AMICUS AI
Citation Codes
Neutral Citations
2009 INSC 664
Equivalent Citations
citation codes
Case Number
Disposition
Advocates
Judges
Acts
  • Chapter 3 of a report for the year 2003 of the Comptroller and Auditor General of India
  • Section 67(3-A) of the Act
  • Section 5, Subsection 2 of the 1983 Income Tax Act
  • The provisions of the Act and the provisions of the Karnataka Ordinance 11 of 1975
  • Section 66 of the Act, Section 79-B of the Act
  • Section 66(4) of the Karnataka Land Reforms Act, 1961
  • Section 11-A of the Central Excise Act
  • Section 104 of the Karnataka Land Reforms Act, 1961
  • The Central Excise Act (no specific section mentioned)
  • Section 35-E(4) of the Act
  • Drugs and Cosmetics Act
  • The Act (year not specified)
  • Section 104 of the Act
  • Section 5 of the Limitation Act, 1963
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Neutral Citations
2009 INSC 664
Equivalent Citations
citation codes
Case Number
Disposition
Advocates
Judges
Acts
  • Chapter 3 of a report for the year 2003 of the Comptroller and Auditor General of India
  • Section 67(3-A) of the Act
  • Section 5, Subsection 2 of the 1983 Income Tax Act
  • The provisions of the Act and the provisions of the Karnataka Ordinance 11 of 1975
  • Section 66 of the Act, Section 79-B of the Act
  • Section 66(4) of the Karnataka Land Reforms Act, 1961
  • Section 11-A of the Central Excise Act
  • Section 104 of the Karnataka Land Reforms Act, 1961
  • The Central Excise Act (no specific section mentioned)
  • Section 35-E(4) of the Act
  • Drugs and Cosmetics Act
  • The Act (year not specified)
  • Section 104 of the Act
  • Section 5 of the Limitation Act, 1963
Smart Summary

Factual and Procedural Background

The case concerns vast tracts of agricultural land in Neriya Village, Puttur Taluk, Karnataka, purchased through the registered partnership firm M/s Y. Moideen Kunhi & Company. Three partners (Respondents 1–3) filed a declaration under Section 66(4) of the Karnataka Land Reforms Act, 1961 (“the Act”), asserting that the lands were exempt plantation lands under Section 104.

On 27-9-1982 the Belthangady Land Tribunal determined that 368.16 acres were held in excess of the ceiling limit after allowing exemptions and individual units. Suo-motu review proceedings begun under Section 122-A were later dropped.

• Respondents filed WP No. 40425/1982; the State filed WP No. 10920/1983 before the Karnataka High Court.
• Respondents withdrew their writ; the State’s writ was dismissed on 7-11-1990 on merits.
• The State’s review petition (RP No. 817/2004) was dismissed on 26-9-2007, the High Court finding no fraud.

The State thereafter filed special leave petitions (SLPs) in the Supreme Court, but with huge delays—approximately 6500 days against the original High Court order and about 300 days against the review order. The present opinion deals with the State’s application for condonation of that delay.

Legal Issues Presented

  1. Whether the extraordinary delay (about 6500 days) in filing the State’s special leave petitions should be condoned under Section 5 of the Limitation Act, 1963.
  2. Whether alleged fraud in the proceedings below and larger public-interest considerations furnish “sufficient cause” for such condonation.

Arguments of the Parties

Appellant State of Karnataka

  • Strict standards of delay should not defeat public justice; governmental litigation is often slowed by bureaucratic procedures or manipulated delays.
  • Large public interests are involved: over 4000 acres, of which nearly 3500 acres are said to be forest land.
  • Cited examples (including Comptroller & Auditor General report) to show systemic delays and urged a liberal approach consistent with Supreme Court precedents.

Respondents (Declarants)

  • No fraud was committed; any errors were at most errors of judgment.
  • The State’s own officers were lethargic; a 14-year delay in seeking review and further delay in filing SLPs remain unexplained.
  • Non-filing of timely appeals by the State cannot be characterised as fraud by respondents.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
State (NCT of Delhi) v. Ahmed Jaan (2008) 14 SCC 582 Latitude toward State delays; public interest should not suffer due to bureaucratic delay. Quoted to justify a liberal approach when condoning governmental delay.
State of Haryana v. Chandra Mani (1996) 3 SCC 132 Government litigation is prone to procedural delay; “certain amount of latitude” permissible. Relied on as supporting authority for condonation.
Special Tehsildar, Land Acquisition v. K.V. Ayisumma (1996) 10 SCC 634 Same principle of liberal construction of “sufficient cause.” Cited along with other cases in the Ahmed Jaan extract.
State of Nagaland v. Lipok Ao (2005) 3 SCC 752 Strict standards of proof may defeat public justice in governmental delay matters. Referenced to reinforce need for flexibility.
Nand Kishore v. State of Punjab (1995) 6 SCC 614 Condonation of exceptionally long delay (over 30 years) in the interest of substantial justice. Used as illustration that even very long delays can be excused.
G. Ramegowda v. Special Land Acquisition Officer (1988) 2 SCC 142 Liberal construction of “sufficient cause” where public interest may suffer due to officers’ fraud or bad faith. Quoted extensively; forms the doctrinal basis for condonation.
Moti Ram Deka, AIR 1964 SC 600 Referenced historically in explaining condonation in Nand Kishore. Part of narrative supporting exemplary condonation practices.
Gurdev Singh, AIR 1964 SC 1585 Same as above. Referenced within quotation from Nand Kishore.
In re National Bank of Wales Ltd. (1899) 2 Ch 629 (CA) Observation that business and government function on trust, not distrust. Cited in the Ramegowda quotation to underline reliance on officers.

Court's Reasoning and Analysis

1. The Court acknowledged that governmental agencies often suffer procedural delays, sometimes deliberate, but emphasised that public interest—here involving more than 4000 acres and possible forest land—cannot be sacrificed to technicalities.

2. Reviewing past jurisprudence, the Bench underscored that “sufficient cause” under Section 5 Limitation Act must be liberally construed when State action is involved, citing Ahmed Jaan, Chandra Mani, Lipok Ao and Ramegowda.

3. It recognised a limit to this liberality but noted that the present matter is “a classic example” warranting intervention, because failure to hear the appeal could irreversibly harm public resources.

4. At the same time, the Court highlighted the State’s “casual and lethargic” conduct and the possibility that delays were engineered to aid unscrupulous litigants, warranting exemplary costs.

5. Balancing these factors, the Court condoned the delay but imposed a substantial monetary sanction as a deterrent and directed internal accountability measures against responsible officials.

Holding and Implications

DELAY CONDONED subject to payment of Rs 10 lakhs as exemplary costs within eight weeks. The SLPs will be listed for admission only after proof of such payment is filed. The Court expressly refrained from expressing any opinion on the underlying merits.

Implications: The decision reinforces a liberal but conditional approach to condoning governmental delay: public interest justifies hearing the matter, but financial penalties and directions for internal action ensure accountability of negligent officials. No new substantive legal precedent on land-reforms was set; the immediate effect is procedural—allowing the SLPs to be heard while directing the State to act against those responsible for the delay.

To access the original judgment, please Sign In or Subscribe.

    State Of Karnataka v. Y. Moideen Kunhi (Dead) By Lrs. And Others

    Dr. Arijit Pasayat, J.— The special leave petitions are directed against the judgment and order dated 7-11-1990 in Writ Petition No. 40425 of 1982 and Writ Petition No. 10920 of 1983 and order dated 26-9-2007 in Review Petition No. 817 of 2004 passed by a learned Single Judge of the Karnataka High Court.

    2. It appears that there is a delay of more than nearly 6500 days against the original order and about 300 days so far as the review petition is concerned. Before dealing with the question of delay it is necessary to take note of the State's case before the High Court.

    3. The records disclose that the agricultural lands to the extent of 50.89 acres, 30.00 acres, 462.00 acres and 3485.83 acres were purchased through registered partnership firm M/s Y. Moideen Kunhi & Company. All the lands are sub-divisions of Serial No. 146 of Neriya Village, Puttur Taluk.

    4. The declaration under Section 66(4) of the Karnataka Land Reforms Act, 1961 (hereinafter referred to as “the Act”) was filed by the three partners of the firm i.e Respondents 1, 2 and 3 herein for determination of the excess holding. In the very declaration it is stated that the lands being the plantation lands, are exempted under Section 104 of the Act. It is further mentioned therein that all the declarants are the partners of the firm, having 1/3rd share in the properties purchased and that the declarants have furnished the declaration without prejudice to their contentions that the provisions of the Act and the provisions of the Karnataka Ordinance 11 of 1975 are not applicable to the aforesaid lands.

    5. The Land Tribunal, Belthangady by the order dated 27-9-1982 held that the declarants are holding the lands to an extent of 368.16 acres in excess of the ceiling limit. The Tribunal opined that 2820 acres are exempted lands. After deducting the tenanted lands and exempted lands, the Tribunal ultimately held that an area of 530.16 acres has to be taken into consideration for the purpose of determining excess holding. After deducting ten units for each of the declarants, the Tribunal held that an area of 368.16 acres is the excess land. Thereafter the Land Tribunal suo motu initiated review proceedings under Section 122-A of the Act for reviewing its order dated 27-9-1982. The review proceedings were also dropped on 10-11-1982.

    6. The order of the Land Tribunal was questioned before the High Court by the three declarants in WP No. 40425 of 1982. So also the State of Karnataka challenged the order of the Land Tribunal by filing WP No. 10920 of 1983. During the course of hearing, the three declarants withdrew WP No. 40425 of 1982. However, WP No. 10920 of 1983 filed by the State of Karnataka was dismissed by the High Court on 7-11-1990 on merits holding that there is no error in the order passed by the Land Tribunal.

    7. It was contended on behalf of the State that the Tahsildar being the Secretary of the Land Tribunal should have sent the declaration filed under Section 66 of the Act by the three declarants to the Deputy Commissioner to be dealt with under the provisions of Section 79-B of the Act, to consider whether the question by the registered partnership firm is valid or not; instead he proceeded to submit the report to the Land Tribunal which has no jurisdiction to decide the question about the lands purchased by the firm; that the Tahsildar should not have been merely dependent upon the certificates of the Cardamom Board and the Rubber Board to conclude that the lands in question are plantation lands; that the Tahsildar has fraudulently prepared the inspection report according to which he visited the lands in question within a day and that he could not visit every nook and corner of the lands in question; that the Land Tribunal should also not have entertained the declaration filed under Section 66 of the Act as the lands have been purchased and held by the registered firm; that the Tribunal also says that the members of the Land Tribunal inspected the lands within one day, which is a make-believe affair; that the statement made before the High Court in WP No. 42774 of 1982 that the excess lands have been surrendered, is also a fraud practised on the Court inasmuch as the declarants have not actually surrendered the excess lands; that the learned Judge who decided WP No. 10920 of 1983 has opined that the Tahsildar being the government official, there was no need to send notice to the State or other officials; that when the Tahsildar who is directly concerned with the case has practised fraud, learned Judge should have issued notice to the Deputy Commissioner or the Revenue Secretary; that the learned Judge while disposing of WP No. 10920 of 1983 has opined that the declarants claim the lands not as partners but in their personal capacity which is an error apparent on the face of the record as the declaration itself has been filed as the partners of firm; that fraud vitiates everything and therefore the order passed by the Tribunal as well as by the High Court in WP No. 10920 of 1983 are null and void as they are obtained by the declarants by practising fraud. Therefore, the review petition was filed.

    8. The stand of the respondents on the other hand was that no fraud was committed by the respondents or by the Secretary of the Land Tribunal. Error of judgment cannot be equated to fraud and since there was a delay of 14 years in filing the review petition even after the Deputy Commissioner allegedly discovered the alleged fraud on 10-2-2003, the delay in filing the review petition which was in fact filed on 8-10-2004 has not been explained. It was their stand that non-filing of the appeal by the State will not amount to fraud by the officials of the State.

    9. The High Court found that there was no element of fraud and, therefore, the review petition was dismissed. However, liberty was given to the State or the Tribunal to get the land to the extent of 368.16 acres surrendered in accordance with law.

    10. The State found that the allegation of fraud related to non-surrender of the land. The stand of the respondents was that the lands were surrendered by the declarants before the Surveyor of the State who had accepted the possession.

    11. The High Court accepted that the land was surrendered before the Tribunal as is required under law. It was further observed that if the State felt that the lands surrendered by the respondents are not suitable, it is open to the State to initiate action under Section 67(3-A) of the Act. Liberty was given to the Tribunal or the State to initiate steps for getting the land surrendered in accordance with Section 67 by initiating necessary proceedings.

    12. It is submitted by the learned counsel for the appellant State that this Court while dealing with an application for condonation of delay especially those filed by the Government, has held that adoption of strict standard of proof sometimes fails to protect public justice, and it would result in public mischief by skilful management of delay in the process of filing an appeal. It is submitted that many government matters are delayed by either the nature of the bureaucratic process or by deliberate manipulation of the same by taking advantage of loopholes in the conduct of litigation. By way of an example only reference is invited to Chapter 3 of a report for the year 2003 of the Comptroller and Auditor General of India.

    13. The chapter entitled “Review on Handling of Appeal Cases in the Central Excise Department” reads in pertinent part as under:

    “3.5 Analysis of adverse decisions due to departmental lapses.
    3.5.1 Dismissal of appeals on account of delay in filing of appeals.”

    14. As per instructions issued by the Board in October 1991, the Commissioner of Central Excise must ensure that all the documents including the original certified copy of Cegat order, photocopies of the order in original and order in appeal along with application for condonation of delay are enclosed with the proposal sent to the Board for filing civil appeal before this Court. The time-limit prescribed for review by the Commissionerate is 10 days from the date of receipt of certified copy of the order. The processing of case at the Board's office includes drafting, vetting and finalisation of appeal. The jurisdictional Commissioner within 60 days may file the appeal from the date of receipt of Cegat orders in the Commissionerate of Central Excise.

    15. Test check of the records in 16 Commissionerates of Central Excise revealed that 32 appeals filed by the Department involving revenue of Rs 50.41 crores were dismissed by this Court and three cases involving Rs 2.00 crores by Cegat on account of abnormal delays in filing of the appeals. Audit scrutiny revealed that delays had occurred at all the stages viz. receipt of certified copy, submission of papers to the Board, examination of papers at the Board's office, drafting of appeal by the panel counsel; and filing of appeal by CCE. The total period of delay varied from 119 to 691 days.

    16. Some of the illustrative cases are discussed below:

    (i) Delay by Panel Counsel
    Cegat set aside (March 1997) an order issued by CCE in April 1992 confirming demand of Rs 29.13 crores and penalty of Rs 2 crores, against M/s National Organic Chemicals India Limited, in Mumbai VI Commissionerate of Central Excise, for invoking Section 11-A without adequate evidence of intention to evade duty. This Court on 15-1-1999 dismissed the appeal filed by the Department against Cegat order dated 5-3-1997 on account of delay in filing of appeal by seven months. The period of delay included four months taken by the panel counsel in drafting the appeal.
    (ii) Delay by the Board
    In the case of M/s Time Pharma, involving revenue of Rs 1.83 crores, the Commissionerate of Central Excise Mumbai II (now Mumbai III) received certified copy of Cegat's order after 14 days on 4-2-1997 and sent comments to the Board after 23 days as against the prescribed period of ten days. Although the Board decided before 17-4-1997 to go in appeal, the appeal was filed only on 5-6-1998. This Court dismissed the appeal on the ground that there was an inordinate delay of about 360 days in filing the appeal without giving any satisfactory explanation. The Commissionerate of Central Excise attributed the delay to the Board.
    (iii) Supplementary appeal filed after six years
    Mumbai II Commissionerate of Central Excise, filed an appeal in Cegat on 14-6-1993 against an order of the Commissioner dated 31-3-1992 regarding irregular availment of SSI exemption and consequent availment of Modvat credit at higher rates by a group of six assessees (M/s Azo Dye Chem and five others). The appeal was, however, filed in respect of only one assessee whereas the case was against all the six manufacturing units and fourteen others being Directors and Managers of the said units. After six years, on the instructions from Junior Departmental Representative, the supplementary appeals along with application for condonation of delay in filing appeals against the others were filed in Cegat on 11-10-1999 under Section 35-E(4) of the Act. However, Cegat dismissed these appeals on 21-7-2000 borrowing a larger Bench decision dated 12-7-2000 in the same case where it was held that Cegat has no power to condone the delay. The main appeal filed in time (14-6-1993) was also dismissed by Cegat on 21-7-2000 on the ground that no appeal had been filed against the other noticees. The revenue involved in this case was Rs 1.18 crores.
    (iv) Frivolous reasons for condonation
    In Hyderabad I Commissionerate of Central Excise, two appeals filed by the Department against the order of the Commissioner (Appeals) on whether certain products manufactured by the assessees (M/s Neyland Laboratories Limited and M/s Aurbindo Pharma Ltd.) are bulk drugs under the Drugs and Cosmetics Act, were dismissed (17-8-2002) by Cegat as time barred as there was a delay of 48 days in filing the appeals. The reasons put forth by the Department that the new Collector of Central Excise needed time to familiarise to the work were not accepted. Failure to file an appeal before Cegat in time resulted in dismissal of the appeal involving revenue of Rs 81.81 lakhs.

    It is submitted that even with the introduction of safeguards against delay in the process, in an occasional case delay occurs which is inexplicable in normal circumstances. The question is whether such delay should result in the negation of the State's claim and at the cost of the interest of the members of the public whose cause has not been carefully espoused. It is submitted by the appellant State that in such cases, delay must be visited with consequences but the interest of the inhabitants of the State must be protected.

    17. In State (NCT of Delhi) v. Ahmed Jaan (2008) 14 SCC 582, (2008) 11 Scale 455 it was held as follows:

    “11. … ‘15. It is axiomatic that decisions are taken by officers/agencies proverbially at a slow pace and encumbered process of pushing the files from table to table and keeping it on the table for considerable time causing delay — intentional or otherwise — is a routine. Considerable delay of procedural red tape in the process of their making decision is a common feature. Therefore, certain amount of latitude is not impermissible. If the appeals brought by the State are lost for such default no person is individually affected but what in the ultimate analysis suffers, is public interest. … In the event of decision to file appeal, needed prompt action should be pursued by the officer responsible to file the appeal and he should be made personally responsible for lapses, if any. Equally, the State cannot be put on the same footing as an individual. The individual would always be quick in taking the decision whether he would pursue the remedy by way of an appeal or application since he is a person legally injured while State is an impersonal machinery working through its officers or servants.”

    Further at para 11 this Court held that:

    “11. … The above position was highlighted in State of Haryana v. Chandra Mani (1996) 3 SCC 132; Special Tehsildar, Land Acquisition v. K V. Ayisumma (1996) 10 SCC 634 and State of Nagaland v. Lipok Ao (2005) 3 SCC 752. It was noted that adoption of strict standard of proof sometimes fail to protract public justice, and it would result in public mischief by skilful management of delay in the process of filing an appeal.”
    (emphasis supplied)

    18. This Court has in appropriate cases even condoned delays of over 30 years in filing of SLPs. In Nand Kishore v. State of Punjab (1995) 6 SCC 614 this Court held:

    “13. The step of the three-member Bench so taken reveals its mind as reflected in the above proceedings. Their Lordships wanted to do substantial justice. It was thought better to advise the petitioner to file a special leave petition. As we view this order, having invited the petitioner to file the special leave petition, it is no longer advisable or appropriate for us to retrace back the step put forward by the three-member Bench. It is significant to recall that the writ application was dismissed on 5-2-1962 and the moment Moti Ram Deka case AIR 1964 SC 600 appeared on the scene, the appellant on 24-2-1964, within limitation, brought forward his suit which got strengthened by Gurdev Singh case AIR 1964 SC 1585 appearing within a couple of months of its filing. The appellant-special leave petitioner was thus bona fide pursuing an appropriate remedy for all these years. In these circumstances, we think that an appropriate case for condonation of delay of the intervening period has been made out. We, therefore, allow CC No. 11644 of 1991 and condone the long durated delay in these exceptional circumstances. On doing so, we grant leave to appeal. The appeal thus arising and Civil Appeal No. 632 of 1975 may now be disposed of together.”

    19. On perusal of the explanation offered it is clear that the officials who were dealing with the matter have either deliberately or without understanding the implications dealt with the matter in a very casual and lethargic manner. It is a matter of concern that in very serious matters action is not taken as required under law and the appeals/petitions are filed after a long lapse of time. It is a common grievance that it is so done to protect unscrupulous litigants at the cost of public interest or public exchequer. This stand is more noticeable where vast tracts of lands or large sums of revenue are involved.

    20. Even though the courts are liberal in dealing with the belated presentation of appeals/applications, yet there is a limit up to which such liberal attitude can be extended. Many matters concerning the State Government and the Central Government are delayed either by the nature of bureaucratic process or by deliberate manipulation of the same by taking advantage of loopholes in the conduct of litigation. Several instances have come to the notice of this Court whereas as noted above appeals have been filed where the revenue involved runs to several crores of rupees. It is true that occasionally delay occurs which is inexplicable in normal circumstances.

    21. The case at hand is a classic example where the circumstances are the same. More than 4000 acres of land are involved out of which, according to the State, nearly 3500 acres constitute forest land. Ultimately, the Court has to protect the public justice. The same cannot be rendered ineffective by skilful management of delay in the process of making challenge to the order which prima facie does not appear to be legally sustainable.

    22. The expression “sufficient cause” as appearing in Section 5 of the Limitation Act, 1963 (in short “the Limitation Act”) must receive a liberal construction so as to advance substantial justice as was noted by this Court in G. Ramegowda v. Special Land Acquisition Officer (1988) 2 SCC 142, AIR 1988 SC 897. Paras 16-17 of the judgment reads as follows:

    “16. The law of limitation is, no doubt, the same for a private citizen as for governmental authorities. Government, like any other litigant must take responsibility for the acts or omissions of its officers. But a somewhat different complexion is imparted to the matter where Government makes out a case where public interest was shown to have suffered owing to acts of fraud or bad faith on the part of its officers or agents and where the officers were clearly at cross-purposes with it.
    17. Therefore, in assessing what, in a particular case, constitutes ‘sufficient cause’ for purposes of Section 5, it might, perhaps, be somewhat unrealistic to exclude from the considerations that go into the judicial verdict, these factors which are peculiar to and characteristic of the functioning of the Government. Governmental decisions are proverbially slow encumbered, as they are, by a considerable degree of procedural red tape in the process of their making. A certain amount of latitude is, therefore, not impermissible. It is rightly said that those who bear responsibility of Government must have ‘a little play at the joints’. Due recognition of these limitations on governmental functioning — of course, within reasonable limits — is necessary if the judicial approach is not to be rendered unrealistic. It would, perhaps, be unfair and unrealistic to put Government and private parties on the same footing in all respects in such matters. Implicit in the very nature of governmental functioning is procedural delay incidental to the decision-making process. In the opinion of the High Court, the conduct of the law officers of the Government placed the Government in a predicament and that it was one of those cases where the mala fides of the officers should not be imputed to Government. It relied upon and trusted its law officers. Lindley, M.R, in National Bank of Wales Ltd. In re LR (1899) 2 Ch 629 (CA), observed, though in a different context: (Ch p. 673)
    ‘… Business cannot be carried on upon principles of distrust. Men in responsible positions must be trusted by those above them, as well as by those below them, until there is reason to distrust them.’ ”

    23. Keeping in view the importance of questions of law which are involved we are inclined to condone the delay subject to payment of exemplary costs which we fix at rupees ten lakhs to be paid within a period of eight weeks to the respondents. The delay is condoned subject to the payment of the aforesaid amount as costs. After making the payment the receipt thereof shall be filed before this Court along with an affidavit. Only after the payment is made the special leave petitions shall be listed for admission. We make it clear that we have not expressed any opinion on the merits of the case.

    24. It is imperative that the State shall immediately initiate action as available in law against every person responsible for the alleged fraud and delay in pursuing the remedies, fix responsibility and recover the amount paid as costs from them. Needless to say, orders shall be passed in this regard by the competent authority after grant of opportunity to the person(s) concerned. If any action under criminal law(s) is to be taken, same shall be taken.

    Use AI to get other relevant cases.

    Comments

    State Of Karnataka v. Y. Moideen Kunhi (Dead) By Lrs. And Others
    (May 4, 2009)