Smart Summary

Factual and Procedural Background

The appeal challenges the trial court order dated 25-4-1995 (below Ext. 62 in Special Civil Suit No. 436 of 1992) which rejected the appellant's application under Order 39 Rule 11 of the Civil Procedure Code seeking to strike out the defence of certain respondents.

The appellant, Smt Asha (wife of Madhusudan Joshi), filed Special Civil Suit No. 436 of 1992 for partition and separate possession claiming a 1/10 share in the suit property. Respondent 1 is Ashok H. Bhide (the appellant's brother), Respondent 2 is his wife Sumitra, Respondent 3 is their son Ashutosh, Respondent 4 is Smt Anuradha Huddar (a partner in M/s Saket Builders), and Respondents 5–7 are sisters of the appellant-plaintiff.

The appellant had earlier moved for temporary injunction under Order 39 Rules 1 and 2; that application was rejected by the trial court on 10-6-1992. The appellant's appeal against that order (No. 68 of 1992) was dismissed by this Court by an order quoted at length in the opinion (dated in the text as 6-10-1992) which directed that out of the amount of consideration in respect of the suit property, the respondents should keep 1/10 of the said amount in a fixed deposit at State Bank of India, Dharampeth Branch, Nagpur, for the respective shares of the appellant and certain respondents for an initial period of three years.

Pursuant to the High Court's directions, Respondents 1 to 4 were required to deposit Rs. 4,80,000 (Rs. 1,20,000 each towards the shares of the appellant and Respondents 5 to 7). The respondents deposited only Rs. 1,20,000, and the appellant filed Contempt Petition No. 123 of 1993. In that contempt petition respondents 1 to 4 gave an undertaking on 22-7-1993 to furnish surety/security for the respective shares of Respondents 5 to 7. This Court disposed of the contempt petition on 22-7-1993 on the basis of that undertaking, directing respondents to furnish the security within four weeks (the opinion records that period as expiring on 19-8-1993).

The respondents did not furnish security within the four-week period. They produced a solvency certificate on 25-8-1993 which the trial court refused to accept (the court required surety other than the suit house). The respondents later applied on 1-11-1993 to the trial court for an extension of time to furnish a fresh solvency certificate; that application was rejected by the trial court on the ground it had no power to extend the High Court prescribed time. Respondents challenged that rejection by filing a civil revision with an application for condonation of delay; the High Court rejected the condonation application on 1-9-1994, and the revision stood dismissed.

In view of the respondents' failure to furnish security as per the undertaking and High Court directions, the appellant moved an application in the suit under Order 39 Rule 11 read with Section 151 CPC (Ext. 62) to strike out the defence of Respondents 1 to 4 for breach of the undertaking and misleading the Court. The trial court rejected that application and accepted the solvency certificate; the appellant challenged that rejection by way of the present appeal. The High Court allowed the appeal, set aside the impugned order dated 25-4-1995 and struck off the defence of Respondents 1 to 4, and ordered that the appeal against order is allowed with no order as to costs.

Legal Issues Presented

  1. Whether Order 39 Rule 11(1) of the Civil Procedure Code (as added by the Bombay High Court notification) is mandatory in nature so that a breach of an order or undertaking by defendants requires striking out their defences.
  2. Whether the trial court was correct in accepting security/solvency certificate furnished by Respondents 1 to 4 after the period prescribed by the High Court and in refusing to strike out their defences when they breached the undertaking and direction of the High Court.

Arguments of the Parties

Appellant's Arguments

  • The appellant argued that she filed the partition suit claiming 1/10 share and that respondents 1 to 4 were required by the High Court's directions to deposit Rs. 4,80,000 (Rs. 1,20,000 each) but deposited only Rs. 1,20,000.
  • The respondents gave a specific undertaking in Contempt Petition No. 123 of 1993 on 22-7-1993 to furnish surety/security for the respective shares of Respondents 5 to 7 and this Court accepted that undertaking and directed that security be furnished within four weeks.
  • The four-week period expired on 19-8-1993 and the respondents did not furnish the security within that period; the respondents also did not apply to this Court for extension of time.
  • The respondents produced a solvency certificate on 25-8-1993 which the trial court refused on the ground it related to the suit house and the shares were undecided; irrespective, the solvency certificate was produced after the expired period and should have been rejected.
  • The respondents' later application on 1-11-1993 for extension before the trial court was beyond that court's jurisdiction; their civil revision was dismissed for delay. Given this deliberate non-compliance and oblique conduct, the appellant argued she was entitled to strike out the defendants' defences under Order 39 Rule 11 CPC.

The opinion records that no affidavit was filed by the respondents to controvert the appellant's allegations; the respondents' specific opposing legal arguments are not detailed in the opinion.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Ratnakar D. Patade v. Smita Pandurang Dalvi, 1996 1 Mah LJ 76 Authority holding that Order 39 Rule 11(1) of the CPC is mandatory in nature; distinction between mandatory and directory rules; where failure to comply leads to a specified consequence the requirement is to be treated as mandatory. The High Court relied on this decision to fortify its view that R.11(1) is mandatory and that failure by defendants to comply with an order/undertaking entails striking out their defence rather than leaving the matter to mere discretion.
Sharif-Ud-Din v. Abdul Gani Lone, 1980 1 SCC 403 Supreme Court principle that where a statute prescribes a particular manner of doing an act and prescribes a consequence for failure, that requirement is typically mandatory. The High Court invoked this principle (as quoted in Ratnakar) to support the mandatory construction of R.11(1) despite the use of the word "may" in the provision.

Court's Reasoning and Analysis

The Court proceeded step-by-step from facts to legal conclusion as follows:

  1. Acceptance of Facts: The Court observed that no affidavit was filed by the respondents to dispute the appellant's factual allegations; in the absence of such contradiction, the Court accepted the facts as presented by the appellant.
  2. Nature of High Court Direction and Undertaking: The Court recited the High Court's earlier order directing deposit/retention of 1/10 of consideration in fixed deposit and recorded the respondents' undertaking in Contempt Petition No. 123 of 1993 to furnish security within four weeks from 22-7-1993 for the remaining amount.
  3. Non-Compliance: The Court found that respondents did not furnish the security within the four-week period and did not seek or obtain an extension from the High Court; their subsequent efforts to obtain an extension from the trial court were beyond the trial court's jurisdiction and were rightly rejected; the revision challenging that rejection was dismissed for delay by this Court.
  4. Legal Character of Order 39 Rule 11(1): The Court analysed Order 39 Rule 11(1) (as added by Bombay High Court notification) and held that although the provision uses the word "may", the scheme, intent and objective of the Rule show it was intended to confer a power to take definite and positive action when a party defies an order or breaches an undertaking. Applying established principles about construing "may" as mandatory when the provision requires definite consequences, the Court concluded that R.11(1) is mandatory in nature.
  5. Precedential Support: The Court relied on the Single Judge decision in Ratnakar D. Patade (and the Supreme Court's Sharif-Ud-Din decision quoted therein) to support the conclusion that R.11(1) should be construed as mandatory and that failure by defendants to comply requires the specified consequence (striking out defences).
  6. Application to Facts: Given the respondents' deliberate non-compliance with the undertaking and the High Court direction, and the absence of any valid extension of time from the High Court, the trial court had no jurisdiction to accept security offered after the expiry of the prescribed period. The trial court's acceptance of the late security and refusal to strike out the defence was characterized as perverse and misconceived, contrary to R.11(1).
  7. Conclusion: The impugned trial court order was set aside and the defences of Respondents 1 to 4 were struck off pursuant to the mandatory consequences under Order 39 Rule 11(1).

Holding and Implications

Holding:

The impugned order dated 25-4-1995 passed by the trial court is set aside and the defence of Respondents 1 to 4 is struck off. The appeal against order is allowed. No order as to costs.

Implications:

  • Direct effect: The trial court's order rejecting the appellant's application under Order 39 Rule 11 and accepting the late security is overturned; Respondents 1–4 lose their defences in the suit as a direct consequence of their failure to comply with the High Court's direction and undertaking.
  • Legal consequence: The Court held that Order 39 Rule 11(1) (as added by the Bombay High Court) is mandatory in nature so that breach of a court order or undertaking by defendants attracts the specified consequence of striking out their defences. The opinion applies the mandatory construction to the facts of this case to require the consequence set out in the Rule.
  • Scope and precedent: The opinion applies and cites earlier authority (Ratnakar and Sharif-Ud-Din) in support of the mandatory interpretation. The decision enforces the existing principle that where a provision prescribes a consequence for non-compliance, that consequence must follow. The opinion records no separate order as to costs.

    Asha Petitioner v. Ashok H. Bhide And Others S

    The Judgment of the Court was delivered by

    D.D Sinha, J.— Heard Shri Vyawahare, learned counsel for the appellant. The counsel for the respondents is absent.

    2. The appeal against order is directed against the order dated 25-4-1995 passed by the 4th Joint Civil Judge, Senior Division, Nagpur below Ext. 62 in Special Civil Suit No. 436 of 1992 whereby application moved by the appellant under Or. 39 R. 11 of the Civil Procedure Code for striking out defence of the respondents came to be rejected.

    3. Shri Vyawahare, learned counsel for the appellant, states that appellant Smt Asha w/o Madhusudan Joshi filed Special Civil Suit No. 436 of 1992 for partition and separate possession and claimed 1/10 share in the suit property. It is contended that present Respondent 1 Ashok H. Bhide is the brother of the appellant (plaintiff). Respondent 2 Smt Sumitra is the wife of Respondent 1. Respondent 3 Ashutosh is the son of Respondents 1 and 2. Respondent 4 Smt Anuradha Huddar is a partner in M/s Saket Builders and Respondents 5 to 7 are sisters of the appellant-plaintiff.

    4. It is further contended by the learned counsel for the appellant that the appellant along with suit filed an application under Or. 39 Rr. 1 and 2 of the Civil Procedure Code for temporary injunction. The said application was rejected by the trial court on 10-6-1992. Being aggrieved by the same, appellant filed appeal against order bearing No. 68 of 1992 challenging validity of the order dated 10-6-1992 passed by the trial court. It is submitted that this Court dismissed the appeal against order vide order dated 6-10-1992 with directions, which read thus:

    “While dismissing the present appeal, Respondents 1 to 5 are directed that out of amount of consideration in respect of suit property, they shall keep 1/10 of the said amount in the fixed deposit in State Bank of India, Dharampeth Branch, Nagpur in respect of respective shares of the appellant and Respondents 2, 3 and 4 for initial period of three years. In case special civil suit is not decided within the said period, the said amount shall be further invested in the fixed deposit as per directions of the learned trial Judge. In the meantime, neither the appellant nor Respondents 2 to 4 shall withdraw the said amount. With this direction, the appeal is dismissed. However, there is no order as to costs.”

    5. Learned Counsel Shri Vyawahare states that Respondents 1 to 4 were in fact required to deposit Rs. 4,80,000 as per directions of this Court vide order dated 6-11-1992 passed in appeal against Order No. 68 of 1992, out of which respondents have deposited only Rs. 1,20,000 and since the remaining amount of Rs. 3,60,000 was not deposited by the respondents, the appellant filed a contempt petition bearing No. 123 of 1993 for taking appropriate action against the present Respondents 1 to 4 under the provisions of the Contempt of Courts Act. It is contended that present Respondents 1 to 4 filed a specific undertaking in the contempt petition on 22-7-1993, which reads thus:

    “We, Respondents 1 to 4 hereby undertake to furnish surety/security for the respective shares of Respondents 2, 3 and 5 before the trial court as directed by this Court.”

    6. It is submitted by the learned counsel for the appellant that this Court accepted the undertaking filed in the contempt petition and disposed of the contempt petition on 22-7-1993 by observing thus:

    “This undertaking given by the respondent that he will furnish security in addition to the amount deposited of Rs. 1,20,000 shall satisfy the requirement of this order. The respondent is directed to furnish the above security within a period of four weeks from the date of this order.”

    The learned counsel for the appellant submits that the period of four weeks expired on 19-8-1993. Till then, Respondents 1 to 4 did not furnish security as per their undertaking dated 22-7-1993 and, therefore, there is a wilful and deliberate disobedience committed by Respondents 1 to 4 not only in respect of the undertaking given by them in contempt petition, but also of the directions given by this Court in Contempt Petition No. 123 of 1993 whereby Respondents 1 to 4 were directed to furnish security within a period of four weeks from 22-7-1993.

    7. Learned Counsel Shri Vyawahare further submits that respondents did not file any application before this Court for extension of time to furnish security as directed by this Court nor such time was extended by this Court. However, on 25-8-1993 present Respondents 1 to 4 (Defendants 1, 5, 6 and 7 in the suit) furnished solvency certificate of Rs. 3,60,000 in compliance with the order dated 22-7-1993 passed by this Court in the contempt petition. It is contended by the learned counsel that the trial court refused to accept solvency certificate produced by Respondents 1 to 4 on the ground that solvency certificate furnished by them was in respect of the suit house and since shares of the parties in the suit property were not decided, Respondents 1 to 4 were directed to furnish surety other than the suit house. It is further contended that in the first place trial court should have rejected the solvency certificate submitted by Respondents 1 to 4, even otherwise on the ground that the same is furnished after expiry of period granted by this Court for this purpose apart from reasons for which the same is refused.

    8. It is further contended by Shri Vyawahare that Respondents 1 to 4 on 1-11-1993 filed an application before the trial court for grant of time to furnish fresh solvency certificate. That application was rightly rejected by the trial court vide order dated 1-11-1993 by observing that prayer made by the respondents in the application cannot be accepted because trial court has no power to extend the time-limit given by the High Court. It is submitted that Respondents 1 to 4 challenged the order dated 1-11-1993 passed by the 2nd Joint Civil Judge, Junior Division, Nagpur by filing Civil Revision Application St. No. 14520 of 1994 along with application for condonation of delay before this Court. This Court vide order dated 1-9-1994 rejected the application for condonation of delay and consequently, civil revision application, which was registered as CRA Stamp No. 14502 of 1994 automatically stood dismissed. It is contended that Respondents 1 to 4 instead of honouring the undertaking given to this Court and obeying directions given by this Court in the contempt petition, not only failed to honour and comply the same, but adopted a peculiar course with the oblique motive to give go-bye to the terms and conditions of the undertaking as well as directions issued by this Court vide order dated 22-7-1993 in the contempt petition.

    9. It is further contended by the learned counsel for the appellant that in view of the above referred facts and circumstances, the appellant moved an application in Special Civil Suit No. 436 of 1992 under Or. 39 R. 11 read with S. 151 of the Civil Procedure Code (Ext. 62) for striking out the defence of Respondents 1 to 4 for misleading the Court and for breach of the order. It is contended that trial court vide order dated 25-4-1995 not only rejected the application filed by the appellant, but also accepted the solvency certificate furnished by Respondents 1 to 4. Being aggrieved by this order, the appellant has filed the present appeal against order.

    10. It is vehemently argued by the learned counsel for the appellant that the impugned order was passed by the trial court without taking into consideration the above referred undisputed facts. It is submitted that as per order dated 22-7-1993 passed by this Court in Contempt Petition No. 123 of 1993, Respondents 1 to 4 were directed to furnish security within a period of four weeks from 22-7-1993 and the said period expired on 19-8-1993. It is contended that the respondents did not obtain any extension of time from this Court in this regard. The trial court also rejected the application filed by Respondents 1 to 4 for extension of time to furnish the solvency certificate and revision against the said order was also dismissed by this Court. In a situation like this, the appellant was entitled to move an application under Or. 39 R. 11 of the Civil Procedure Code for striking out the defence of the respondents and the trial court ought to have accepted the application and struck out the defence of Respondents 1 to 4. The impugned order is, therefore, unsustainable in law and may be set aside.

    11. I have given anxious thought to the facts placed before this Court by the learned counsel for the appellant and also considered the legal contentions canvassed by him. In the instant case, no affidavit appears to have been filed by the respondents controverting the allegations made by the appellant in the appeal against order. In absence thereof, I am inclined to accept the facts placed by the learned counsel for the appellant before me.

    12. In the instant case, this Court vide order dated 6-11-1992 dismissed the appeal against Order No. 68 of 1992 filed by the appellant and directed that out of the amount of consideration in respect of suit property, the respondents shall keep 1/10 of the said amount in the fixed deposit in State Bank of India, Dharampeth Branch, Nagpur in respect of the respective shares of the appellant and present Respondents 5 to 7 initially for a period of three years with the further observation that if the suit is not decided within the said period, amount shall be further invested in the fixed deposit as per directions of the Court. In view of the above referred direction given by this Court, it was undoubtedly clear that Respondents 1 to 4 were required to deposit amount of Rs. 4,80,000 i.e Rs. 1,20,000 each towards the share of the appellant and Respondents 5 to 7. It is not in dispute that the respondents deposited an amount of Rs. 1,20,000 in State Bank of India only and gave a specific undertaking in Contempt Petition No. 123 of 1993 dated 22-7-1993 that Respondents 1 to 4 shall furnish surety for the respective shares of Respondents 5 to 7 before the trial court as directed by this Court vide order dated 16-11-1992 in appeal against Order No. 68 of 1992. This Court while disposing of the contempt petition vide order dated 22-7-1993 showed indulgence and granted concession to Respondents 1 to 4 to furnish security in respect of present Respondents 5 to 7 to the tune of Rs. 3,60,000 before the trial court instead of depositing the said amount. This Court, however, gave a specific direction to Respondents 1 to 4 to furnish the said security within a period of four weeks from 22-7-1993. Respondents 1 to 4 in view of these facts, were not only bound to furnish security in view of their undertaking to the Court, but were specifically directed to furnish security within a period of four weeks. Respondents 1 to 4 did not either care to honour the undertaking given before this Court dated 22-7-1993 nor obeyed the direction given by this Court by furnishing security for the amount of Rs. 3,60,000 within a period of four weeks i.e on or before 19-8-1993. Respondents 1 to 4 in the backdrop of these facts have committed deliberate and intentional disobedience of the terms and conditions of their own undertaking as well as directions issued by this Court in the contempt petition.

    13. It is not at all disputed that Respondents 1 to 4 neither made any application to this Court for extension of time nor this Court has extended time for furnishing security beyond the period of four weeks as directed by this Court. I am surprised to see the audacity of Respondents 1 to 4, who have made an application for extension of time before the trial court on 1-11-1993 knowing fully well that it is beyond the jurisdiction of the trial court to extend the time, which was prescribed by the High Court vide order dated 22-7-1993. The trial court was absolutely justified in rejecting the application for extension of time moved by Respondents 1 to 4 vide order dated 1-11-1993. It is really surprising that Respondents 1 to 4 thereafter challenged the order dated 1-11-1993 by filing civil revision application before this Court. The conduct of the respondents in filing civil revision application demonstrates oblique motive with which the revision was preferred. However, this Court did not condone the delay caused in filing revision by dismissing application for condonation of delay, with the result, the civil revision application also stood dismissed. The entire conduct of Respondents 1 to 4 in the backdrop of the above referred facts, reveals that Respondents 1 to 4 never intended to honour the undertaking given to this Court and comply with the directions issued by this Court in the contempt petition. On the other hand, there was a deliberate attempt made by Respondents 1 to 4 by moving application for extension of time to furnish security before the trial court and by challenging the order passed by the trial court rejecting the said application by way of civil revision application in this Court in order to frustrate the condition of undertaking given by them as well as directions issued by this Court in the contempt petition.

    14. It will be proper at this stage to consider the provisions of Or. 39 R. 11(1) of the Civil Procedure Code. This Rule is added by the Bombay High Court Notification No. 0102/77 dated 5-9-1983 and contemplates that where the Court orders any party to a suit or proceeding to do or not to do a thing during the pendency of the suit or proceeding or where any party to a suit or proceeding gives any undertaking to the Court to do or refrain from doing a thing during the pendency of the suit or proceeding and such party commits any default in respect of or contravenes such order or commits a breach of such undertaking, the Court may dismiss the suit or proceeding, if the default or contravention or breach is committed by the plaintiff or applicant or strike out the defences, if the default or contravention or breach is committed by the defendants or opponent. The proviso to this Rule contemplates that before passing any order under this sub-rule, notice shall be given to the parties likely to be affected by such order to be passed.

    15. R. 11 is added in Or. 39 of the Civil Procedure Code by the High Court vide notification dated 5-9-1983 with a specific purpose and to achieve definite objective. The intent of Rule is to provide the necessary action to be taken by the Court in case parties to the suit defy the order passed by the Court or commit breach of undertaking given to the Court. This provision is introduced with a positive object that the parties to the suit must face necessary consequences contemplated by this Rule in case they defy the order of the Court or commit breach of the undertaking given to the Court. The scheme of Or. 39 R. 11(1) is to clothe the Court with a power to take appropriate action against the parties to the suit in case they defy the order of the Court or commit breach of the undertaking given to the Court. It is no doubt true that the words “Court may” used in the provision, which in the normal set of circumstances, imply that the discretion given to the Court for taking necessary action in the circumstances mentioned in the order, are directory. However, the word “may” in a given case is directory or mandatory needs to be construed in view of scheme of the provision as well as intent and objective to be achieved by such provision. Similarly, weighing of the consequences of holding a provision to be mandatory or directory is vital and more often than not determinative of the very question whether the provision is mandatory or directory. When the design of a statute or provision is to clothe with the power in the Authority or Court for taking definite and positive action in case of breach thereof, then the provision must be construed to be mandatory in nature even though the word used is “may”. While applying these parameters to R. 11(1), I have no hesitation to hold that R. 11(1) of Or. 39 of the Civil Procedure Code is mandatory in nature.

    16. My view is fortified by the view expressed by the learned Single Judge of this Court in Ratnakar D. Patade v. Smita Pandurang Dalvi 1996 1 Mah LJ 76. It is observed by the learned Single Judge in the above referred judgment, which reads thus: (Mah LJ p. 82, para 11)

    “11. The difference between a mandatory rule and a directory rule is that while former must be strictly observed, in the case of the latter, substantial compliance may be sufficient to achieve the object regarding which the rule is enacted. As held by the Supreme Court in Sharif-Ud-Din v. Abdul Gani Lone 1980 1 SCC 403 whenever a statute prescribes that a particular act is to be done in a particular manner and also lays down that failure to comply with the said requirement leads to a specific consequence, it would be difficult to hold that the requirement is not mandatory and the specified consequences should not follow. R. 11(1) lays down that failure to comply with court's Order leads to specified consequence and on fair construction thereof, it is clear that if a party commits default in complying court's order or contravenes it then the consequence as provided therein has to follow. The whole purpose of R. 11(1) would be frustrated if the word ‘may’ in sub-s. (1) would receive construction to mean ‘discretionary’ or ‘directory’. In my view keeping in mind the general object intended to be secured and carefully attending to the scope of the provision, R. 11(1) of the Code of Civil Procedure is ‘mandatory’ in nature and the trial court has erred in construing it as ‘discretionary’ in nature.”

    17. In the backdrop of the settled legal position, it must follow that if any party to the proceedings after giving undertaking to the Court commits any default or contravenes or commits a breach of such undertaking and if such breach or default is committed by the defendants, then the necessary consequence shall be to strike out the defences of the defendants. Similar is the case in respect of order passed by the Court whereby party to the suit is required to do or not to do a thing during pendency of the suit and if any default or breach is committed in respect of such order passed by the Court and if it is by the defendants, then necessary consequence would be that the Court shall strike out the defence of such defendants.

    18. In the instant case, in the backdrop of the above referred facts, Respondents 1 to 4 not only committed total breach of undertaking given to the Court, but also contravened and breached the order dated 22-7-1993 passed by this Court in Contempt Petition No. 123 of 1993 whereby respondents were directed to furnish security in respect of Respondents 5 to 7 to the tune of Rs. 3,60,000 in the trial court within a period of four weeks. It is pertinent to note that period of four weeks granted by this Court for the above referred purpose to Respondents 1 to 4 had expired on 19-8-1993. Thereafter, lower court had no jurisdiction to accept security, if any, furnished by Respondents 1 to 4 after the said period unless period for this purpose is specifically extended by this Court. By the impugned order, the trial court in utter disregard to the facts, such as time granted by the High Court expired on 19-8-1993, application for extension of time for furnishing security moved by the respondents was dismissed by the trial court vide order dated 1-11-1993 and revision preferred by the respondents against the order dated 1-11-1993 passed by the trial court also came to be dismissed, permitted Respondents 1 to 4 to furnish security and accepted the same on totally misconceived and unfounded grounds. The entire approach of the trial court is totally perverse and misconceived and, therefore, the impugned order in my opinion, is devoid of substance and de hors the provisions of Or. 39 R. 11(1) of the Civil Procedure Code.

    19. For the reasons stated hereinabove, the impugned order dated 25-4-1995 passed by the trial court is set aside and defence of Respondents 1 to 4 is hereby struck off.

    20. The appeal against order is allowed. No order as to costs.