Judgment Summary — K.A. Swami, C.J.

Factual and Procedural Background

The State Government issued a notification under S. 4(1) of the Land Acquisition Act, 1894 (as amended in 1984) proposing acquisition of 103.72 acres in Kuniamuthur village, Coimbatore District for public education-related purposes. The S. 4(1) notification was published in the Official Gazette on 21.11.1984. Publication in newspapers and the local substance-publication occurred later (newspapers: “Daily Thanthi” and “The Hindu” during November 1985; public notice in the locality on 29.11.1985). Objections were filed and S.5-A enquiries were held (25.4.1986 and 22.9.1986). A declaration under S.6(1) was issued on 18.11.1986 and published in late November 1986.

Several writ petitions challenged the acquisition proceedings. A learned single Judge allowed certain writ petitions and quashed the acquisition proceedings by order dated 16.9.1991 in W.P. Nos. 6001 of 1990, 14396, 15994 and 15995 of 1988. The State of Tamil Nadu and the Sub-Collector, Coimbatore (W.A. Nos. 28–31 of 1992) and V.L.B. Trust (W.A. Nos. 37–40 of 1992) appealed from that common order. The present judgment is the appellate decision allowing the State’s appeals and setting aside the single Judge’s order.

Legal Issues Presented

  1. Whether the time gap between publication of the S.4(1) notification in the Official Gazette (21.11.1984) and publication of the substance of the notification in the locality (29.11.1985) vitiated the acquisition proceedings?
  2. Whether the time gap between the two publications had been explained by the acquiring authority?
  3. Whether the time gap between the two publications caused any prejudice to the petitioners?
  4. Whether the petitioners were guilty of laches in approaching the Court?
  5. Whether the order of the learned single Judge quashing the acquisition proceedings was liable to be interfered with?

Arguments of the Parties

Appellants' (State and V.L.B. Trust) Arguments

  • The time gap between Gazette publication (21.11.1984) and local publication (29.11.1985) had been sufficiently explained by administrative difficulties arising from implementation of the amended Act, translation and procedural streamlining, and an errata/ratification process; thus the delay was justified.
  • The delay did not cause prejudice to the petitioners; the petitioners had not pleaded any prejudice.

Respondents' (Petitioners) Arguments

  • Counsel for the petitioners argued that the long time gap effectively unlinked the Gazette notification and the local publication, amounting to non-compliance with the mandatory requirement to publish the substance of the notification in the locality under S.4(1).
  • It was contended that where there is such a long gap, demonstrating prejudice is unnecessary because public notice is a mandatory requirement and its non-compliance vitiates the proceedings.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Deepak Pahwa v. Lt. Governor of Delhi (AIR 1984 S.C. 1721) - Mandatory compliance with S.4(1) (Gazette, two newspapers, and local public notice).
- Publication in Gazette and local notice need not be simultaneous; they must be contemporaneous (a gap is permissible).
- A time gap alone does not void acquisition; if gap is so large as to prima facie show lack of bona fides, further probing is required to see if delay caused prejudice.
The Court applied these propositions as the controlling legal test. It held that a long gap does not automatically invalidate the notification; absent allegations of lack of bona fides or actual prejudice, the gap did not vitiate the acquisition in the present case.
State of Mysore v. V.K. Kannan (AIR 1975 S.C. 2190) Principle on laches: challenges to notifications should be made within a reasonable time; delay may disentitle a party to relief. The Court applied the laches principle from this decision to hold that petitioners who delayed (3–5 years) despite knowledge and participation in acquisition proceedings were guilty of laches and disentitled to relief.
M. Vijayaraghavan v. State of Tamil Nadu (1993 Writ L.R. 294) Earlier Division Bench consideration of similar explanations for delay; acceptance of some explanations for delay in publication. The Court noted that the Division Bench in Vijayaraghavan had accepted explanations offered and found no prejudice. That decision was relied upon in assessing the acceptability of the State's explanation up to 8.5.1985.
Nandakumar v. State of Tamil Nadu & another (1986 Writ L.R. 164) Application of Deepak Pahwa principles where no explanation for time gap was offered; contemporaneity required and an unexplained long gap found to break continuity of action. The Court distinguished Nandakumar on facts because in that case no explanation was provided, whereas in the instant case explanations were offered for a substantial part of the period.
P. Venkatarathinam Naidu v. State of Tamil Nadu & 2 others (1990 T.L.N.J. 264) Reliance on Deepak Pahwa where no counter-affidavit/explanation was filed; illustrating that unexplained gaps invalidate continuity. The Court treated this decision as factually similar to Nandakumar and distinguishable on facts because an explanation existed here for part of the period.
Government of Tamil Nadu v. S. Jayaraman (1992 Writ L.R. 332) Observations about computation of time for S.6 declaration (whether counted from first Gazette publication or last publication/public notice); an obiter remark on time gap exceeding two months was noted. The Court held the remarks about two months to be obiter and not a ratio; it stated the specific observation could not be read as a binding proposition that gaps over two months automatically invalidate acquisition.
Tamil Nadu State Housing Board v. Shanmughasundara Nadar & ors. (1988 Writ L.R. 55) Suggested that challenges to S.4 compliance should be raised before S.5-A enquiry completes so defects can be remedied. The Court expressly disagreed with this proposition in its broad form, emphasizing that a party who approaches under Article 226 without undue delay after S.6 may not be put out of court; nonetheless, the Court did not need to decide this issue for the present case.
Satish Kapur v. State of Haryana (AIR 1932 Punj. & Har. 276); Rattan Singh v. State (AIR 1976 Punj. & Har. 279); Suryanarayana Reddy v. Andhra Pradesh (AIR 1983 Andh. Pra. 17); Mohd. Khaja v. Govt. of A.P. (AIR 1982 HOC 270); Sanjivalah Nagar Depressed and Backward Classes Sangh v. District Collector, Hyderabad (AIR 1983 Andh. Pra. 142) Various High Court decisions referenced in Deepak Pahwa concerning the interpretation of contemporaneity and permissibility of a time-gap between Gazette publication and local notice. The Supreme Court in Deepak Pahwa reviewed these decisions; the present Court recognized that Deepak Pahwa approved certain Full Bench/Division Bench observations which reject a rule of strict simultaneity.
Shahnaz Saliman v. Govt. of A.P. (Full Bench, unreported) Full Bench observations that simultaneity is not required; publication in Gazette and local substance-publication need not be exactly simultaneous and exact simultaneity cannot be imported into S.4(1). The Court noted the Full Bench observations (as quoted in Deepak Pahwa) and agreed with the legal proposition that exact simultaneity is not mandated.

Court's Reasoning and Analysis

The Court proceeded in structured steps:

  1. Chronology and factual matrix: It set out the dates of Gazette publication (21.11.1984), newspaper publications (November 1985) and local public notice (29.11.1985), the S.5-A enquiries, and the S.6 declaration (published late November 1986).
  2. Identified the legal test from Deepak Pahwa: compliance with S.4(1) is mandatory; simultaneity is not required but the two events must not be so separated by time as to appear "unlinked" or to raise a prima facie inference of lack of bona fides; where the gap is large, the court must inquire into causes and any prejudice.
  3. Evaluated State's explanation: The State explained administrative reasons related to enactment/implementation of the amended Act, translation, errata/ratification, and procedural delays. The Court found the explanation valid up to 8.5.1985 and accepted the relevance of errata and administrative sequencing for that period. The explanation for the period 8.5.1985 to 13.11.1985 was held to be general and not specific.
  4. Assessed bona fides and prejudice: The Court noted that the petitioners did not plead lack of bona fides on the part of the acquiring authority, nor did they plead any prejudice caused by the delay. The purpose of acquisition was not disputed. Applying Deepak Pahwa, the Court held that absent allegations of bad faith or specific prejudice, the time-gap did not vitiate the acquisition.
  5. Distinguished adverse authorities: The Court distinguished cases (e.g., Nandakumar, P. Venkatarathinam Naidu) where no explanation was offered, noting those decisions turned on the absence of any explanation. It treated an observation in Government of Tamil Nadu v. S. Jayaraman as obiter and not determinative.
  6. Considered laches: The Court accepted the State's contention that petitioners delayed unduly in filing writ petitions (some petitions filed three to five years after the relevant publication dates), despite earlier participation (filing objections and attending S.5-A enquiry). Relying on State of Mysore v. V.K. Kannan, the Court concluded petitioners were guilty of laches and therefore disentitled to relief under Article 226.
  7. Conclusion from combined analysis: Because the time-gap did not, on the facts and in absence of pleaded bad faith or prejudice, vitiate the acquisition, and because petitioners were guilty of laches, the Court concluded the single Judge's order quashing acquisition proceedings should be interfered with and set aside.

Holding and Implications

Holding: Writ Appeals Allowed; the order of the learned single Judge dated 16.9.1991 is set aside and the writ petitions (W.P. Nos. 14396, 15994, 15995 of 1988 and 6001 of 1990) are dismissed.

Implications and direct consequences:

  • The acquisition proceedings, insofar as challenged in the listed writ petitions, are restored and are no longer quashed by the single Judge's order.
  • The petitioners were held guilty of laches; accordingly they are disentitled to relief under Article 226 on that ground.
  • The Court emphasized that a time-gap between Gazette publication and local publication does not automatically invalidate acquisition; courts must examine explanation, bona fides and whether prejudice is shown. On the facts, no such invalidation was warranted here.
  • There will be no order as to costs.

Broader legal implications: The judgment applies and follows the Supreme Court's framework in Deepak Pahwa regarding contemporaneity vs. simultaneity of S.4(1) publications and reaffirms that unexplained delays can invalidate proceedings but that an explained gap without allegations of bad faith or prejudice will not necessarily do so. The Court distinguished earlier cases where no explanation existed. The opinion does not purport to lay down a new precedent beyond its application of existing authorities.

Order pronounced by K.A. Swami, C.J.; Writ Appeals allowed; single Judge's order set aside; writ petitions dismissed; no costs.

    W.A Nos. 28 To 31 Of 1992: State Of Tamil Nadu And Another v. Rajendran And 23 Others.

    JUDGMENT — K.A Swami, C.J

    These writ appeals are preferred against the order dated 16.9.1991 passed by the learned single Judge in W.P Nos. 6001 of 1990, 14396, 15994 and 15995 of 1988. W.A Nos. 28 to 31 of 1992 are by the state of Tamil Nadu and the Sub-Collector, Coimbatore against the common order dated 16.9.1991 by the learned single Judge in W.Ps 6001 of 1990, W.P 14396, 15994, 15995 of 1988. Whereas W.A Nos. 37 to 40 of 1992 are also preferred against the very same order by V.L.B Trust, Kuniamathur, Coimbatore District for whose benefit the acquisition in question is made. All these writ petitions are decided by a common order. Learned single Judge has allowed the writ petitions and quashed the acquisition proceedings. Hence, the State Government and the V.L.B Trust have come up in these writ appeals.

    2. In the light of the contentions urged by both sides the following points arise for consideration:—

    i) Whether the time gap between the publication of the notification in the official gazette under S. 4(1) of the Act on 21.11.1984 and publication of the substance of the said notification in the locality on 29.11.1985 has vitiated the acquisition proceedings?

    ii) Whether the time gap between the two publications has been explained by the acquiring authority?

    iii) Whether the time gap between the two publications has caused any prejudice to the petitioners?

    iv) Whether the petitioners are guilty of laches?

    v) Whether the order of the learned single Judge is liable to be interfered with?

    3. Facts necessary for the purpose of considering the contentions urged under the aforesaid points on both sides are as follows:— The State Government published in the Official Gazette dated 21.11.1984 the notification dated 20.10.1984 under S. 4(1) of the Land Acquisition Act, 1894, as amended in 1984, hereinafter referred to as ‘the Act’ in G.O.Ms No. 1382 Education Department proposing to acquire an extent of 103.72 acres comprised in various survey numbers situated in Kuniamuthur village, Coimbatore District, for the purposes of construction of a polytechnic, a Girls' High School, Hostel Buildings, Quarters, Playground, etc. The said notification was published in the ‘Daily Thanlhi’ dated 13.11.1985 and ‘The Hindu’ dated 20.11.1985 The substance of the notification was published in the locality on 29.11.1985 Persons interested in the lands filed objections. Enquiry under S. 5-A of the Act was held on 25.4.1986 and 22.9.1986 A report was submitted by the land Acquisition Officer to the State Government under S. 5-A of the Act and the same was accepted by the State Government and a declaration under S. 6(i) of the Act in G.O.Ms No. 1857, Education Department, dated 18.11.1986 was published in the Gazette on 26.11.1986, and in the newspaper ‘Daily Thanthi’ on 27.11.1986 and ‘Indian Express’ on 28.11.1986, a substance of the same was also published in the locality on 28.11.1986

    4. It is also to be noticed that prior to the filing of these writ petitions, one Vijayaraghavan one of the persons interested in some of the lands acquired under the notifications in question fifed W.P No. 9150 of 1987 challenging both the notifications issued under Ss. 4(1) and 6(1) of the Act. It was dismissed on 16.9.1987 In addition to this, there was another W.P No. 5377 of 1987, filed by one Francis questioning the Declaration made under S. 6(1) of the Act. It was also dismissed on 23.9.1987 Vijayaraghavan went up in W.A No. 74 of 1989 and the same was dismissed on 21.12.1990 and the said judgment is reported in M. Vijayaraghavan v. State of Tamil Nadu (1993 Writ L.R 294). The present writ petitions were filed after the aforesaid two writ petitions were dismissed. It is necessary to stale the dales on which each of these writ petitions was filed. W.P No. 14396 of 1988 was filed on 21.12.1988 and W.P No. 6001 of 1990 was filed on 22.11.1988 W.P Nos. 15994 and 15995 of 1988 were filed on and 5.5.1990 We have already pointed out that W.A Nos. 37 to 40 of 1992 are filed by the VLB Trust for whose benefit the acquisition of the lands in question has been made.

    5. Learned single Judge has held that there has been delay in the publication of the substance of the notification in the newspapers and in the locality under S. 4(1) of the Act and that delay has resulted in delinking of the acquisition proceedings from the publication of the notification under S. 4(1) in the official gazette, therefore, the acquisition proceedings are vitiated. On the ground of laches on the part of the petitioners, it has been held by the learned single Judge that there is no delay on the part of the petitioners in W.P Nos. 14396, 15994 and 15995 of 1988, therefore, it is not possible to hold that there is a delay on the part of the petitioners in W.P No. 6001 of 1990 as well. Accordingly, learned single Judge has allowed the writ petitions and quashed the land acquisition proceedings in so far as the petitioners' lands are concerned.

    Points (i) to (iii):

    As these points are interconnected, they are taken up together for determination.

    6. The contentions of the learned Government Pleader appearing for the appellants in W.A Nos. 28 to 31 of 1992 and also learned counsel for the appellants in W.A Nos. 37 to 40 to 1992 are as follows:—

    i) That the time gap between the publication of the nomination under S. 4(1) of the Act in the Gazette on 21.11.1984 and the public notice of the substance of the said notification in the locality on 29.11.1985 has been sufficiently explained.

    ii) That this delay or gap of time has also not caused any prejudice to the petitioners and that in fact it is the contention of learned Government Pleader that no such plea has been raised by the petitioners.

    7. On the contrary, it is the contention of Mr. Habibullah Badsha, learned Senior Counsel, that the time gap is so long that both are unlinked as such in law it amounts to non-publication of the substance of the notification issued under S. 4(1) of the locality, therefore it must be held that there is non-compliance with the mandatory requirement of causing public notice of the substance of the notification in the locality. Consequently, according to him, the question of demonstrating any prejudice caused to the petitioners does not arise.

    8. In support of the rival contentions, learned counsel have placed reliance on various decisions which will be adverted to shortly.

    9. The time gap between the two events as already pointed out is about one year. The publication in the official Gazette of the Notification under S. 4(1) of the Act was made on 21.11.1984 while the public notice of the substance of the same was given in the locality on 29.11.1985 The explanation offered by the State in this regard is as follows:

    “11. The Amended Land Acquisition Act had obtained the assent of the President on 24.9.1984 and was published in the Tamil Nadu Government Gazette on 5.12.1984 During this nascent stage, the procedures about the publication of dailies and in the locality has not been streamlined by the Government. Due to the introduction of the amended Act, all of a sudden, the implementation of the publication in the dailies and in the locality proper attention could not be paid in view of large number of Land Acquisition Cases pending at S. 4(1) stage. An errata ratification in the above case was also sent to Government for approval and publication on 5.1.1985

    12. The correct procedure to be followed about the publication in the dailies and in the locality was intimated by the District Revenue Officer to the Revenue Divisional Officer, Coimbatore, only in his letter dated 29.4.1985 received on 715.1985 The English notification has been transtated into Tamil and necessary Tamil Publications were sent to District Revenue Officer from the office of the Revenue Divisional Officer on 8.5.1985 itself. With reference to the letter No. 46366/85-1 of the Director of Information and Public Relations, the Elegant Publicities has published the notifications in The Hindu English edition daily on 20.11.85 and in ‘Daily Thanthi’ Coimbatore edition on 12.11.85 Soon after the publication made in the dailies by the Government, necessary locality publication was made on 29.11.85 There was no wilful intention for the belated publication in the dailies and the reasons were purely due to administrative reasons.”

    In reply to the averments made in Paragraphs 11 and 12 of the counter-affidavit, the petitioners in their additional affidavit have stated:—

    “7. It is most respectfully submitted that the averments in Para No. 11 of the Counter Affidavit do not explain the delay in publication that it could be termed as just and reasonable. It is wrong to state that the Act was amended ail of a sudden. The respondents cannot take the plea that proper attention could not be paid in view of a large number of land acquisition cases pending at the 4(1) notification stage and hence they could not implement the publication in the dailies and locality immediately. To say the least, it is an irresponsible statement. There is no justification for the long delay. The requirement, regarding publication of the substance of the notification in the locality was there, even before the amendment Act came into force. It is not as if the respondents were not aware of the method and manner of publication of the substance of the notification. It is not proper 16 state that the manner of publication in the dailies and in the locality had not been streamlined. It is wrong to state that the amended Act came all of a sudden and hence the publication became difficult.

    8. It is respectfully submitted that after 4(1) notification was published in the Gazette, the publication in the dailies and the substance of the notification to be published in the locality should be done within a short time. This has been insisted upon by the Government and the petitioners reliably learn that the Government had instructed the land acquisition authorities not to delay the publication in the dailies and the locality after the publication of the 4(1) notification in the Government Gazette. The publications are mandatory requirements and they cannot be flouted according to the whims and fancies of the Authorities.”

    A similar explanation offered in the earlier writ petitions where the vary same notification was questioned, was considered by a Division Bench of this Court in Vijayaraghavan, M v. The State of Tamil Nadu & 2 others (1995 Writ L.R 294) and it was observed as follows:

    “So far as the present case is concerned, we find there has been some explanation and that apart nothing has been said or substantiated before us to show any prejudice having been caused to or suffered by the appellant on that account. Consequently we sec no merit even otherwise in the plea either. Further, we see some force in the objection of the learned Government Pleader on the ground of laches in raising a point of the nature at a later stage relying upon the decision reported in state of Mysore v. V.K Kannan & Ors. (AIR 1975 S.C 2190) wherein the Apex Court in paragraph 16 held as follows:—

    “The notification under S. 4 was published on 13.4.1987 Object ions were filed by the respondent under S. 54 of the Act. The Deputy Commissioner submitted his report to the Government, The Government overruled the objections. The notification under S. 6 was published in the gazette on 19.10.1968 The Writ Petition challenging the validity of the notification was filed some time in Jury or August, 1969. We do not think that the respondent was entitled to challenge the validity of the notification under S. 4 of the Act as the Writ Petition challenging the notification was filed after an unreasonable lapse of time. If public notice as required by S. 4 of the Act was not given and that would per se vitiate the notification under S. 4 the appellant should have challenged its validity within a reasonable time of the publication of the notification. The respondent knew of the notification and filed objections under S. 5A of the Act. In these circumstances, we see no reason to accept the submission of counsel.”

    It may be relevant to notice that one of the explanations offered is that there was an erratum publication of the notification on 5.1.1985 It is true that when a large extent of land is acquired for a particular purpose, any error that is noticed in that notification will have the effect of withholding the entire acquisition proceedings. Therefore, though the errata is stated to relate to some other land acquired along with the lands in question under the impugned notification and not of the petitioner, nonetheless, the date of errata notification should also go to the benefit of the State in ex-plaining the delay that has occurred in the publication of the substance of the notification in the locality. The period from 5.1.1985 to 8.5.1985 has also been explained. For the subsequent period, there is no clear explanation. However, after the notification was published in the dailies, there has not been a delay in causing public notice of the substance of the notification to be given at the convenient places in the locality because it has been done on 29.11.1985, as the notifications were published in ‘Daily Thanthi’ and ‘The Hindu’ on 13.11.1985 and 20.11.1985 respectively. Learned single Judge has stressed; and before us learned Senior Counsel appearing for respondents also has emphasised, that there is virtually no explanation for the delay from 8.5.1985 to 13.11.1985 and, therefore, it is contended that S. 4(1) notification should be held to be void and consequently all further proceedings taken pursuant thereto must also fall to the ground.

    10. We must now consider as to whether the delay by itself will render the proceedings void. Learned Government Pleader has placed reliance on the decision in Deepak Pahwa v. Lt. Governor of Delhi (AIR 1984 S.C 1721) wherein the following propositions have been laid down: It is mandatory to comply with the requirements of S. 4(1) of the Act which provides that apart from the publication of the notification in the Official Gazette, the same shall have to be published in two newspapers, one in the vernacular, and another in English, and the public notice of substance of that notification shall also be published at the convenient places of the locality, where the land is situated. In paragraph 3 of the Judgment, it has been held that the publication in the Official Gazette and public notice in the locality are the essential elements of S. 4(1) and not the simultaneity or immediacy of the publication and the public notice. Paragraph 3 or the judgment reads thus:

    “3. It may be noticed at once that S. 4(1) does not prescribe that public notice of the substance of the notification should be given in the locality simultaneously with the publication of the notification in the Official Gazette or immediately thereafter. Publication in the Official Gazette and public notice in the locality are two vital steps required to be taken under S. 4(1) before proceeding to take the next step of entering upon the eland under S. 4(2). The time factor is not a vital element of S. 4(1) and there is no warrant for reading the words ‘simultaneously’ or ‘immediately thereafter’ into S. 4(1). Publication in the Official Gazette and public notice in the locality are the essential elements of S. 4(1) and not the simultaneity or immediacy of the Publication and the public notice. But since the steps contemplated by S. 4(2) cannot be undertaken unless, publication is made and public notice given as contemplated by S. 4(1), it is implicit that the publication and the public notice must be contemporaneous though not simultaneous or immediately after one another. Naturally contemporaneity may involve a pap of time and by the very nature of the things, the publication in the Official Gazette and the public notice in the locality must necessarily he separated by a gap of time. This does not mean that the publication and the public notice maybe separated by a long interval or time. What is necessary is that the continuity of action should not appear to be broken by a deep gap. If there is publication in the Gazette and if there is public notice in the locality, the requirements of S. 4(1) must be held lobe satisfied unless the two are unlinked from each other by a gap of time so large as may lend one to the prima facie conclusion of lack of bona fides in the proceedings for acquisition. If the notification and the public notice are separated by such a large gap of time may become necessary to probe further to discover it there is any cause for the delay and if the delay has caused prejudice to any one.”

    (Emphasis supplied)

    In Paragraph 6 of the judgment, it has been further held:—

    “We are unable to read the observations in State Of Mysore v. Abdul Razak Sahib as laying down any general principle tat every time-gap between the publication in the gazette and the public police in the Gazette and the public notice in the legality is fatal to the acquisition. Apart from the physical impossibility of synchronising the publication in the Gazette and the public notice in the locality, one can visualise a variety of circumstances which may bring about a time-gap between the two. There may be a breakdown or bandh as happened in one of the reported cases in Andhra Pradesh (Sader Anjuman Ahmedlyya Muslim Mission v. State (AIR 1980 Andh. 246) or there may be some other justifiable reason. This Court did not lay down any general principle that an acquisition would be regard as void if the notification published in the Official Gazette was not accompanied accompanied or immediately followed by the public notice. What in fact appears to have been said was that a person interested in the property can be regarded to have and notice of the proposed acquisition if both the requirements of S. 4(1) are complied with whether simultaneously or one after the other. As we said no invariable rule was laid down that an acquisition would be regarded as void whenever there was a gap of time between the publication in the Gazette and the public notice in the locality.” (emphasis supplied).

    In paragraph 7 of the judgment, various decisions are referred to, and the relevant portion from the decision of a Full Bench the Andhra Pradesh High Court has been reproduced and it has been specifically approved. Paragraph 7 of the judgment is as under:

    “7. We do not think that it is necessary to refer to the decision of the High Court in detail except to say that we consider Satish Kapur v. State of Haryana (AIR 1932 Punj. & Hor. 276): Rattan Singh v. State (AIR 1976 Punj & I Hor. 279); Suryanarayana Reddy v. Andhra Pradesh AIR 1983 Andh. Pra. 17 and Mohd. Khaja v. Govt. of A.P AIR 1982 HOC 270) (Andh. Pra.) were wrongly decided and that Sanjivalah Nagar Depressed and Backward Classes Sangh v. District Collector, Hyderabad (AIR 1983 Andh. Pra. 142) was rightly decided. In the last mentioned case, there is a reference to several earlier Division Bench judgments and the judgment of the Full Bench which the learned Judges had followed. In particular, the learned Judges have referred to the following observations of a Full Bench of the Andhra Pradesh High Court in Shahnaz Saliman v. Govt. of A.P (a decision which for some unknown reason has not been reported in any of the Law Reports).

    “There is no warrant for the contention that the publication in the Official Gazette and the notification at convenient places in the said locality should be simultaneous and be done precisely at the same time. If that were the intention of the legislature, it could have said so Something which is not in the section cannot be imported into it. The publication of the substance of S. 4(1) notification at convenient places in the locality is required out of anxiety of the Legislature to make it certain that it is brought to the notice of the affected persons. What all that is required is that before anything is done as contemplated by sub-S. (2), the substance of S. 4(1) notification must be published in the locality of the land. Several times it may prove to be a physical impossibility if simultaneous publication is insisted upon. It is not possible to think that the legislature has provided for an impracticable and at the same time unnecessary task. What S. 4(1) requires is that S. 4(1) notification must be published in the Official Gazette and its substance at convenient places in the said locality.”

    We agree with these observations.”

    Thus, the following propositions emerge from the decision of the Supreme Court: (i) it is mandatory to comply with the provisions of S. 4(1) (ii). The publication of the notification under S. 4(1) in the Official Gazette and public notice of the same in the locality need not be simultaneous or immediate and can be contemporaneous as it involves a gap of time; therefore, both must necessarily be separated by a gap of time, (iii) The time gap between the publication of the notification in the Official Gazette and public notice of the substance of the notification in the locality does not by itself render the acquisition void, (iv) If the two events are unlinked from each other by a gap of time so large as may lead to the prima facie conclusion of lack of bona fides in the proceedings for acquisition then it may become necessary to probe further to discover if there is any cause for the delay and if the delay has caused prejudice to anyone.

    11. In the instant case, there is a time gap as already pointed out, between the Gazette publication of the notification and the public notice of the substance of the notification in the locality. There is an explanation offered for the delay which, as already referred to, was accepted in Vijayaraghavan's case by a Division Bench of this court, we have also found that there is explanation upto 8.5.1985, and the explanation from 8.5.1985 till 13.11.1985 is not specific, it is only general. If the gap of time is long as laid down by the Supreme Court in Deepak Pahwa's Case, by itself it does not lead to invalidity of the notification and the Court is required to find out whether such a delay is due to lack of bonafides in the proceedings and has caused prejudice to anyone. In this regard, it may be pointed out that the petitioners have not pleaded lack of bona fides on the part of the acquiring authority and even before us the purpose for which the acquisition is made has not been questioned. Therefore, we proceed on the basis that it is not a case in which there is lack of bona fide on the part of the acquiring authority. As far as causing prejudice to any one is concerned, there is no plea in that regard. It is not the petitioners' case that this delay has caused prejudice to them in any manner. We are of the view that in the absence of any attack by the petitioners on the motive of the acquiring authority so as to lead to lack of bona fides in the proceedings for acquisition of the lands in question and in the absence of any plea of prejudice being caused to them on account of the time-gap between the publication of the notification in the Official Gazette and the publication of substance of the same in the locality, we find it very difficult to hold, in the light of the decision of the Supreme Court in Deepak Pahwa's Case that the acquisition is vitiated by reason of this time-gap.

    12. We now take up for consideration the other decisions relied Upon by learned Senior Counsel appearing for the respondents. No doubt, in Nandakumar v. State of Tamil Nadu & another (1986 Writ L.R 164) a Division Bench of this Court has referred to the decision of the Supreme Court in Deepak Pahwa's case, but that was a case in which there was no explanation offered for the time gap between the two events. After referring to the decision in Deepak Pahwa's case, it was observed:

    “… though the publication need not be simultaneous, the public notice must be contemporaneous. We have already noticed that S 4(1) notification was published in the Gazette on 7th June, 1978 and the publication in the locality was made only on 19th December, 1978 more than six months later. No counter affidavit has been filed to show the continuity of action as required in the judgment of the Supreme Court. The learned Additional Government Pleader vaguely suggested that there was an erratum published in respect of the same some time on 1st November, 1978 and that was the reason for the delay. We have perused the land acquisition file produced by the learned Additional Government Pleader. The erratum related to one or other of the boundaries of or 5 survey numbers and not any deletion or omission of any property. Nothing prevented the Government from publishing the notification in the locality immediately after publication in the Gazette, liven after the alleged errata published on 1st November, 1978, there was a long gap of more than one month and 19 days in the issue of public notice. We are satisfied that the continuity of action was broken by a deep gap. We are not satisfied that the delay in the publication in the locality was caused by any bona fide reason.”

    Thus that was a case in which no explanation whatsoever was offered by the State Government for the time gap that had occurred between the publication of S. 4(1) notification and the public notice of the substance of the same in the locality. In addition to this, the proposition laid down in Deepak Pahwa's Case that delay by itself will not render the notification void that if it is shown that the gap of time is so large as to lead to the prima facie conclusion of lack of bona fides in the proceedings for acquisition, it would be necessary to probe further to discover if there is any cause for the delay and such delay has caused prejudice to any one. This aspect had not been referred to in that decision. Hence, we are of the view that the said decision is distinguishable on the facts of that case.

    13. In P. Venkatarathinam Naidu v. State of Tamil Nadu & 2 others (1990 T.L.N.J 264) the decision in Deepak Pahwa's case was also referred to. In this case also, no counter affidavit was filed offering any explanation, which, if offered, could have been tested to find out its tenability and also as to why continuity of action was not kept up, and what were the factors that prevented the respondents from adhering to the continuity process. That being so, this decision also stands on the same footing as the one rendered in Nandakumar v. State of Tamil Nadu & another 1986 Writ L.R 164 about which we have already pointed out that it is distinguishable on facts.

    14. In Government of Tamil Nadu v. S. Jayaraman (1992 Writ L.R 332)the question raised before us, did not arise for consideration. It may be pointed out that in that case, the learned single Judge held that for the purpose of determining whether the Declaration under S. 6 of the Act had been made within the time prescribed under the Act, the period was to be computed from the date S. 4(1) notification was published in the official Gazette and riot from the date it was last published. On that basis, it was held by the learned single judge that the Declaration made under S. 6(1) was beyond time as such the acquisition Proceedings were invalid. The Division Bench, however, took the view that the time was to be computed from the last of the dates of such publication and the giving of such public notice as stated in S. 4(1) of the Act. Accordingly, it was held that the declaration under S. 6 was well within time. The question as to whether the gap of time between the publication of notification under S. 4(1) in the Gazette, and the public notice of the substance of the same in the locality would render the acquisition invalid, did not arise for consideration in that case. Therefore, we are of the view that the observation contained in paragraph 16 of the judgment cannot be held to be the ratio of the said decision. It is an obiter dictum as it did not arise for decision as such it was not required for the purpose of the decision. In addition, it has not been laid down in that case that if the gap of time is more than two months, the acquisition will be invalid. It is only stated that if the time gap exceeds two months, the acquisition proceeding is liable to be questioned. Therefore, it is not possible to read the said observation as laying down a proposition that the acquisition will be invalid if the time gap between the publication of S. 4(1) notification in the official gazette and causing public notice of the substance of the same at convenient places of the locality, exceeds two months.

    15. We are of the view that in the instant case, as already pointed out, the time gap has been properly explained and even if there is no proper explanation for the period between 8.5.1985 and 13.11.1985, it cannot be held to have resulted in breaking the continuity and thereby de-linking both the events. It is also not possible to hold that it has caused prejudice to the petitioners. If fact it is not their case that any prejudice is caused to them. Further, it cannot also be said that the proceedings of acquisition lack in bona fides. Accordingly, points (1) and (iii) are answered in the negative and point No. (ii) is answered partly in the affirmative and partly in the negative as pointed out above.

    16. Point No. IV Laches- learned Government Pleader has laid much stress on it. According to him, W.P No. 6001 of 1990 has been filed in the year 1990 whereas the other three writ petitions have been filed in the year 1988. If the date of publication of S. 4(1) notification viz. 29.11.1985 is taken into account, in one case there is a delay of five years and in other cases there is a delay of three years. It is also contended that even if the Declaration made under S. 6(1) of the Act is taken into consideration, the same having been published in the locality on 28.11.1986, there is no explanation for the delay in filing the writ petitions in 1988 and 1990. In support of the plea that the petitioners are not entitled to any relief as they are guilty of laches, learned Government Pleader has placed reliance on the decision in State of Mysore v. V.K Kannan (AIR 1975 S.C 2190) wherein at paragraph 16 it has been laid down that when the notification under S. 6 was published in the gazette on 19.10.1968 and the writ petition challenging the validity of the notification was filed sometime in July or August 1969, the respondent was not entitled to challenge the notification under S. 4 of the Act, as the same was filed after an unreasonable lapse of time. We are of the view that the proposition laid down in that case is squarely applicable to the facts of the case on hand. It is not as if the petitioners were not aware of the acquisition proceedings, for, they have filed objections to the notification published under S. 4(1) and have also participated in the enquiry under S. 5-A of the Act. Nevertheless, they waited in some cases for three years and in another case for five years. In between, it may be pointed out that two writ petitions had been filed by the owners of other lands acquired under the same notification to which we have already adverted. One matter was taken up in writ appeal. Of course, before that writ appeal was decided, these writ petitions came to be filed. In addition to this there is no explanation for this long delay. Hence, we are of the view that the learned single Judge is not correct in holding that the petitioners are not guilty of laches in approaching this court. It is to be noted that in Vijayaraghavan's case, referred to above, the petitioners who approached the Court in the year 1985 itself were found to be guilty of laches. Consequently, we hold that the petitioners are guilty of laches and as such they are disentitled to seek relief under Article 226 of the Constitution of India.

    17. It may be pointed out that land acquisition is made for a public purpose. If it has to be interfered with the party has to be diligent and has to approach the Court without undue delay.

    18. Of course, learned Government Pleader has also placed reliance on the decision in Tamil Nadu State Housing Board v. Shanmughasundara Nadar & three others (1988 Writ L.R 55) in which it has been stated:

    “In our view the proper occasion to raise a challenge to the invalidity of the proceedings under the Land Acquisition Act on the ground that the provisions of S. 4 have not been complied with, is before the proceedings of the enquiry under S. 5A of the Act are completed and Declaration under S. 6 is made. In such a case, if the defect is found that defect can be remedied and the proceedings can be restored.”

    With great respect we find ourselves difficult to agree with the aforesaid proposition because It is open to the State even after S. 5-A enquiry, to drop the proceedings. Therefore, the mere fact that the aggrieved party does not approach this Court challenging S. 4(1) notification before S. 5-A enquiry, and approaches this court under Art. 226 of the Constitution without undue delay after the declaration is made under S. 6 of the Act, there will be no justification to put him out of court on the ground of laches. However, it is not necessary to consider this aspect of the matter as stated in that decision, except stating that we find it difficult to agree with the said proposition. Accordingly point No. (iv) is answered in the affirmative.

    19. In the light of the findings recorded on points (i) to (iv), point No. (v) has to be necessarily answered in the affirmative. It is accordingly answered in the affirmative.

    20. For the reasons staled above, we pass the following order. The order of the learned single Judge has to be interfered with. Accordingly, the Writ Appeals are allowed. The order of the learned single Judge in W.P Nos. 14396, 15994 and 15995 of 1988 and 6001 of 1990, dated 16.9.1991 is set aside and the writ petitions are dismissed. There will be no order as to costs.