  • section 80 of the Code of Civil Procedure,
  • section 15(2) of the Indian Limitation Act
  • SECTION 80 CIVIL PROCEDURE CODE
  • section 77 of the Indian Railways Act
  • section 15(2) of the Limitation Act
  • Art. 30 of the Limitation Act
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Equivalent Citations
citation codes
Case Number
Advocates
Judges
Acts
  • section 80 of the Code of Civil Procedure,
  • section 15(2) of the Indian Limitation Act
  • SECTION 80 CIVIL PROCEDURE CODE
  • section 77 of the Indian Railways Act
  • section 15(2) of the Limitation Act
  • Art. 30 of the Limitation Act
Smart Summary

Structured Summary of the Judgment delivered by P.N. Mookerjee, J.

Factual and Procedural Background

This Rule challenges a decree of the learned Subordinate Judge of Burdwan in Small Cause Court Suit No. 134 of 1951. The Subordinate Judge allowed, in part, a plaintiffs' claim for compensation against the defendant Railway for damage to part of a consignment of biri tobacco booked at Station Vadtal for carriage and delivery to the plaintiffs at Burdwan. The booking was under Risk Notes A and B.

The Railway (petitioner) pleaded usual defences: denial of misconduct, claim to protection under the Risk Notes, non-service of statutory notices, allegation that the claim was excessive, and that the suit was barred by limitation. The Subordinate Judge overruled the railway's defence contentions, decreed the suit in part (but disallowed interest), and the railway obtained this revisional Rule.

Legal Issues Presented

  1. Whether the Railway's acts or omissions constituted misconduct (negligence amounting to misconduct) disentitling the Railway to protection under the Risk Notes.
  2. Whether a notice under section 77 of the Indian Railways Act, served upon the Chief Commercial Manager instead of the General Manager, constituted a proper service in law.
  3. Whether the plaintiffs' suit was barred by limitation under Article 30 of the Limitation Act, and the effect of section 15(2) of the Limitation Act and the statutory notice under section 80 of the Code of Civil Procedure on the limitation period.

Arguments of the Parties

Petitioner (Railway) — arguments advanced by Mr. Bhabesh Narayan Basu

  • Challenged the learned Subordinate Judge's finding on the question of misconduct, relying particularly on the decision in Ralliaram Dingta v. The Governor General of India in Council (48 C.W.N 554) to argue that the finding of misconduct could not be sustained.
  • Contended that the notice under section 77 of the Indian Railways Act was not properly served because it was sent to the Chief Commercial Manager rather than to the General Manager; relied on Union of India v. Indumati Saha (55 C.W.N 662) for the proposition that strict compliance requires service on the General Manager.
  • Argued the suit was time-barred: Article 30 of the Limitation Act provides one year from the date when the loss or injury occurred; the railway contended the relevant date of delivery (and thus start of limitation) was on or about 1st or 2nd September 1950, making the suit (filed 5th November 1951) beyond the permissible period even after accounting for a two-month extension under section 15(2) of the Limitation Act for statutory notice under section 80 CPC.

Opposite Parties / Plaintiffs — points mentioned in the opinion

  • Plaintiffs maintained that delivery to them occurred on 4th September 1950 (pleading in para. 4 of the plaint), and that the suit filed on 5th November 1951 was within time after allowing the two-month extension under section 15(2) of the Limitation Act (and because 4th November 1951 was a holiday, the suit was properly filed on 5th November 1951).
  • On limitation, counsel for the opposite parties (Mr. Janah) also advanced an argument (referred to in the judgment) that Exhibit 4 contained an acknowledgement sufficient in law to give a fresh start to the limitation period (an argument the Court noted but found unnecessary to decide given its other findings).

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Ralliaram Dingta v. The Governor General of India in Council (48 C.W.N 554) Authority relied upon by petitioner to challenge the Subordinate Judge's finding on misconduct. The Court noted the petitioner relied on this decision but observed judicial opinion on the point is not uniform and did not accept it as a basis to disturb the Subordinate Judge's finding in this case.
Union Of India v. Indumati Saha (55 C.W.N 662) Decision enjoining strict compliance with section 77 service requirements, recognizing the General Manager as the appropriate authority to be served. The Court acknowledged the decision and its strict view but declined to apply it to overturn the Subordinate Judge's order; the Court preferred a view that service on the Chief Commercial Manager may be substantial compliance in practice.
Bengal Nagpur Railway Co., Ltd. v. Moolji Sicka & Co. (35 C.W.N 133) Authority stating tests for when negligence amounts to misconduct disentitling the carrier to Risk Note protection. The Court held the Subordinate Judge's finding of misconduct was in accordance with the tests laid down in this decision and supported the finding that the Railway was guilty of negligence amounting to misconduct in the present case.
B.N Ry. Co. Ltd. v. Moolji Sicka & Co. (A.I.R. 1932 Cal. 70) Supportive authority on misconduct/neglect tests (cited alongside Bengal Nagpur decisions). The Court treated this decision as substantially supporting the Subordinate Judge's misconduct finding.
Bengal Nagpur Railway Company Ltd. v. Haji Latif Abdulla (A.I.R. 1937 Cal. 410) Authority cited in support of findings on misconduct/negligence. The Court cited it as substantial support for the Subordinate Judge's finding of misconduct.
Shamsul Huq v. Secretary of State (I.L.R. 57 Cal. 1286 : A.I.R. 1930 Cal. 332) Authority accepting service of notice under section 77 on the Chief Commercial Manager as good service. The Court cited this case as precedent supporting the validity of service on the Chief Commercial Manager and relied on it in rejecting the petitioner's second contention.
Sristidhar Mandal v. Governor-General in Council (A.I.R. 1945 Cal. 412) Decision holding that service of a section 77 notice on the Chief Commercial Manager suffices because that officer deals with claims; includes Henderson, J.'s observations. The Court quoted Henderson, J.'s reasoning approvingly and treated this decision as a principal authority supporting substantial compliance by service on the Chief Commercial Manager.
Chaturbhuj Bam Lal v. Secretary of State for India (A.I.R. 1927 A.C. 214) (cited as Allahabad High Court view) Authority (via Allahabad High Court) accepting service on Chief Commercial Manager as substantial compliance. The Court cited this to show earlier decisions supporting service on the Chief Commercial Manager as good service.
Bansi v. Governor-General of India in Council (56 C.W.N 83) Full Bench decision approving Henderson, J.'s view that a section 77 notice is not a condition precedent to institution of suit and that service on railway administration suffices. The Court observed this Full Bench approval of Henderson, J.'s view and used it to justify refusing to treat the petitioner's service objection as ground for revision in this case.
(A.I.R. 1927 All. 215) and related older Calcutta decisions (I.L.R. 57 Cal. 1286 : A.I.R. 1930 Cal. 332; A.I.R. 1945 Cal. 412) Earlier decisions supporting practical/substantial-compliance approaches to service under section 77. The Court cited these as part of a body of authority supporting service on the Chief Commercial Manager and used them to justify non-interference on this technical ground.
Haji Ajam v. Bombay and Persia Steam Navigation Co. (I.L.R. 26 Bom. 562) Authority indicating that an acknowledgement can give a fresh start of limitation. The Court mentioned this decision as possible support for the plaintiffs' alternative argument (Exhibit 4 as an acknowledgement), but did not decide the point since it found limitation not attracted on its primary findings.
Jainarain v. The Governor-General of India (A.I.R. 1951 Cal. 462) Decision cited both for limitation principles (that onus is on the carrier to prove date of loss) and as possible support for restart-by-acknowledgement. The Court cited this case in support of the view that the onus of proving the date of loss is on the carrier and also as authority consistent with the acknowledgment point (not decided here).
River Steam Navigation Co., Ltd. v. Bisweswar Kundu (A.I.R. 1928 Cal. 371) Authority holding that under Art. 30 the onus to prove the date of “loss or injury” is on the carrier and, failing that, the date of delivery should be taken. The Court relied on this decision (among others) in concluding the onus lay upon the Railway and that absent satisfactory proof, the date of delivery should be taken as start of limitation.
Gangadhur Ram Chandra v. Dominion of India (A.I.R. 1950 Cal. 394) Another authority supporting the view that the onus to prove date of loss under Art. 30 is on the carrier. The Court cited it as part of established precedent supporting its limitation analysis.
Jugal Kishore v. G.I.P. Ry. Co. and G.I.P. Ry. v. Firm Radha Mal Manni Lal (I.L.R. 47 All. 549 : A.I.R. 1925 All. 656) Decisions cited as part of the body of authority on limitation and onus under Art. 30. The Court cited these as authorities consistent with taking date of delivery as the relevant date when the carrier fails to prove otherwise.
East Indian Railway v. Gopilal Sharma (A.I.R. 1941 Cal. 304) Decision applying Art. 30 and dismissing suit brought beyond one year from date of delivery. The Court cited it as an example where the view (that delivery date is the relevant date if carrier fails to prove otherwise) was applied and to support the Court's interpretation of Art. 30.

Court's Reasoning and Analysis

The Court proceeded by examining each of the petitioner's principal contentions in turn and applying the facts and authorities shown in the record.

1. Approach to the Rule and general disposition

The Court observed that the points raised by the petitioner were largely technical. Even where technical arguments had some merit, the Court stated it was not inclined to interfere in revision on mere technicalities when the learned Subordinate Judge's decision accorded with substantial justice between the parties. Thus discretionary revisional powers were to be exercised so as to avoid upsetting a decision that achieved substantial justice.

2. Misconduct / Negligence

The learned Subordinate Judge had found as fact that rainwater penetrated through crevices of flap doors, that the bags were placed by the sides of the flap doors (not away from them) by railway staff, and that given the season railway authorities knew or ought to have realized the risk of rain damage to tobacco if so placed. On these findings the Subordinate Judge held the Railway guilty of negligence amounting to misconduct and therefore not entitled to protection under the Risk Notes.

The petitioner relied on Ralliaram Dingta to challenge that conclusion; the Court noted conflicting judicial opinion on what amounts to misconduct. The Court found the Subordinate Judge's misconduct finding was well-supported by other bench decisions (Bengal Nagpur Railway Co. v. Moolji Sicka &c. and related cases) and declined to disturb that factual and legal conclusion because it produced substantial justice in this case. The Court therefore refused to give effect to the petitioner's contention on misconduct insofar as it would justify revisional interference.

3. Service under section 77, Indian Railways Act

The petitioner conceded a section 77 notice had been sent in time but contended it was not properly served because it was sent to the Chief Commercial Manager and not the General Manager. The Court reviewed authorities taking different views. It cited decisions (Shamsul Huq; Sristidhar Mandal; Chaturbhuj Bam Lal) which accepted service on the Chief Commercial Manager as substantial compliance because that officer deals with claims and the statutory purpose is served. The Court also acknowledged a recent contrary decision (Union of India v. Indumati Saha) taking a strict approach.

The Court expressed reluctance to overrule the earlier, practical view without fuller consideration, and emphasised that the statutory notice under section 77 is not a condition precedent to suit (a point approved by a Full Bench in Bansi v. Governor-General). Because service upon the Chief Commercial Manager served the statutory purpose in practice and because the Subordinate Judge's decision produced substantial justice, the Court rejected the petitioner's contention on service.

4. Limitation under Article 30 and onus of proof

The Subordinate Judge found delivery to the plaintiffs occurred on 4th September 1950. The petitioner contested that finding, arguing delivery was on 1st or 2nd September so the suit was filed too late. The Court examined the record (noting Exhibit 2, the shortage certificate, and that the plaint expressly stated delivery on 4th September 1950, which was not controverted in the written statement) and concluded the Subordinate Judge correctly took 4th September 1950 as the date of delivery.

The Court then applied Article 30 of the Limitation Act, which provides a one-year period "from the date when the loss or injury occurs" for suits against a carrier for losing or injuring goods. The Court reiterated the settled principle (citing River Steam Navigation Co. v. Bisweswar Kundu; Gangadhur Ram Chandra; Jainarain; and others) that the onus of proving the date of loss or injury is on the carrier, and if the carrier fails to discharge that onus, the date of delivery to the consignee is to be treated as the relevant date for starting limitation.

The Court found the Railway had practically adduced no satisfactory evidence to show when the damage actually occurred and had not discharged the onus. Accepting 4th September 1950 as the delivery date, the one-year period ran to 4th September 1951; adding the two-month extension under section 15(2) of the Limitation Act for statutory notice under section 80 CPC, the last day for filing was 4th November 1951 — a holiday — so filing on 5th November 1951 was within time. The Court therefore overruled the petitioner's limitation plea.

5. Miscellaneous / undisposed points

The Court noted an alternative argument (advanced for the opposite parties) that Exhibit 4 might constitute an acknowledgement restarting limitation and mentioned authorities (Haji Ajam; Jainarain) that might support that proposition, but the Court found it unnecessary to decide that question in this case given its primary findings on delivery date and the onus issue.

Holding and Implications

Holding: The Court refused the petitioner's Rule and discharged the Rule. All submissions made by the petitioner's learned Advocate were rejected.

Implications:

  • The decree of the learned Subordinate Judge in Small Cause Court Suit No. 134 of 1951 (allowing the plaintiffs' claim in part and disallowing interest) stands as not disturbed by this revisional proceeding.
  • The petitioner's pleas on misconduct, improper service under section 77, and limitation were each considered and rejected on the record and reasoning given: misconduct finding was sustained on the evidence; service on the Chief Commercial Manager was treated as substantial compliance in the circumstances; and the limitation plea failed because the Railway did not discharge the onus to prove an earlier date of loss.
  • The Court directed that the parties will bear their own costs in this Court.
  • No broad new precedent resolving the conflict of authorities on the precise test of "misconduct" or on the strictness of service under section 77 was established: the Court expressly declined to refer the conflict to a Full Bench and indicated it would not decide the broader conflict here, relying instead on the facts and the interest of substantial justice in this case.

End of summary — based solely on the contents of the provided opinion.

    Union Of India v. Messrs. Gujrat Tobacco Co. And Ors. Opposite Parties.

    The Judgment of the Court was delivered by

    P.N Mookerjee, J.:— This Rule is directed against a decree passed by the learned Subordinate Judge of Burdwan in Small Cause Court Suit No. 134 of 1951 allowing in part the plaintiffs' claim for compensation against the defendant Railway. The claim arose out of damages alleged to have been caused to a part of a consignment of biri tobacco booked at Station Vadtal for carriage and delivery to the plaintiffs at Burdwan. The booking was under Risk Notes A and B and the usual defences were taken by the petitioner Railway denying misconduct, claiming protection under the Risk Notes and alleging non-service of the statutory notices. It was further pleaded that the plaintiffs' claim was excessive and was also barred by limitation. The learned Subordinate Judge overruled the defence contentions and decreed the plaintiffs' suit He, however, disallowed the plaintiffs' claim for interest. Against the decree passed as aforesaid, the defendant Railway obtained the present Rule.

    2. In support of the Rule, Mr. Bhabesh Narayan Basu, urged three points. He challenged the finding of the learned Subordinate Judge on the question of misconduct, contended also that there was no proper service of notice under section 77 of the Indian Railways Act and finally that the plaintiffs' suit was time-barred. Upon the first point, Mr. Basu drew our attention particularly to the decision of this court in the case of Ralliaram Dingta v. The Governor General of India in Council (1) (48 C.W.N 554) and submitted that in the light of the observations contained in that judgment the learned Subordinate Judge's finding against the petitioner on the question of misconduct could not be sustained. On the above basis Mr. Basu claimed full protection for his client against the plaintiffs' claim, made in the suit, under the Risk Notes, referred to above.

    3. It was next argued by Mr. Basu that there was, in the present case, no proper service of notice under section 77 of the Indian Railways Act. It was not and, indeed, it could not be denied that a notice under that section had been sent to the Railway in time but the contention, put forward by Mr. Basu, was to the effect that as it was sent to the Chief Commercial Manager and not to the General Manager, the service was not a proper service in law. For this proposition strong reliance was placed on the recent decision of this court reported in 55 C.W.N 662 [Union Of India…Defendant, v. Indumati Saha…Plaintiff, Opposite Party. (2)].

    4. The petitioners' third contention was that, in any event, the plaintiffs' claim was barred by limitation, the suit having been instituted on the 5th November, 1951, although delivery wad taken by the plaintiffs opposite parties on the 1st September, 1950, On this plea of limitation Mr. Basu's argument was that the Article of the Limitation Act applicable to the present case being admittedly Article 30 which allowed a period of one year, from the date “when the loss or injury” occurred, that is, one year from the date of delivery to the plaintiffs, at the latest, for institution of the suit, the time for such institution in the present case expired, in the first instance, oh the 1st of September, 1951 at the latest, and, the plaintiffs being entitled to a deduction or extension of two months under section 15(2) of the Indian Limitation Act on account of the statutory notice of suit which had to be given and was given under section 80 of the Code of Civil Procedure, the very last date of filing the suit was November 1, 1951, but, the suit having been filed admittedly on November 5, 1951, it was clearly time-barred.

    5. The points, raised by Mr. Basu, are mainly of a technical character and, although we would not say that all of them are wholly without substance, so far at least as technicalities are concerned, we are not inclined to interfere in this Rule on technical grounds, even if they were in the petitioner's favour, as the plaintiffs' claim, to the extent that it has been allowed by the learned Subordinate Judge, appears to be quite a just claim on the merits and as, accordingly, by the decision, complained against in this Rule, substantial justice appears to have been done between the parties.

    6. The learned Subordinate Judge found as a fact that the damage to the tobacco was caused by rain water penetrating through the crevices of the flap doors on both sides of the wagon. He also found that the bags in question were placed by the sides of the flap doors and not away from them by the railway staff although it was known to, at least, it ought to have been realised by, the railway authorities that rain being usual at the time of the year when the consignment was being carried, the tobacco was likely to be damaged by rain water if placed near the flap door. On these findings, the learned Subordinate Judge held the Railway guilty of negligence amounting to misconduct and disentitling them to any protection under the Risk Notes.

    7. It was urged before us that the negligence, found above, would not satisfy the test of misconduct as laid down in the case cited, namely, (1) 48 C.W.N 554. Judicial opinion on this point is not, however, uniform and the learned Judge's finding of misconduct appears to be well-founded on the tests laid down in that behalf in the other Bench decision of this Court reported in Bengal Nagpur Railway Co., Ltd. v. Moolji Sicka & Co. (3) (35 C.W.N 133) and it is also substantially supported by the cases of B.N Ry. Co. Ltd.… v. Moolji Sicka & Co.…Opposite Party. (4) (A.I.R 1932 Cal. 70) and Bengal Nagpur Railway Company Ltd. v. Haji Latif Abdulla (5) (A.I.R 1937 Cal. 410). There is much to be said in favour of either point of view and, in a proper case, the question may have to be considered by a Full Bench of this Court. As, however, as we have already said, the learned Subordinate Judge's decision has at least the merit of substantial justice, it is unnecessary for us in this Rule to discuss this point any further or to consider the question of reference of the conflict of judicial opinion to a Full Bench, and we would content ourselves by refusing to give effect to the petitioner's above contention in this case simply on the ground that, even if it be technically correct, it would hardly justify interference with the learned Subordinate Judge's decision, which plainly accords with substantial justice, in the exercise of the discretionary revisional powers of this Court

    8. Upon the second contention too the position is substantially similar. We have said that the notice under section 77 of the Indian Railways Act was served upon the Chief Commercial Manager. Such service has been accepted as good service in the decisions of this Court reported in Shamsul Huq v. Secretary of State (6) (I.L.R 57 Cal. 1286 : A.I.R 1930 Cal. 332) and in Sristidhar Mandal v. Governor General in Council (7) (A.I.R 1945, Cal. 412) and also by the Allahabad High Court in the case of Chaturbhuj Bam Lal v. Secretry of State for India (8) (A.I.R 1927 A.C 214), broadly upon the view, inter alia, that as claims against the Railway are dealt with by that Officer service of this notice of claim upon him must be taken to be substantial compliance with the requirements of law. In the case Sristidhar Mandal v. Governor-General in Council (7) (A.I.R 1945 Cal. 412), cited above, where also the notice under section 77 was served upon the Chief Commercial Manager, Henderson, J., put the matter straight in his own inimitable language: “The law is certainly remarkable”, so remarked the: learned Judge, “if a good claim is to be dismissed, because a notice is given to the Officer whose duty it is to investigate it and he proceeded to hold that Notice was given to the right officer” and “it would be an extraordinary thing if that is held to be an invalid notice”. Continuing the learned Judge made the following observations at page 413 of the Report: “The service of a notice under section 77 is not a condition precedent to the institution of the suit. Section 140 was undoubtedly enacted to help claimants and not to assist the railway administration to make a dishonest defence. If the notice is served within its terms the Railway have no answer. It does not matter in the least whether any individual officer knew about it or not. It is, however, sufficient to comply with section 77 if in fact notice is given to the railway administration. The notice under section 80, Civil Procedure Code, was duly served on the Government of India. As usual it was forwarded to the General Manager of opposite party No. 3. He did nothing whatever except to send it to the gentleman who received the notice under section 77 from the petitioner direct. It is quite obvious that, if the notice under section 77 had been sent to the General Manager, he would merely have forwarded it to the Chief Commercial Manager. In these circumstances, it would be preposterous to say that no notice has been given to the Railway administration”. That sums up admirably the gist of the position, taken up by the learned Judge, on this aspect of the matter and it is difficult to say that there is no substance in his supporting observations. A contrary opinion has no doubt been expressed in the recent decision of this Court in the case of Union Of India…Defendant, v. Indumati Saha…Plaintiff, Opposite Party. (2) (55 C.W.N 662), enjoining strict such compliance with the statute in the matter of such service and recognising the General Manager alone as the appropriate authority to be served with notice under section 77. We are not prepared to say, however, without a fuller consideration that the earlier view is in law totally unacceptable. It has, at least, all the commonsense of the matter from a practical point of view and as the purpose of the statutory notice is sufficiently and unquestionably served by service upon the Chief Commercial Manager he being the authority who actually deals with claims against the Railways Act, the notice under section 77 “is not” —as distinguished from the other statutory notice under section 80 of the Civil Procedure Code a condition precedent to the institution of the suit, as held by Henderson, J., in the passage quoted and now settled by the Full Bench in the recent case of Bansi v. Governor-General of India in Council, 56 C.W.N 83, where, at p. 89 of the Report, Henderson, J.'s view on this point was expressly approved and as in matters of this kind Courts ought not to be too technical or hypercritical so as to hinder the cause of justice, and not further it, by insisting upon strict technicalities, the decisions in (8) A.I.R 1927 All. 215; (6) I.L.R 57 Cal. 1286 : A.I.R 1930 Cal. 332 and (7) A.I.R 1945 Cal. 412 may well be supported, even if strict logic or the letter of the law inclines towards the contrary view. We are satisfied, how ever, as already stated, that the decision of the learned Subordinate Judge in the present case is quite in consonance with substantial justice and we would not, therefore, interfere with it in revision, even if it were technically not quite correct. The petitioner's second contention also is, accordingly, rejected.

    9. There remains now the petitioner's submission, namely, the point of limitation. The learned Subordinate Judge has rejected this plea of limitation on the finding that the date of delivery of the goods to the plaintiffs opposite parties was the 4th September, 1950. It is contended before us that, in taking the said date as the date of delivery, the learned Subordinate Judge has committed an error. It is argued by Mr. Basu that the actual date of delivery in the present case was the 1st or the 2nd September, 1950, and that, therefore, the suit was filed at least a day or two too late. On the materials before us, we are unable to accept this contention. Ex. 2, the shortage certificate, clearly shows that delivery was taken by the plaintiffs opposite parties on the 4th September, 1950. It seems to us further that the different dates, mentioned in Exs. A and B, the Railway's Delivery Book and Unloading Book, do not either refer to or give us clearly the date of delivery to the plaintiffs. That this is so is well-confirmed, and, indeed, placed beyond doubt or dispute, by the pleadings in the case. In the plaint it was specifically stated in paragraph 4 that the delivery was made to the plaintiffs on the 4th September, 1950. This was not controverted in the written statement. In the above state of things, it is idle to contend that the learned Subordinate Judge was wrong in taking the 4th September, 1950, as the relevant date of delivery and, that being so, there is no substance in the petitioner's contention that the plaintiff's suit was time-barred. In the view, we have just expressed, it is unnecessary for us to consider the other argument on this point, advanced by Mr. Janah, who appeared before us on behalf of the opposite parties, that, in any event, Ex. 4 contains an acknowledgment, sufficient in law to give a fresh start of limitation. We may point out, however, that, apparently, at least, this argument has the support of the decision of the Bombay High Court in the case of Haji Ajam v. Bombay and Persia Steam Navigation Co. (9) (I.L.R 26 Bom; 562), and also this Court's decision in the recent case of Jainarain v. The Governor-General of India (10) (A.I.R 1951 Cal. 462), and may thus, possibly save the plaintiffs' suit from being time-barred. As already stated, however, it is not necessary for us to consider this last question in the present case and we do not, therefore, propose to examine Mr. Janah's argument on this point any further. The relevant date of delivery, as correctly taken by the learned Subordinate Judge, being the 4th September, 1950, the statutory period of one year under Art. 30 of the Limitation Act—which, as we shall presently show, started to run in the present case from the said date of delivery-would take us to the 4th September, 1951, and the plaintiffs being clearly entitled to a further period of two months under section 15(2) of the Limitation Act on account of the statutory notice of the suit under section 80 of the Code of Civil Procedure, the last date for the filing of the suit would be the 4th November, 1951, which being, admittedly, a holiday, as found by the learned Subordinate Judge, the suit must be held td have been properly filed on the 5th November, 1951, quite within the time allowed by law. The petitioner's plea of limitation is, accordingly, overruled.

    10. It only remains to add that, in the present case, it is not possible to argue that limitation would start earlier than from the date of delivery to the plaintiffs. There is no dispute that Art. 30 of the Limitation Act would apply to this case. That Article contemplates suit, “against a carrier for compensation for losing or injuring goods” and under it limitation starts or begins to run from the date “when the loss or injury occurs”. Such loss or injury obviously occurs while the goods are in the custody of the carrier and, prima facie, therefore, the date thereof will be within its special or “peculiar” knowledge,-in any event, the carrier will certainly be in a much better position than either the consignor or the consignee to prove that date and, accordingly, it has been held over and over again that, under Art. 30 of the Limitation Act, the onus to prove the date of “loss or injury”, mentioned in the third column of that Article, is, where the goods are carried by rail and the loss or injury occurs in the course of such transit, on the Railway concerned, and, in the absence of satisfactory evidence on its part on this point, that is, in the event of its failure to discharge the onus, the date of delivery to the party should be taken as the relevant date of “loss or injury”, or, in other words, as the starting point of limitation under Art. 30.

    11. This was the-view taken in at least three decisions of this Court, namely, River Steam Navigation Co., Ltd. v. Bisweswar Kundu (11) (A.I.R 1928 Cal. 371); Gangadhur Ram Chandra v. Dominion of India (12) (A.I.R 1950 Cal. 394) and Jainarain's case (10) (A.I.R 1951 Cal. 462), already: cited, and also by the Allahabad High Court in (13) (I.L.R 45 All. 43 : A.I.R 1923 All. 22) (Jugal Kishore v. G.I.P Rly. Co. and G.I.P Rly. v. Firm Radha Mal Manni Lal (14) (I.L.R 47 All. 549 : A.I.R 1925 All. 656), and, in some of those decisions, it was even spoken of as well-settled. The same view of the law is also to be found in East Indian Railway v. Gopilal Sharma (15) (A.I.R 1941 Cal. 304), where, however, the suit was dismissed as it had been brought beyond one year from the date of delivery of the goods to the plaintiff. That view namely, what we have set out before, seems to us to be eminently reasonable and, in our opinion, the law on this point was correctly laid down in the cases cited and the relevant statutory provision was there correctly interpreted.

    12. In the case before us, the petitioner Railway has practically adduced no evidence to show when the damages, which have now been sued for in this suit, and actually proved, had occurred. The Message Book (Ext. C) is hardly sufficient for the purpose. The onus, therefore, that lay upon the petitioner under Art. 30 of the Limitation Act, cannot be said to have been discharged. It may also be pointed out in this connection that, in the petitioner's written statement, there is no allegation that the loss or injury occurred at any point of time earlier than; the date of delivery to the plaintiffs. In the circumstances, we are bound to hold that, in the present case, the date of delivery to the plaintiffs would be the starting point of limitation and, accordingly, in view of our findings, made above, the petitioner's plea of limitation must fail.

    13. In the result, therefore, all the submissions, made by the petitioner's, learned Advocate, are rejected and this Rule is discharged. We direct, how-ever, that, in the circumstances of this case, the parties will bear their own costs in this Court.

    Guha Ray, J.:— I agree.

    A.K.D.G