Smart Summary

Structured Summary of the Opinion

Factual and Procedural Background

The petitioner filed a writ petition under Article 226 of the Constitution of India seeking to set aside the acceptance of the bid of Respondent No.3 by Respondent Nos.1 and 2 on the ground that Respondent No.3 did not fulfil essential conditions of the tender. The petitioner further sought a direction to Respondent Nos.1 and 2 to issue the work order to the petitioner.

The e-tenders concerned engine-oriented mulberry pruners/shoot/brush cutting machines. On 13.02.2015 the Court prohibited the issuance of any work order while issuing notice to the respondents. The matter was finally heard on 27.03.2015, with interim orders earlier passed to prevent the relevant grants from lapsing given the approaching financial year end and the need of farmers. The matter was heard on the basis of a Rule issued and made returnable forthwith. Counsel for all parties were heard.

Legal Issues Presented

  1. Whether the acceptance of Respondent No.3's bid by Respondent Nos.1 and 2 was legally sustainable given the contention that Respondent No.3 did not comply with mandatory commercial test report requirements set out in the tender (i.e., whether Respondent No.3 fulfilled essential tender conditions).
  2. Whether the bids of rival parties (petitioner and Respondent No.3) were assessed on the same parameters and whether the comparative evaluation adopted by Respondent Nos.1 and 2 complied with the duty to ensure a "level playing field".
  3. Whether the decision to accept the tender of Respondent No.3 was such that "no responsible authority acting reasonably and in accordance with law could have reached" it (i.e., whether the decision was arbitrary or irrational).
  4. Whether the public interest was affected by the decision to accept Respondent No.3's tender.

Arguments of the Parties

Petitioner's Arguments

  • The tender required submission of a sample commercial test report from the Central Government or a recognized institute, an Agriculture University of India, or a State Government recognized institute; the petitioner complied with this mandatory condition.
  • Respondent No.3 did not provide the required commercial test report. Instead it submitted a manufacturer physical report dated 28.01.2015 and a practical field test report dated 24.01.2011 from Birsa Agricultural University, Ranchi, which the petitioner contended was not a commercial test report and was focused on field trials rather than comprehensive performance parameters.
  • The petitioner's commercial test report addressed detailed operational parameters; Respondent Nos.1 and 2 could not meaningfully assess Respondent No.3's pruner in the absence of comparable data.
  • The petitioner raised an objection on 06.02.2015 about Respondent No.3's non-compliance, but that objection was not considered; the petitioner alleged manipulation of inward receipt records relating to the objection.
  • As the petitioner's pruner was technically sound, the petitioner sought that the work order issued to Respondent No.3 be revoked and the work order be issued to the petitioner.
  • During arguments the petitioner also stated it was willing to supply its pruner at the same rate as quoted by Respondent No.3.

Respondent Nos.1 and 2 (Government) Arguments

  • Perusal of test reports (items 11 to 13) showed that the petitioner itself did not meet all technical requirements.
  • The commercial test report submitted by the petitioner demonstrated non-compliance with prescribed parameters.
  • Respondent No.3 submitted a necessary commercial test report on-line; in absence of any ISI specifications or uniform accepted parameters for such machines, the 24.01.2011 test report submitted by Respondent No.3 needed to be accepted and was acted upon.
  • Although the petitioner's reports may not have been fully up to mark, the petitioner's pruner was not rejected; both offers were considered and Respondent No.3's bid was accepted because it quoted the lowest price.

Respondent No.3's Arguments

  • Adopted the arguments of the Government Pleader for Respondent Nos.1 and 2.
  • Maintained that as the petitioner's machine was not up to the mark, there was no scope for considering it and thus no basis for comparison; Respondent No.3's tender being the lowest and valid, it needed acceptance.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Tata Cellular v. Union Of India ((1994) 6 SCC 651) Judicial review applies to government contractual decisions to prevent arbitrariness/favouritism, but there are inherent limitations; Article 14 must be kept in view when accepting/refusing tenders; state may refuse lowest tender but not for collateral purposes. The Court invoked this authority to explain the limited scope of judicial interference in tender matters while emphasizing the need to prevent arbitrariness under Article 14.
Reliance Energy Limited v. Maharashtra State Road Development Corporation ((8) SCC 1) Doctrine of "level playing field" and requirement of legal certainty in tender norms; arbitrary or inconsistent evaluation processes can vitiate the decision-making process. The Court relied on this to stress that unequal or discriminatory treatment in tender evaluation violates the level playing field and that norms must be legally certain.
Michigan Rubber (India) Ltd. v. State of Karnataka ((2012) 8 SCC 216) Before interfering in tender matters, court should ask (i) whether the authority's process/decision was mala fide or so arbitrary/irrational that no reasonable authority could have reached it, and (ii) whether public interest is affected; absent affirmative answers, no interference under Article 226. The Court posed and applied these two questions to the facts, found affirmative answers to both, and accordingly intervened in the tender decision.
B.S. Minhas v. Indian Statistical Institute ((1983) 4 SCC 582) Executive authorities must be held to the standards by which they profess to act; obligations under procedural rules/bye-laws must be scrupulously observed to avoid arbitrariness. The Court used this principle to hold that Respondent Nos.1 and 2 were obliged to follow or lay down proper parameters and procedures for evaluating pruners, to ensure fairness.
Vitarelli v. Seaton (quoted in Indian precedents) An executive agency must be rigorously held to the standards by which it professes its actions; procedural standards must be observed. Quoted via Indian precedents to underpin the obligation of the State authorities to adhere to declared standards and procedures when evaluating tenders.
Ramana Dayaram Shetty v. International Airport Authority of India Support for the proposition that administrative authorities must observe the standards and procedures they set for themselves. Cited as supporting authority for the requirement that Respondent Nos.1 and 2 adhere to or establish evaluative standards to avoid arbitrariness.
Amarjit Singh Ahluwalia v. State of Punjab; Sukhdev Singh v. Bhagatram Sardar Singh Raghuvanshi Acceptance in Indian jurisprudence of the Vitarelli principle that procedural standards must be observed by executive authorities. Used to show consistent judicial approach requiring authorities to follow prescribed or professed procedures.
Sorah Builders v. Shreejikrupa Buildcon Ltd. (2009) 11 SCC 9 Authority on acceptance of next lowest tender in certain circumstances (as cited by petitioner). The Court observed that reliance on this authority by the petitioner to urge acceptance of next lowest tender was misconceived on the facts of the present case.
Bharat Biotech International Ltd. v. Directorate of Medical Education & Research & Others (2011 (1) All MR 668) Public authorities are duty bound to comply with norms of fairness cast by Article 14. The Court cited this to emphasise that the State respondents executing welfare measures must take precautionary measures and show complete diligence to safeguard beneficiaries (farmers) and act fairly.

Court's Reasoning and Analysis

The Court first examined the content and quality of the commercial test reports submitted by the competing parties. It recorded that the petitioner's commercial test report included adverse operational observations (e.g., operator fatigue due to excessive vibration and noise, fuel leakage during field operation, noise levels exceeding warning/danger limits and expert suggestions for noise reduction). The petitioner had conducted extensive field trials (9 test trials over 26.1 hours, with specific durations for different attachments) and provided more comprehensive operational data.

In contrast, Respondent No.3's report (tested at BAU, Kanke, Ranchi) was described by the Court as appearing superficial: it focused on field test parameters (condition of field, source of draft power, condition of operator) and omitted mention of key technical factors such as safety provisions, engine performance tests, mechanical vibration measurements, noise measurement, hardness and chemical composition of critical components. The Government Pleader's explanation — that there are no uniform accepted standards for such machines — was considered but found insufficient.

The Court reasoned that, in absence of uniform norms, it was incumbent on Respondent Nos.1 and 2 to lay down their own evaluative parameters in advance or consult experts to evaluate shallow test reports. Comparing two unequal and technically non-comparable reports to select the "best pruner" was improper. As State actors executing welfare measures for farmers, Respondent Nos.1 and 2 had a heightened duty to evolve and apply proper standards to avoid arbitrariness and to protect public interest.

The Court addressed the petitioner's procedural complaint about the date of objection and inward entries, observing that the respondents' inward register was not maintained regularly and thus that particular contention was of limited weight on the facts before the Court.

Applying the Michigan Rubber formulation, the Court asked (i) whether the decision to accept Respondent No.3's tender was one that no responsible authority acting reasonably could have reached, and (ii) whether public interest was affected. The Court found affirmative answers to both questions on the facts presented, and therefore concluded judicial intervention was warranted.

Given these findings, the Court quashed and set aside the acceptance of Respondent No.3's tender and any work order issued to Respondent No.3. It directed Respondent Nos.1 and 2 to undertake a proper evaluation of the petitioner’s and Respondent No.3’s bids based on touchstones/parameters to be evolved in advance and in consultation with experts, with notice to all concerned. The Court permitted Respondent Nos.1 and 2, if they deemed it in the public interest, to invite fresh tenders after determining standards. The offers of the petitioner and Respondent No.3 were restored and kept open for fresh consideration in accordance with the Court's directions.

Holding and Implications

Holding: The Court quashed and set aside the acceptance of the tender and any work order (if issued) in favour of Respondent No.3, and directed Respondent Nos.1 and 2 to re-evaluate the offers of the petitioner and Respondent No.3 using parameters to be determined in advance in consultation with experts. The offers of both parties were restored and kept open for fresh consideration in accordance with the Court's directions. The Court partly allowed the writ petition and made the Rule absolute in those terms with no order as to costs.

Implications:

  • The immediate consequence is that the previous administrative decision accepting Respondent No.3's tender is nullified and any work order is set aside; the bid offers of the petitioner and Respondent No.3 are restored for re-evaluation.
  • Respondent Nos.1 and 2 are directed to establish clear evaluative parameters in advance, in consultation with experts and with notice to interested parties, before re-assessing bids (or inviting fresh tenders). This imposes a procedural obligation on the State authorities to ensure fairness and technical adequacy in tender evaluation for the benefit of farmers.
  • The Court continued its earlier interim directions (dated 27.03.2015) aimed at preventing lapse of budgetary grants until suitable procurement is effected in accordance with the Court's directions.
  • No express new legal precedent was declared by this judgment; the Court applied and relied upon established principles from earlier Supreme Court and High Court decisions concerning judicial review of tenders, fairness, level playing field and the obligation of administrative authorities to adhere to or promulgate evaluative standards.

Rule made absolute in the terms stated above; no orders as to costs.

To access the original judgment, please Sign In or Subscribe.

    Padgilwar Agro Industries v. Director & Ors.

    By this petition under Article 226 of the Constitution of India, the Petitioner seeks a writ to set aside acceptance of bid of respondent no.3 by the respondent nos.1 and 2 on the ground that said respondent no.3 does not fulfill essential conditions of the tender invitation with further prayer to direct respondent nos. 1 and 2 to issue work order to the petitioner. The E-

    tenders were invited for Engine oriented Mulberry Pruner/ shoot/Brush cutting machine. On 13,02.2015, while issuing notice to the respondents, Judgment wp789.15 this Court prohibited issuance of work order. Matter has been heard finally on 27.03.2015, and considering the fact that the pruners are meant for farmers and approaching financial year end, we have passed suitable interim orders to see that the grants do not lapse.

    2. Considering the nature of controversy and with consent of all the parties, we have heard the matter finally by issuing "Rule" and making it returnable forthwith. We have heard Shri R.S. Parsodkar, learned Counsel for the petitioner, Mrs. B.H. Dangre, learned Government Pleader for Respondent nos. 1 and 2 and Shri A.V. Muley, learned Counsel for the Respondent no.3.

    3. Shri Parsodkar, has urged that the sample of pruner was to be submitted to Directorate of Sericulture on 04.02.2015 with commercial test report of the Central Government or recognized institute, any agriculture University of India or State Government Recognized Institute. Petitioner complied with this mandatory condition while respondent No. 3 did not have such test report. It only submitted a physical report dated 28.01.2015 of Manufacturer and a practical field test report dated 24.01.2011 of Birsa Agricultural University, Ranchi. The later report is also not a commercial test Judgment wp789.15 report but, it is more on the trial on land and not on performance or working of machine under all parameters. The report dated 28.01.2015 only points out the length, speed in RPM and maximum sound power level. Petitioner gave the requisite report as per clause 7 of the Annexure-A i.e., technical bid. As respondent No.3 could not comply with this mandatory term, petitioner raised an objection on 06.02.2015, but, that has not been looked into and respondent Nos. 1 and 2 have attempted to fabricate its receipt on 11.02.2015. Date 06.02.2015, put on it by petitioner has been scored off and inward entry is alleged to be made on 13.02.2015. Attention is also invited to commercial test report submitted by the petitioner to point out how various parameters are required to be applied. Appreciation of those details by the respondent Nos. 1 and 2, as seen in para 10 of reply affidavit of respondent Nos. 1 and 2 is also pressed into service with the contention that such an application of mind, qua the pruner of respondent No.3 is not possible in absence of relevant data. It is stated that the respondent Nos. 1 and 2 have found pruner of petitioner technically sound and hence, work order be issued to it by revoking the same issued to respondent No.3.

    Support is drawn from the rejoinder filed by the petitioner on 118.3.2015, particularly its para 12.

    Judgment wp789.15

    4. Learned Government Pleader appearing on behalf of respondent Nos. 1 and 2 invites attention to stand of said respondents in affidavit in reply. She pleads that perusal of test reports, particularly item nos. 11 to 13 show that petitioner itself did not meet all the technical requirements.

    Commercial test report submitted by the petitioner is relied upon to demonstrate that his pruner does not comply with the prescribed parameters. Respondent No.3 submitted necessary commercial test report on-line. She states that as there are no ISI specifications or any standard parameters for uniform testing, the test report dated 24.01.2011 furnished by respondent No.3 needs to be accepted and has been accordingly accepted and acted upon. Though the commercial test reports of petitioner were not up to the mark, the pruner of the petitioner was not rejected and it was considered along with the pruner of respondent No.3, and as price quoted by respondent No.3 was lowest, its bid was accepted.

    5. Shri Muley, learned Counsel adopts arguments of Mrs. Dangre, learned Government Pleader and adds that when the pruner of petitioner was not up to the mark, there was and is no scope for consideration thereof, and there can not be any comparison between them.

    As the offer of respondent No.3 is lowest and even otherwise, as petitioner Judgment wp789.15 is not eligible, the tender of respondent No.3 being only legal and valid one, it needed acceptance.

    6. Before proceeding further, it would be appropriate to mention the extent of jurisdiction available to this Court in such matters. In Tata Cellular v. Union Of India., ((1994) 6 SCC 651), at page 675, Hon'ble Apex Court observes :-

    "70. It cannot be denied that the principles of judicial review would apply to the exercise of contractual powers by Government bodies in order to prevent arbitrariness or favouritism. However, it must be clearly stated that there are inherent limitations in exercise of that power of judicial review. Government is the guardian of the finances of the State. It is expected to protect the financial interest of the State. The right to refuse the lowest or any other tender is always available to the Government. But, the principles laid down in Article 14 of the Constitution have to be kept in view while accepting or refusing a tender. There can be no question of infringement of Article 14 if the Government tries to get the best person or the best quotation. The right to choose cannot be considered to be an arbitrary power. Of course, if the said power is exercised for any Judgment wp789.15 collateral purpose the exercise of that power will be struck down."

    Judgment of Hon'ble Supreme Court in Reliance Energy Limited Vs. Maharashtra State Road Development Corporation Ltd. & Ors . ( (8) SCC 1), is important. In Global Tender for completing Mumbai Trans Harbour Link on BOT basis, REL/HDEC- Consortium was disqualified to participate in the second phase/stage as the consortium partner HDEC has not satisfied the Net Cash Profit criteria. Consultants for MSRDC treated the provision for doubtful debt as a cash expense though conceptually it is a non-cash expense. Two methods of "cash flow reporting" i.e. direct and indirect give identical results in the matter of the final total and they differ only in presentation of the data. No reason was given by the Consultants of MSRDC for rejecting the indirect method invoked by the Chartered Accountants of REL/HDEC. In the evaluation process, the Consultants for MSRDC mixed-up two concepts of non-compliance of financial criteria and the impact in future years on cash flow. For non-consideration of the Reconciliation Method under cash flow reporting system, the impugned decision-making process stood vitiated. Decision to exclude REL/HDEC, was held arbitrary, whimsical and unreasonable. Allowing the appeal Hon'ble Supreme Court held that REL/HDEC (Consortium) was erroneously Judgment wp789.15 excluded from the second stage of bidding process. It also has pointed out that the doctrine of "level playing field" is embodied in Article 19(1)(g) of the Constitution and provides space within which equally-placed competitors are allowed to bid so as to sub-serve the larger public interest.

    Decisions or acts which result in unequal and discriminatory treatment, violate the doctrine of "level playing field" When tenders are invited, the terms and conditions must indicate with legal certainty, norms and benchmarks. "Legal certainty" is an important aspect of the rule of law.

    Vagueness or subjectivity in the said norms may result in unequal and discriminatory treatment and may violate doctrine of "level playing field".

    In Michigan Rubber (India) Ltd. v. State of Karnataka, ((2012) 8 SCC 216), at page 229, Hon'ble Apex Court explains :

    "24. Therefore, a court before interfering in tender or contractual matters, in exercise of power of judicial review, should pose to itself the following questions:
    (i) Whether the process adopted or decision made by the authority is mala fide or intended to favour someone; or whether Judgment wp789.15 the process adopted or decision made is so arbitrary and irrational that the court can say: "the decision is such that no responsible authority acting reasonably and in accordance with relevant law could have reached"? And
    (ii) Whether the public interest is affected?
    If the answers to the above questions are in the negative, then there should be no interference under Article 226."

    7. Question in present matter is whether the bids of rival parties have been assessed on same parameters ? The commercial test report on petitioner's pruner shows a remark that fatigue was seen after half hour of operation due to excessive vibrations and noise level and the operator complained of pain in different parts of body like arms, shoulder, right side thigh etc. During 26.1 hour field operation, fuel leakage was observed from the carburetor. Noise at operators ear and bystander's ear level was at higher level as against warning or danger limits of 85dB(A) and 90dB(A) for continuous exposure of 8 hours per day. Expert has suggested reduction in noise level to improve operational safety and comfort. Respondent No.3's pruner was tested at BAU,Kanke, Ranchi. It was found to function Judgment wp789.15 satisfactorily in normal conditions. Parameters of test applied in practical field test are a) Condition of field i.e., land; b) source of draft power and implementation, and c) condition of operator. The factors like safety provision, engine performance test, mechanical vibration measurement, noise measurement, hardness and chemical composition of critical components like 3 teeth blade, circular disc do not find mention in test report of respondent No.3. Even field tests in case of petitioner appear to be more extensive and comprehensive and put forth more data on operational performance of the pruner. Field tests for 26.1 hours duration comprising of paddy harvesting with circular disc and brush /weeds cutting 3 teeth blade attachments were carried out for 10.6 hours and 15.5 hours respectively.

    Total 9 test trials were conducted. Thus commercial test reports in case of machine of the respondent no.3 appear to be superficial in nature. Learned Government Pleader has attempted to explain this by pointing out the absence of any accepted uniform standards in the matter.

    8. We can not delve more into the niceties and technicalities of the pruners of parties before us. If the uniform norms are not available, it was open to the respondent nos. 1 and 2 to lay down its own parameters for evaluating the performance of such machines. If it found a particular Judgment wp789.15 commercial test report shallow, it ought to have consulted the experts in the field to enable it to reach suitable decision. It could not have compared two unequal reports in an effort to find out the best pruner. It should have beforehand laid down the relevant parameters and demanded compliance with it instead of leaving it to individuals to devise their own standards or tests. Here, we have to reiterate that the respondent nos. 1 and 2 have not refused to consider the bid of petitioner, but having matched it with that of respondent no.3, they arrive at the conclusion that commercial bid of the respondent no.3 is lower than that of petitioner.

    9. Hon'ble Apex Court has explained the position in B.S. Minhas v.

    Indian Statistical Institute, ((1983) 4 SCC 582), at page 594 :

    "23. The next question that arises for consideration is whether the appointment of Respondent 4 as Director of Respondent 1 is illegal because of non-compliance with bye-law 2. Bye-

    law 2 does require that before appointment, the vacancy in the post of Director should be suitably publicized. In the instant case, it is admitted on both sides that no publicity whatsoever was given in respect of the vacancy. The contention of Shri Garg, however, is that the bye-law having no force of statute, non-compliance with its requirement Judgment wp789.15 cannot in any way affect the appointment of Respondent 4 as Director of Respondent no.1. Shri Tarkunde, however, contended that assuming that the bye-law is not statutory, even so Respondent no.1 was bound to comply with it. In support of his contention he strongly relied upon Ramana Dayaram Shetty v. International Airport Authority of India. The Court in that case held: (SCC p. 503, para 10) ig "It is a well-settled rule of administrative law that an executive authority must be rigorously held to the standards by which it professes its actions to be judged and it must scrupulously observe those standards on pain of invalidation of an act in violation of them. This rule was enunciated by Mr Justice Frankfurter in Vitarelli v. Seaton where the learned Judge said:

    An executive agency must be rigorously held to the standards by which it professes its action to be judged.... Accordingly, if dismissal from employment is based on a defined procedure, even though generous beyond the requirements that bind such agency, that procedure must be scrupulously observed.... This judicially evolved rule of administrative law is now firmly established and, if I may add, rightly so. He that takes the procedural sword shall perish with the sword.'"

    Judgment wp789.15 The aforesaid principle laid down by Mr Justice Frankfurter in Vitarelli v. Seaton has been accepted as applicable in India by this Court in Amarjit Singh Ahluwalia v. State of Punjab and in subsequent decision given in Sukhdev Singh v.

    Bhagatram Sardar Singh Raghuvanshi. Mathew, J.

    quoted the above-referred observation of Mr Justice Frankfurter with approval.

    igIn view of the pronouncement of this Court on the point it must be held to be obligatory on the part of Respondent no.1 to follow the bye-

    laws, if the bye-laws have been framed for the conduct of its affairs to avoid arbitrariness.

    Respondent no.1 cannot, therefore, escape the liability for not following the procedure prescribed by bye-law 2."

    Thus, when the respondent nos. 1 and 2 are obliged to offer level playing field and choose the best pruner for the farmers, it was and it is their duty to evolve proper parameters for judging the said machines. Here, the respondent nos. 1 and 2 did not refuse to consider the bid of petitioner, but, have treated it as a valid commercial offer. Therefore only, they compared it with bid of respondent no.3. They also reach the conclusion that bid of the respondent no.3 is lower than that of petitioner. While Judgment wp789.15 undertaking this exercise, it was aware of the technical factors that needed a look before holding any pruner to be technically sound. It was also alive to the test reports of petitioner and hence of the fact that commercial test report of the respondent no.3 is technically incomplete. It could not have therefore treated the offer of the respondent no.3 as suitable offer. Being "State" within Article 12 of the Constitution of India, and also bound to take every such step in the public interest, it should have called upon the respondent no.3 to submit the commercial test report also under the heads on which it could scrutinize the pruner of the petitioner. It can not escape this responsibility under the pretext that there are no ISI or other well-

    settled accepted norms for said machine. Such a self serving plea may at times indicate lack of bonafides. It has deviated from the right perspective in the matter. Respondent nos. 1 and 2 who are executing the welfare measure that too, in favour of agriculturist class on one hand and manufacturers of pruner or brush cutting machines like the petitioner or respondent no.3 who operate commercially on the other hand, can not come together and force wrong appliances on farmers. Having accepted to discharge such an obligation, respondent nos. 1 and 2 can not avoid to take necessary precautionary measures and must show that it has acted with complete diligence to safeguard the farmers. Otherwise it will not be duly honouring Judgment wp789.15 the faith reposed in it. It will lead to arbitrariness, abuse of authority and refusal to act fairly. Division Bench of this Court in Bharat Biotech International Ltd. vs. Directorate of Medical Education & Research & Others. (2011 (1) All MR 668), has held that such public authority is duty bound to comply with the norms of fairness cast upon it by Article 14.

    Whether petitioner submitted any objection on 06.02.2015 or then its entry was taken in inward register by respondent nos. 1 and 2 later on is hardly relevant. We have in our order dated 27.03.2015 noted how the inward entries were not taken every day by the office of these respondents. As said register is not being maintained regularly, it is not credit-worthy at least at this stage in these proceedings.

    10. We can not forget that during arguments, Shri Parsodkar, learned counsel upon instructions also stated that petitioner is ready and willing to supply its pruner at the same rate as quoted by respondent no.3. This offer raises other vital issues which again may require attention of other respondents. Support drawn by learned Counsel for petitioner from Sorah Builders vs. Shreejikrupa Buildcon Ltd. (2009) 11 SCC 9) to urge that next lowest tender of petitioner needs to be accepted is misconceived in these facts. In this background when we put the questions - (i) Whether the Judgment wp789.15 decision to accept tender of respondent no.3 is such that no responsible authority acting reasonably and in accordance with law could have reached it ? and (ii) Whether the public interest is affected?, we find the answer to both in affirmative, in present facts. Hence as laid down by the Hon'ble Apex Court in Michigan Rubber (India) Ltd. v. State of Karnataka (supra), we are inclined to intervene in this matter.

    11. Accordingly, we quash and set aside the acceptance of tender of as also work order, if any, issued to respondent no.3 by the respondent nos.

    1 and 2. We direct said respondent to have proper evaluation of the bids of the petitioner and respondent no.3 on necessary touch stones. These touch stones or the parameters for tests be evolved in advance and in consultation with the experts in the field keeping in mind the need of the farmers. These standards be determined before embarking upon the exercise and with notice to all concerned. If after such standards are decided, the respondent nos. 1 and 2 deem it in public interest to invite fresh tenders, we leave it free to do so. If it finds it appropriate to examine the offers of the petitioner and respondent no.3 on said parameters, it is also free to do so.

    12. Only to enable the respondent nos. 1 and 2 to undertake this Judgment wp789.15 exercise, we partly allow the writ petition. The offers of the petitioner and respondent no.3 are restored back, and kept open for fresh consideration as per law in terms of the directions given in paragraph above. Respondent nos. 1 and 2 have undertaken this exercise in the interest of farmers as a part of State welfare activity. Hence, directions issued by this Court on 27.03.2015, with view to save the budget grants from lapsing are continued and shall remain in force till the said respondents procure the standard pruners to suit its requirements.

    13. Rule is made absolute in these terms with no orders as to costs.