Structured Summary of the Provided Opinion

Factual and Procedural Background

The petitioner, an Electrical Executive Engineer posted to the M.R.T. Division, Jamshedpur, sought quashing of (a) the disciplinary order dated 31.12.1997 which awarded stoppage of two increments with cumulative effect, censure and withholding of salary during the period of suspension (except subsistence allowance already paid) (Annexure-2), and (b) the appellate order dated 7.8.1999 which withdrew the stoppage of two increments but confirmed the censure and withholding of salary (Annexure-1).

Relevant events: on 30.4.1987 a meter at Usha Alloy Ltd., Adityapur, was changed in the presence of officers including the petitioner. The old (defective) meter was not devaluated to M.R.T., Jamshedpur. A charge-sheet concerning the loss of that old meter was served on the petitioner on 7.2.1991. The petitioner gave an explanation. The Board initially withdrew the charge against the petitioner by resolution dated 28.8.1991 (Annexure-9), but departmental proceedings continued against other officers. Later, by resolution dated 22.9.1995, the Electricity Board initiated departmental enquiry against the petitioner (Annexure-10).

The petitioner challenged initiation of proceedings in C.W.J.C. No. 10370/95; that writ petition was dismissed on 28.3.1997. An enquiry was held in which the petitioner participated and four witnesses were examined. The enquiry report found the petitioner partly responsible for not following prescribed procedure, resulting in loss of the old meter. A second show-cause notice dated 20.12.1997 alleged that the petitioner had requisitioned a new meter from Ranchi and thus had duty to take possession of the old meter after replacement; the petitioner responded on 29.12.1997 asserting charges were not proved and second show-cause with proposed punishment was impermissible. The disciplinary authority imposed punishment (Annexure-2); on appeal the stoppage of increments was withdrawn but censure and withholding of salary were confirmed (Annexure-1). The writ petition now challenges those orders.

Legal Issues Presented

  1. Whether the disciplinary order dated 31.12.1997 and the appellate order dated 7.8.1999 are liable to be quashed.
  2. Whether charges against the petitioner (relating to loss of the old meter and alleged failure to follow prescribed procedure / ensure physical custody) were properly framed and proved in the departmental enquiry.
  3. Whether there was any violation of the principles of natural justice or procedural irregularity in the departmental proceedings.
  4. Whether the High Court should reappraise evidence or substitute its own view of facts reached by the enquiry authority (i.e., the scope of judicial review in departmental enquiries under Article 226).

Arguments of the Parties

Petitioner's Arguments

  • There was no charge that the petitioner was specifically required to ensure safe custody of the old meter.
  • The charges were not proved during the departmental enquiry and therefore the punishment orders (Annexures-2 & 1) are bad in law.
  • The second show-cause notice with proposed punishment was not permissible because that specific charge had not been framed against the petitioner earlier.
  • The petitioner relied on State of Assam v. Mohan Chandra Kalita to argue that evidence extraneous to the charge prejudiced the enquiry officer and that the charge could not be sustained on conjecture.

Respondents' Arguments (as set out in counter-affidavit and submissions)

  • There were no lapses in the departmental proceeding and no violation of the principles of natural justice was alleged in that regard.
  • The petitioner had brought the new meter for replacement and was present when the old meter was replaced; he ought to have ensured safe custody and deposited the old meter as required.
  • The loss of the old meter (an important piece of evidence causing loss of revenue to the Board) was attributed to negligence and irresponsible acts by the officers present, including the petitioner.
  • The petitioner was given full opportunity to prove innocence and the enquiry officer recorded findings of partial guilt; a criminal case was also instituted against the petitioner and cognizance taken.
  • The scope of judicial interference in departmental enquiries is limited; the court cannot act as an appellate authority to reappraise evidence.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
State of Assam v. Mohan Chandra Kalita, (1972) 4 SCC (N) 11 : A.I.R. 1972 S.C. 2535 Illustrates that where evidence adduced is extraneous to the charge and the enquiry officer bases conclusions on conjecture (without evidence that the delinquent authorised or connived in the act), the charge cannot be sustained. The court distinguished this authority: it found Mohan Chandra Kalita not applicable because in the present case the petitioner himself brought the new meter and was present at replacement, and the enquiry found he failed to ensure safe custody—facts materially different from the Mohan Chandra Kalita situation.
High Court of Judicature at Bombay v. Uday Singh, (1997) 5 SCC 129 Holds that departmental enquiries do not require the criminal standard of proof; technical rules of evidence and proof beyond reasonable doubt are not applicable; preponderance of probability suffices. The court invoked this principle to affirm that the departmental enquiry's standard of proof is lower than criminal standard and that findings based on preponderance are permissible.
Government of T.N. v. A. Rajapandian, (1995) 1 SCC 216 Held that a tribunal has no jurisdiction to reappreciate evidence and set aside disciplinary orders for insufficiency of evidence if there is no fault in the procedure. The court relied on this to emphasize the limited scope of judicial review and that appellate reappraisal of evidence is inappropriate where proceedings are regular.
Indian Oil Corporation Ltd. v. Ashok Kumar Arora, (1997) 3 SCC 72 : A.I.R. 1997 S.C. 1030 Affirms that where enquiry findings are supported by evidence (e.g., employee was main brain behind forgery), the High Court was wrong to interfere with such findings. The court cited this to support non-interference with the enquiry authority's findings where evidence exists to sustain those findings.
B.C. Chaturvedi v. Union of India, (1995) 6 SCC 749 States that courts/tribunals cannot reappreciate evidence and substitute their own findings of fact in departmental enquiries; interference is permitted only where there is a fault in the decision-making process. The court applied this principle to conclude that it should not interfere with the disciplinary findings absent procedural faults or absence of evidence; thus the petition should fail.

Court's Reasoning and Analysis

The court proceeded by first examining the charges as framed: they related to the loss of the old meter which was replaced in the presence of the petitioner and other officers, and alleged that the loss occurred due to negligence of the officers present. One charge (referred to as "Gha") specifically alleged failure to obtain the certificate of giving charge of the old meter from the petitioner (Electrical Executive Engineer) which resulted in the meter being lost and revenue loss to the Board.

The court noted that the petitioner participated in the enquiry. The enquiry officer's report recorded that the allegation the meter was kept in the petitioner's car was not proved, but nevertheless concluded that:

  • The petitioner brought the new meter to the site without a regular requisition from the Supply Wing;
  • The petitioner should have ensured a regular requisition and the physical custody of the old meter after its replacement;
  • The prescribed procedure was not adopted during the replacement and, being present at that time, the petitioner was responsible for not following procedure which resulted in the loss.

The court rejected the petitioner's contention that charges were not proved. It distinguished State of Assam v. Mohan Chandra Kalita on the basis that Mohan Chandra involved evidence extraneous to the charge and conclusions based on conjecture, whereas the present case involved the petitioner bringing the new meter and being present at replacement and thus directly connected to the procedural lapse alleged.

The court then reviewed authorities on standard of proof and scope of judicial review in departmental enquiries: it reiterated that departmental enquiries require proof on preponderance of probabilities rather than criminal standard; that courts and tribunals should not reappraise evidence or substitute their own findings when there is no fault in the proceedings; and that interference is justified only where there is lack of evidence to support findings or violation of principles of natural justice. Applying those principles to the present facts, the court concluded there was evidence to support the enquiry officer's finding of partial responsibility and no shown breach of natural justice or procedural fault.

Holding and Implications

WRIT PETITION DISMISSED.

Implications:

  • Direct effect: The court dismissed the petition challenging the disciplinary and appellate orders; the appellate order had already modified the disciplinary order by withdrawing the stoppage of increments but confirming the censure and withholding of salary, and those confirmed aspects remain unimpaired by this judgment.
  • The court emphasised the limited scope of judicial review in departmental enquiries: it will not substitute its own appreciation of evidence where the findings are based on some evidence and there is no breach of natural justice or procedural irregularity. The opinion does not purport to lay down any new principle of law beyond applying established precedents.

    Purushottam Singh v. Bihar State Electricity Board & Ors.

    1. The writ petition has been filed for quashing the order dated 31.12.1997 whereby the disciplinary authority awarded major punishment of stoppage of two increments with cumulative effect, censure and withholding the salary during the period of suspension except subsistence allowance already paid, Annexure-2 and also the appellate order dated 7.8.1999 whereby major punishment i.e stoppage of two increments with cumulative effect was withdrawn and the punishment of censure and withholding of salary during the period of suspension except subsistence allowance paid, Annexure-1 was confirmed.

    2. The petitioner was posted as Electrical Executive Engineer, M.R.T Division, Jamshedpur in the year 1987. On 30.4.1987 the meter of Usha Alloy Ltd. Adityapur was changed in presence of the officers of M.R.T including the petitioner and the supply wings. The old defective meter was not devaluted to M.R.T Jamshedpur. On 7.2.1991 a charge-sheet was furnished to the petitioner in connection with loss of old meter which was said to have been lost after change of meter in the premises of Usha Alloy Ltd. The petitioner filed explanation. Subsequently the Board vide its resolution dated 28.8.1991 withdrew the charge made against the petitioner, Annexure-9 but the departmental proceeding continued against the other officers. The Electricity Board vide its resolution dated 22.9.1995 initiated a departmental enquiry against the petitioner in connection with the said charge, Annexure-10. The petitioner challenged the charges in C.W.J.C No. 10370/95. The said writ petition was dismissed on 28.3.1997 In the departmental proceeding enquiry was made and the petitioner participated in the enquiry. In the enquiry four witnesses were examined i.e Asst. Electrical Engineer (Supply) Sri Subodh Narain, Electrical Executive Engineer (Supply) Sri Vijay Bhushan Prasad, Electrical Executive Engineer, M.R.T Ranchi Sri Murli Manohar Prasad and Junior Engineer (Supply) Sri Deonandan Singh. On conclusion of the enquiry, enquiry report was submitted to the disciplinary authority holding that the petitioner is partly responsible for not following the prescribed procedure which resulted in loss of old meter. The enquiry report was furnished to the petitioner and second show-cause notice was issued to the petitioner on 20.12.1997 stating therein that the petitioner had requisitioned himself new meter from Ranchi and as such it was duty of the petitioner to take possession of the old meter after replacement from the Electrical Executive Engineer (Supply). The petitioner submitted his show-cause on 29.12.1997 stating therein that the charges levelled against him were not proved during the enquiry. Besides, the aforesaid charge was not framed against the petitioner and as such second show-cause notice with proposed punishment was not permissible under the law.

    3. The disciplinary authority on consideration of show-cause passed order of punishment, Annexure-2. The petitioner filed appeal against the said order and the appellate authority withdrew one punishment i.e stopage of two increments with cumulative effect, however, confirmed the punishment of censure and withholding of salary during the period of suspension except subsistence allowance already paid, Annexure-1.

    4. A counter-affidavit has been filed on behalf of respondent nos. 1 & 2 wherein stand has been taken that there was no lapses in the departmental proceeding or violation of principle of natural justice nor any such allegation has been made. The petitioner had brought the new meter for replacement at the premises of the consumer. He ought to have ensured safe custody of the meter and as such it was his responsibility to take defective meter and deposit the same as required. The petitioner was present in the premises at the time of replacement of meter but he did not take care to ensure that old meter be kept in the safe custody. The entire charge was based on the fact that old meter replaced from the premises of the consumer was mis-placed due to negligence and irresponsible act on the part of the officers including the petitioner and as such it cannot be said that there was no charge for which petitioner was punished. The petitioner appeared in the proceeding and full opportunity was given to prove innocence and thereafter enquiry officer submitted his report holding the petitioner partially guilty of the charges. A criminal case had also been instituted against the petitioner in which cognizance has already been taken. More-over, it is matter of judicial review in which scope of interference by the court is limited. The court cannot function as appellate authority.

    5. Learned counsel for the petitioner during the course of argument submitted that there was no charge that the petitioner ought to have ensured safe custody of the old meter. More-over, charges were not proved against the petitioner during enquiry and as such orders of punishment, Annexures-2 & 1 are bad in law. On the other hand, learned counsel for the respondents contended that the charges were with respect to loss of old meter which was an important evidence in the case causing loss of revenue to the Electricity Board. The petitioner had brought the meter for replacement at the premises of the consumer. He and other officers were present. He ought to have ensured safe custody of the old meter and deposited the same as required and as such in no way it can be said that there was no such charge. More-over, Enquiring Officer had found the petitioner guilty of the charges.

    6. To resolve the issue involved in the case it would be relevant to examine the charges. The charges were with respect to loss of meter. The charges framed against the petitioner and others are at page 57 of the writ petition wherefrom it appears that charge was that old meter in the premises of consumer was replaced by new meter in presence of the petitioner and other officers of Supply Division, Electricity Board but old meter which was an important evidence in case was lost due to negligence of the officers present there. Charge (Gha) is that the officers of the supply division of Electricity Board did not obtain the certificate of giving charge of the old meter from the Electrical Executive Engineer, M.R.T the petitioner, due to which the said meter which was an important evidence in the case was lost. Neither First Information Report was lodged for loss of meter nor any concrete effort was made to trace out the lost meter and due to lapses on the part of delinquent officers the metre was lost causing loss of revenue to the Electricity Board. It is thus obvious from the charges as indicated above that charges were with respect to loss of meter due to laches of the officers present at the time of replacement of meter/proceedee and as such it cannot be said that there was no charge or that the petitioner was punished without charge.

    7. The petitioner participated in the enquiry. On conclusion of enquiry report was submitted to the disciplinary authority holding that the charge that meter was kept in the car of the petitioner was not proved. However, the Enquiry officer recorded the finding that new meter was brought to the site by the petitioner without regular requisition from the Supply Wing. He should have been more particular to ensure regular requisition for the new meter and physical custody of the old meter after its replacement by new meter. The said procedure had not been adopted when the work was taken up i.e during actual time of replacement of the old meter by the petitioner who was present at that very time and as such he is responsible for not following the prescribed procedure which resulted in loss of meter. The submission of learned counsel for the petitioner that charges were not proved against the petitioner during enquiry in view of the findings arrived at as indicated above, in my opinion, has no substance at all.

    8. Learned counsel for the petitioner, however, relied upon a decision in the case of State of Assam v. Mohan Chandra Kalita, (1972) 4 SCC (N) 11 : A.I.R 1972 S.C 2535. In the said case Sub Dy. Collector, respondent, went to village Missamari in a school bus and paid compensation to some persons but could not pay to all of them. He informed them that if he gets conveyance, he will come next day otherwise they should come to Dhekiajuli. The people who were still to be paid said that it would be inconvenient for them to go to Dhekiajuli and later suo motu decided that they would pay charge of conveyance. The respondent Sub Dy. Collector arrived next day at Missamari in a taxi and went into the room of Mauzadar and began to make payment. Some persons started collecting some fee out side the room on behalf of the respondent. On the said fact charge was framed against respondent Sub. Dy. Collector that “he realised from those to whom he was paying compensation amounts certain percentage of compensation money due to them for payment of hire charges of a vehicle by which he was reported to have visited the office. After enquiry disciplinary authority removed respondent Sub. Dy. Collector from service. However, the High Court quashed the order removing from service and as such the State of Assam challenged the said order before the Supreme Court. The Apex Court perused the evidence and found that it is clear beyond doubt that none of the witnesses testified to the fact that the respondent authorised the collection of hire for carriage nor any one said that they complained to him about the collections that were being made out side the room. In such a situation the Apex Court has held that evidence was led in respect of the matter extraneous to the charge prejudicing the Enquiry officer against the delinquent and the Enquiry officer based his conclusion on conjectures and there was no evidence to show that any amount as alleged was realised by the delinquent himself or at his instance or even by his connivance, therefore, the charge cannot be sustained. In my view said case is not applicable to the facts and circumstances of the case as the petitioner himself brought the meter. He along with others was present at the time of replacement of meter in the premises of the consumer but he did not take care to ensure safe custody of the old meter. The charges were with respect to loss of meter and as such the case relied upon by the learned counsel for the petitioner, in my view, does not stand for rescue of the petitioner. More-over, the High Court under Article 226 of the Constitution of India is not required to appraise the evidence or to decide the case as an appellate authority.

    9. However, in the case of High Court of Judicature at Bombay v. Uday Singh, (1997) 5 SCC 129, it was held by the Apex Court that standard of proof as required in criminal case is not required in the departmental enquiry. Technical rule of evidence and proof beyond doubt is not applicable to the departmental enquiry. Preponderance of probability and conclusion drawn as a reasonable man from evidence on record is sufficient for the purpose of departmental enquiry, in the case of Government of T.N v. A. Rajapandian, (1995) 1 SCC 216, the Apex Court has held that Tribunal has no jurisdiction to reappreciate the evidence and set aside the order of dismissal on the ground of insufficiency of evidence to prove the charges if there is no fault with the proceeding. In the case of Indian Oil Corporation Ltd. v. Ashok Kumar Arora, (1997) 3 SCC 72 : A.I.R 1997 S.C 1030, the employee submitted forged medical bill for reimbursement. The finding of the enquiry authority was that delinquent was main brain behind submsision of such bills. In such a situation the Apex Court has held that High Court was wrong in interfering with such finding and order of disciplinary authority. In the case of B.C Chaturvedi v. Union of India, (1995) 6 SCC 749 the Apex Court held that in a case of departmental enquiry the court/Tribunal cannot interfere with the finding of fact on evidence and substitute its own independent finding. It can interfere only when there is fault in decision making process, where the findings are based on some evidence the court/Tribunal cannot reappreciate the evidence and substitute its own finding. Therefore, on consideration as discussed above it has become obvious that this Court will not interfere with the order of punishment unless it is shown that there is no evidence to inflict the punishment or there was a violation of principle of natural justice. In the instant case it has already been held that charge was with respect to loss of meter. New meter was brought by the petitioner and he was present at the time of replacement of meter. The petitioner was not found guilty for taking away meter but Enquiry authority has come to conclusion that petitioner was guilty for not ensuring physical custody of the old meter after its replacement and as such it cannot be said that it is case of no evidence or the said finding is not based on the charges.

    10. Therefore, on consideration as discussed above, I find no merit in the writ petition. Accordingly, it is dismissed.