These writ petitions are filed praying for quashing the
notification dated 06.05.2008 and for directing to consider and pass
orders on the application for renewal of permit submitted by the
petitioners, untrammelled by the aforesaid notification. In this
judgment, facts as pleaded in W.P.(C) No. 15194 & 17813 of 2008
alone are referred and the exhibits referred to are in the order in
which they are marked in W.P.(C)No.15194/2008.
2. Petitioner in W.P.(C) 15194/08 is the registered owner of
stage carriage KL-5Q 4050, operating on the long distance inter-
district route Kottayam-Banthadukka. Ext. P1 permit was originally
granted to one Shaji Kuruvilla and was valid for the period from
12.9.1996 to 11.9.2001 and was subsequently renewed for a further
W.P.(C) No. 15194 OF 2008
period of 5 years upto 11.9.2006. In the meanwhile, with effect from
16.4.1998 the permit was transferred to the petitioner. Petitioner
sought renewal of the permit for a further period of 5 years by
submitting his application as early as on 10.6.2005. Since orders
renewing the permit have not been passed, petitioner was operating
his service on the strength of temporary permits issued under Section
87(1)(d) of the Motor Vehicles Act, 1988, the last of which is Ext. P2,
valid till 31.5.2008. As the period of Ext. P2 was expiring, petitioner
submitted Ext. P3 application for temporary permit, but however, the
4th respondent is refusing to consider Ext. P3 since the petitioner had
not submitted a no objection certificate from the 2nd respondent,
K.S.R.T.C. It is stated that according to the 4th respondent, in view of
the finalised scheme published vide Ext. P5 notification dated
6.5.2008 issued under Section 100 (3) of the Motor Vehicles Act, 1988
(hereinafter referred to as the Act, for short) renewal of permit, either
regular or temporary, can be granted only on obtaining an NOC from
the KSRTC, the State Transport Undertaking.
3. The contentions urged is that the 1st respondent,
exercising its power under Section 99 of the Act read with Rule 236
W.P.(C) No. 15194 OF 2008
of the Kerala Motor Vehicles Rules (hereinafter referred to as the
Rules, for short) had published Ext.P4, a proposal on 9.5.2007
relating to 31 routes in the State in supercession of the existing
notification in relation to those enumerated routes. Clauses 4, 5
and 19 of the schedule to Ext. P4 being relevant, are extracted
below for reference:
4. Whether the services are to In the Private Sector, permits,
be operated by the State regular and temporary existed on
Transport Undertaking to the or prior to 18-4-2007 alone will
exclusion of other persons or continue asgivensuch.
(b) Is such exclusion shallthe As in schedule 4 above
be
partial, the sectors ofother
route
servicesfrom towhere
are be excluded;
and
(c) Whether it is proposed to
allow other servicepassengers
to pick or Yes, on portions of the route,
set
betweendown two places on permitted to operate
the routeanycovered by the
scheme.
W.P.(C) No. 15194 OF 2008
4. Whether the services are to In the Private Sector, permits,
be operated by the State regular and temporary existed on
Transport Undertaking to the or prior to 18-4-2007 alone will
exclusion of other persons or continue asgiven
such.
It is stated that while the proposal published, was as above, on
6.5.2008 the 1st respondent published the approved scheme, as
required under Section 100(3) of the Act. Clauses 4, 5 and 19 of
Ext. P5 being relevant, are extracted below for reference:
"4. Whether the services are to be Yes. regular and temporary
operated by the State Transport permitsThe
issued in the private sector
Undertaking to the exclusion of 9.5.2006 alone will
other persons or otherwise. on or priortotocontinue
be allowedSuch for the time
being. permits will be
renewed only if the STU is not
willing to provide substitute bus in
its vacancy. New permits will be
issued in favour of State Transport
Undertaking only Permitsnot issued
after
renewed9.5.2006circumstance.
presents a clear departure from the corresponding clauses in Ext. P4
proposal. According to counsel, while Ext. P4 envisaged saving and
retention of all permits which existed on or prior to 18.4.2007, Ext.
P5 provides for continuation of permits issued prior to a still
W.P.(C) No. 15194 OF 2008
anterior date, viz., 9.5.2006 and that too, only as a temporary
measure. It is also contended that the renewal of the said permits
would again be subject to obtaining a no objection certificate from
the KSRTC as and when application for renewal of permit is
considered. It is submitted and that all permits granted between
the period from 9.5.2006 to 18.4.2007 would be liable to be
terminated on the expiry of its validity without any renewal.
According to the petitioner this has been done without any notice to
the permit holders.
5. Similarly in so far as clause 19 of Ext. P5 is concerned, it
is stated that this provision confers on the KSRTC an absolute
discretion to pick and choose any private operator and demand on
his vacating the route while at the same time ensuring continuance
of other favoured persons. It is contended that though the
replacement is to be made following the principle last come first go,
in view of the insistence of the no objection of the KSRTC for
renewal of permits, the power conferred is arbitrary and will lead to
discriminatory treatment. According to the petitioners this is clearly
at variance from the method for displacement contemplated by Ext.
W.P.(C) No. 15194 OF 2008
P4 proposal where the KSRTC could exercise its power by
appropriate notification, and only when it could exclusively operate
on the route. It is generally on the aforesaid basis, complaining that
the statutory provisions have been violated and that natural justice
has been denied to operators W.P. (C) No. 15194/08 has been filed
seeking to quash Ext. P5 approved scheme.
6. A counter affidavit has been filed by the 1st respondent and
a statement has been filed on behalf of the 2nd respondent.
According to the 1st respondent, the Government had published
Ext.P4 draft scheme pursuant to the undertaking given before the
Hon'ble Supreme Court in Civil Appeal No. 4994/02. It is stated
that the draft scheme was published in accordance with Section 99
of the Act and that in terms of Section 99(2) when a proposal is
published, then from the date of publication of such proposal no
permit shall be granted to any person, except a temporary permit in
the manner as provided therein. It is stated that Section 100 of the
Act requires publication of the proposal for filing objections and
that as per sub section (2), the State Government may, after
considering the objections and after giving an opportunity to the
W.P.(C) No. 15194 OF 2008
objector or his representatives and the representatives of the State
Transport Undertaking to be heard in the matter, if they so desire,
approve or modify such proposal.
7. It is stated that it was in exercise of this power that after
considering the objections that the 1st respondent had approved the
scheme with suitable modifications. It is stated that the provisions of
Chapter VI of the Act have got overriding effect over Chapter V and
other laws and once the scheme has been finalised and published
under Section 100(2) it is a law and is binding on all parties. In the
counter affidavit, the grounds on which Ext. P5 is challenged are all
denied by the 1st respondent and the 1st respondent submits that the
scheme is liable to be upheld by this Court.
8. In the statement filed on behalf of the 2nd respondent
they would contend that once a proposal is notified inviting
objections, the State Government is bound to consider the objections
and thereafter approve and publish the scheme in the manner as
provided under Section 100(2) of the Act. While finalising the draft
scheme the State Government is entitled to either approve the same
as such or approve the draft with modifications. It is stated that the
W.P.(C) No. 15194 OF 2008
modifications made to Ext. P4 are in exercise of the power under
Section 100(2) of the Act and that the contentions raised in the writ
petition have no substance.
9. The petitioners in W.P.(C) No. 17813/08 submits that the
consequence of the Division Bench judgment in Rahul Tom v. K.S.R.T.C. {2001(3) KLT 261} in which the 1st petitioner herein was
the petitioner, was abrupt stoppage of more than 17,000 private
stage carriage operators in the private sector. Against the aforesaid
judgment, appeals were filed before the Apex Court and by Ext. P1
order, the parties were directed to maintain status quo pending
further orders in the appeal. It is stated that subsequently leave has
been granted and Civil Appeal No. 4994 of 2002 and connected
matters are pending consideration of the Apex Court. The Apex
Court subsequently passed Ext. P2 order directing that the KSRTC
and the private operators shall give their suggestions to the State
Government as to how workable arrangements can be worked out
to prevent unnecessary inconvenience to the travelling public. It
was directed that the concerned authorities of the State Government
will have discussions with the parties and find out a solution, if
W.P.(C) No. 15194 OF 2008
possible. Petitioners submit that in implementation of Ext. P2
order, suggestions were made to the State Government and that
discussions were also held on various occasions. It is stated that
finally the State Government issued Ext. P3 Order dated 31.12.2005
where it was stated that
the Private Stage Carriage Operators as on
2.11.05 are permitted to operate their service buses along with the
KSRTC. The Transport Commissioner will forward necessary
proposals to Government for the amendment of the
supplementation scheme forthwith.
It is stated that it was in
pursuance to Ext. P3 Govt. Order that when draft notification was
issued on 9.5.2006 under Section 99 of the Motor Vehicles Act,
1988, clause 4 thereof provided that the existing private operators
will be permitted to continue. However, objections were raised
against clauses 4 and 19 of Ext.P4 and as a result thereof, the State
Government appointed an expert committee consisting of Transport
Minister, Industries Minister, Labour Minister, Transport
Commissioner and Secretary to Government, Transport to consider
the entire aspects of the matter. According to the petitioners,
report was submitted by the aforesaid committee, with a suggestion
W.P.(C) No. 15194 OF 2008
to retain all existing services without any interruption. Petitioners
submit that it was accepting this recommendation that when
preliminary notification was issued on 9.5.2007, clauses 4 and 19
were suitably modified safeguarding the interests of the existing
private operators. It is stated that in view of the safeguards that
were incorporated in the notification dated 9.5.2007, petitioners
had no cause to raise any objection.
10. Referring to page 7 of the counter affidavit filed by the
State in W.P.(C) No. 17876/08 it was contended that though the
Government admits the constitution of the expert committee, no
reason whatsoever has been stated for ignoring the
recommendations made by the committee. On the other hand, as
rightly contended by counsel for the petitioners all that is stated
that
even though the Government constituted the above said
expert committee, the Government is not bound to accept all the
suggestions of the said Committee.
Petitioners also pointed out
that from what is stated in paragraph 20 of the affidavit, it was only
on account of the objections from the State Transport Undertaking
and its employees, deviations were made from the notification
W.P.(C) No. 15194 OF 2008
dated 9.5.2007, ignoring the recommendations of the expert
committee.
11. I heard the counsel for the petitioners, the learned Govt.
Pleader and the Standing Counsel for the K.S.R.T.C.
12. The relevant statutory provisions which are required to
be noticed are those contained in Chapter VI of the Act and the
Rules 236 to 248of the Kerala Motor Vehicles Rules. Sections 99
and 100 of the Act being relevant for the disposal of this case, are
extracted below for reference:
"Sec. 99: Preparation and publication of proposal regarding
road transport service of a State Transport undertaking: (1)
Where any State Government is of opinion that for the
purpose of providing an efficient, adequate, economical and
properly co-ordinated road transport service, it is necessary
in the public interest that the road transport services in
general or any particular class of such service in relation to
any area or route or portion thereof should be run and
operated by the State transport undertaking, whether to the
exclusion, complete or partial, of other persons or otherwise,
the State Government may formulate a proposal regarding a
scheme giving particulars of the nature of the services
proposed to be rendered, the area or route proposed to be
covered and other relevant particulars respecting thereto and
shall publish such proposal in the Official Gazette, of the
State formulating such proposal and in not less than one
newspaper in the regional language circulating in the area or
route proposed to be covered by such scheme and also in
such other manner as the State Government formulating
W.P.(C) No. 15194 OF 2008
such proposal deem fit.
(2) Notwithstanding anything contained in sub section (1),
when a proposal is published under that sub section, then
from the date of publication of such proposal, no permit
shall be granted to any person, except a temporary permit
during the pendency of the proposal and such temporary
permit shall be valid only for a period of one year from the
date of its issue or till the date of final publication of the
scheme under Section 100, whichever is earlier".
"Sec.100: Objection to the proposal:- (1) On the publication
of any proposal regarding a scheme in the Official Gazette
and in not less than one newspaper in the regional language
circulating in the area or route which is to be covered by
such proposal any person may, within thirty days from the
date of its publication in the Official Gazette, file objections
to it before the State Government.
(2) The State Government may, after considering the
objections and after giving an opportunity to the objector or
his representatives and the representatives of the State
transport undertaking to be heard in the matter, if they so
desire, approve or modify such proposal.
(3) The scheme relating to the proposal as approved or
modified under sub-section (2) shall then be published in
the Official Gazette by the State Government making such
scheme and in not less than one newspaper in the regional
language circulating in the area or route covered by such
scheme and the same shall thereupon become final on the
date of its publication in the Official Gazette and shall be
called the approved scheme and the area or route to which it
relates shall be called the notified area or notified route:
Provided that no such scheme which relates to any
inter-State route shall be deemed to be an approved scheme
W.P.(C) No. 15194 OF 2008
unless it has the previous approval of the Central
Government.
whereNotwithstanding
a scheme is notanything contained in this section,
published as an approved scheme
under sub-section (3) in the Official Gazette within a period
of one year from the date of publication of the proposal
regarding the scheme in the Official Gazette under sub-
section (1), the proposal shall be deemed to have lapsed".
13. A reading of Section 99 shows that where any State
Government is of opinion that for the purpose of providing an
efficient, adequate, economical and properly co-ordinated road
transport service, it is necessary in the public interest that the road
transport services in general or any particular class of such service in
relation to any area or route or its portion should be run and
operated by the State transport undertaking, whether to the
exclusion, complete or partial, of other persons or otherwise, the
State Government may formulate a proposal regarding a scheme
giving particulars of the nature of the services proposed to be
rendered, the area or route proposed to be covered and other
relevant particulars respecting thereto and shall publish such
proposal in the Official Gazette of the State and in not less than one
newspaper in the regional language circulating in the area or route
W.P.(C) No. 15194 OF 2008
proposed to be covered by such scheme and also in such other
manner as the State Government deems fit.
14. In exercise of the rule making power of under Section 107,
the rules in Chapter VI of the Kerala Motor Vehicle Rules providing
for special provisions relating to State transport undertakings have
been framed by the State Government. Rule 236 provides that every
proposal framed under Section 99 of the Act shall be in Form "A"
and shall be published in the Official Gazette and in not less than
one daily newspaper in the regional language circulating in the area
involved. It is also provided that a copy of every scheme proposed
to be published in the Gazette shall be forwarded to the State
Transport Undertaking, to the Secretary of the State Transport
Authority and the Regional Transport Authority concerned. Form A
appended to the Rules gives a schedule containing as many as 19
columns and specify the details to be incorporated in a proposal.
15. Once draft is published in the manner as stated above,
Section 100 of the Act comes into play and in terms of Section 100
(1), on the publication of any proposal in the manner provided
therein, any person may, within thirty days from the date of its
W.P.(C) No. 15194 OF 2008
publication in the Official Gazette, file objections before the State
Government. The manner in which objections are to be filed is
provided under Rule 237 and it provides the particulars to be given
in the objections, which shall be filed before the Secretary to
Government, Public Works and Transport Department, and
simultaneously copies shall be forwarded to the State Transport
Undertaking, the State Transport Authority and the Regional
Transport Authority concerned. Once objections are filed in the
manner as provided in Section 100(1) of the Act and Rule 237 of
the K.M.V. Rules, the State Government is to consider the same in
terms of Section 100(2). Rule 238 provides that the Chief Minister
or any other Minister nominated by him or any officer nominated by
the Government in this behalf, shall be the authority to consider the
objections and hear the objectors. Clause (b) of the Rule provides
that the representatives of the State Transport Undertaking and the
objectors or their authorised representative, if they so desire, shall
be heard. The place, date and time of hearing shall be
communicated to the concerned persons at least fourteen days
before the date of hearing.
W.P.(C) No. 15194 OF 2008
16. Once objectors are heard, it is for the State Government to
consider and approve the proposal, with or without modification.
Once approval is accorded, Section 100(3) and Rule 239 provides
the manner of publishing the approved scheme which shall be
notified in Form B in the Official Gazette and in one daily newspaper
in the same manner as provided in Rule 236. Section 100(3) further
provides that once publication is effected as above, the scheme
shall become final on the date of its publication in the gazette and
shall be called the approved scheme and the area or route to which
it relates shall be called the notified area or notified route.
17. The aforesaid being the relevant statutory provisions, I
shall proceed to examine the judicial precedents where the courts
have dealt with the corresponding provisions in Sections 68 C and D
of the Motor Vehicles Act, 1939.
18. In the context of the scheme notified by the Government
of Andhra Pradesh the Supreme Court had held in G. Nageswara
Rao v. Andhra Pradesh State Road Transport Corporation {AIR 1959
SC 308} that the enquiry that is contemplated under S. 68 is quasi
judicial in nature and it imposes a duty on the State Government to
W.P.(C) No. 15194 OF 2008
decide judicially while approving or modifying the scheme. The
relevant portion of paragraph 21 of the judgment is extracted
below for reference:
"Applying the aforesaid test, let us scrutinize the provisions
of Ss. 68-C and 68-D and the relevant rules made under the
Act to ascertain whether under the said provisions the State
Government performs a judicial act or an administrative one.
Section 68-C may be divided into three parts: (i) The State
Transport Undertaking should come to an opinion that it is
necessary in public interest that the road transport service in
general or any particular class of such service in relation to
any area or route or portion thereof should be run or
operated by the State Transport Undertaking, whether to the
exclusion, complete or partial, of other persons or otherwise;
(ii) it forms that opinion for the purpose of providing an
efficient, adequate, economical and properly co-ordinated
road transport service; and (iii) after it comes to that opinion,
it prepares a scheme giving particulars of the nature of the
services proposed to be rendered, area or route proposed to
be covered and such other particulars respecting thereto as
may be prescribed and causes it to be published in the
Official Gazette.
distinction betweenThe section, therefore makes a clear
the purpose for which a scheme is
framed and the particulars of the scheme. To state it
differently, though the purpose is to provide an efficient
adequate, economical and co-ordinated road transport
service in public interest, the scheme proposed may affect
individual rights such as the exclusion, complete or partial,
of other persons or otherwise, from the business in any
particular route or routes. Under Sec. 68-C, therefore, the
State Transport Undertaking may propose a scheme affecting
the proprietary rights of individual permit holders doing
transport business in a particular route or routes. The said
proposal threatens the proprietary right of that individual or
W.P.(C) No. 15194 OF 2008
individuals. Under S. 68-D read with Rules 8 and 10 made
under the Act, any person affected by the aforesaid proposed
scheme may file objections within the prescribed time before
the Secretary of the Transport Department. Under the said
provisions, the State Government is enjoined to approve or
modify the scheme after holding an enquiry and after giving
an opportunity to the objectors or their representatives and
the representatives of the State Transport Undertaking, to be
heard in the matter in person or through authorised
representatives. Therefore, the proceeding prescribed is
closely approximated to that obtaining in courts of justice.
There are two parties to the dispute. The State Transport
Undertaking, which is a statutory authority under the Act,
threatens to infringe the rights of a citizen. The citizen may
object to the scheme on public grounds or on personal
grounds. He may oppose the scheme on the ground that it is
not in the interest of the public or on the ground that the
route which he is exploiting should be excluded from the
scheme for various reasons. There is, therefore, a proposal
and an opposition and the third party, the State Government
is to decide that lis and prima facie it must do so judicially.
The position is put beyond any doubt by the provision in the
Act and the Rules which expressly require that the State
Government must decide the dispute according to the
procedure prescribed by the Act and the Rules framed there
under, viz., after considering theappears
objections and after hearing
both the parties. It thereforeimposes to us that this is an
obvious casetowhere the Act act a duty on the State
Governmentthe decide theproposed judicially in approving or
modifying scheme by the Transport
Undertaking".
19. In Malik Ram v. State of Rajasthan {AIR 1961 SC 1575} the
Supreme Court followed the judgment in Nageswara Rao's case and
paragraph 6, to the extent relevant, reads as follows:
W.P.(C) No. 15194 OF 2008
"The next question is the scope of the hearing under Section
68-D(2). The officer has held that the scope of the hearing
is confined only to hearing of arguments and no more, and
that is why he rejected the prayer of the appellant for leading
evidence, whether oral or documentary. Now it has been
held by this Court in Nageswara Rao v. Andhra Pradesh State
Road Transport Corporation, (1959) Sup (1) SCR 319: (AIR
1959 SC 308), that a State Government acts as a quasi-
judicial tribunal when giving a hearing under S. 68-D. The
purpose of the hearing is that the State Government has to
satisfy itself that the opinion of the State Transport
Undertaking formed under S. 68-C, namely that the scheme
is for the purpose of providing an efficient, adequate,
economical and properly co-ordinated road transport
service, is correct. The objections are all made to show that
the scheme does not provide for an efficient, adequate,
economical and properly co-ordinated road transport
service. In order therefore to arrive at the conclusion that
the draft scheme provides for a transport service of this
nature, the State Government as a quasi-judicial authority
may require materials to come to that conclusion.
20. Both the above judgments and the subsequent
judgments rendered by the Apex Court were followed by a Division
Bench of this Court in C.C. Transports Co. v. State of Kerala {1977
KLT 661} where it has been held as follows:
"of
The process involved in notifying and approving a scheme
nationalisation is a quasi-judicial process. A hearing and
determination of the objections to the notified scheme in an
objective fashion is a prime necessity. An approval of the
scheme after hearing the objections is a sufficient indication
in itself of an objective assessment and determination of the
objections. The order approving a nationalised scheme
W.P.(C) No. 15194 OF 2008
symbolises, and can well be regarded as the quintessence of,
a determination of the objections. How far the stamp of
approval can be a substitute for a speaking order spoken of
in some of the decisions as an elementary requirement of a
quasi-judicial process, may be an interesting academic
pursuit; but on the facts, and on the state of the authorities,
we think it should cause little difficulty. So understood, we
are of the view that there has been no violation of the
statutory provisions in this case and that the order approving
the scheme is not vitiated by any illegality".
21. Interpreting Section 99 of the Motor Vehicles Act, 1988, in
its judgment in Jagdip Singh v. Jagir Chand {AIR 2001 SC 3027} the
Supreme Court has held:
"From the aforesaid section, it is apparent that before
framing the scheme, the State Government should arrive at
a conclusion that:-
(1) for the purpose of providing an efficient, adequate,
economical and properly co-ordinated road transport
service;
(2) it is necessary in the public interest;
(3) that the road transport services in general or in
particular class of such service in relation to any area or
route or portion thereof should be run and operated by the
State Transport Undertakings;
(4) to the exclusion, complete or partial of other
persons or otherwise;
(5) the State Government is required to formulate a
proposal regarding the scheme giving particulars
W.P.(C) No. 15194 OF 2008
(a) nature of services proposed to be rendered,
(b) the area or route proposed to be covered and;
(c) other relevant particulars respecting thereto.
(6) and the State shall publish such proposal
(a) in the Official Gazette of the State formulating such
proposal;
(b) in not less than one newspaper in the regional
language circulating in the area or route proposed to be
covered by such scheme; and
(c) in such other manner as the State Government
formulating such proposal deem fit.
Main purpose of the aforesaid section is to have some
routes/area reserved for the State Transport Undertaking, that
too, for the purpose of providing an efficient, adequate,
economical and properly coordinated Road Transport service.
Further, such scheme must be in public interest, that is to say,
larger number of buses operating on different routes for the
convenience and benefit of travelling public at a cheaper rate.
In such a scheme, some routes can be reserved exclusively or
partially for the State Transport Undertakings".
22. Read in the context of the aforesaid judgments rendered
by the Apex Court and this Court it can be concluded that while
exercising its power under Section 99 of the Act the State
Government should first come to a conclusion that it is necessary in
public interest that road transport services in general or any
W.P.(C) No. 15194 OF 2008
particular class of such service in relation to any area or route or
portion thereof should be run and operated by the State transport
undertaking, whether to the exclusion, complete or partial, of other
persons or otherwise. It should form such opinion for the purpose
of providing an efficient, adequate, economical and properly co-
ordinated road transport service. Once opinion is formed as above,
a proposal is prepared giving particulars of the nature of the
services proposed to be rendered, the area or route proposed to be
covered and other relevant particulars in respect thereof and such
proposal shall be published in the official gazette. Since the
proposal thus notified affects the proprietary rights of individual
permit holders engaged in transport business, the statute provides
that any person affected by the aforesaid proposed scheme may file
objections in the manner prescribed. Once objections are filed the
State Government is enjoined to hold an enquiry and give an
opportunity to the objectors or their representatives and the
representatives of the State transport undertaking to be heard in the
matter and thereafter approve the scheme with or without
modifications and that is notified in the Gazette. The procedure
W.P.(C) No. 15194 OF 2008
prescribed, is comparable with what that is obtaining in the courts
of law with two parties to the dispute, the State transport
undertaking on the one side and on the other side, citizens who
have the right to object to the proposal on public or personal
grounds or on the ground that it is not in the interest of the public
or that the route which he is operating should be excluded from the
scheme for other reasons that he may have. It is for the State
Government to decide that dispute and it must do so in a judicial
manner.
23. Courts had occasion to consider the necessity of
complying with the principles of natural justice while approving
and notifying a scheme under the Act. The question as to whether
the Government can approve what is foreign to a proposal notified
under Section 100(1) also has engaged attention of the courts. One
such judgment is that of the Division Bench of the Madhya Pradesh
High Court in Baluram Daluram v. State of Madhya Pradesh {AIR
1967 M.P. 130}. Paragraph 11, to the extent it is relevant reads as
follows:
Apart from this, the Government can approve or modify
W.P.(C) No. 15194 OF 2008
only the scheme framed by the State Transport Undertaking
in terms of S. 68-C. The Government have no authority to
approve something not included in the Scheme on the
hypothesis that by implication it shall be deemed to have
been included in the Scheme. No doubt the State
Government can totally reject a Scheme. But it cannot under
the authority of approving and modifying the Scheme claim
the power of approving something which is not proposed at
all.
24. Similar view has been expressed by a Division Bench of the
Andhra Pradesh High Court in Andhra Pradesh State Road
Transport Corporation v. R. Maheswari {AIR 1976 A.P. 232}.
Paragraph 16 in so far as it is relevant, reads as follows:
"As per sub Section (2), the State Government, may approve
the scheme as published under Section 68-C or modify after
considering the objections. The word 'modify' in the said sub
Section means 'to change slightly or partially in character'.
The State Government when it approves the scheme under
Section 68-D of the Act presents no difficulty. But when it
comes to a question of modification of the scheme, the
modification quite obviously could only be made, having
regard to the objections filed. The objections filed can only
be in relation to the scheme published under Section 68-C.
It is plain that no otherIt objections can be entertained by the
State Government. is quite patent that the scheme
published under Section 68-C does not make any reference
to an inter-State route or inter-State operators. The
impugned clause in the note was added in the scheme
published by the Government under Section 68-D(3) of the
Act. That impugned clause which is appended to the note at
the end of the published scheme added a condition that the
permit holders of stage carriages on the inter-State routes
W.P.(C) No. 15194 OF 2008
shall not pick up or set down intra-State passengers on the
notified route. But for this condition introduced in the
scheme published under Section 68-D, the inter-State
operators plying along the notified route could pick up or set
down passengers. With regard to the condition imposed in
the impugned clause, no objections could have been filed by
the inter-State operators, as the scheme published under
Section 68-C made no reference to any inter-State route.
Their objections, if any, in that respect could not have been
made. Some of the inter-State route permit holders are also
intra-State permit holders. Their objections would only have
been in relation to the intra-state route which is the notified
route and not of something which was never found in the
scheme published under Section 68-C of the Act. Thus there
can be no doubt that the introduction of a new condition in
the note appended to the scheme published under Section
68-D was made without hearing the writ petitioners, who are
inter-State operators. Thus, principles of natural justice are
violated and the conditions introduced behind the back of
those who were not heard cannot be allowed to stand."
25. A reading of the aforesaid judgments, make it clear that
the power of modification available to the Government under
Section 68C of the 1939 Act or Section 100(2) of the 1988 Act, only
enables it to change the proposal slightly or partially in character or
to change somewhat the form or qualities. It has been held that
such modification can be made only in relation to the proposal
published and that introduction of a new provision in the approved
scheme without notice to the affected parties, is in violation of the
W.P.(C) No. 15194 OF 2008
principles of natural justice and that any condition so introduced,
cannot be sustained.
26. It was canvassed before me that the law as applicable to
Section 23 of the General Clauses Act is equally applicable to a draft
published in terms of Sections 99 and 100 of the Act. Relying on
the decision in Maula Bux v. Appellate Tribunal of State Transport
Authority, Jaipur {AIR 1962 Rajasthan 19} it was contended that
once a draft is published, it is open to the Government to make the
scheme with or without changes in the published draft subject to
the condition that the scheme so made is not foreign to the draft.
27. Relying on the judgment of the Supreme Court in The
Municipal Corporation Bhopal v. M. Hassan {AIR 1972 SC 892} it
was argued that the power to approve includes power not to
approve the scheme. Sindhi Sahiti Multipurpose Transport Co-
operative Society Ltd. v. State of Madhya Pradesh {AIR 1977 SC
441} was relied on to contend that it is open to any aggrieved
person to challenge a scheme on the ground that it is not a valid
scheme as required by the provisions of the Motor Vehicles Act.
Since the position canvassed by the counsel, being settled and as
W.P.(C) No. 15194 OF 2008
the learned Govt. Pleader also did not contend to the contrary, I do
not consider that a detailed discussion on these aspects is
necessary.
28. In the aforesaid background what is required to be
examined is whether the scheme notified by the Government by
notification dated 6.5.2008 is a valid one. As can be seen from Ext.
P4 proposal, in terms of clause 4 thereof, regular and temporary
permits existed on or prior to 18.4.2007 were to continue as such.
Similarly, as per clause 19 of Ext. P4, replacement by KSRTC was
contemplated only by issuing a notification in the official gazette
and that too when KSRTC could operate such route exclusively. The
contention is that since the proposal in Ext. P4 saved permits
existing upto 18.4.2007 and as replacement was only by a
notification and that too, as and when the KSRTC could operate
exclusively on the notified routes, petitioners were not aggrieved by
Ext. P4. It was while so by Ext. P5 the approved scheme was
published which provided that only the permits issued prior to
9.5.2006 will be allowed to continue for the time being and that
such permits will be renewed only if the KSRTC is not willing to
W.P.(C) No. 15194 OF 2008
provide substitute bus in its vacancy. It is pointed out that clause
19 of Ext. P5 gave freedom to KSRTC to replace any existing private
permit in the notified route on its expiry by providing substitute
vehicles on a selective basis. The basis of last come first go
provided in clause 19, it is argued, is therefore meaningless.
29. Comparing the provisions of clauses 4 and 19 of Ext. P4
with the corresponding clauses of Ext. P5, it is pointed out that Ext.
P5 makes substantial departure from Ext. P4 at least in the
following respects: (1) While clause 4 of Ext. P4 permitted
continuance of permits that existed prior to 18.4.2007 Ext. P5
provided continuance only for permits existed prior to 9.5.2006 and
that also for the time being. (2) As per clause 4 of Ext. P5 even
those permits which were in existence as on 9.5.2006 will be
renewed only if KSRTC was unwilling to provide substitute bus in
the vacancy. (3) Clause 19 of Ext. P4 provided replacement of
private permits by notification and only when KSRTC was able to
operate exclusively on such routes. (4). The corresponding
provision in Ext. P5 gave freedom to KSRTC to replace any existing
private permit of its expiry on the basis of last come first go.
W.P.(C) No. 15194 OF 2008
30. Highlighting the variation in clauses 4 and 19 of Exts. P5
as compared to those in Ext. P4, it is argued that fixation of
9.5.2006 and by making renewal conditional on the KSRTC's
unwillingness to provide substitute bus in the vacancy and giving it
freedom to replace any permit, the 1st respondent has exceeded its
power under Section 100(2) of the Act. It is contended that the
provision in clauses 4 and 19 of Ext. P5 were introduced without
notice to the affected operators and that as these clauses were not
included in the proposal they did not have any opportunity to file
their objections to the said provisions and hence natural justice is
violated. To the contrary, the learned Govt. Pleader asserted that
the 1st respondent was exercising its power of approval with
modification conferred on it under Section 100(2) of the Act, while
modifying Ext. P4 and finalising the scheme as per Ext. P5
notification.
31. On appreciating the rival contentions, I am inclined to
agree with the counsel for the petitioners that clauses 4 and 19 of
Ext. P5 notified scheme, substantially varies from the proposal
contained in Ext. P4. It is also true that while in Ext. P5 even the
W.P.(C) No. 15194 OF 2008
restricted right for renewal of permit is available only to those
permits issued on or prior to 9.5.2006, the proposal in Ext. P4
permitted renewal of permits existed as on 18.4.2007. This
necessarily means that at least a section of the permit holders, viz.,
those who were issued permits during 9.5.2006 and 18.4.2007, did
not have notice of the scheme as notified and their right of renewal
has been denied without giving them an opportunity to file their
objections and make their representations as provided in Section
100 of the Act. Similar is the case with clause 19 also. Clause 19 of
Ext. P4, contemplated replacement by notification and that too, only
when KSRTC could operate the route exclusively. In the approved
scheme, this has been changed completely.
32. This action of the State Government is beyond its power
under Section 100(2) of the Act and is in violation of the principles
of natural justice. True, the Government have the power to approve
the scheme with modifications, which includes the power not to
approve the scheme also. In this case, the power asserted by the
learned Govt. Pleader is the power to approve the scheme with
modifications. As already noticed the power to approve with
W.P.(C) No. 15194 OF 2008
modification does not confer on the Government the power to
introduce something which is foreign to the proposal notified for
objections. The word 'modification' has to be understood as
enabling the Government to make variations of a provision already
incorporated in the proposal and under the power of modification
may be the Government can drop a proposal or make variations in
the form or quality. As against this, under the cover of its power of
modification, the 1st respondent has introduced substantially
different clauses in the notified scheme, the details of which have
already been adverted to.
33. As already noticed by me, a comparison of the clauses
contained in the notification dated 9.5.2007 and the notification
dated 6.5.2008 shows that there are substantial changes in clauses
4 and 19. As argued by the learned counsel for the petitioners in
W.P.(C) No. 17813/08, the Apex Court had directed the parties to
discuss among themselves to arrive at a workable solution, which
led to the issuance of the Govt. Order dated 31.12.2005, which
finds reflection in the draft notification dated 9.5.2007, these are
valid contentions which could have been urged by the petitioners,
W.P.(C) No. 15194 OF 2008
had the Government notified clauses 4 and 19 of the notification
dated 06.05.2008, in the draft published on 9.5.2007. Though the
Government which had appointed the expert committee was not
bound by its recommendations still it must have valid reasons for
ignoring the recommendations. No reason whatsoever is
forthcoming in the counter affidavit. That apart the Government
also did not make it known to the petitioners that it proposes to
depart from the recommendations, while finalising the scheme by
notification dated 6.5.2008. In my view, these proposals ought to
have found a place in the draft notification and having not done, the
petitioners did not have any opportunity to raise their objections to
the provisions contained in the notification dated 6.5.2008. For this
reason also, clauses 4 and 19 of the notification dated 6.5.2008
deserves to be invalidated.
34. In my view, the State exceeded its powers by notifying
the approved scheme with provisions which are foreign to the
proposals notified inviting objections. I therefore hold that
clauses 4 and 19 of Ext. P5 are in excess of the powers conferred
on the 1st respondent under Section 100(2) of the Act and that these
W.P.(C) No. 15194 OF 2008
provisions were introduced in violation of the principles of natural
justice. The aforesaid provisions of Ext. P5 dated 6.5.2008
necessarily will have to be set aside and I do so.
35. However, it is clarified that this judgment will not stand in
the way of the respondents in publishing a fresh draft and proceed
with the matter afresh. It is also clarified that I have not examined
the merits of the various other contentions that have been raised by
both sides and I leave open these contentions which can be urged
as and when draft notification is published by the Government.
36. Applications for permits, regular or temporary, will be
considered by the authority concerned in the light of this judgment
and as expeditiously as possible, and at any rate within 8 weeks of
production of a copy of this judgment.
Writ petitions are disposed of as above.
ANTONY DOMINIC
JUDGE
jan/-