AMICUS AI
Citation Codes
Neutral Citations
009 INSC 1022
Equivalent Citations
citation codes
Case Number
Disposition
Advocates
Judges
Acts
  • Section 5, Subsection 2 of the 1983 Income Tax Act
  • Code of Civil Procedure, Section 151
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Neutral Citations
009 INSC 1022
Equivalent Citations
citation codes
Case Number
Disposition
Advocates
Judges
Acts
  • Section 5, Subsection 2 of the 1983 Income Tax Act
  • Code of Civil Procedure, Section 151
Smart Summary

Factual and Procedural Background

The appellant–plaintiff claims ownership over 67,824.50 sq. yards of land at Borabanda, Fateh Nagar, Ashok Marg, Hyderabad (“the suit property”). Under a development agreement-cum-power of attorney dated 21-9-2007, the respondent-defendants undertook to pay a total of Rs 30.50 crores in specified tranches and to construct residential blocks on the land.

Alleging multiple breaches—dishonoured post-dated cheques, failure to provide a bank guarantee, departures from the sanctioned scheme, and unauthorised dealings with third parties—the appellant terminated the agreement and filed a suit for recovery of possession and damages. Two applications for interim injunction under Order 39 Rules 1 & 2 CPC sought to (i) restrain alienation of the suit property and (ii) prevent any change to its nature and character.

The Second Additional City Civil Judge, Hyderabad, appointed an Advocate Commissioner, found that “substantial construction” had already been completed, and refused the injunction, subject to three protective conditions. On appeal, the High Court of Andhra Pradesh affirmed the refusal but deleted Conditions 1 and 2. The appellant then approached the Supreme Court, which also appointed an Advocate Commissioner to verify the current status of construction before deciding the appeals.

Legal Issues Presented

  1. Whether the appellant-plaintiff is entitled to an interlocutory injunction restraining the respondent-defendants from further construction or alienation of the suit property after termination of the development agreement.
  2. Whether the Supreme Court should interfere with concurrent findings of the trial court and the High Court that (a) substantial construction exists and (b) the balance of convenience disfavors an injunction.

Arguments of the Parties

Appellant-Plaintiff’s Arguments

  • Relied on the first Commissioner’s report to assert that no substantial construction had been undertaken, making injunctive relief appropriate.
  • Emphasised that the development agreement had been lawfully terminated; hence the respondents lacked authority to continue construction.

Respondent-Defendants’ Arguments

  • Pointed to both Commissioners’ reports and additional photographs to show that large-scale construction was already completed, involving “crores of rupees” in investment.
  • Contended that stopping construction now would cause irreparable loss, whereas any eventual decree in favour of the appellant could be met by damages or demolition without prejudice to equities.

Table of Precedents Cited

No precedents were cited in the provided opinion.

Court's Reasoning and Analysis

1. Acceptance of factual findings: Both the trial court and High Court had, on an unchallenged Commissioner’s report, found substantial construction. The Supreme Court reiterated that it will not disturb concurrent findings absent perversity.

2. Independent verification: A Court-appointed Advocate Commissioner confirmed that out of 1,800 planned flats, work was underway or completed on 1,555 units, evidencing extensive construction.

3. Balance of convenience & irreparable injury: The Court held that halting construction would destroy existing structures and inflict irreparable loss on the respondents, whereas the appellant could be compensated by damages or restoration if it ultimately succeeded.

4. Monetary safeguards: The respondents had already deposited the entire contractual amount (albeit belatedly) and furnished the requisite bank guarantee, reducing any financial prejudice to the appellant.

5. Equitable considerations: Re-affirming that parties cannot claim equities over unauthorised construction, the Court preserved Condition 3 of the trial court’s order, requiring disclosure to prospective purchasers that their rights are subject to the suit’s outcome.

Holding and Implications

Holding: The appeals are DISMISSED; the refusal of interlocutory injunction by the trial court (as affirmed by the High Court) stands, with only Condition 3 remaining operative.

Implications: Construction may continue pending trial, but purchasers must be warned that their interests are subject to the suit’s result, and the respondents cannot claim equities from the construction. The Supreme Court directed (i) filing of the written statement within four weeks, and (ii) expedited trial disposal within six months. No broader legal precedent was set beyond reaffirming the limited scope for appellate interference with concurrent discretionary orders on injunctions.

To access the original judgment, please Sign In or Subscribe.

    Ece Industries Limited (2) v. S.P Real Estate Developers Private Limited And Another

    Tarun Chatterjee, J.— Leave granted. These two appeals have been filed from a common order passed by the High Court of Andhra Pradesh at Hyderabad by which the High Court had affirmed an order of the Second Additional City Civil Judge at Hyderabad, disposing of an application for injunction filed at the instance of the appellant-plaintiff on two applications for injunction in a suit for recovery of possession and damages.

    2. The appellant-plaintiff alleged in their plaint that they are the owner of 67,824.50 sq yd of land, situated at Borabanda, Fateh Nagar, Ashok Marg, Hyderabad (hereinafter referred to as “the suit property”). The appellant-plaintiff as well as the respondent-defendants executed a development agreement-cum-power of attorney on 21-9-2007. Under the said agreement, the respondent-defendants agreed to pay an aggregate sum of Rs 30.50 crores in the following manner:

    (i) Rs 13.50 crores by way of non-refundable amount.
    (ii) Rs 16.72 crores for utilising the consultations, advice and services of the petitioner over the suit property along with service tax on the said amount for which invoices had been raised by the appellant-plaintiff.
    (iii) Rs 28,36,525 towards the cost of land.

    3. It is the case of the appellant-plaintiff that since the respondent-defendants had acted in breach of the agreement, the same was duly terminated. Some of the breaches of the agreement in question, as alleged by the appellant-plaintiff, are as follows:

    (i) Respondent 1 issued twelve post-dated cheques for a total sum of Rs 16.72 crores—eleven post-dated cheques for Rs 1.40 crores each and one post-dated cheque for a sum of Rs 1.32 crores.
    (ii) The respondent did not furnish a bank guarantee for the amount of Rs 16.72 crores and also did not pay the service tax payable on the said amount.
    (iii) Out of the twelve post-dated cheques given by the respondent, two cheques were honoured, four cheques of Rs 1.4 crores each were dishonoured on presentation and balance cheques were not presented.
    (iv) Respondent 1 did not carry out construction in accordance with the sanctioned scheme.
    (v) The respondents entered into an agreement with third parties without furnishing any details thereof.
    (vi) The respondents were selling dwelling units to persons who cannot be termed as members of the weaker sections of the society.”

    4. Since the agreement was terminable and when it was found by the appellant-plaintiff that the respondent-defendants were proceeding to change the nature and character of the suit property, a suit had been filed by the appellant-plaintiff for the recovery of possession and damages. In the aforesaid suit, two applications for injunction under Order 39 Rules 1 and 2 read with Section 151 of the Code of Civil Procedure were filed by the appellant-plaintiff. In one application, the main relief that was claimed by the appellant-plaintiff was to restrain the respondent-defendants from alienating or transferring the suit property including the structures coming up thereon and in the other, for injunction over the suit property from changing the nature and character thereof pending disposal of the suit.

    5. While dealing with the applications for injunction, the Second Additional City Civil Judge at Hyderabad had appointed an Advocate Commissioner to find out the extent of construction raised by the respondent-defendants in the suit property as the appellant-plaintiff sought to contend that there was no construction at all in the suit property.

    6. The Advocate Commissioner appointed by the trial court submitted his report, which is already on record. While deciding the applications for injunction, the said report was taken into consideration by the trial court and after hearing the learned counsel for the parties, the trial court was prima facie satisfied that substantial construction was undertaken and completed by the respondent-defendants, which had required them to invest crores of rupees.

    7. The trial court, considering this fact that substantial construction was completed, refused to grant an order of injunction in favour of the appellant-plaintiff from making any further construction in the suit property but the applications for injunction were, however, disposed of with the following conditions:

    “(1) That the respondent-defendants shall deposit the balance value of the property, which comes to around Rs 28,00,000 in court within one month.
    (2) That it shall furnish bank guarantee for the value of the unrealised post-dated cheques, and pay/deposit the value of four cheques, which were dishonoured, within one month from today.
    (3) That the respondent-defendants shall not claim equities over the construction made in the land and they are bound by the decision in the suit. The respondent-defendants shall furnish the particulars of the prospective buyers of the residential units in advance to the competent authority/urban land ceiling, and it must be made clear to the prospective buyers that their purchases are subject to the result of the suit by making a ‘specific recital’ in the agreement of sale or sale deed, as the case may be.”

    8. Aggrieved by the order of the trial court, two appeals were preferred by the appellant-plaintiff before the High Court of Andhra Pradesh at Hyderabad, which by the impugned order, had affirmed the order of the trial court on the question of construction in the suit property, but set aside the directions given by the trial court so far as Clauses 1 and 2, as mentioned above, are concerned in the order of the trial court. It is these concurrent orders, which are now under challenge before us in these appeals. At the time of admission of this matter, caveat had already been filed by the respondent-defendants. In that view of the matter, we fixed the hearing of the matter on 22-7-2009.

    9. While hearing the petitions on merits, Mr R.F Nariman, learned Senior Counsel appearing for the appellant-plaintiff, invited us to the report of the Advocate Commissioner and after taking us through the same, sought to contend that in fact, no construction has been made by the respondent-defendants and, therefore, in view of the admitted fact that the agreement, having been already cancelled, the respondent-defendants cannot be permitted to proceed with the construction on the suit property and the application for injunction, therefore, must be allowed.

    10. On the other hand, Dr. A.M Singhvi, learned Senior Counsel appearing for the respondent-defendants also took us through the report of the Advocate Commissioner and the other materials on record and at the same time, also had produced recent photographs, which were not produced in the courts below and contended that the High Court was fully justified in affirming the orders of the trial court inter alia holding prima facie that a substantial construction has already been made on the suit property, for which the respondent-defendants have invested a huge sum of money and in that view of the matter, the question of grant of injunction at this stage could not arise at all.

    11. After hearing the learned Senior Counsel for the parties and after going through the Advocate Commissioner's report and the impugned order of the High Court as well as of the trial court, application for injunction and counter filed to the same, we were of the prima facie view that before deciding these appeals finally on merits, it would be for ends of justice to find out the actual position of the suit property and for that reason, we appointed an Advocate Commissioner from this Court by our order dated 23-7-2009 (2009) 12 SCC 773, who would inspect the suit property and submit a report by 27-7-2009 on the following points:

    (i) Whether constructions have been made on the different blocks of the suit property and how many blocks are still remaining vacant?
    (ii) If constructions have been made, what is the nature and extent of such constructions?
    (iii) Whether such constructions can be said to be substantial constructions or not?
    (iv) Whether constructions have been completed in some blocks of the suit property and the flats constructed in such blocks are ready for use and occupation?
    (v) Also to see the local features.

    Accordingly, the learned Advocate Commissioner visited the spot and submitted his report, which was also taken up for consideration along with the main matter. The report of the Advocate Commissioner may be kept on record.

    12. On behalf of the appellant-plaintiff, Mr Nariman, learned Senior Counsel, submitted that even from the report submitted by the Advocate Commissioner appointed by this Court, it would be clear that substantial construction has not been made in the suit property, whereas Dr. Singhvi, learned Senior Counsel, also has drawn our attention to the report of the Advocate Commissioner of this Court and submitted that there cannot be any doubt that substantial construction has already been made by the respondent-defendants, for which a huge sum of money has already been invested.

    13. On the question of extent of construction made by the respondent-defendants in the suit property, we have, therefore, considered the findings of the High Court as well as of the trial court and also the report submitted by the learned Advocate Commissioner in this Court. The High Court as well as the trial court concurrently found, after going through the report of the Advocate Commissioner, who was appointed by the trial court, that substantial construction has already been made in the suit property. Since no objection was raised by either of the parties to the report of the learned Advocate Commissioner, we accept the same without any objection and direct that the same may be kept on record.

    14. It is well settled now by a catena of decisions of this Court that when two courts concurrently rejected the application for injunction, it would not be open for the third court to interfere with the said concurrent findings until and unless it is brought to the notice of the third court that such findings are perverse or arbitrary.

    15. So far as the findings of the trial court regarding construction on the suit property is concerned, let us look into its said findings on the question of construction, which are as follows:

    “In the light of the above circumstances, I find that, already as per the report of the Commissioner and also as per the photographs produced by him, a major construction work was undertaken and completed, it must have required the respondent to invest crores of rupees.”

    16. So far as the findings of the High Court on the question of extent of construction are concerned, it is also the finding of the High Court that the respondent-defendants have already taken over possession and made substantial construction, as would be evident from the record and also from the report of the Advocate Commissioner, who was appointed by the trial court.

    17. These are the two concurrent findings of fact arrived at by the High Court as well as by the trial court on the question of extent of construction on the suit property. Still, in order to be satisfied on the question of construction in the suit property, as noted hereinearlier, we appointed an Advocate Commissioner, who submitted his report.

    18. We have carefully examined the report of the Advocate Commissioner appointed by us from which the following points may be noted:

    “4. The respondent-defendants' counsel had supplied the layout of the site plan of the project. Principally, the entire project is divided into eight blocks. The plan for construction of eight blocks is approved by the authorities. A photocopy of the approved site plan of the project is annexed as Annexure C-2. Each block is divided into various rows. There is no evenness in the number of rows for each block. Some blocks have more rows and some blocks have less rows. The blocks are numbered in the site plan attached herewith as Annexure C-3. For better understanding and for better description of the areas in the blocks, I had given numbers for the rows in each block separately in the site plan. The layout is as under:

    1. Block I two rows (60 apartments) 295 apartments in the triangular area. Work has not been started. 2. Block II two rows (150 apartments) 3. Block III two rows (85 apartments) 4. Block IV six rows (330 apartments) 1555 apartments in the rectangular area. Work-in-progress at various stages. 5. Block V seven rows (385 apartments) 6. Block VI two rows (240 apartments) 7. Block VII six rows (300 apartments) 8. Block VIII six rows (300 apartments)

    5. It is stated that each block will have ground floor (car park) + five floors.”

    A perusal of the report of the learned Advocate Commissioner therefore shows that out of 1800 flats to be constructed in the suit property in eight blocks, only in 295 apartments in the triangular area, work has not been started, whereas in the rest 1555 apartments in five blocks, work is in progress at various stages.

    19. Therefore, it is evident from the perusal of the report of the Advocate Commissioner filed in this Court that substantial progress has been made in the matter of construction on the suit property as it is evident that such substantial construction has been completed in at least 50% in the rectangular pieces of the suit property whereas work for Blocks IV to VIII is going on except Rows 3 to 6 in Block VII where there is a mound of soil to a height of about two floors and also boulders of granite rock cut into rectangular pieces of identical sizes lying in the area. It is also found from the report that the constructions have been completed in Rows 1 and 2 in Block VIII. Apart from that, 98% of the work is also completed on first, second and third floors of Rows 1 and 2 of Block VIII.

    20. Since the roads have not been laid and the parking has not been made available, according to the learned Advocate Commissioner, the purchasers would not be in a position to occupy the flats. So far as other blocks are concerned, the learned Advocate Commissioner was of the view that a huge construction activity on a war footing basis is underway in respect of the disputed area which includes Blocks IV to VIII.

    21. Therefore, in view of the concurrent findings of the courts below and also from the findings arrived at by the Advocate Commissioner appointed by this Court in his report, we cannot but hold that substantial construction has been made and therefore, the submission of Mr Nariman that substantial construction has not been made, cannot be accepted. Keeping this in mind, let us now proceed to consider whether substantial injury would be faced by the appellant-plaintiff in the event an order of injunction is not granted to them.

    22. As noted hereinearlier, the development agreement-cum-general power of attorney was entered into by the respondent-defendants with the appellant-plaintiff and as per the terms and conditions, parties agreed that a sum of Rs 13.50 crores had to be paid besides Rs 16.72 crores for the service of consultancy and Rs 28,36,175 was the cost, which comes to Rs 30.50 crores.

    23. It was further agreed that it was only after the payment of the amount agreed upon, necessary documents were to be executed. That apart, under the agreement, the respondent-defendants had to furnish bank guarantee in regard to the amount stated to have been paid in four cheques.

    24. In the plaint as well as in the application for injunction, it was alleged by the appellant-plaintiff that the respondent-defendants, after paying the first instalment, had failed to pay the balance instalments as agreed upon by them because of an order of injunction obtained by the appellant-plaintiff against the respondent-defendants in a writ petition filed by them in the High Court of Andhra Pradesh at Hyderabad.

    25. It is true that the respondent-defendants, after paying the first instalment, had failed to pay the other instalments payable within the time specified under the agreement, but it is an admitted position that although the deposits were belatedly made but the entire amount under the agreement has already been deposited and in compliance with the agreement, a bank guarantee has also been furnished. Such being the state of affairs i.e substantial construction has been made on the suit property in respect of which crores of money have been invested by the respondent-defendants and since the respondent-defendants have already paid/deposited the amount payable in terms of the agreement, although belatedly, to the appellant-plaintiff, we do not think that the appellant-plaintiff will suffer any substantial injury if the construction work is not stopped by an order of injunction.

    26. It is well settled that when construction has been made on a land, which is of considerable magnitude, and when the plaintiff shall not face any substantial injury, if no order of injunction is granted because of payment/deposit of the entire amount payable by the defendant to the plaintiff under the agreement, though belatedly, we are of the view that the Court will not, as a matter of course, pass an order of injunction against the other party restraining the other party from raising any construction on the suit property till the disposal of the suit.

    27. If ultimately, the suit filed by the appellant-plaintiff is decreed, he can be compensated in damages or the respondent-defendants may be directed to pull down the construction and deliver vacant possession to the appellant-plaintiff when no equity can be claimed for such construction by the respondent-defendants.

    28. On the other hand, in our view, if at this stage, an order of injunction is granted against the respondent-defendants from proceeding with further construction in the suit property, it will undoubtedly destroy the constructions already made by the respondent-defendants and the respondent-defendants will suffer irreparable loss and injury for not allowing them to make construction on the suit property.

    29. That apart, in view of our discussions made hereinabove, the entire amount payable by the respondent-defendants having been paid/deposited in favour of the appellant-plaintiff, there is no reason to pass an order of injunction against the respondent-defendants when the appellant-plaintiff would not face substantial injury for permitting the respondent-defendants to proceed with the construction in the suit property.

    30. Accordingly, in view of our discussions made hereinabove, we are, therefore, of the view that the balance of convenience lies against granting an order of injunction, which, if granted, will substantially and irreparably injure and prejudice the respondent-defendants. For the reasons aforesaid, we are, therefore, of the view that the High Court was fully justified in affirming the order of the trial court refusing to grant any order of injunction in favour of the appellant-plaintiff.

    31. That apart, in our view, when the High Court as well as the trial court had refused to grant injunction in favour of the appellant-plaintiff based on a consideration of the materials on record and after considering the balance of convenience and inconvenience of the parties and when such findings of the High Court as well as of the trial court do not suffer from any perversity or arbitrariness, it is not open for this Court to interfere with such order of the High Court as well as of the trial court.

    32. However, there is one another aspect of the matter. As noted hereinearlier, the trial court, while refusing to grant injunction in favour of the appellant-plaintiff has given certain directions to the respondent-defendants, which have already been noted hereinearlier. In view of the fact that Clauses 1 and 2 have already been complied with by the respondent-defendants, those clauses need not remain. So far as Clause 3 is concerned, it appears to us that the said clause should remain, that is to say, the respondent-defendants shall not claim equities over the construction made in the suit property and they would be bound by the decision in the suit.

    33. Furthermore, the respondent-defendants, as directed by the trial court, shall furnish particulars of the prospective buyers of the residential units in advance to the competent authority/urban land ceiling as it must be made clear to the prospective buyers that their purchases are subject to the result of the suit by making a “specific recital” in the agreement of sale or sale deed, as the case may be.

    34. In view of our discussions made hereinabove, we do not find any merit in these appeals. We, however, make it clear that whatever observations we have made while deciding these two appeals, would not stand in the way of the courts below from deciding the merits of the suit and it is also made clear that the trial court shall not be influenced by any of the observations or findings made in this order or of the High Court, while deciding the application for injunction.

    35. Considering the facts and circumstances of the present case, we direct the trial court to dispose of the suit at an early date, preferably within six months from the date of filing the written statement by the respondent-defendants. The respondent-defendants are directed to file their written statement within four weeks from this date, if not filed in the meantime.

    36. The appeals are thus dismissed. There will be no order as to costs.