  • provisions of section 23-A of Madhya Pradesh Nagar Tatha Gram Nivesh Adhiniyam, 1973 (hereinafter referred to as 'the Adhiniyam')
  • section 4 read with section 17(1) of the Land Acquisition Act, 1894 (hereinafter referred to as 'the Act')
  • TAMIL NADU STATE HOUSING BOARD ACT
  • provisions of sub-section (1) or sub-section (2)
  • section 17(1) the procedure under section 5-A
  • LAND ACQUISITION ACT 1894
  • provisions of sections 18, 19 and 22
  • Sub-sections (1) and (4) of section 17
  • provisions and section 17(4)
  • provision of section 17(4)
  • section 9, sub-section (1),
  • section 4, sub-section (1)."
  • LAND ACQUISITION ACT
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Equivalent Citations
citation codes
Case Number
Advocates
Judges
Acts
  • provisions of section 23-A of Madhya Pradesh Nagar Tatha Gram Nivesh Adhiniyam, 1973 (hereinafter referred to as 'the Adhiniyam')
  • section 4 read with section 17(1) of the Land Acquisition Act, 1894 (hereinafter referred to as 'the Act')
  • TAMIL NADU STATE HOUSING BOARD ACT
  • provisions of sub-section (1) or sub-section (2)
  • section 17(1) the procedure under section 5-A
  • LAND ACQUISITION ACT 1894
  • provisions of sections 18, 19 and 22
  • Sub-sections (1) and (4) of section 17
  • provisions and section 17(4)
  • provision of section 17(4)
  • section 9, sub-section (1),
  • section 4, sub-section (1)."
  • LAND ACQUISITION ACT
Smart Summary

Court Opinion Summary (Dipak Misra, J.)

Factual and Procedural Background

This consolidated group of three appeals challenges the sustainability of the Single Judge's composite order dated 14-3-2002 in W.P. No. 7045/2000, W.P. No. 85/2001 and W.P. No. 245/2002. The matters were heard together because common questions of law were raised.

A notification under section 4 read with section 17(1) of the Land Acquisition Act, 1894 was issued on 19-10-2000 and published in the Official Gazette on 24-11-2000. The acquisition initially proposed 63.344 hectares in several villages in Tahsil Huzur, District Bhopal, for construction of a bypass road. The State invoked the urgency clause and dispensed with the enquiry under section 5-A. A declaration under section 6 was issued on 14-12-2000 and the writ petitions were amended to challenge that notification.

Petitioners challenged the acquisition on grounds that included: (a) the acquisition area for certain petitioners was increased after the initial proposal and that increase was impermissible; (b) the acquisition contravened the Bhopal Development Plan; (c) the notification was vague and did not identify survey numbers; (d) there was no mention that section 17(4) had been invoked and thus enquiry should not have been dispensed with; and (e) in one petition it was alleged that certain temples were demolished after acquisition.

The Single Judge rejected these challenges, holding among other things that the notification was not vague, that the urgency clause had been validly invoked and dispensed with enquiry under section 5-A, that acquisition was not contrary to the Development Plan because of a No Objection Certificate, and that factual disputes (such as demolition of temples) could not be resolved in the writ petition. The State's execution of the bypass project and foreign funding / Pilot Project aspects were noted by the courts as relevant to urgency.

Legal Issues Presented

  1. Whether the Single Judge's order dated 14-3-2002 upholding the notifications under section 4 read with section 17(1) and the dispensation of enquiry under section 5-A is sustainable.
  2. Whether invocation of the urgency clause and the dispensation of the enquiry (section 5-A) under the Land Acquisition Act was valid where section 17(4) was not specifically mentioned in earlier correspondence and sanction orders.
  3. Whether the acquisition was contrary to the Bhopal Development Plan and whether section 23-A of the Madhya Pradesh Nagar Tatha Gram Nivesh Adhiniyam, 1973 overrides or affects the operation of the Land Acquisition Act in this context.
  4. Whether the notification under section 4 was impermissibly vague (for example, by not specifying survey numbers) and therefore invalid.
  5. Whether the amendment/increase in the area proposed for acquisition was legally permissible.
  6. Whether allegations of demolition of temples post-acquisition were admissible for decision in the writ petitions.

Arguments of the Parties

Appellants' Arguments (as presented in the opinion)

  • The Single Judge erred in concluding that there was material on record to justify invocation of power under section 17(4) because the court did not properly distinguish between section 17(1) and section 17(4) of the Land Acquisition Act.
  • The provisions of section 23-A of the Madhya Pradesh Adhiniyam were not adverted to in proper perspective; when there is a change in the master plan, land acquisition proceedings could not have been initiated.
  • The petitioners argued that the initial proposal covered a smaller area and that later increase in area was impermissible and mala fide.
  • The notification was alleged to be vague because survey numbers were not mentioned, making identity of the land indiscernible.
  • It was contended that there was no mention in earlier records that section 17(4) had been taken recourse to and that competent authority had not sanctioned invocation of section 17(4).
  • Reliance was placed on the decision in Nandeshwar Prasad & others v. U.P. Government & others (AIR 1964 SC 1217) to support the appellants' position regarding the necessity of a positive opinion for dispensing with section 5-A.

Respondents' / State's Arguments (as presented in the opinion)

  • There was no violation of the Bhopal Development Plan; in any event the land in question did not fall within the ambit of that plan for the purposes argued by the petitioners.
  • The bypass road construction is independent of the Development Plan, and a No Objection Certificate (NOC) was obtained from the Town and Country Planning Authority.
  • There was application of mind and sufficient material to invoke the urgency clause because of heavy traffic, the need to control it, and immediate availability of funds under the Pilot Project funded by a foreign government.
  • The Commissioner had sanctioned the proposal and granted permission under section 17(1); records and the notification show that enquiry under section 5-A was dispensed with—even though earlier correspondence may have mentioned only section 17(1).
  • Master plan considerations and acquisition under the Land Acquisition Act operate in distinct spheres; the Adhiniyam does not abridge the Land Acquisition Act.
  • Documents (including Annexures RA-8 and RA-10) demonstrate sanction for invoking urgency and dispensation of enquiry.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Nandeshwar Prasad and others vs. U. P. Government and others, AIR 1964 SC 1217 Held that it is not necessary that when Government makes a direction under section 17(1) it should also make a direction under section 17(4); if the Government makes a direction only under 17(1) the procedure under section 5-A still has to be followed before a section 6 notification is issued; only when Government makes a declaration under 17(4) does the requirement of section 5-A fall away. The Court relied on this authority to explain that subsections (1) and (4) of section 17 are independent, and to assess whether a declaration dispensing with enquiry had been effectively made in the present matter. The Court concluded that, on the facts and documents (including the notification expressly stating that enquiry was dispensed with), the substance of section 17(4) was satisfied even if earlier correspondence mentioned only section 17(1).
State of Tamil Nadu and others vs. L. Krishnan and others, AIR 1996 SC 497 Held that section 4 of the Land Acquisition Act does not require that a duly published scheme under another statute (e.g., a housing board scheme) be enforced before a notification under section 4 is issued; the Land Acquisition Act is not nullified or controlled by the State Housing Board Act. The Court cited this authority to support the view that the Land Acquisition Act is not overridden or controlled by the Adhiniyam (section 23-A) and that acquisition under the Act does not require enforcement of a scheme under another enactment prior to issuing section 4 notification.
S. S. Darshan vs. State of Karnataka, AIR 1996 SC 671 The Court observed that where land is acquired by the State under the Land Acquisition Act, arguments based on a different user shown in master plans do not prevent acquisition under the Act. The Court relied on this proposition to reject the contention that acquisition was impermissible because the purpose of acquisition differed from the land-use shown in the master plan, reinforcing the conclusion that master plan provisions do not preclude acquisition under the Land Acquisition Act.

Court's Reasoning and Analysis

The Court proceeded by first reproducing and examining sections 17(1) and 17(4) of the Land Acquisition Act to frame the legal dispute about the urgency clause and the dispensation of enquiry under section 5-A.

The Court analyzed the precedential guidance in Nandeshwar Prasad (AIR 1964 SC 1217) and accepted that subsections (1) and (4) of section 17 are independent: a direction under section 17(1) does not automatically constitute a declaration under section 17(4) dispensing with section 5-A. However, the Court emphasized that the dispositive factor is whether there was a decision or declaration dispensing with enquiry, and that such a decision may be discerned from the notification and the contemporaneous records.

On the facts, the Court examined the correspondence, the sanction order of the Commissioner and the notification itself. The notification expressly stated that the enquiry under section 5-A had been dispensed with. The Court found that the tenor of the documents, the Commissioner’s permission under section 17(1), the No Objection Certificate from the Town and Country Planning Department, and the urgency of the project (including foreign funding and Pilot Project timing) collectively evidenced the State's intention to dispense with the enquiry. Therefore, the absence of an explicit earlier mention of section 17(4) in some correspondences did not vitiate the notification.

The Court addressed the contention based on section 23-A of the Madhya Pradesh Adhiniyam by reproducing that provision and comparing it with sections 4 and 17 of the Land Acquisition Act. Relying on L. Krishnan and S. S. Darshan, the Court concluded that the Adhiniyam (section 23-A) does not override, abridge or control the operation of the Land Acquisition Act; they operate in different spheres and no fusion of the statutes is warranted.

The Court also upheld the Single Judge's determinations that (a) the particulars in the notification were sufficient to identify the land and did not render the notification vague, (b) the revised plan increasing the acquisition area was approved by competent authority and was neither illegal nor mala fide on the material before the court, and (c) factual disputes (for example, alleged demolition of temples) could not be effectively adjudicated in the writ petitions as they required factual determination beyond the writ scope.

Holding and Implications

HOLDING: The appeals are dismissed. The Single Judge's order dated 14-3-2002 was upheld and the appeals were dismissed in limine without any order as to costs. (The court's concluding line: "Appeals dismissed.")

Implications:

  • The direct effect is that the Single Judge's order sustaining the notifications under section 4 read with section 17(1) and the dispensation of the enquiry under section 5-A stands affirmed, and the challenged land acquisition notifications remain valid according to this decision.
  • The Court's reasoning confirms that, on the facts, the absence of an explicit earlier mention of section 17(4) in certain correspondences did not automatically vitiate the notification where the notification itself and the contemporaneous records evidenced an intention to dispense with enquiry.
  • The Court treated the Land Acquisition Act and the Adhiniyam as operating in distinct spheres, relying upon precedents to reject the proposition that section 23-A of the Adhiniyam overrides the Land Acquisition Act for the purposes contested in these petitions.
  • This opinion does not purport to set out any broader novel legal principle beyond the application of established precedent to the facts; the direct consequence is the dismissal of the appeals and upholding of the Single Judge's order.

    Jaganath Dhaniram Jindal And Another v. State Of M.P And Others

    DIPAK MISRA, J.: -

    In these three appeals the sustainability of the order dated 14-3-2002 passed by the learned Single Judge in a composite order in W.P. No. 7045/2000, W. P. No. 85/2001 and 245/2002 have been called in question and as common questions of law were raised they were heard analogously for the purpose of admission and are disposed of by this common order. It is worthwhile to mention here as the learned Single Judge has referred to' the facts in general and dealt with the legal contentions raised by the learned counsel for the parties in an elaborate manner, compartmentalizing every facet of submission, we think it apposite to state the facts from the order and deal with the contentions which have been highlighted before us.

    2. The facts as have been uncurtained are that a notification under section 4 read with section 17(1) of the Land Acquisition Act, 1894 (hereinafter referred to as 'the Act') was issued on 19-10-2000 which was eventually published in the Official Gazette dated 24-11-2000. Initially, it was decided to acquire 63.344 hectares of land situate in different villages, namely, Ratanpur Sadak, Chhan, Maksi, barrai, Rapadiya, Jhagaria Khurd, Khajuri Khurd and Khajuri Kala in Tahsil Huzur, District Bhopal. The State Government took the decision that there was urgency for acquisition as land in question was required for construction of bypass road. In accordance with the aforesaid decision the urgency clause as engrafted under section 17 of the Act was invoked and the enquiry under section 5-A was dispensed with. During the pendency of the writ petitions a notification under section 6 of the Act was issued on 14-12-2000 and accordingly, amendments were made in the petitions incorporating the said notification and challenging the legal propriety of the same.

    3. It was put forth in the writ petitions that the land of the petitioners therein situate in village Ratanpur Sadak in the initial proposal was for less area, later on proposal was amended and the area increased and such an increase was not permissible in law. It was urged before the learned Single Judge that the Bhopal Development Plan had already been prepared and the bypass road is being constructed in total contravention of the provisions of the said Development Plan which does not have sanction of law. It was highlighted that the notification is vague as survey numbers are not being mentioned and hence, the identity of the land on scrutiny of the notification issued under section 4 of the Act is not discernible which makes it vulnerable in law. It was submitted before the learned Single Judge that there was no mention in the notification that section 17(4) was taken recourse to and, therefore, the dispensation of enquiry as envisaged under section 5-A of the Act was pregnable. It was put forth that competent authority has not sanctioned invocation of section 17(4) of the Act and that alone creates a dent in the notification which is incurable and makes it indefensible.

    4. On behalf of the functionaries of the State a stance was taken that there has been no violation of Bhopal Development Plan and in any case the land in question does not come within the ambit and sweep of the said plan and hence, the question of modification or alteration does not arise. It was also set forth that construction of bypass road is an independent act having no connectivity with the Bhopal Development Plan. No Objection Certificate was taken from the Town and Country Planning Authority. It was also canvassed before the learned Single Judge that there has been application of mind and the urgency clause was invoked as there was heavy traffic and it was required to be controlled and that apart, sanction of fund under the Pilot Project was an immediate factor, the importance of which cannot be marginalised. The proceeding of the meeting, held by the Secretary, was brought on record. It was also put forth that there was clerical mistake in the proposal which was pointed out by the Town and Country Planning Authority. It was also argued that the Commission has sanctioned the acquisition and the same clearly shows the applicability of mind and appreciation of the factum of urgency.

    5. It is appropriate to state here that in W.P. No. 85/2001 an additional submission was raised before the learned Single Judge that after acquisition certain temples were demolished. The aforesaid assertion was controverted by filing the counter affidavit.

    6. The learned Single Judge after hearing the learned counsel for the parties came to hold that there was no vagueness in the notification issued under section 4 of the Act inasmuch as the particulars which had been given in the notification was good enough for identification to ostracise the infirmity of vagueness; that the acquisition of land is not contrary to the Bhopal Development Plan as the Town and Country Planning Department had issued a 'No Objection Certificate' and further the challenge to a notification issued under section 4 of the Act on the ground that the purpose of acquisition is different than the permitted land used under the master plan was untenable; that the records clearly show that there has been invocation of urgency clause as encapsuled under section 17(4) of the Act because such a satisfaction is subjective in nature and there was enough material on record to arrive at such a conclusion; that non-mentioning of section 17(4) of the notification cannot be regarded as central vice to nullify the notification issued whereby the urgency clause has been invoked; that the facts which have been brought on record clearly exposit that there is immediacy and urgency in the matter and as the project is funded by Foreign Government and is taken as Pilot Project it is peremptory to be completed within a specified time and thence, the construction of bypass as an actual fact cannot brook any delay; that the revised plan for acquisition of 154.46 acres is neither illegal nor mala fide as the same has been approved by the competent authority and notifications were issued for the same; that satisfaction in regard to urgency is perceptible and that meets the requirement of law; and that the destruction of temple as alleged having been disputed and being in the realm of facts cannot be adverted to in the writ petition.

    7. We have heard Mr. N. S. Kale, learned senior counsel and Mr. Rakesh Shroti for the appellants and Mr. S. K. Yadav, learned Government Advocate for the respondents. At the very outset we must say that various submissions were raised before the learned Single Judge. He has dealt with the contentions in an elaborate manner. Mr. Kale, learned senior counsel, raised only two fold contentions before us, namely, the learned Single Judge has fallen into an error by coming to the conclusion that there is material on record for invocation of power under section 17(4) of the Act inasmuch as the learned Single Judge while arriving at such a conclusion has not kept in view. The subtle distinctions between section 17(1) and 17(4) of the Act, and secondly the provisions of section 23-A of Madhya Pradesh Nagar Tatha Gram Nivesh Adhiniyam, 1973 (hereinafter referred to as 'the Adhiniyam') have not been adverted to in proper perspective and when there is a change in the master plan, the land acquisition proceedings could not have been initiated. The learned senior counsel to bolster his submission has placed reliance on the provisions of the Act and the Adhiniyam and also placed reliance on the decision rendered in the case of Nandeshwar Prasad and others vs. U. P. Government and others, AIR 1964 SC 1217.

    8. We may hasten to add here that though the matters were listed for admission, we thought it apposite to have the submission of Mr. S. K. Yadav, learned Government Advocate, who unhesitatingly argued the matter in appugnation to the submissions raised by the learned senior counsel and opposed the submissions with vehemence. Learned Government Advocate has put forth that a case of this nature is absolutely urgent as it is a Pilot Project and foreign funds are to be utilized and a bypass road has to be constructed for the interest of the larger collective and, therefore, individual interest must succumb. To elucidate the aforesaid submission it was urged by him that the competent authority invoked the urgency clause and the material on record would go a long way to show that the said exercise was carried out and it not solely deducible on the principles of inference. It was canvassed by him that non-mentioning of section 17(4) of the Act in the notification does not vitiate the same as the law is well settled that records can be produced to substantiate that there had been application of mind to take recourse to section 17(4) of the Act in its entirety. The learned Government Advocate has further submitted that the master plan and construction of bypass road are two independent actions and the proceeding under the Land Acquisition Act is not affected or controlled by the Adhiniyam. He has also referred to Annexures-RA-8 and RA-10 to pyramid his submission that there had been sanction for invocation of the urgency clause.

    9. In order to appreciate the gravamen of submission of Mr. Kale, learned senior counsel, we think it apposite to reproduce section 17(1) and 17(4) of the Act. They read as under :-

    "17. Special powers in cases of urgency.- (1) In cases of urgency, whenever the appropriate Government so directs, the Collector, though no such award has been made, may, on the expiration of fifteen days from the publication of the notice mentioned in section 9, sub-section (1), take possession of any land needed for public purpose. Such land shall thereupon vest absolutely in the Government, free from all encumbrances.

    17(4) In the case of any land to which, in the opinion of the appropriate Government, the provisions of sub-section (1) or sub-section (2) are applicable, the appropriate Government may direct that the provisions of section 5a shall not apply, and, if it does so direct, a declaration may be made under section 6 in respect of the land at any time after the date of the publication of the notification under section 4, sub-section (1)."

    10. It is urged by him that if the anatomy of the aforesaid provision is dissected there remains no trace of doubt that there is a gulf of distinction between section 17(1) and section 17(4) of the Act. It is his proponement that a positive opinion has to be formed by the appropriate Government that there has to be dispensation of enquiry as envisaged under section 5-A of the Act and if such an opinion is not formed the urgency clause does not get attracted and section 5-A of the Act will have scope for full play. As has been indicated earlier the learned senior counsel has placed reliance on a three Judge Bench decision rendered in the case of Nandeshwar Prasad (supra). In the aforesaid case it has been held that it not necessary even where the Government makes a direction under section 17(1) that it should also make a direction under section 17(4). If the Government makes a direction only under section 17(1) the procedure under section 5-A would still have to be followed before a notification under section 6 is issued. Their Lordships further laid down that it is only when the Government makes a declaration under section 17(4) of the Act then it becomes not necessary to take action under section 5-A of the Act and make a report there under.

    11. From the aforesaid decision it is quite vivid that Sub-sections (1) and (4) of section 17 are two independent provisions and section 17(4) clearly lays a postulate that an order has to be passed dispensing with an enquiry under section 5-A of the Act. It is not clear from the aforesaid decision that it is obligatory on the part of the competent authority to mention section 17(4) of the Act in the notification. In our considered view non mentioning of the said provision does not make the notification susceptible. What requires is that there has to be an order or declaration. There has to be a decision. The learned Single Judge in paragraph 29 of the order has come to hold that various proceeding indicating that enquiry was proposed to be dispensed with and the Commissioner has clearly sanctioned the proposal. As this was the main plank of submission of Mr. Kale, learned senior counsel appearing for the appellant, we have also dwelled upon this aspect and adverted to the realm of facts. The learned Government Advocate has drawn our attention to certain documents as has been indicated hereinbefore. We have perused the said documents. On a scrutiny of the same it is clearly perceptible that the Commissioner had granted permission under section 17(1) of the Act. The learned Government Advocate has also drawn our attention to the notification. In the notification it has been clearly mentioned that there shall be dispensation of enquiry as envisaged under section 5-A of the Act. Submission of Mr. Kale is that the insertion of such an aspect in the notification does not make the notification valid. It is also put forth by him that there must be a decision in this regard. On a perusal of the sanction order passed by the Commissioner and the acts taken by the State Government it is quite clear that the State Government wanted to invoke the urgency clause. True it is, in the case of Nandeshwar Prasad (supra) it has been held that it does not necessarily mean that when an order is passed under section 17(1), an order under section 17(4) is also passed. Their Lordships further observed that in law it is not necessary that this should be so. In the case at hand what has weighed with us is that though there is mention of section 17(1) in various correspondences, the nature and tenor of correspondences, the action taken by the State Government from various angles and the 'No Objection Certificate' obtained from the competent authority of the Town and Country Planning Department clearly go a long way to show that intention was to dispense with the enquiry and the said intention has been reflected in the notification wherein there is unequivocal mention that enquiry under section 5-A has been dispensed with. True it is, in the notification section 17(4) has not been mentioned, but we are of the considered view that such non mention does not vitiate the notification inasmuch as quintessence of the provision of section 17(4) finds place in the notification. The Government might not have specifically stated in its correspondences to dispense with the enquiry but when the notification clearly spells out so and the urgency of the matter makes it absolutely graphic, this Court cannot close its eyes and come to hold that there was no intention to dispense with the enquiry. In fact, on a periscopic analysis of the documents in entirety the mapping becomes clear and the substratum of purpose is perceivable. When the notification is express and explicit in this regard and the attending circumstances show there is immediacy and urgency we unhesitatingly hold that competent authority had understood the correspondence in this manner and accordingly, the notification had been issued. We may hasten to add here that in the case of Nandeshwar Prasad (supra) the Apex Court has also used the word 'declaration' in paragraph 11 of the judgment. The notification is a declaration. Hence, we are not persuaded by the submission of Mr. Kale that no order has been passed for dispensing the enquiry as envisaged under section 5-A of the Act.

    12. The next contention raised by Mr. Kale, learned senior counsel, is that there has been violation of provision enshrined under section 23-A of the Adhiniyam and such violation makes the notification issued under the Adhiniyam sensitively susceptible. Per contra, Mr. S. K. Yadav, learned Govt. Advocate contended that provisions of both the Act and the Adhiniyam operate in different fields.

    13. To appreciate the aforesaid submissions it is apposite to reproduce section 23-A of the Adhiniyam. It reads as under :-

    "23-A. Modification of Development Plan or Zoning Plan by State Government in certain circumstances. - (1) The State Government, on its own motion or on the request of Development Authority, may make modification in the Development Plan or the Zoning Plan for urgent public purpose. The modification so made in the Development Plan or Zoning Plan shall be an integrated part of the revised Development Plan or Zoning Plan.

    (2) The State Government shall publish the draft of modified plan together with a notice of the preparation of the draft modified plan and the place or places where the copies may be inspected, continuously for two days in such two daily news papers which are in the approved list of Government for advertisement purpose having circulation in the area to which it relates and a copy thereof shall be affixed in a conspicuous place in the office of the Collector, inviting objections and suggestions in writing from any person with respect thereto within fifteen days from the date of publication of such notice.

    After considering all the objections and suggestions as may be received within the period specified in the notice and shall, after giving reasonable opportunity to all persons affected thereby or being heard, the State Government shall confirm the modified plan.

    (3) The provisions of sections 18, 19 and 22 shall not apply for modification made by the State Government.

    Explanation.- For the purpose of this section 'public purpose' includes creation, development and maintenance of human settlements or any part thereof."

    14. On a perusal of the aforesaid provision and the provisions enshrined under sections 4 and 17 of the Act we are of the considered view that the Land Acquisition Act is not regulated or its provisions are in any way abridged by section 23-A of the Adhiniyam. It is apposite to mention here that the learned single Judge has placed reliance on the decisions rendered in the case of State of Tamil Nadu and others vs. L. Krishnan and others, AIR 1996 SC 497 and S. S. Darshan vs. State of Karnataka, AIR 1996 SC 671. In the case of L. Krishnan (supra) the Apex Court held that section 4 of the Act does not state expressly or by necessary intendment lays a postulate that before a notification is issued or published there under proposing to acquire the land for the purpose of a body like Tamil Nadu Housing Board, a duly published scheme prepared in accordance with the relevant Act should be enforced. In the aforesaid decision their Lordships clearly laid down that the Land Acquisition Act is not nullified or controlled by the provisions of Tamil Nadu State Housing Board Act. In the case of S. S. Darshan (supra) a two Judge Bench of the Apex Court came to hold as under:-

    "11. The last submission of learned counsel for the appellant is that the user of the acquired land shown in the master plan being different, there cannot be a conversion of the user except in accordance with the provisions for making the change in the land use. It is not a case of change of user by the owner of the land but one of acquisition by the State under the provision of the Land Acquisition Act, 1894. This argument also had no merit."

    15. In view of the aforesaid enunciation of law we experience no difficulty to concur with the view expressed by the learned Single Judge that section 23-A of the Adhiniyam does not have any over-riding effect over section 4 or section 17 of the Act. In fact, if we allow ourselves to say so, they operate in two different spheres and as a proposition of law it does not warrant any kind of fusion.

    16. Before we part with the case we think it apposite to mention here that as the construction of bypass road is undertaken and the project is funded by a foreign government, it has its immediacy and it has to be completed in quite promptitude. It really cannot brook any delay. The notification published by the State Government is quite unequivocal and clear that there has been dispensation of enquiry under section 5-A of the Act. When the intention of the notification is absolutely clear there is no reason to interpret to dissect it in a technical manner to find faults with it as such an anatomical dissection or X-ray of the provisions to the inner spectrum solely for the purpose of finding out a technical remora for construction of bypass road, in our considered view, is absolutely unwarranted. In our view, if the entire gamut of facts are appreciated in proper perspective in the backdrop of declaration made in the notification there remains no scintilla or trace of doubt that there is urgency in the matter and the competent authority has consciously acted and the notification has come into being. The same is beyond assail.

    17. Resultantly, the appeals, being sans merit, stand dismissed in limine without any order as to costs.