ex. P9 (7 kanals 8 marlas sold for Rs. 21,97,500 registered 9.10.1997) and Ex. P20 (100 sq. yards sold for Rs. 1,35,000 registered 30.4.1997) for Balloke and multiple sale deeds for Baranhara (Ex. P18, P19, P22) showing post-acquisition sales.
  • The learned court below erred in finding the references time-barred and on merits in rejecting the case for enhancement despite the evidence.
  • Appellants pointed to the need to file writ petitions to secure payment of compensation after possession was taken.

Respondents' Arguments

  • Section 18(2) provides a maximum period of six months for filing objections counted from date of pronouncement (or knowledge) of award; the landowners’ own conduct established knowledge because almost all filed a writ petition (C.W.P. No.16059 of 2000) on 21.11.2000 which referred to the award dated 19.1.2000.
  • Objections filed on 5.11.2001 were beyond six months from admitted date of knowledge and therefore barred by limitation; there is no enabling provision to extend this period and the court below correctly non-suited the appellants.
  • On merits, the State pointed out that the Government itself revised values upwards via a Committee (Balloke to Rs. 10,00,000 per acre; Baranhara to Rs. 9,25,000 per acre) and that sale deeds produced by appellants were mostly post-acquisition, small plots and non-comparative in nature — some located in abadi/road abutting areas — and therefore unreliable. The State produced its own sale deeds (Ex. R1 to R6) showing lower values at the relevant time.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Sher Singh v. Union of India, AIR 1983 P&H 107 The opinion lists this case as relied upon by appellants; the text does not elaborate the specific rule from this case. The case was cited by the appellants; the court's detailed reasoning does not extract a distinct principle from it in the opinion.
Ram Kishan v. The State of Haryana and another, 1986 PLJ 399 The opinion lists this case as relied upon by appellants; specific principle in the text is not elaborated. Referenced by parties; the court mentions it among similar authorities but does not separately analyze it beyond grouping with other supporting cases.
Naunehal Singh (died) & others v. Union of India and another, 1991 PLJ 302 Listed by appellants; principle not separately set out in the opinion. Cited by appellants; court groups it with other authorities expressing similar views on limitation/knowledge.
Nihal Singh & others v. Union of India and another, 1986 PLJ 649 Listed by appellants; principle not separately set out in the opinion. Cited by appellants; treated as one of several supporting authorities.
Jaswant Rai v. Land Acquisition Collector and another, (1989-1) 95 PLR 270 Listed by appellants; specific rule not elaborated in the opinion. Cited by appellants as supportive authority; not separately analysed.
Neetu & another v. Hukmi and others, 1997(1) PLJ 559 Listed by appellants; text does not set out a distinct principle from this case. Referred to by appellants among supporting precedents.
Raja Harish Chandra Raj Singh v. Deputy Land Acquisition Officer and another, AIR 1961 SC 1500 Holds that "date of the award" in proviso to Section 18(2) must mean the date when the award is communicated to the party or is known by him (actual or constructive); the making of an award involves communication. Used to establish that the date for limitation runs from actual or constructive knowledge of the award rather than the mere physical signing/filing of the award.
State of Punjab v. Mst. Qaisar Jehan Begum and another, AIR 1963 SC 1604 Holds that the six-month limitation for reference runs from the date of knowledge of the award. Supports the proposition that limitation must be computed from date of knowledge (actual/constructive) of the award.
Mohammed Hasnuddin v. State Of Maharashtra, AIR 1979 SC 404 Explains that the conditions in Section 18 (including limitation) are 'matters of substance' and observance is a condition precedent to Collector's power to make reference; application within prescribed time is sine qua non. Used to underscore that compliance with the limitation in Section 18 is mandatory for a valid reference by the Collector.
Officer on Special Duty (Land Acquisition) & another v. Sham Manilal Chandulal & others, (1996) 9 SCC 414 Holds that the limitation in proviso to Section 18(2) cannot be extended by applying Section 5 of the Limitation Act; Collector is not a 'court' for that purpose and extension is not permissible. Applied to conclude that the six-month time-limit is mandatory and not extendable by general limitation provisions.
State Of Karnataka v. Laxuman, (2005) 8 SCC 709 Adopts the same view as Officer on Special Duty that limitation under Section 18(2) cannot be extended. Noted as a subsequent confirmation of the non-extendability principle.
Parsottambhai Maganbahi Patel & others v. State of Gujarat, AIR 2005 SC 3464 States that the latter part of Section 18(2)(b) must be computed with regard to the date on which landowners got knowledge of the award (actual or constructive); principle applies where owners/representatives are not present at award. Relied upon to affirm that the 'date of award' is to be treated as date of knowledge and that this rule applies where owners were not present/no Section 12(2) notice served.
Jagat Singh v. Punjab State and others, 1983 Cur. L. J. 601 Mentioned as expressing a similar view on computation of limitation from date of knowledge; the opinion does not set out an independent rule from the case. Cited alongside other authorities as part of a consistent line of cases supporting the knowledge-based computation of limitation.
Usaf & another v. The Collector Urban Estate Land Acquisition, Urban Development, Punjab, 1989(1) PLR 253 Referenced as consistent authority; specific principle not separately detailed in the opinion. Used to show consistent judicial approach on limitation and knowledge of award.

Court's Reasoning and Analysis

The court's analysis proceeded in two primary strands: (A) interpretation and application of limitation provisions under Section 18(2) of the Land Acquisition Act, and (B) assessment of the merits (valuation).

(A) Limitation — statutory interpretation and application to facts

  1. The court set out the timeline of material events: Section 4/17 notification 23.4.1997; Section 6/17 notification 11.6.1997; possession taken 26/27.10.1998; Collector's award announced 19.1.2000; writ petitions (C.W.P. No.16059 of 2000) filed by most landowners on 21.11.2000 referring to the award; orders on 15.12.2000 and 20.12.2000 recording that cheques had been prepared and that Rs. 10,95,48,800 had already been paid; objections were filed on 5.11.2001.
  2. The court examined Section 18(2) proviso, noting the alternative periods (six weeks from notice under Section 12(2) or within six months from the date of Collector's award, whichever expires first) applicable where the landowner was not present/represented.
  3. Relying on precedent (notably Raja Harish Chandra; State of Punjab v. Qaisar Jehan Begum; Parsottambhai Patel), the court adopted the established principle that "date of the Collector's award" in the proviso must be read as the date when the award is communicated to or known by the person concerned — i.e., actual or constructive knowledge.
  4. On the question of whether the limitation period is extendable, the court relied on Officer on Special Duty v. Sham Manilal Chandulal and related authorities, concluding that the period under proviso to Section 18(2) is mandatory and not extendable by the general provisions of the Limitation Act (Section 5 or otherwise).
  5. Applying these principles to the facts, the court held that the landowners had actual knowledge of the award by at least 21.11.2000 (the date of the writ petition which expressly referred to the award). The objections filed on 5.11.2001 therefore fell outside the six-month period computed from the date of knowledge and were time-barred. The court found no infirmity in the lower court's finding that the references were barred by limitation.

(B) Merits — valuation of land

  1. Even if limitation were not decisive, the court addressed whether the appellants made out a case for enhancement of compensation.
  2. The court noted that the Government itself had revised values upwards by a Committee to Rs. 10,00,000 per acre (Balloke) and Rs. 9,25,000 per acre (Baranhara), which weighs against appellants' contentions that collector's earlier figures were too low.
  3. The court scrutinised the sale deeds relied upon by the appellants: most were post-acquisition and concerned very small areas (100 to 375 sq. yards), often located in abadi or road-abutting areas — not comparable to the large contiguous acquisition (130 acres plus). Only Ex. P9 (7 kanals 8 marlas — registered 9.10.1997) dealt with a substantial area. The State had produced sale deeds (Ex. R1–R6) showing lower values at the relevant time.
  4. Given the post-acquisition character, limited size, and non-comparability of most sale deeds cited by appellants, and the State's evidence, the court found no case for enhancement of compensation.

Holding and Implications

Holding: For the reasons stated, the court dismissed the appeals. In particular:

  • On limitation: The periods in proviso to Section 18(2) are mandatory and not extendable. Where a landowner or representative is not present at the time of announcement of the award, the relevant time runs either from receipt of notice under Section 12(2) (six weeks) or from the date of actual or constructive knowledge of the Collector's award (six months), whichever expires first. The appellants had knowledge of the award by 21.11.2000; their objections filed on 5.11.2001 were therefore beyond six months and time-barred.
  • On merits: Even substantively, no case for enhancement of compensation was made out given the nature and timing of sale deeds relied upon by appellants and the evidence produced by the State.
  • Final Disposition: The appeals are dismissed.

Implications: The immediate consequence is that the land owners' objections were held time-barred and their claims for enhanced compensation were rejected; thus the collector's award (and the government revision evidence) stands as applied. The opinion relies on and applies settled precedents regarding computation of limitation and the non-extendability of the specific statutory period; it does not purport to establish a new legal principle beyond existing authorities.

This summary is limited strictly to information contained in the provided opinion and does not add or infer facts beyond those expressly stated in the text.

    Gurdip Singh Another v. Sub Divisional Magistrate, Ludhiana Others

    Rajesh Bindal J.:- This order will dispose of a bunch of the above-mentioned appeals arising out of the same acquisition, where the learned court below has dismissed the references filed by the land owners on account of delay as well as on merits.

    2. The facts have been extracted from R.F.A. No. 1467 of 2004.

    3. Briefly, the facts are that land measuring 130 acres, 5 kanals and 7 marlas, situated in villages Balloke and Baranhara, Tehsil and District Ludhiana was acquired vide notification dated 23.4.1997, issued under Section 4 read with Section 17 of the Land Acquisition Act, 1894 (for short, 'the Act') for construction of Sewerage Disposal Work at Baranhara. The same was followed by notification under Section 6 read with Section 17 of the Act on 11.6.1997. The Land Acquisition Collector (for short, 'the Collector') assessed the market value of the acquired land in village Balloke @ Rs. 3,00,000/- per acre and in village Baranhara @ Rs. 3,25,000/- per acre. Aggrieved against the same, the land owners filed objections, which were referred to Additional District Judge, Ludhiana, who keeping in view the material placed on record by the parties, upheld the award of the Collector.

    4. Learned counsel for the appellants submitted that the findings recorded by the learned court below on both the counts, namely, that the references filed by the land owners were time barred and on merits no case for further enhancement had been made out, are totally erroneous. He submitted that in terms of the provisions of Section 18 of the Act, the objections could be filed within six weeks from the date of award in case the land owners are present at the time of pronouncement of the award. In other cases, it would be within 6 weeks of the receipt of the notice from the Collector under Section 12(2) of the Act or within six months from the date of Collector's award, whichever period expires first. The submission is that in the present case, the land was acquired invoking emergency provisions under Section 17 of the Act. Notification under Section 4 read with Section 17 of the Act was issued on 23.4.1997 and under Section 6 read with Section 17 of the Act was issued on 11.6.1997. Without announcing the award, possession of the land was taken on 26/27.10.1998. Though the award was announced on 19.1.2000, but the amount of compensation was not paid to the land owners, which was paid only on 19.9.2001 and the objections which were filed on 5.11.2001 were within limitation of six months as enumerated under Section 18(2) of the Act. The period of limitation provided for therein has been interpreted to mean that the same has to be filed within six months from the date of knowledge of the award. The knowledge in the present case has to be considered on the date on which the amount of compensation was paid to the appellants as it is not disputed that the appellants were not present when the award was announced and further notice under Section 12(2) of the Act was not served upon the appellants. He further submitted that even for getting the amount of compensation, after the possession of the land was taken by the State, they had to file writ petitions in this Court. In support of the contentions reliance was placed upon Sher Singh v. Union of India, AIR 1983 P&H 107; Ram Kishan v. The State of Haryana and another, 1986 PLJ 399; Naunehal Singh (died) and others v. Union of India and another, 1991 PLJ 302; Nihal Singh and others v. Union of India and another; 1986 PLJ 649; Jaswant Rai v. Land Acquisition Collector and another, (1989-1) 95 PLR 270 and Neetu and another v. Hukmi and others, 1997(1) PLJ 559.

    5. As far as merits of the case are concerned, the submission is that the findings of the learned court below dismissing the claim of the appellants for further enhancement of compensation are totally perverse considering the evidence produced on record by them. In fact, the learned court below has failed to consider and appreciate the true import thereof while determining the compensation. The land in question, which was acquired for the purpose of construction of Sewerage Disposal Work, pertained to two villages, namely, Balloke and Baranhara. As regards village Balloke is concerned, sale deeds (Ex. P9 and Ex. P20) have been totally ignored. Vide sale deed (Ex. P9), 7 kanals and 8 marls of land was sold for a sum of Rs. 21,97,500/-. The aforesaid sale deed was registered on 9.10.1997. Vide sale deed (Ex. P20), 100 square yards of land was sold on 30.4.1997 for a sum of Rs. 1,35,000/-. Even if the aforesaid transactions were entered into after the issuance of notification under Section 4 of the Act on 23.4.1997, the same could still be relied upon for the purpose of determination of compensation for the acquired land after the application of a reasonable cut. The sale deed (Ex. P20) was registered merely a week after the date of acquisition. Even if the same was for a small piece of plot, a cut can be applied, considering the fact that the total acquisition was for 130 acres, 5 kanals and 7 marlas. As regards village Baranhara is concerned, reference was made to sale deeds (Ex. P18, Ex. P.19 and Ex. P.22) registered on 5.8.1997, 16.7.1998 and 27.10.1997 for 375 square yards, 226.37 square yards and 250 square yards, respectively. The same argument was reiterated even for the aforesaid sale deeds, namely, application of a reasonable cut for sale transactions being subsequent to the acquisition and for small plots. The submission was that there was no comparative sale transaction immediately prior to the acquisition and for that reason, the subsequent sale transactions were produced on record, the genuineness of which has not been disputed. Initially, some of the land owners filed C.W.P. No. 11544 of 1997- Manmohan Singh and others v. State of Punjab and others, challenging the acquisition, which was dismissed on 23.7.1998.

    6. In response to the arguments of learned counsel for the appellants, learned counsel for the respondents submitted that the provisions of Section 18(2) of the Act provides for maximum period of six months for filing objections against the award, i.e., from the date of pronouncement of the award. Even if that is considered to be the date of knowledge of the pronouncement of award, in the present case, almost all the landowners filed C.W.P. No. 16059 of 2000 -- Amar Bir Singh Sidhu and others v. State of Punjab and others, in this court on 21.11.2000 praying for setting aside of the award dated 19.1.2000, which was subsequently disposed of on 20.12.2000. The mere fact that the land owners had referred to the award of 19.1.2000 in the writ petition filed on 21.11.2000 shows that they had actual knowledge of pronouncement of the award on that date. It is not in dispute that the objections were filed on 5.11.2001, which is clearly beyond the period of six months from the admitted date of knowledge of the award and there being no enabling provision for extension of this time, the learned court below has rightly non-suited the appellants on account of the objections being delayed.

    7. As far as merits of the case are concerned, learned counsel for the respondents submitted that initially the acquired land of village Baloke was valued at Rs. 3,00,000/- per acre and that of village Baranhara at Rs. 3,25,000/- per acre. However, thereafter a Committee was constituted which increased the value of the land of village Balloke to Rs. 10,00,000/- per acre and that of village Baranhara to Rs. 9,25,000/- per acre. The same was given considering the prevailing prices in the area. He further submitted that none of the sale deeds produced by the land owners on record can be considered for two reasons, namely, all of them are postacquisition and secondly the same cannot, in any manner, be considered to be comparative as far as the acquired land is concerned. As against the sale-deeds produced by the land owners, the respondents had produced on record sale deeds (Ex. R1 to Ex. R6) showing that value of the land in the area at the time of acquisition was far less and further even the site plans produced by the land owners on record clearly established that these were located far off from the acquired land. Even otherwise, the same were pertaining to small plots either located in the abadi or on road, which cannot possibly be relied upon for the purpose of valuation of a big chunk of land.

    8. Heard learned counsel for the parties and perused the relevant referred record.

    9. The issues, which arise for consideration in the present set of appeals are:

    (i) Whether the period for filing objections under different eventualities as provided for under Section 18(2) of the Land Acquisition Act, 1894 is mandatory or the delay in filing of the objections can be condoned?

    (ii) Whether the period provided for filing objections under proviso (b) in Section 18(2) of the Act is to be counted from the date of Collector's award or from the date of knowledge of the award?

    (iii) In case the objections filed by the land owners are found to be within limitation, whether the assessment of compensation for the acquired land is just and fair?

    Questions (i) and (ii)

    10. The facts, which are evident from the record are that notification under Section 4 read with Section 17 of the Act was issued on 23.4.1997. Notification under Section 6 read with Section 17 of the Act was issued on 11.6.1997. The acquisition was challenged by some of the land owners by filing C.W.P. No. 11544 of 1997, which was dismissed on 23.7.1998. It is admitted by the appellants that possession of the land was taken from them on 26/27.10.1998. The Collector announced the award on 19.1.2000. It is further admitted case of the parties that C.W.P. No. 16059 of 2000 was filed by almost all the land owners jointly on 21.11.2000 inter-alia on the ground that in spite of the award having been announced on 19.1.2000, amount of compensation has not been paid till date, in which at the time of issuance of notice of motion on 23.11.2000, a Division Bench of this Court directed the respondents to produce the cheques for the amount due to each of the petitioners on the next date of hearing. The writ petition was finally disposed of on 20.12.2000 on the statement of learned counsel for the State that majority of the land owners had been paid the compensation, however, some of them will be paid within two weeks therefrom on account of the fact that there was some error in the calculation.

    11. It is further evident from record that one Tara Singh son of Kapoor Singh filed C.W.P. No. 9925 of 2001 (Ex. P5) challenging the award dated 19.1.2000 inter-alia on the same ground, which was taken in C.W.P. No. 16059 of 2000. Further prayer in the petition was for a direction to the State either to pay the amount of compensation or restore the land back to the petitioner therein. The writ petition was disposed of as infructuous on 19.9.2001 on the stand of the respondents therein that amount of compensation due to the petitioner had already been paid. Meaning thereby that the land owners had the knowledge of the award having been announced on 19.1.2000 at the time of preparation of the writ petitions filed in this Court, which is dated 21.11.2000. Another fact, which is not in dispute, is that the objections were filed by the appellants on 5.11.2001.

    12. As regards payment of compensation is concerned, though the land owners claimed that it was paid on 19.9.2001 and not at the time of announcement of the award, whereas the stand of the respondents is that it was paid immediately after the land owners filed C.W.P. No.16059 of 2000 in this Court.

    13. In the aforesaid factual matrix, the issue which arises for consideration by this Court is, as to whether the objections filed by the appellants are to be treated within time by considering the limitation from the date the appellants claimed that they received the amount of compensation or from the date they admittedly had the knowledge of announcement of the award. It is for the reason that admitted case of the parties is that at the time of announcement of the award, the appellants were not present and notice under Section 12(2) of the Act was also not served by the Collector on the land owners.

    14. As regards the payment of compensation to the appellants is concerned, in my opinion, the stand of the appellants that the same was paid on 19.9.2001 is contrary to the material on record. It is evident from the two orders passed by this Court in C.W.P. No. 16059 of 2000 on 15.12.2000 and on 20.12.2000, which are extracted below:

    Order dated 15.12.2000

    “Mr. Berry, learned counsel for respondent Nos. 1, 2 and 5, states that cheques for the amount due to the various landowners have been prepared. An officer of the Department is present with the cheques. Mr. Berry submits that the petitioners may appear before the Land Acquisition Collector, respondent No. 5, at Ludhiana, on December 18, 2000, and obtain the cheques. He has also filed a statement showing the apportionment of the compensation to the landowners. This statement is taken on record as Mark `A'.

    The hearing of the case is adjourned to December 20, 2000. The petitioners may appear before the Land Acquisition Collector, Ludhiana on December 18, 2000 and collect their cheques. The factual position shall be conveyed to the Court on December 20, 2000.”

    Order dated 20.12.2000

    “The petitioners have approached this Court with the grievance that even though they had been divested of the possession of the land in the year 1998, no compensation has been paid to them despite the award having been given by the Collector.

    Mr. M. C. Berry, Sr. DAG, Punjab states that an amount of Rs. 10,95,48,800/- has already been paid after making the deduction of tax at source. He further states that in case of 13 petitioners whose particulars have been given in para 2 of the short reply filed today by Mr. Manjit Singh Brar, SDM, Ludhiana West-cum-Land Acquisition Collector, there has been an error of calculation. The full amount shall be released to them within two weeks from today. Mr. Berry further states that in case of land owners who have not approached the court, necessary orders for payment shall be made if they file a representation in that behalf. The payment shall be made within one month after the receipt of representation.

    In view of the above, counsel for the petitioners states that this writ petition has been rendered infructuous. It is, accordingly, disposed of. No costs.”

    15. A perusal of the aforesaid orders shows that on 20.12.2000, it has been recorded that a sum of Rs. 10,95,48,800/- had already been paid and in the cases of 13 petitioners in the writ petition, on account of certain calculation error, there was some delay and that amount was also undertaken to be released within two weeks. So the contention of learned counsel for the appellants that the amount was paid on 19.9.2001 is not supported by any material on record, as referred to at the time of hearing.

    Section 18 of the Act is extracted below:

    “ 18. Reference to Court.- (1) Any person interested who has not accepted the award may, by written application to the Collector, require that the matter be referred by the Collector for the determination of the Court, whether his objection be to the measurement of the land, the amount of compensation, the persons to whom it is payable, or the apportionment of the compensation among the persons interested.

    (2) The application shall state the grounds on which objection to the award is taken:

    Provided that every such application shall be made,- (a) if the person making it was present or represented before Collector at the time when he made his award, within six weeks from the date of the Collector's award;

    (b) in other cases, within six weeks of the receipt of the notice from the Collector under Section 12, sub-section (2), or within six months from the date of the Collector's award, whichever period shall first expire.”

    16. The aforesaid section provides that in case any person interested does not accept the award, he may by written application to the Collector require that the matter be referred to the court. The objections can be regarding measurement of the land, the amount of compensation, the persons to whom it is payable or the apportionment of compensation amongst the persons interested. The application should contain the grounds on which the award is objected to. Proviso to sub-section (2) of Section 18 of the Act provides the period in which the objections could be filed. Clause (a) thereof provides that in case a person is present or represented before the Collector at the time of announcement of the award, the objections can be filed within six months from the date of the Collector's award. Clause (b) provides that in other cases, the objections can be filed within six weeks of the receipt of notice from the Collector under Section 12 (2) of the Act or within six months from the date of Collector's award, whichever period expires first.

    17. The issue as to whether the period of six months is to be counted from the date of award of the Collector or from the date of knowledge of the award to the person concerned or from the date of payment of compensation to the land owners, is no more res integra and similar is the position with regard to the fact whether the objections filed beyond the period of six months either from the date of award or from the date of knowledge of the award could be entertained or have to be dismissed as time-barred.

    18. In Raja Harish Chandra Raj Singh v. The Deputy Land Acquisition Officer and another, AIR 1961 SC 1500, Hon'ble the Supreme Court opined that knowledge of the party affected by the award either actual or constructive is an essential requirement of fair play and natural justice. The expression “the date of the award” used in proviso (b) to Section 18(2) of the Act must mean the date when the award is either communicated to the party or is known by him either actually or constructively. In case the rights of a person are affected by any order and limitation is prescribed for enforcement of the remedy by the person aggrieved against the said order, the making of the order must mean either actual or constructive communication of the said order to the party concerned. The relevant paragraphs thereof are extracted below:

    “6. ........ If the award is treated as an administrative decision taken by the Collector in the matter of the valuation of the property sought to be acquired it is clear that the said decision ultimately affects the rights of the owner of the property and in that sense, like all decisions which affect person, it is essentially fair and just that the said decision should be communicated to the said party. The knowledge of the party affected by such a decision, either actual or constructive, is an essential element which must be satisfied before the decision can be brought into force. Thus considered the making of the award cannot, consist merely in the physical act of writing the award or signing it or even filing it in the office of the Collector; it must involve the communication of the said award to the party concerned either actually or constructively. If the award is pronounced in the presence of the party whose rights are affected by it, it can be said to be made when pronounced. If the date for the pronouncement of the award is communicated to the party and it is accordingly pronounced on the date previously announced the award is said to be communicated to the said party even if the said party is not actually present on the date of its pronouncement. Similarly if without notice of the date of its pronouncement an award is pronounced and a party is not present the award can be said to be made when it is communicated to the party later. The knowledge of the party affected by the award, either actual or constructive, being an essential requirement of fair play and natural justice the expression “the date of the award” used in the proviso must mean the date when the award is either communicated to the party or is known by him either actually or constructively. In our opinion, therefore, it would be unreasonable to construe the words “from the date of the Collector's award” used in the proviso to S. 18 in a literal or mechanical way.

    19. In The State of Punjab v. Mst. Qaisar Jehan Begum and another, AIR 1963 SC 1604, Hon'ble the Supreme Court opined that the limitation period of six months for an application for reference to the court will run from the date of knowledge of the award.

    20. In Mohammed Hasnuddin v. State Of Maharashtra., AIR 1979 SC 404, Hon'ble the Supreme Court opined as under:

    “24. The word `require' in Section 18 of the Act implies compulsion. It carries with it the idea that the written application makes it incumbent on the Collector to make a reference. The Collector is required to make a reference under Section 18 of the Act on the fulfilment of certain conditions. The first condition is that there shall be a written application by a person interested who has not accepted the award. The second condition is as to the nature of the objections which may be taken, and the third conditions is as to the time within which the application shall be made. The power of the Collector to make a reference under S. 18 is thus circumscribed by the conditions laid down therein, and one condition is the condition regarding limitation to be found in the proviso.

    25. The conditions laid down in S. 18 are 'matters of substance and their observance is a condition precedent to the Collector's power of reference', as rightly observed by Chandavarkar J. in Re Land Acquisition Act (supra). We are inclined to the view that the fulfilment of the conditions, particularly the one regarding limitation, are the conditions subject to which the power of the Collector to make the reference exists. It must accordingly be held that the making of an application for reference within the time prescribed by proviso to S. 18, sub-sec. (2) is a sine qua non for a valid reference by the Collector.”

    21. In Officer on Special Duty (Land Acquisition) and another v. Sham Manilal Chandulal and others, (1996)9 SCC 414, Hon'ble the Supreme Court considered the issue as to whether limitation provided for under Section 18(2) of the Act for filing objections can be extended and it was answered in the negative. Paragraphs 17 and 18 thereof are extracted below:

    “17. It is to be remembered that the Land Acquisition (Amendment) Act (68 of 1984) was enacted prescribing the limitation to exercise the power under sections 4, 6 and 11 and also excluded the time occupied due to stay granted by the courts. Taking cognizance of the limitation prescribed in proviso to sub-section (2) of Section 18, the provisions of the Limitation Act were not expressly extended. Though Section 29(2) of the Limitation Act is available, and the limitation in proviso to sub-section (2) of Section 18 may be treated to be special law, in the absence of such an application by Land Acquisition (Amendment) Act (68 of 1984), the Act specifically maintains distinction between the Collector and the court and the Collector/LAO performs only statutory duties under the Act, including one while making reference under Section 18. It is difficult to construe that the Collector/LAO while making reference under Section 18, as statutory authority still acts as a court for the purpose of Section 5 of the Limitation Act.

    18. Though hard it may be, in view of the specific limitation provided under proviso to Section 18(2) of the Act, we are of the considered view that sub-section (2) of Section 29 cannot be applied to the proviso to sub-section (2) of Section 18. The Collector/LAO, therefore, is not a court when he acts as a statutory authority under Section 18(1). Therefore, Section 5 of the Limitation Act cannot be applied for extension of the period of limitation prescribed under proviso to sub-section (2) of Section 18. The High Court, therefore, was not right in its finding that the Collector is a court under Section 5 of the Limitation Act.”

    22. The same view was followed in State Of Karnataka v. Laxuman., (2005) 8 SCC 709.

    23. Similarly, in Parsottambhai Maganbahi Patel and others v. State of Gujarat, AIR 2005 SC 3464, Hon'ble the Supreme Court opined that limitation under the latter part of Section 18(2)(b) of the Act has to be computed having regard to the date on which the land owners got knowledge of the declaration of the award either actual or constructive. This principle is applicable only in situation where the land owner or his representative is not present when the award is made or where no notice under Section 12(2) of the Act is served upon him. Similar view was expressed by this Court in Jagat Singh v. Punjab State and others, 1983 Cur. L. J. 601; Ram Kishan's case (supra); Usaf and another v. The Collector Urban Estate Land Acquisition, Urban Development, Punjab, 1989(1) PLR 253. Jaswant Rai's case (supra) and Naunehal Singh (died) and others' case (supra).

    Answer to Questions No. (i) and (ii)

    24. In view of the aforesaid enunciation of law, the answer to questions No. (i) and (ii) is that in case the land owner or his representative is not present at the time of announcement of the award, the objections can be filed either within six weeks from the date of receipt of notice from the Collector under Section 12(2) of the Act or within six months from the date of award of the Collector, whichever period expires first. The provisions are mandatory in nature. The time period provided therein cannot be extended. The date of award of the Collector has been interpreted to mean that it is the date of actual or constructive knowledge of award to the person concerned, as the words “date of Collector's award” cannot be given literal meaning considering the fact that in the absence of knowledge of announcement of the award, no one can possibly file objections thereto.

    25. If the facts of the present case are concerned, the admitted position available on record is that the land owners had the knowledge of the award at the time of filing of writ petition in this court on 21.11.2000, where they had sought quashing of the award or in the alternative prayed for payment of compensation in terms of the award which had not been paid. The objections were also admittedly filed on 5.11.2001, which were clearly beyond the period of six months from the date of knowledge of the award. Accordingly, no fault can be found with the findings of the learned court below holding the objections to be beyond limitation.

    Question No. (iii)

    26. As far as argument of learned counsel for the land owners regarding valuation of the acquired land is concerned, in my opinion, no case has been made out for any increase. The value, as assessed by the Collector initially at Rs.3,00,000/- per acre and Rs.3,25,000/- per acre for the land pertaining to villages Balloke and Baranhara respectively, was revised by the Government itself to Rs. 10,00,000/- and Rs. 9,25,000/- per acre for the aforesaid villages, respectively. It would not be safe to place reliance on the sale deeds produced by the land owners considering the fact that some of them were registered after the date of issuance of notification under Section 4 of the Act. Barring one sale deed (Ex. P9), which was registered on 9.10.1997, where the area dealt with was 7 kanals and 8 marlas, in all other sale deeds (Ex. P18 to Ex. P20 and Ex. P22), the area dealt with was merely measuring 100 square yards to 375 square yards and the location thereof is also either in the abadi or abutting a road. The notification under Section 4 of the Act in the present case was issued on 23.4.1997 and the area acquired is also substantial, i.e., 130 acres, 5 kanals and 7 marlas. As against that, the State had produced on record sale deeds (Ex. R1 to Ex. R6) showing quite less value of the land in the area at the relevant time.

    27. Considering the aforesaid facts, in my opinion, even no case for enhancement of value of acquired land can be made out.

    For the reasons mentioned above, the appeals are dismissed.