  • Section 24(2) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013
  • Section 48 of the Act
  • Section 114(1) and (2) of the 1894 Act
  • Section 5-A of the Land Acquisition Act, 1984
  • Section 114(1) of the 2013 Act
  • Section 4 of the Land Acquisition Act, 1894
  • Section 4 Land Acquisition Act, 1984
  • Section 48 of the Land Acquisition Act
  • None mentioned for other acts/articles, but '1983 Income Tax Act' is not present in the text.
  • The 2013 Act
  • The 1894 Act
  • The Explosives Rules, 1983 framed under The Explosives Act, 1884
  • Section 5, Subsection 2 of the 1983 Income Tax Act
  • Article 14 of the Constitution
  • Section 6 of the Act
  • Section 48(1) of the Act
  • Sub-section (2) of Section 114, however, makes Section 6 of the General Clauses Act, 1897 applicable with regard to the effect of repeal but this is subject to the provisions in the 2013 Act.
  • Section 24(2) of the 2013 Act
  • Section 4 of the Land Acquisition Act, 1984
  • Section 6 of the Land Acquisition Act, 1984
  • Section 5-A of the Act
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Equivalent Citations
citation codes
Case Number
Disposition
Advocates
Judges
Acts
  • Section 24(2) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013
  • Section 48 of the Act
  • Section 114(1) and (2) of the 1894 Act
  • Section 5-A of the Land Acquisition Act, 1984
  • Section 114(1) of the 2013 Act
  • Section 4 of the Land Acquisition Act, 1894
  • Section 4 Land Acquisition Act, 1984
  • Section 48 of the Land Acquisition Act
  • None mentioned for other acts/articles, but '1983 Income Tax Act' is not present in the text.
  • The 2013 Act
  • The 1894 Act
  • The Explosives Rules, 1983 framed under The Explosives Act, 1884
  • Section 5, Subsection 2 of the 1983 Income Tax Act
  • Article 14 of the Constitution
  • Section 6 of the Act
  • Section 48(1) of the Act
  • Sub-section (2) of Section 114, however, makes Section 6 of the General Clauses Act, 1897 applicable with regard to the effect of repeal but this is subject to the provisions in the 2013 Act.
  • Section 24(2) of the 2013 Act
  • Section 4 of the Land Acquisition Act, 1984
  • Section 6 of the Land Acquisition Act, 1984
  • Section 5-A of the Act
Smart Summary

Factual and Procedural Background

The appellant established a fireworks manufacturing unit at Village Kasar, Tehsil Bahadurgarh, District Jhajjar, Haryana in 1990 and initially obtained a licence to store 1,700 kg of explosives. Subsequent permissions allowed storage of up to 2,00,000 kg, triggering an Explosives Rules requirement of a 71-metre safety radius around the magazine.

On 24 January 2001, the State of Haryana issued a notification under Section 4 of the Land Acquisition Act, 1894 to acquire land in several villages, including 71 kanals belonging to the appellant. Although some adjoining industrial lands were released, a portion of the appellant’s land was finally acquired under a Section 6 declaration. The appellant’s objections under Section 5-A were rejected, leading to Civil Writ Petition No. 9710 of 2003, which the High Court dismissed on 5 July 2011.

The appellant challenged the High Court’s decision before the Supreme Court. While the appeal was pending, the 2013 Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act (“2013 Act”) came into force. Relying on Section 24(2) of that Act, the appellant sought a declaration that the acquisition had lapsed because (i) the award was dated 8 October 2003—more than five years before 1 January 2014, and (ii) neither possession had been taken (owing to interim “status quo” orders dated 3 July 2003 by the High Court and 19 March 2012 by the Supreme Court) nor compensation paid within five years (the deposit for the appellant was made only on 9 April 2014).

Legal Issues Presented

  1. Whether, under Section 24(2) of the 2013 Act, the land-acquisition proceedings initiated in 2001 and culminating in an award dated 8 October 2003 stand lapsed because compensation was not paid and possession not taken within five years prior to the commencement of the 2013 Act.
  2. Consequently, whether the appellant is entitled to restoration of his land and quashing of all acquisition proceedings.

Arguments of the Parties

Appellant’s Arguments

  • The award (8-10-2003) is more than five years old as of 1-1-2014; compensation was deposited only on 9-4-2014 and never paid to the appellant.
  • Interim “status quo” orders ensured that physical possession remained with the appellant; hence, the State never took possession.
  • Under Pune Municipal Corporation v. Harakchand Misirimal Solanki and allied cases, deposit of compensation in the treasury or belated deposit in court is not “payment” under Section 24(2).
  • Sree Balaji Nagar confirms that periods of judicial stay do not extend the statutory five-year window.
  • Therefore, both conditions in Section 24(2) are satisfied and the acquisition must be deemed to have lapsed.

Respondent’s Arguments

This information was not available in the provided opinion.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Pune Municipal Corpn. v. Harakchand Misirimal Solanki (2014) 3 SCC 183 Interpretation of Section 24(2): acquisition lapses if award is 5+ years old and compensation unpaid or possession not taken. Applied as the main authority to conclude that deposit in treasury or belated court deposit does not satisfy “paid”; thus proceedings lapse.
Union of India v. Shiv Raj (2014) 6 SCC 564 Further elucidation of Section 24(2) requirements. Cited to reinforce that both conditions trigger automatic lapse.
Bimla Devi v. State of Haryana (2014) 6 SCC 583 Same principle on lapse under Section 24(2). Supportive precedent; referenced in the chain of authorities.
Bharat Kumar v. State of Haryana (2014) 6 SCC 586 Lapse of acquisition under Section 24(2). Strengthened the interpretive framework adopted by the Court.
Sree Balaji Nagar Residential Assn. v. State of T.N. (2015) 3 SCC 353 Delay due to court stay does not extend the five-year period in Section 24(2). Relied upon to reject any exclusion of the period during which interim orders were in force.
Sube Singh v. State of Haryana (2001) 7 SCC 545 Referential background regarding Haryana’s policy on releasing acquired land. Mentioned to contextualise similar disputes; not determinative of Section 24(2) issue.
Kishan Das v. State of Haryana, SLP (C) No. 15645 of 2008 (Interim Order 18-7-2008) Stay of dispossession in analogous circumstances. Cited to highlight previous judicial protection of similarly situated landowners.

Court's Reasoning and Analysis

After examining the statutory framework and undisputed facts, the Court proceeded as follows:

  1. Confirmed that the award was passed on 8 October 2003, well before the five-year cut-off (1 January 2014) in Section 24(2).
  2. Noted that interim “status quo” orders prevented the State from taking physical possession of the land.
  3. Observed that compensation was neither paid to the appellant nor deposited in court within five years; the first deposit (9 April 2014) occurred more than a decade after the award.
  4. Applied the ratio of Pune Municipal Corpn. that treasury deposits or delayed court deposits do not equal “payment”.
  5. Applied Sree Balaji Nagar to rule that the pendency of stays does not toll the five-year period.
  6. Held that both statutory conditions—non-payment of compensation and non-taking of possession—were met, triggering the legal fiction of automatic lapse under Section 24(2).
  7. Consequently, acquisition proceedings were quashed and the appellant’s application (IA No. 5) was allowed.

Holding and Implications

Holding: The Supreme Court allowed the appeal, quashing the acquisition proceedings and declaring that, under Section 24(2) of the 2013 Act, the land and building of the appellant stand released from acquisition.

Implications: The decision restores ownership and possession of the land to the appellant and reinforces a consistent judicial approach that acquisition proceedings automatically lapse when the dual conditions of Section 24(2) are satisfied. The ruling applies existing precedent without creating new legal doctrine.

To access the original judgment, please Sign In or Subscribe.

    Sita Ram v. State Of Haryana And Another

    V. Gopala Gowda, J.— Leave granted. This appeal is directed against the final judgment and order dated 5-7-2011 passed by the High Court of Punjab and Haryana at Chandigarh in Sita Ram v. State of Haryana WP (C) No. 9710 of 2003 dismissing the writ petition.

    2. The facts of the case are briefly stated hereunder: the appellant started his factory for manufacturing fireworks in the year 1990 at Village Kasar, Tehsil Bahadurgarh, District Jhajjar and was granted a licence by the Chief Controller of Explosives for storage of explosives under the Explosives Rules, 1983 framed under the Explosives Act, 1884.

    3. Under the Explosives Rules, it is mandatory to maintain open radial safety distance of 71 m from all sides around the magazine storing 2 lakh kg of fireworks. The letter dated 5-3-2001 was issued to the appellant's firm by the Joint Chief Controller of Explosives, Faridabad, stipulating that 71 m of safety radial distance must be maintained from all sides of the magazine storing 2 lakh kg of fireworks. The Explosive Rules further mandate that land of 71 m radius around the magazine should also be free from construction for the continuance of the explosive licence.

    4. As per document Annexure P-9-H dated 28-5-1990, it appears that the permission was granted to store the explosives only to the extent of 1700 kg. So far as the requirement for keeping 71 m of mandatory safety distance, it is applicable only in cases where permission has been granted to store explosive to the extent of 2 lakh kg. This fact is evident from the document P-9-Q.

    5. A letter dated 5-3-2001 was issued by the Department of Explosives. Initially, the appellant got permission for manufacture of fireworks of 1700 kg but later on the Department of Explosives granted licence to the appellant's firm for storing 2 lakh kg of fireworks in the magazine situated at the appellant's land. The said letter dated 5-3-2001 is written to M/s Gupta and Co. and it states thus:

    “Adverting to your letter dated 2-3-2001, it is clarified that minimum land required for a firework factory having 6 processing sheds may be computed as follows as required under the Explosive Rules, 1983. The magazine accommodating 2,00,000 kg of fireworks should observe radial safety distance of 71 m from all sides.”

    6. Vide Letter dated 27-10-1999, the Department of Explosives, Government of India, granted amended permission for possession and sale of fireworks to the extent of 2 lakh kg at magazine situated at Village Kasar, District Rohtak, Haryana which reads as under:

    “Licence No. E.25(11) 51 dated 31-3-1992 is hereby amended for possession and sale of fireworks (Class 7, Divn. 2, Sub-Divn. 1 and 2) — 2,00,000 kg from your magazine at Village Kasar, Distt. Rohtak (Haryana).”

    But as stated above, the land in question is necessarily required as per the mandate of the Explosive Rules.

    7. On 24-1-2001 the Government of Haryana issued Notification under Section 4 of the Land Acquisition Act, 1984 (hereinafter referred to as “the Act”) for acquisition of land of Villages Kasar, Sankhol, Jhakhodha and Saidpur, Tehsil Bahadurgarh, District Jhajjar including land measuring 71 kanals owned by the appellant for the purpose of development of area.

    8. Objections filed under Section 5-A of the Act for release of the appellant's land was considered and found to have merit and part of the appellant's land was released from acquisition. Following the same, the notification was issued under Section 6 of the Act, under which the remaining part of the appellant's land that was not released from acquisition was acquired whereas land belonging to other industries such as M/s Rockwell Industries Pvt. Ltd., M/s H.B Plastics Pvt. Ltd., M/s Rocklight Chemicals and Resins Pvt. Ltd., M/s Prag Auto Products Ltd. were released from acquisition and these industries were even given permission for change of land use. It is argued that the respondents thus had adopted a pick-and-choose policy, which is a clear case of discrimination, violative of Article 14 of the Constitution and also amounts to unreasonable and arbitrary action by them.

    9. Being aggrieved by the same, the appellant filed Civil Writ Petition No. 9710 of 2003 before the High Court of Punjab and Haryana at Chandigarh. The High Court was pleased to grant interim restraint order against the respondents in favour of the appellant in regard to possession of the land in question and passed order dated 3-7-2003 in CWP No. 9710 of 2003 in terms of order dated 25-11-2002 passed in a connected CWP No. 13557 of 2002.

    10. During the pendency of the said writ petition, the State Government framed a comprehensive policy dated 26-10-2007 for releasing land from acquisition proceedings and placed reliance upon following certain relevant clauses:

    “1. No request will be considered after one year of award. Only those requests will be considered by the Government where objections under Section 5-A were filed.
    2.***
    3. Any factory or commercial establishment which existed prior to issuance of Section 4 Land Acquisition Act, 1984 notification will be considered for release.
    4-5.***
    6. That the Government may also consider release of any land in the interest of integrated and planned development for where the owners have approached the Hon'ble Courts and have obtained a stay against dispossession:
    Provided that the Government may release any land on the grounds other than stated above under Section 48(1) of the Act under exceptionally justifiable circumstance for the reasons to be recorded in writing.”

    Under this policy, land having construction prior to issuance of notification under Section 4 of the Act were not included in the acquisition. The factory and commercial establishments which existed prior to issuance of notification under Section 4 of the Act were also to be released from acquisition. The constructed area of ‘A’ and ‘B’ grade should be left out from acquisition. Further, in cases where the owners of land approached the courts and got stay order against their dispossession were also to be considered for release from acquisition.

    11. This Court considered the said policy in Sube Singh v. State of Haryana (2001) 7 SCC 545 and granted “stay of dispossession” in similar matter involving the same policies issued by the State of Haryana for releasing the land, in Kishan Das v. State of Haryana SLP (C) No. 15645 of 2008 vide order dated 18-7-2008. Further, this Court by its order dated 5-1-2011, granted “leave” in the same matter along with batch of other matters, wherein also the same policy of the State of Haryana is involved for releasing such land covered under the policy from acquisition.

    12. The High Court after examining the facts, evidence produced on record and circumstances of the case observed that the permission was granted to the appellant to set up a fire cracker factory and as per Annexure P-9-H dated 28-5-1990, the said permission was granted to store the explosives only to the extent of 1700 kg. On the statutory requirement of keeping 71 m of mandatory safety distance, the High Court held that it was applicable only in cases where permission was granted to store explosives to the extent of 2,00,000 kg which was evident from Annexure P-9-Q. It was further held that the documents put on record indicate that in the year 1991, permission was granted in favour of the appellant to set up a fire cracker factory as per document P-9-H dated 28-5-1990 and that there was nothing on record at any time that permission was granted to the appellant by the Joint Chief Controller of Explosives, North Circle, Faridabad to store 2,00,000 kg of explosives was either cancelled or modified. From the perusal of the photographs produced that the industrial unit was not in working condition, there was wild growth of grass, and the doors and window panes of the building were also found to be missing is the contention urged by the respondents. The High Court held that there was no visible activity in sight so far as the premises is concerned in the photographs and that after getting the licence; the so-called industrial unit was not in operation. Therefore, the objections raised by the appellant under Section 5-A of the Act to the preliminary notification are not tenable in law and the High Court held that no legal flaw has been shown to the Court by the appellant that acquisition proceedings are bad in law. Therefore, the High Court opined that there is nothing to interfere with the acquisition proceedings at the instance of the appellant and dismissed the petition.

    13. The correctness of the said impugned judgment and order WP (C) No. 9710 of 2003 of the High Court is challenged by the appellant by filing this civil appeal urging various legal contentions. Brief and relevant facts are stated for the limited purpose in this case as we have examined the application filed by the appellant under Section 24(2) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (for short “the 2013 Act”).

    14. This Court vide order dated 19-3-2012 SLP (C) No. 5346 of 2012 issued notice and dasti in addition to the ordinary process and directed to maintain “status quo” with regard to the subject property. The said interim order is still in force.

    15. The learned counsel for the appellant placed reliance upon the decision of this Court in Sube Singh (2001) 7 SCC 545 stating certain relevant facts relating to the land acquisition of the appellant and referring to the affidavit of Shri T.L Satyaprakash, Special Secretary to Government of Haryana and Director, Industries and Commerce, Haryana Chandigarh dated 19-4-2011 filed in CWP No. 7218 of 2002 before the High Court in compliance with its order dated 24-1-2011, where the status of land of various writ petitions pending before the High Court was given including the appellant's land which reads thus:

    “That it is further respectfully submitted that the State Government issued another Notification dated 24-1-2001 under Section 4 of the Land Acquisition Act, 1894 for acquisition of land measuring 616 acres 1 kanal 9 marlas, for a public purpose, namely, for development of industrial area in Villages Bahadurgarh, Kasar, Sankhol, Jhakhodha and Saadpur, Tehsil Bahadurgarh, District Jhajjar. As per the provisions of the Act, the said notification was published in the Official Gazette dated 24-1-2001 of the State Government and in two daily newspapers, namely, Hari Bhoomi dated 11-2-2001 and Financial Express dated 10-2-2001. The State Government issued Notification dated 19-7-2001 under Section 48 of the Act for land measuring 1 acres 7 kanals 17 marlas of Village Sankhol. Subsequently, another Notification dated 9-1-2002 was issued under Section 48 of the Act for land measuring 6 acres 1 kanal 15 marlas of Village Sankhol.
    Subsequently, the State Government after considering the recommendations of the LAC, Jhajjar and the comments of the Hsiidc, issued Notification dated 22-1-2002 under Section 6 of the Act for acquisition of land measuring 576 acres 5 kanals 12 marlas of Villages Bahadurgarh, Kasar, Sankhol, Jhakhodha and Saadpur, Tehsil Bahadurgarh, District Jhajjar. As per the provisions of the Act, the said Notification was published in the Official Gazette dated 22-1-2002 of the State Government and in two daily newspapers, namely, Hari Bhoomi dated 31-1-2002 and The Pioneer dated 3-2-2002. The LAC, Jhajjar, announced the award of the land comprising in Villages Bahadurgarh, Kasar and Saadpur on 8-10-2003 and of Villages Saadpur, Sankhol and Jhakhodha on 23-12-2003, thus completing the acquisition proceedings.”

    16. The learned counsel for the appellant has also placed strong reliance upon the additional affidavit filed by T.L Satyaprakash, Special Secretary to Government, Haryana, wherein he has stated at Para 8, the relevant portion of which reads thus:

    “… That the total amount of the entire acquired land measuring 272 acres 3 kanals 15 marlas comes to Rs 91,25,156. It is further submitted that there were 794 claimants in all out of whom 748 persons have already received their compensation to the tune of Rs 8,81,77,626. The balance amount of compensation belongs to the remaining 46 persons including the petitioner amounting to Rs 30,27,530 out of which the petitioner's compensation comes to Rs 16,52,952 and the said amount stands deposited in the Court on 9-4-2014.”

    17. The learned counsel for the appellant has placed strong reliance upon the interim order of the High Court dated 3-7-2003 and this Court vide interim order dated 19-3-2012 SLP (C) No. 5346 of 2012 passed “status quo” regarding possession of land involved in the proceedings which is in force in support of plea for grant of relief under Section 24(2) of the 2013 Act as the appellant has been in actual physical possession of the land and not been paid compensation in respect of the acquired land and building. The award was passed by the Land Acquisition Collector in this case on 8-10-2003 which is more than 5 years as on 1-1-2014, when the above Act came into force and undisputedly the deposit of the compensation payable to this appellant as per the statement of fact sworn to in the affidavit referred to supra is on 9-4-2014 which is more than 5 years from the date of the award passed prior to the commencement of the 2013 Act.

    18. In view of the aforesaid undisputed fact, the acquisition proceedings of land and building of this appellant have lapsed under Section 24(2) of the 2013 Act.

    19. The interpretation of Section 24(2) of the 2013 Act has been made by this Court in Pune Municipal Corpn. v. Harakchand Misirimal Solanki (2014) 3 SCC 183, Union of India v. Shiv Raj (2014) 6 SCC 564, Bimla Devi v. State of Haryana (2014) 6 SCC 583, Bharat Kumar v. State of Haryana (2014) 6 SCC 586 and Sree Balaji Nagar Residential Assn. v. State of T.N (2015) 3 SCC 353 The relevant paras 20 and 21 from the three-Judge Bench judgment of this Court in Pune Municipal Corpn. case (2014) 3 SCC 183 are extracted hereunder:

    “20. … it is clear that the award pertaining to the subject land has been made by the Special Land Acquisition Officer more than five years prior to the commencement of the 2013 Act. It is also admitted position that compensation so awarded has neither been paid to the landowners/persons interested nor deposited in the court. The deposit of compensation amount in the Government treasury is of no avail and cannot be held to be equivalent to compensation paid to the landowners/persons interested. We have, therefore, no hesitation in holding that the subject land acquisition proceedings shall be deemed to have lapsed under Section 24(2) of the 2013 Act.
    21. The argument on behalf of the Corporation that the subject land acquisition proceedings have been concluded in all respects under the 1894 Act and that they are not affected at all in view of Section 114(2) of the 2013 Act, has no merit at all, and is noted to be rejected. Section 114(1) of the 2013 Act repeals the 1894 Act. Sub-section (2) of Section 114, however, makes Section 6 of the General Clauses Act, 1897 applicable with regard to the effect of repeal but this is subject to the provisions in the 2013 Act. Under Section 24(2) land acquisition proceedings initiated under the 1894 Act, by legal fiction, are deemed to have lapsed where award has been made five years or more prior to the commencement of the 2013 Act and possession of the land is not taken or compensation has not been paid. The legal fiction under Section 24(2) comes into operation as soon as conditions stated therein are satisfied. The applicability of Section 6 of the General Clauses Act being subject to Section 24(2), there is no merit in the contention of the Corporation.”

    20. Further, this Court in Sree Balaji Nagar Residential Assn. v. State of T.N (2015) 3 SCC 353, held that Section 24(2) of the 2013 Act does not exclude any period during which the land acquisition proceeding might have remained stayed on account of stay or injunction granted by any court. It was conclusively held that the legislature has consciously omitted to extend the period of five years indicated in Section 24(2) of the 2013 Act for grant of relief in favour of landowners even if the proceedings had been delayed on account of an order of stay or injunction granted by a court of law or for any reason.

    21. In the light of the above findings recorded by us on the rival factual and legal contentions, and considering the averments made in the application and documents produced on record and after examining Section 24(2) of the 2013 Act along with the decision of Pune Municipal Corpn. (2014) 3 SCC 183 and other cases referred to supra, we are of the considered view that the plea of the appellant should be accepted and relief as prayed for has to be granted for the undisputed reason that the award was passed on 8-10-2003 and five years have elapsed long back and the compensation undisputedly was not paid within 5 years to the appellant. The conditions mentioned in Section 24(2) of the 2013 Act are satisfied by the appellant for allowing the plea as stated by him that the land acquisition proceedings in respect of his acquired land and building must be deemed to have lapsed in terms of Section 24(2) of the 2013 Act. The abovementioned three-Judge Bench (2014) 3 SCC 183 decision and other cases of this Court referred to supra with regard to the interpretation made under Section 24(2) of the 2013 Act, would be aptly applicable with all fours to the fact situation in respect of the land covered in this appeal.

    22. In view of the aforesaid findings and reasons recorded by us, the prayer made in the application of the appellant is allowed holding that the acquisition proceedings in respect of the appellant's land/building have elapsed. IA No. 5 is allowed. The appeal is disposed of in the abovesaid terms by quashing the acquisition proceedings of the land/building of the appellant.