Factual and Procedural Background

These matters were heard together because they raised common questions of law and fact. The Special Land Acquisition Officer (Malaprabha Project, Saundatti) and various claimants filed appeals and cross-objections against a common judgment and award dated 22.11.2001 in LAG No. 345/2000 and connected matters.

The State acquired lands in Budihal Village, Bailhongal Taluk, for submergence under the Malaprabha Project. The Preliminary Notification was published on 31.7.1997 and the Final Notification on 17.9.1998. Possession of the lands had been taken earlier on 29.8.1985. The Land Acquisition Officer originally awarded compensation of Rs. 25,000 per acre. Claimants invoked Section 18(1) of the Land Acquisition Act seeking a reference; the Reference Court (trial court in the reference) awarded Rs. 50,000 per acre and awarded interest on the enhanced amount from the date of possession (29.8.1985).

The High Court (Abdul Nazeer, J.) heard the appeals/cross-objections and authored this common judgment.

Legal Issues Presented

  1. Whether the determination of compensation by the Reference Court at Rs. 50,000 per acre is just and proper.
  2. Whether the claimants are entitled to interest from the date of taking possession (29.8.1985) or only from the date of the Preliminary Notification (Section 4(1) notification).

Arguments of the Parties

Appellant's Arguments (Special Land Acquisition Officer / State)

  • The award of Rs. 50,000 per acre is excessive and exorbitant, particularly because the lands are dry (rain-fed) lands.
  • The Reference Court's award of interest from the date of possession is contrary to the law as declared by the Supreme Court in Union of India v. Budh Singh (1995 6 SCC 233); where possession was taken prior to publication of the Section 4(1) notification, interest should be awarded only from the date of publication of the notification.
  • Reliance was placed on a Division Bench decision of the High Court in Land Acquisition Officer v. Veerabhadraiah (MFA 4672/01 dated 2.7.2003) for the proposition that interest cannot be awarded for the period anterior to publication of the Section 4(1) notification.

Claimants' Arguments

  • The award of Rs. 50,000 per acre is too low given the material on record; the claimants sought a market value of Rs. 70,000 per acre based on comparable awards and the income-yield method: average yield (6.5 qtls/acre) × average price (Rs. 2,200/qtl) = gross income Rs. 12,150; less 40% cultivation cost = Rs. 7,290; applying a standard multiplier of 10 gives Rs. 72,900, and the claimants restricted their claim in cross‑objections to Rs. 70,000 per acre.
  • They relied on a previous decision of this Court in Special Land Acquisition Officer v. Basannagouda Sangappagouda (MFA No. 6128/01 & Crob No. 175/02 dated 8.9.03) where Rs. 70,000 per acre was awarded for similarly situated lands.
  • On interest, claimants contended they were entitled to interest from the date of possession and relied on multiple authorities including Prem Nath Kapur v. National Fertilizers Corporation (1996 2 SCC 71), Siddappa Vasappa Kuri v. Special LAO (2002 1 SCC 142), decisions of this Court (including Sankappa Kallappa Kalasad and Virupaxigouda Linganagouda Patil), HAL v. Muniswamy Reddy (ILR 1992 KAR 3319), Sachidananda Kakodkar v. Special LAO (Bombay HC, 1999 1 LACC 416) and D.V. Lakshmana Rao v. State of Karnataka (2001 4 Kar. L.J 185) to support entitlement to interest from the date of possession (argument also invoking the rule that later or larger-bench decisions govern conflicting precedents).

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Union of India v. Budh Singh (1995 (6) SCC 233) That statutory provisions of the Land Acquisition Act govern liability to pay interest; a court cannot award interest for any period anterior to publication of the Section 4(1) notification in the appropriate Gazette; publication of Section 4(1) gives legitimacy to possession taken under the Act; the Supreme Court in that case directed interest at 9% p.a. from a specified date in that matter. The High Court treated Budh Singh as directly on point for the question whether interest is payable from date of possession taken prior to Section 4(1) notification; relied upon Budh Singh to hold that interest is payable only from the date of the Preliminary (Section 4(1)) notification.
Land Acquisition Officer v. Veerabhadraiah (MFA 4672/01 dated 2.7.2003) Division Bench of this Court followed Budh Singh and held that when compensation is determined with reference to the date of Preliminary notification, interest cannot be calculated from date of taking possession; Court has no jurisdiction to award interest for period anterior to Section 4(1) notification. Cited by the appellant and relied on by the High Court as a recent Division Bench decision of this Court supporting the principle in Budh Singh; used to reinforce the conclusion that interest should run only from the date of the Preliminary Notification.
Prem Nath Kapur v. National Fertilizers Corporation of India Ltd. (1996 2 SCC 71) In the context of entitlement to interest and order of appropriation of deposited amounts, the Apex Court indicated that claimants are entitled to interest from the date of possession (as stated in the opinion). Relied upon by claimants to argue entitlement to interest from date of possession. The High Court observed that the precise point regarding interest from pre-notification possession did not directly arise in Prem Nath Kapur and therefore found it not applicable to displace Budh Singh on the facts of this case.
Siddappa Vasappa Kuri v. Special Land Acquisition Officer ((2002) 1 SCC 142) Held that if possession is taken prior to publication of Section 4(1) notification, additional compensation is payable only from the date of Section 4(1) notification and not from the date of taking possession; starting point for calculation under Section 23(1)(a) is date of publication of Section 4(1). The High Court noted Siddappa's holding on additional compensation and the date for calculation, but treated it (along with Prem Nath Kapur) as not altering the direct applicability of Budh Singh to the present question of interest from pre-notification possession.
HAL v. Muniswamy Reddy (ILR 1992 KAR 3319) Division Bench of the Karnataka High Court held that interest under Section 34 should be awarded from the date of taking possession, on the ground of deprivation of right to possession. Cited by claimants to support interest from date of possession. The High Court acknowledged this conflicting view but preferred to follow the Supreme Court's ruling in Budh Singh and the Division Bench decision in Veerabhadraiah which align with that Supreme Court authority.
Special Land Acquisition Officer v. Sankappa Kallappa Kalasad (1997 (2) KLJ 371) Single Judge decision cited as holding interest payable from date of taking possession. Cited by claimants. The High Court noted the existence of such decisions but treated them as conflicting authorities that do not control over the Supreme Court's view in Budh Singh.
Special Land Acquisition Officer v. Virupaxigouda Linganagouda Patil (1997 (2) KLJ 453) Single Judge decision also cited as supporting interest from date of possession. Cited by claimants; the High Court acknowledged it but concluded Budh Singh and the Division Bench decision in Veerabhadraiah were the proper authorities to follow for the present issue.
Sachidananda Kakodkar v. Special Land Acquisition Officer (1999 1 LACC 416) Bombay High Court, placing reliance on HAL, held that interest is payable from the date of taking possession rather than from date of Section 4(1) notification. Cited by claimants. The High Court recorded this conflicting view but did not adopt it, preferring the Supreme Court's authority in Budh Singh for the present facts.
D.V. Lakshmana Rao v. State of Karnataka (2001 4 Kar. L.J 185) Addressed the rule applicable when there are conflicting judgments of the Supreme Court: typically the later decision prevails, but where an earlier decision is of a larger Bench and a later is of a smaller Bench, the larger Bench's decision will be binding. Cited by claimants to argue that larger‑bench decisions should govern. The High Court discussed the principle but found that the situation in the present case did not require applying that rule to displace Budh Singh; concluded Budh Singh was directly on point.
Special Land Acquisition Officer v. Basannagouda Sangappagouda (MFA No. 6128/01 & Crob No. 175/02 dated 8.9.2003) A decision of this Court awarding Rs. 70,000 per acre for lands similarly situated (Malaprabha Project acquisitions) and relying on similar documentary material. The High Court relied on this decision as a relevant and persuasive comparative judgment and, together with the Reference Court's material (yield, price, deduction, multiplier), used it as a guiding precedent to fix market value at Rs. 70,000 per acre for the present lands.

Court's Reasoning and Analysis

The High Court undertook a two‑stage analysis corresponding to the two points framed.

On compensation (Point (i)):

  • The Reference Court's determination was examined: the Reference Court relied on Ex. P.2 (yield certificate), Ex. P.3 (APMC price list, Bailhongal), and prior judgments (Ex. P.4, Ex. P.5) in deciding market value.
  • The Reference Court had findings that DCH cotton was cultivated on the lands; there were no wells/borewells (lands are dry, rain‑fed); Ex. P.2 showed yield ~6.527 qtls/acre and the Court adopted a minimum yield of 6.5 qtls/acre. The Reference Court found average price about Rs. 2,200 per quintal, yielding gross income of Rs. 12,150 per acre; after deducting 40% for cultivation costs, net returns were about Rs. 7,290 per acre; applying standard multiplier of 10 produced Rs. 72,900, and claimants limited their claim to Rs. 70,000 per acre.
  • The High Court noted that prior awards for similarly situated lands are relevant evidence and are a safe guide because some element of estimation is inherent in land‑value determinations. In particular, the Court relied on the earlier decision in Basannagouda Sangappagouda where Rs. 70,000 per acre was awarded for comparable lands.
  • On balancing the Reference Court's calculations, the documentary material and the comparable judgment, the High Court concluded that Rs. 70,000 per acre was the appropriate market value to be awarded to the claimants.

On interest (Point (ii)):

  • There was no dispute that possession was taken prior to the Preliminary Notification (Section 4(1)) — question was whether interest under Section 34 of the Land Acquisition Act is payable from the date of possession or from the date of Preliminary Notification.
  • The High Court analyzed the Supreme Court's decision in Union of India v. Budh Singh (1995 6 SCC 233). That decision holds that the Act is a self-contained code for interest liability; a court cannot award interest for the period anterior to publication of the Section 4(1) notification in the appropriate Gazette and that publication is a condition precedent that legitimizes possession under the Act. In Budh Singh the Supreme Court directed interest at 9% p.a. from a certain date in that case.
  • The Court also examined a Division Bench decision of this Court in Veerabhadraiah, which followed Budh Singh and held that where compensation is determined with reference to the date of Preliminary notification, interest cannot be calculated from the date of taking possession.
  • Claimants' reliance on Prem Nath Kapur and Siddappa Vasappa Kuri was considered. The High Court observed that Prem Nath Kapur did not directly address the precise point now before the Court; Siddappa related to additional compensation and set the date for calculation under Section 23(1)(a) from publication of Section 4(1). The High Court concluded that neither decision displaced the applicability of Budh Singh to the present facts.
  • The Court acknowledged other judgments (including HAL, Sankappa Kallappa, Virupaxigouda, Sachidananda Kakodkar) favoring interest from date of possession but treated these as conflicting authorities which do not override the Supreme Court's pronouncement in Budh Singh or the Division Bench's reliance on it in Veerabhadraiah.
  • On this basis the High Court held that the claimants are entitled to interest only from the date of issuance of the Section 4(1) (Preliminary) notification.

Holding and Implications

Core Rulings:

  • The market value of the acquired land is fixed at Rs. 70,000 per acre.
  • The claimants are entitled to interest from the date of the Preliminary Notification (Section 4(1)), along with all other statutory benefits and interest on solatium.
  • The claimants are entitled to proportionate costs.

Implications:

  • Direct effect: The Reference Court's award is varied — compensation is increased to Rs. 70,000 per acre and the period for which interest is payable is fixed to commence from the date of the Preliminary (Section 4(1)) notification, together with statutory benefits and interest on solatium; proportionate costs are awarded to the claimants.
  • On precedent: The Court applied and followed the Supreme Court's decision in Union of India v. Budh Singh and a Division Bench decision of this Court (Veerabhadraiah) on the specific legal question regarding the commencement date for interest when possession preceded the Section 4(1) notification. The opinion does not purport to lay down any new, broader precedent beyond the application of these authorities to the facts before the Court.

    The Special Land Acquisition Officer v. Fakirappa Mugubasappa And Others

    6. 1997 (2) KLJ 371 - Special Land Acquisition Officer, Malaprabha Project IV, Ramdurga v. Sankappa Kallappa Kalasad (deced.) by L.R (Ref) 7, 17 7. 1997 (2) KLJ 453 - Special Land Acquisition Officer, Malaprabha Project IV, Ramdurga v. Virupaxigouda Linganagouda Patil (do) 7, 17 8. ILR 1992 KAR 3319 - HAL v. Muniswamy Reddy (do) 7, 17 9. 1999 (1) LACC 416 - Sachidananda Kakodkar v. Special Land Acquisition Officer (do) 7, 17 10. 2001 (4) Kar. L.J 185 - D.V Lakshmana Rao v. State of Karnataka (do) 7, 18

    Sri K.P Ashok Kumar, HCGP for Appellant
    Sri Lokesh Malavalli, Advocate for Respondents
    Sri Lokesh Malavalli, Advocate for Cross Objectors
    Sri K.P Ashok Kumar, HCGP for Respondent

    JUDGMENT

    Abdul Nazeer, J.:—

    Since common questions of law and fact are involved in all these appeals, with the consent of the learned Counsel for the parties, they are heard and disposed of by this Common Judgment.

    2. These appeals and cross-objections are filed by the Special Land Acquisition Officer, Malaprabha Project, Saundatti and the claimants respectively being aggrieved by the common judgment and award passed in LAG No. 345/2000 and connected matters dated 22.11.2001

    3. The appellant has acquired the lands in question situated in Budihal Village, Bailhongal Taluk, for a public purpose, for the submergence of Malaprabha Project Preliminary Notification was issued on 31.7.1997 followed by a Final Notification dated 17.9.1998 The Appellant has passed an award on 15.4.2000 Possession of the lands was already taken on 29.8.1985

    4. The Land Acquisition Officer has awarded a compensation of Rs. 25,000/- per acre for the acquired lands. Being dis-satisfed with the award, the claimants filed applications under Section 18(1) of the Land Acquisition Act seeking reference before the Civil Judge, Sr. Dn. Bailhongal. By the judgment and award impugned in these appeals, the Reference Court awarded a compensation of Rs. 50,000/- per acre. The Reference Court awarded interest on the enhanced amount from the date of possession i.e from 29.8.1985

    5. I have heard the learned Additional Government Advocate for the Appellant and Sri Lokesh Malavalli, learned Counsel for the claimants/cross-objectors.

    6. Learned Additional Government Advocate contends that the award of Rs. 50,000/- per acre is excessive and exorbitant more so because the lands are dry lands. He further contends that the award of interest from the date of its possession is contrary to the law declared by the Hon'ble Supreme Court in the case of Union of India v. Budh Singh . 1995 6 SCC 233.. He argues that since possession was taken prior to the date of Preliminary Notification, interest is required to be awarded only from the date of Preliminary Notification. He has also placed reliance on the Division Bench decision of this Court in the case of Land Acquisition Officer v. Veerabhadraiah . MFA 4672/01 dd 2.7.03, for the said proposition.

    7. Per contra, learned Counsel for the claimants submits that the award of compensation at Rs. 50,000/- per acre is too low and is contrary to the material on record. Placing reliance on a decision of this Court in the case of Special Land Acquisition Officer v. Basannagouda Sangappagouda . MFA. No. 6128/01 and Crob No. 175/02 dd. 8.9.03 he submits that in identical circumstances, this Court has awarded compensation of Rs. 70,000/- per acre. He points out the finding of fact recorded by the Reference Court that the average price of DCH Cotton per quintal during the relevant period is Rs. 2,200/- and the average yield per acre is 6.5 quintal and the gross income per acre comes to Rs. 12,150/-. Even if the lands are treated as dry lands and 40% of the gross income is deducted towards cost of cultivation, the remaining amount comes to Rs. 7,290/-. On application of standard multiplier of 10, the market value comes to Rs. 72,900/-. He submits that the claimants are atleast entitled to Rs. 70,000/- per acre towards compensation. He further argues that since possession of the land was taken much earlier to the date of Preliminary Notification, the claimants are entitled to interest from the date of taking possession. In this connection he relies on decisions of the Hon'ble Supreme Court in the case of Prem Nath Kapur v. National Fertilizers Corporation of India Limited . 1996 2 SCC 71., Siddappa Vasappa Kuri v. Special Land Acquisition Officer . 2002 1 SCC 142 and the decisions of this Court in the case of Special Land Acquisition Officer, Malaprabha Project IV, Ramdurga v. Sankappa Kallappa Kalasad (Deceased) BY L.R . 1997 2 KLJ 371. Special Land Acquisition Officer, Malaprabha Project IV, Ramdurga v. Virupaxigouda Linganagouda Patil . 1997 2 KLJ 453., Hal v. Muniswamy Reddy . ILR 1992 KAR 3319. and the decision of the Bombay High Court in the case of Sachidananda Kakodkar v. Special Land Acquisition Officer . 1999 1 LACC 416. He also relies on the decision of this Court in the case of D.V Lakshmana Rao v. State of Karnataka . 2001 4 Kar. L.J 185. for the proposition that if there are two conflicting judgments of the Hon'ble Supreme Court, later will prevail over the earlier.

    8. In the light of the rival contentions, the points that arise for consideration are as follows:

    i) Whether the determination of compensation by the Reference Court at Rs. 50,000/- per acre is just and proper.

    ii) Whether the claimants are entitled for interest from the date of taking possession.

    Re. Point No. (i)

    9. The Reference Court has mainly relied on Ex. P. 2 Yield Certificate, Ex. P. 3 Price List issued by APMC, Bailhongal, Ex. P. 4 copy of the judgment in LAC No. 105/1994, Ex. P.5 copy of the judgment in LAC A No. 155/1995 for determination of the market value. The Reference Court upon consideration of the material on record has come to a conclusion that the claimants were growing DCH Cotton on the said land. Material on record also shows that in the acquired lands there were no open wells and bore-wells and all the acquired lands are dry lands and rain fed lands. As per Ex. P. 2, yield of DCH Cotton for the year 1996-1997 is 6.527 quintals per acre. Preliminary Notification is dated 31.7.1997 The claimants have not produced yield certificate for the relevant year 1997-1998. The Reference Court has adopted yield certificate Ex. P. 2 for the year 1997-1998. The Reference Court records a finding that the average price of DCH Cotton per quintal during the relevant period is Rs. 2,200/-. The average price of DCH Cotton if multiplied by a minimum yield per acre 6.5 quintal the gross income per acre comes to Rs. 12,150/- and 40% of the gross income is required to be deducted towards cost of cultivation. The balance comes to Rs. 7,290/-. By applying the standard multiplier of 10, the market value comes to Rs. 72,900/-. The claimants have restricted their claim to Rs. 70,000/- in the Cross-Objections.

    10. Learned Counsel for the claimants has relied on a decision of this Court in the case of Special Land Acquisition Officer v. Basanagouda Sangappagouda, Khuslapur, (Supra) and submits that this Court has awarded a compensation of Rs. 70,000/- for the lands which were similarly situated. In Basanagouda's case, Preliminary Notification was issued on 18.9.1997 i.e about 1 and 1/2 months prior to the date issue of similar Notification in this case. The lands are acquired for Malaprabha Project situated at Bailhongal Taluk. Similar documents have been relied on by the claimants before the Reference Court seeking determination of compensation. After consideration of the material on record, this Court has awarded a compensation of Rs. 70,000/- per acre.

    11. It is fairly well settled that in the matters relating to Land Acquisition, the judgment of a Court in regard to similar lands or properties would be a relevant piece of evidence. It is to be noted that an element of guesswork is inherent in most of the cases involving determination of the market value of the acquired land. Needless to say that the previous awards in respect of similarly situated lands is a safe-guide for determination of compensation. Having regard to the material on record. I am of the view that the claimants are also entitled for compensation of Rs. 70,000/- per acre.

    Re. Point No. (ii).

    12. There is no dispute that possession of the land was taken earlier to the date of preliminary Notification. The question therefore to be considered is whether the claimants are entitled to interest under Section 34 of the Land Acquisition Act from the date of Preliminary Notification or from the date of taking possession. In Budh Singh's case (1995 (6) SCC 233), similar question arose for consideration. In the said case, possession of the land was taken on 15.3.1963 The High Court awarded interest at 18% p.a from the date of possession i.e from 15.3.1963 till 15.11.1984, preceding the date on which the notification under Section 4(1) was published. The Hon'ble Supreme Court held that payment of interest under the Act is squarely covered by the provisions of the Act. It is further held that the parameter for initiation of the proceedings is the publication of the notification under Section 4(1) of the Act in the State Gazette or in an appropriate case in District Gazette as per the local amendments. But the condition precedent is publication of the notification under Section 4(1) in the appropriate gazette and that would give legitimacy to the State to take possession of the land in accordance with the provisions of the Act. The relevant portion reads as under:

    “5. The other provision relevant for this purpose is Section 28 of the Act, which empowers the reference Court or the High Court for awarding interest on the enhanced compensation from the date of taking possession till date of payment as referred to here-in-before. Thus, it could be seen that the statute covers the entire field of operation of the liability of the State to make payment of interest and entitlement thereof by the owner when land has been taken over and possession in consequence thereof, the land owner was deprived of the enjoyment thereof. Thus, it could be seen that the Court has no power to impose any condition to pay interest in excess of the rate and manner prescribed by the statute as well as for a period anterior to the publication of Section 4(1) of the Act in the State Gazette or in an appropriate case in District Gazette as per the local, amendments. But the condition precedent is publication of the notification under Section 4(1) in the appropriate gazette. That would give legitimacy to the State to take possession of the land in accordance with the provisions of the Act. Any possession otherwise would not be considered to be possession taken under the Act. In fact, a situation has been envisaged under Section 48(2) of the Act, namely, that when proceedings under the Act were initiated and in the midstream the proceedings were dropped, the owner who has been deprived of the enjoyment of the property, the statute prescribes the remedy of determination of the amount of compensation due to the owner for the damages suffered by the owner in consequence of the notice of the proceedings under the Act. The statute also imposes liability on the State to reimburse the costs incurred by the owner to defend the proceedings under the Act. The Act is a self contained code and common law principles of justice, equity and good conscience cannot be extended in awarding interest, contrary to the provisions of the statute.”

    13. After consideration of the relevant provisions of the Land Acquisition Act, the Hon'ble Supreme Court has directed payment of interest at 9% p.a on enhanced compensation from 16.10.1984 The Supreme Court has further held as follows:

    “Thus considered, we are of the opinion, that the High Court was clearly in error in directing payment of interest at 18% per annum and that too, from the date of taking possession. The respondents are entitled to interest at 9% per annum on enhanced compensation from 16.10.1984 The appeal is accordingly allowed. However, since the period of limitation for filing and suit for damages from use and occupation by the Stage from 15.3.1963 to 15.11.1984 is barred, though legally we cannot give any direction for payment, it is open to the appropriate Government to consider the same to do the needful to the claimants. No costs.”

    14. A Division Bench of this Court in Veerabhadraiah's case (MFA No. 4672/2001 disposed of on 2.7.2003) has taken a similar view following the decision of the Supreme Court in Budh Singh's case. The relevant portion is as follows:

    “The Reference Court has awarded interest at the rate of 9% p.a for one year from the date of taking possession (27.3.1986) and thereafter at the rate of 15% p.a When the compensation is determined with reference to the date of Preliminary notification and not with reference to date of taking possession of the land, obviously, interest cannot be worked out from the date of taking possession. The matter is now covered by the decision of the Supreme Court in Union of India v. Budh Singh (1995 (6) SCC 233), wherein the Supreme Court held that Court has no jurisdiction to award interest for any period anterior to notification under Section 4(D of the Act. Hence, the direction of the Reference Court for payment of interest from the date of taking possession of the land is liable to be set aside.”

    (Emphasis supplied)

    15. Placing reliance on the decision of the Supreme Court in Prem Nath Kapur's case, (1996 (2) SCC 71) learned Counsel for the claimants submit that the claimants are entitled to interest under Section 34 of the LA Act from the date of possession. He further submits that since this decision is rendered by a Larger Bench, it will prevail over Budh Singh's case. In Prem Nath Kapur's case, this point did not directly arose for consideration. The question that arose for consideration is at para-4 which is as follows:—

    “The question, therefore, is when does the liability of the State to pay interest cease? Whether the owner of the land is entitled to appropriate from the amount deposited towards costs and then towards interest and then principal amount and again interest on total amount?”

    In that context, the Apex Court held that the claimants are entitled to interest from the date of possession.

    16. In Siddappa's case ((2002) 1 SCC 142 : AIR 2001 SC 2951) the point for consideration was payment of additional compensation. It is held that if possession of the land is taken prior to the publication of Section 4(1) notification, owner is entitled to additional compensation only from the date of Section 4(1) notification and not from the date of taking over possession. It is further held that the starting point for the purpose of calculating the amount to be awarded under Section 23(1)(a) at the rate of 12% p.a on the market value is the date of publication of Section 4(1) notification and the preliminary point for that purpose is either the date of award or the date of taking possession whichever is earlier.

    17. In Hal's case (ILR 1992 KAR 3319) a Division Bench of this Court has taken a view that interest under Section 34 has to be awarded from the date of taking possession in consideration of deprivation of right to possession. Similar view has been taken by a learned Single Judge of this Court in Sangappa Kallappa's case (1997 (2) KLJ. 371) and in Virupaxigouda Linganagouda Patil's case (1997 (2) KLJ 453). Even in the case Sachhidananda Kakodkar's case, Bombay High Court placing reliance on the Division Bench decision of our High Court in Hal's case held that interest is payable from the date of taking possession of the land and not from the date of issuance of Section 4(1) notification.

    18. Learned Counsel for the claimant's placing reliance on D.V Lakshmana Rao's case (2001 (4) KLJ 185) submits that in the light of the conflicting judgments of the Supreme Court, the decisions in Prem Nath Kapur case and Siddappa's case, have to be followed since the said decisions are rendered by a Larger Bench of the Hon'ble Supreme Court. It is true that whenever there are conflicting judgments, the later will prevail over the earlier. In Lakshmana Rao's case, this Court has held that if there are two conflicting judgments of the Supreme Court with equal number of Judges, the later will prevail over the earlier but where the earlier judgment is of a larger bench and the later judgment is of a smaller bench, then the decision of the larger bench will be binding. In this case, such a situation does not arise for consideration. In Budh Singh case, the point for consideration was when possession is taken prior to the date of 4(1) notification, whether interest is payable from the date of taking possession. The Hon'ble Supreme Court has also held that issuance of notification under Section 4(1) in appropriate gazette would give legitimacy to the State to take possession and any possession taken otherwise would not be considered to be a possession taken under the Act. The Division Bench of this Court in Veerabhadraiah's case has also taken a similar view. The decisions of the Apex Court in Prem Nath Kapur's case and Siddapa's case are not applicable to the facts of this case. In the light of the decision of the Supreme Court in Budh Singh's case which is directly on the point followed by the recent decision of the Division Bench in Veerabhadraiah's case, I am of the view that the claimants are entitled to interest only from the date of issuance of 4(1) notification. I answer the point accordingly.

    19. In the light of the above discussion, the appeals and cross-objections are disposed of in the following terms:

    i) The market value of the land is determined at Rs. 70,000/- per acre.

    ii) The claimants are entitled to interest from the date of Preliminary Notification along with all other statutory benefits and also interest on solatium.

    iii) The claimants are entitled to proportionate costs.

    Use AI to get other relevant cases.

    Comments

    The Special Land Acquisition Officer v. Fakirappa Mugubasappa And Others
    (Feb 23, 2004)