Factual and Procedural Background

The petitioners, during pending arbitral proceedings, applied under Section 27 of the Arbitration & Conciliation Act, 1996, seeking the Arbitral Tribunal's approval to apply to the Court for assistance in taking evidence of certain documents. The Arbitral Tribunal rejected the application, holding that the documents sought were not necessary to prove the case against the broker and that the dispute related to selling brokers was outside the Tribunal’s concern. The petitioners challenged this order/decision dated 29th October 2002 as an award under Sections 18, 31, and 34 of the Act, contending that it was an award subject to challenge under Section 34.

Legal Issues Presented

  1. Whether the order/decision dated 29th October 2002 rejecting the application under Section 27 of the Arbitration & Conciliation Act, 1996, constitutes an arbitral award or interim award within the meaning of the Act.
  2. If the said order/decision is an award, whether a petition under Section 34 challenging it is maintainable at this stage.

Arguments of the Parties

The opinion does not contain a detailed account of the parties' legal arguments.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Satwant Singh Sodhi v. State of Punjab (AIR 1999 SC 2040) Recognition that an award includes an interim award which finally decides the rights of parties, rendering the arbitrator functus officio on those claims. Used to establish that an interim award must finally determine a claim or part thereof to qualify as an award under the Act.
Sanshin Chemicals Industry v. Oriental Carbons & Chemicals Ltd. (AIR 2001 SC 1219) Decision on venue of arbitration is an interim award amenable to challenge under Section 34. Supported the principle that only decisions finally determining an issue or claim qualify as awards.
Anuptech Equipments Pvt. Ltd. v. Ganpati Co-operative Housing Society Ltd. AIR 1999 Bom. 219 Distinction between orders and awards; orders may terminate proceedings without deciding merits, awards decide merits. Clarified that orders and awards are distinct, and not all orders are challengeable as awards.
Konakan Railway Corporation Ltd. v. Rani Constructions Pvt. Ltd. AIR 2002 SC 778 Arbitration & Conciliation Act, 1996 is based on the UNCITRAL Model Law but with significant departures; Model Law judgments are not directly applicable. Emphasized the need to interpret the Act on its own terms rather than relying solely on Model Law precedents.
Japan Line Ltd. v. Aggelinki Charts Compania Maritima S.A. (The “Angelic Grace”) (1980) Lloyd's Rep 288 Interim awards can be made on any issue referred to arbitrators; arbitrators must specify the matter decided and act fairly. Provided guidance on the nature and requirements of interim awards under English law, influencing interpretation under the Act.
SL Sethia Lines Ltd. v. Navlagro Maritime Corporation (The “Kostas Melas”) (1981) 1 Lloyd's Rep. 18 Recognition and development of interim awards in maritime arbitration, including their power and limitations. Reinforced that interim awards must decide matters in dispute and cannot alter parties’ economic positions without deciding claims.
Hindustan Petroleum Corporation Ltd. v. Batliboi Environmental Engineers Ltd. (2001 CLC 811) Orders under Section 16 ruling on jurisdiction are not awards and not challengeable under Section 34, but appealable under Section 37. Used to show that jurisdictional rulings are distinct from awards and have a separate appeal mechanism.
K/S A/S Bill Biakh v. Hyundai Corporation (1988) 1 Lloyd's Rep. 187 English courts do not have jurisdiction to correct procedural errors by treating procedural rulings as awards. Supported the distinction between procedural orders and awards, influencing interpretation of what constitutes an award.
Three Valleys Water Committee v. Binnie and Partners (1990) 52 BLR 42 Pre-award rulings on procedural matters are not awards. Further supported that procedural orders are not challengeable as awards.

Court's Reasoning and Analysis

The Court analyzed the nature of the order/decision dated 29th October 2002 under the framework of the Arbitration & Conciliation Act, 1996, particularly focusing on the definitions and requirements of an arbitral award under Sections 2(c), 31, and 34. It distinguished between awards (including interim awards) and procedural orders or decisions. The Court emphasized that an award must be a final determination of a claim or part of a claim, supported by reasons, signed by the arbitral tribunal, and must render the tribunal functus officio on that matter.

The Court referred to authoritative definitions and precedents, including English arbitration law and prior Indian Supreme Court rulings, to clarify that procedural rulings such as the rejection of an application under Section 27 do not constitute awards. It noted that orders under Section 16 concerning jurisdiction are appealable but not challengeable as awards under Section 34.

Applying these principles, the Court held that the impugned order rejecting the application for assistance in taking evidence was a procedural order and not an interim award. Consequently, the petitioners cannot challenge it under Section 34 at this stage but may challenge the final award incorporating or merging this order, if grounds under Section 34(2) exist.

Holding and Implications

The Court DISMISSED the petition challenging the order dated 29th October 2002 as an award under Section 34 of the Arbitration & Conciliation Act, 1996.

The direct effect is that the order rejecting the application under Section 27 is not an arbitral award and therefore not subject to challenge under Section 34 at this stage. The petitioners remain entitled to challenge the final award, including this order if it is merged therein, on valid grounds under Section 34(2). No new precedent was established beyond the application of existing principles distinguishing awards from procedural orders.

    Harinarayan G. Bajaj v. Sharedeal Financial Consultants Pvt. Ltd., Mumbai And Another

    1. Heard forthwith.

    In the course of arbitral proceedings which are pending, an order/decision came to he passed on 29th October, 2002, the petitioners had made an application under S. 27 of the Arbitration & Conciliation Act, 1996, Under S. 27 of the Act of 1996 a party with the approval of the Arbitral Tribunal may apply to the Court for assistance in taking evidence, by application dated 6th June, 2002, petitioner prayed that the Arbitral Tribunal may be pleased to apply to the Court for assistance in taking evidence on documents referred to in para 6(C)(II). Those documents were documents under No. 1 to 8 under the heading (C)(II). In the alternative the petitioners prayed, that the Tribunal be pleased to grant relief and/ or approval to the petitioner herein to make an application to the court for assistance in taking evidence of the nature mentioned in the prayer earlier referred to. The Arbitral Tribunal heard the parties and thereafter held that the applicant has not brought out any evidence to establish that the documents sought for were necessary to prove the case against the broker. It further held that the documents at best may be necessary to establish a case which the applicant seeks to make out against the selling brokers. The Tribunal held that the Tribunal was not in any way concerned with that dispute, if any such dispute exists and accordingly rejected the said application under S. 27 of the Act. It is that order/decision, which the petitioner herein seeks to challenge as an award, invoking the provisions of Ss. 18, 31 and 34 of the Act of 1996.

    2. The challenge principally is that the said decision/order is an award. If an Award, it can be challenged under S. 34 of the Act of 1996. It will, therefore, have to be decided whether the order/decision dated 29th October, 2002 is an award which expression includes an interim award. If it is an Award, petition under S. 34 would be maintainable. If not, the Court cannot exercise jurisdiction under S. 34 and the parties will be left to challenge the order/decision when the award is finally made and if in law the challenge falls under one of the grounds set out in S. 34(2). It is also made clear that the correctness or otherwise of the said order/decision is not being gone into as the Court presently is only considering the issue whether the said order/decision, is an Award.

    2A. We may advert to certain provisions of the arbitration & conciliation act 1996 to find out whether the order/decision of the Arbitral Tribunal rejecting an application under S. 27 is an award/interim award as set out under. S. 2(c) of the Act of 1996. Section 2(c) sets out that an arbitral award includes ah interim award. What is an award by itself is not defined. Section 31 of the Act of 1996 sets out the requirements of an award including its form. It provides that an arbitral award shall be made in writing and shall be signed by the members of the Arbitral Tribunal. It further requires that in any arbitral proceedings with more than one Arbitrator, the signature of the majority of all the members of the Arbitral Tribunal shall be sufficient so long as the reason for any omitted signature is stated. The next requirement is that the Award shall state the reasons upon which it is based except for the exceptions set out therein. It must also state the date and the place of arbitration. The subsequent requirements are procedural in nature of communicating the Award to the parties. We are really not concerned with that part. An Award considering S. 2(c) of the Act of 1996 therefore, includes an interim award, and as such will also have to satisfy the same requirements of S. 31 to be treated as an Award. Section 31(6) confers jurisdiction on the Arbitral Tribunal at any time during the arbitral proceedings, to make an interim Arbitral Award on any matter with respect to which it may make a final arbitral award. Section 37 provides for an Appeal against orders. The Uncitral Code also does not define an award. Russell on Arbitration (Twenty-first Edition) para 6.001 defines an Award to mean:—

    “In principle an award is a final determination of a particular issue or claim in the arbitration. It may be contrasted with orders and directions which address the procedural mechanisms to be adopted in the reference. Thus questions concerning the jurisdiction of the Tribunal or the choice of the applicable substantive law are suitable for determination by the issue of an award. Questions concerning the admissibility of evidence or the extent of discovery are procedural in nature and are determined by the issue of an order or direction and not by an award. The distinction is important because an award can be the subject of a challenge or an appeal to the court, whereas an order or direction in itself cannot be so challenged.”

    Keren Tweeddale & Andrew Tweeeddale in A Practical Approach to “Arbitration Law explains an award thus:—

    “The term “Award” is also defined in Article 2 as including an interim partial or final award. However, no further indication of what is an award is given. While there will generally be no uncertainty about an arbitral tribunal's final award there may be some uncertainty when considering a prior ruling in the arbitral proceedings. In Societe Industrial Export-Import v. Societe GECI et GFC 1993 Rev arb 303 the Court was asked to determine whether three (the) procedural orders were in fact awards. The arbitral tribunal had held that as it was competent to rule on its own jurisdiction, it could determine the applicable procedural rules and had rejected an application for suspension of the arbitral proceedings. The Paris Court of Appeal held that in each case the decisions of the arbitral tribunal were in fact awards because they constituted decisions of a jurisdictional nature. In England the courts have held that they have no jurisdiction to correct procedural errors: K/S A/S Bill Biakh v. Hyundai Corporation (1988) 1 Lloyd's Rep. 187. It is implicit from K/S A/S Bill Biakh v. Hyundai Corporation and from Three Valleys Water Committee v. Binnie and Partners (1990) 52 BLR 42 that the English courts do not consider a pre-award ruling on a procedural matter as being an award.”

    3. The Act of 1996 under S. 16 has conferred a power on the Arbitral Tribunal to rule on its own jurisdiction. It is necessary to advert to this provision for assistance to enable the Court to find out whether the order passed under S. 16 would amount to an award considering the argument advanced. An order/decision under S. 16 is an order in respect of which an Appeal is provided under S. 37 of the Act of 1996, the power under S. 16 is the power in the Tribunal to rule on its own jurisdiction including ruling on any objection with respect to existence or validity of an arbitration agreement. In other words, issues pertaining to jurisdiction will be the subject matter of an order or decision under S. 16. In the event the Tribunal comes to a conclusion that it has no jurisdiction, the remedy under the Act is conferred under 5.37 which is an Appeal. If the Tribunal holds that it has jurisdiction that order or decision does not become final, but such order/decision can be subject to a challenge when the Award is finally challenged under S. 34. Section 34 provides that recourse to a Court against an Arbitral Award may be made only by an application for setting aside such an Award. It is, therefore, clear from the reading of S. 16 of the Act of 1996 that a decision that the Arbitral Tribunal has no jurisdiction or that there is no arbitral dispute, under the Act is not treated as an award. There is also no deeming fiction by which it is taken out from the definition of award. It is an order which if it culminates in the closure of proceedings an appeal is provided. If it does not terminate the proceedings, that order/decision can be challenged when the Award itself is challenged. That is how on a proper construction or reading of that Section the nature of the order will have to be considered. In Hindustan Petroleum Corporation Ltd. v. Batliboi Environmental Engineers Ltd., decided on 4th December, 2000 in Arbitration Petition No. 280 of 1999 (reported in 2001 CLC 811) it was argued that an order under S. 16 could be independently challenged as an Award under S. 34. That contention was rejected by this court by holding that it is not an order which could be challenged under S. 34, as S. 34 only permits challenge to an award. This will be relevant in answering the issue. Under the Code of Civil Procedure 1908 an issue as to jurisdiction which is answered either under S. 9A as it stands in the State of Maharashtra or under Order XIV a decision on want of jurisdiction or no jurisdiction results in a decree which can be appealed. However, under the Act of 1996 a decision as to jurisdiction under S. 16 is not treated as an award. Against that order which results in termination of the arbitral reference an appeal is provided. In other words, though it may finally terminate the proceedings, it is not understood as an award as it does not finally decide the claim submitted for adjudication before the Arbitral Tribunal. This is being discussed for the reason, that termination of proceedings can only be in the manner as set out under S. 32 of the Act of 1996. The Act, therefore, provides for termination of proceedings other than by an award. Under S. 32(1) the Arbitral proceedings shall be terminated by the final arbitral award or by an order of the Arbitral Tribunal under sub-sec. (2). What proceedings can be terminated other than by an award under are set out under sub-sec. (2) of S. 32. It amounts to termination (a) when the claimant withdraws the claim subject to the other requirement, (b) the parties agree on the termination of the proceedings or (c) the Arbitral Tribunal finds that the continuation of the proceedings as for any other reason became unnecessary or impossible. It is, therefore, clear that even in a case, where the Arbitral proceedings are terminated the termination of arbitral proceedings does not result in an Award. This distinction will have to be considered when one considers, what can be challenged under s. 34 as an award. section 34 is not a mere remedy in the matter of termination of proceedings. It is basically a remedy against an award either final or interim. The other guiding factor is under S. 37. Certain orders made under the Act are capable of being appealed under S. 37. Under S. 37(1) an Appeal lies in respect of an order granting or refusing to grant any interim measure under S. 9. An Appeal also lies against setting aside or refusing to set aside an Award under S. 34. Under sub-sec. (2) of S. 37 an Appeal lies against a plea under sub-sec. (2) or sub-sec. (3) of S. 16 which are pleas pertaining to jurisdiction as also against an order granting or refusing to grant interim measures under S. 17. Therefore, all orders/decisions passed under the Act of 1996 do not necessarily fall under the expression Awards. It is only a decision/order which satisfies the requirements of S. 31 which is an Award. All others are orders and decisions in the course of the proceedings deciding procedural issues or terminating the arbitral proceedings themselves on the ground that the submission does not fall within the arbitral agreement or that there is no arbitral agreement or that there is no dispute required to be decided by the Arbitral Tribunal.

    The Arbitration and Conciliation Act of 1996 has been drafted based on the Unicitral Model though our Parliament has made various departures from the code. This has been recognised by the Apex Court in the case of Konakan Railway Corporation Ltd. v. Rani Constructions Pvt. Ltd., (2002) 2 SCC 388 : (AIR 2002 SC 778), it is not necessary to advert to the said judgment except to quote the following paragraph from the said judgment:—

    “That the Model Law was only taken into account in the drafting of the said Act is, therefore, patent. The Act and the Model Law are not identically drafted. Under S. 11 the appointment of an arbitrator, in the event of a party to the arbitration agreement failing to carry out his obligation to appoint an arbitrator, is to be made by “the Chief Justice or any person or institution designated by him”; under clause 11 of the Model Law it is to be made by a court. S. 34 of the Act is altogether different from clause 34 of the Model Law. The Model Law and judgments and literature thereon are, therefore, not a guide to the interpretation of the Act and, especially, of S. 11 thereof.”

    4. Another relevant provision which will have to be noted is Section 5 of the Act of 1996. Section 5 provides that notwithstanding anything contained in any other law for the time being in force, in matters governed by this Part, no judicial authority shall intervene except where so provided in this Part. In other words a court can only intervene if a power is conferred on the Court to interfere with the order or award and not otherwise. The corollary that follows is that all orders or decisions by the Arbitral Tribunal are not subject to challenge under the Act of 1996. When and how they can be challenged is not necessary to be answered in this case. What this Court, on the facts of this case, is called upon to answer is whether the order or decision rendered under S. 27 of the Act of 1996 is an interim award.

    5. Considering what has been discussed earlier, it would be necessary to consider the position in law under the Act of 1940. Under the Act of 1940 ‘Award’ was defined under S. 2(b), to mean an arbitration award. The Section atleast did not provide or speak of an interim award. There is, however, judicial recognition that an Award could include an interim award as long as it met the requirements of an Award. See Satwant Singh Sodhi v. State of Punjab (1999) 3 SCC 487 : (AIR 1999 SC 2040). The Apex Court in that case was considering as to the effect of an interim Award. The Court held that whether an interim award is final award or whether an interim award is final till the passing of the final award would depend on the form of the award, if an interim award is intended to finally determine the rights of the parties, it will have the force of a complete award and will continue to have effect even after the final award is delivered. When such an award is made the arbitrator becomes functus officio as regards the claims covered in such an award and such claims cannot be redetermined. It is, therefore, clear that under the Act of 1940 also it was judicially recognised that an Award includes an interim award, but an interim Award to be an award had to decide the claim finally. Once the claim is decided finally the Arbitral Tribunal could not adjudicate further on that claim and became functus officio. It is not necessary to advert to other judgments considering the law as declared in Satwant Singh Sodhi (AIR 1999 SC 2040) (supra). What however, emerges is that a right or claim of the party is finally decided, and the Arbitral Tribunal in so far as the matter decided became functus officio. This must necessarily exclude procedural orders in the course of the arbitral proceedings.

    6. It may be necessary to consider some other decisions in other jurisdictions, in so far as the meaning of an interim award and the power of passing an interim award. For that purpose some judgments passed under English Arbitration Act, 1950 may be considered. It may be noted that large number of interim awards have been passed basically in admiralty matters considering the nature of the disputes in such matters. In the case of Japan Line Ltd. v. Aggelinki Charts Compania Maritima S.A and Davies and Potter (The “Angelic Grace”) (1980) Lloyd's Rep I 288 an interim award came to be passed. While answering the issue of in terim award, Lord Denning referred to S. 14 of the Act of 1950 which provided for an interim award. The said provision reads as under:—

    “Unless a contrary intention is expressed therein, every arbitration agreement shall, where such a provision is applicable to the reference, be deemed to contain a provision that the arbitrator or umpire may, if he think fit, make an interim award, and any reference in this Part of this Act to an award includes a reference to an interim award.”

    Dealing with the Issue of interim award the learned Judge observed as under:—

    “It seems to me that, in making an interim award, the arbitrators can and should look at all the circumstances of the case. They can look at the other two arbitrations as well as this one. They can apply the principle of equitable set off such as was considered in The Nanfri (Federal Commerce v. Molena), (1978) 2 Lloyd's Rep. 132.”

    The right to pass an equitable interim award has been recognised. In SL Sethia Lines Ltd. v. Navlagro Maritime Corporation (The “Kostas Melas”), (1981) 1 Lloyd's Rep. 18. Various contentions were in issue, Considering that, the Court noted that the development of the law one of which was passing of interim awards. The Court observed as under:—

    “The second is the development of a practice among maritime arbitrators to make interim awards in respect of disputed hire during the currency of a time charter.”

    Dealing with the issue of the power of making an interim award the Court observed as under:—

    “First, since the jurisdiction of an arbetrator is a jurisdiction to decide disputes, it follows that the power to make an award is a power to decide matters in dispute between the parties. An award, interim or final, can only be an award in respect of matters referred to the arbitrators for decision. It follows, therefore, that (in the absence of some special agreement between the parties) a submission of disputes to arbitration will not generally give the arbitrators the power to order that one party shall pay a sum to the other, unless the arbitrators decide that sum is due and owing. Arbitrators can decide, by way of interim award, that a minimum sum is payable by one party to the other, if they decide that sum atleast is due and owing; but they cannot generally order that one party should pay a minimum sum to another on account of claims, simply because on a rough look at the case it looks as though such sum at least will prove to be payable, without actually deciding that sum is due and owing. So to order would result in a change in the parties respective economic positions, without deciding any matter in dispute; generally speaking, arbitrators have no power to order such a change. The second point is this. An interim award can relate to any Issue in the matters in dispute referred to the arbitrators; it may relate to an issue affecting the whole claim (e.g the issue of liability, reserving the issue of quantum for a final award), or may relate to a part only of the claims or cross claims submitted to them for decision. It follows that arbitrators, even making an interim award, must specify the issue, or the claim or part of a claim, which is the subject matter of the interim award.”

    The learned Judge then proceeded to observe that in his judgment, arbitrators are fully entitled to make such an interim award, provided that in so doing they observe the ordinary principles applicable to such awards-in particular, namely that their award constitutes a decision upon a matter referred to them, and that they specify in their award the matter which has been decided and further more, that they do not, in disposing of the matter with expedition, infringe the general principle that they must act fairly. From the above under English law an interim award made must satisfy the following:—

    (i) an interim award can relate to any issue in the matters in dispute referred to the arbitrators; it may relate to an issue affecting the whole claim or may relate to a part only of the claims or cross claims submitted to them for decision.

    (ii) The Arbitrators in making an interim award must specify the issue or the claim or part of the claim which is the subject matter of the interim award.

    (iii) In disposing of the matter they should not infringe the general principle that they must act fairly.

    7. As noted earlier S. 31(6) specifically confers a power on the Arbitral Tribunal to make an interim arbitral award or any matter with regard to which it may make a final arbitral award. Award itself has been defined to include an interim award. What then, therefore, is the extent of this expression “award” which has not been defined under the Act. We have earlier seen that the Act of 1996 uses various expressions. That Act is based on the Model law i.e Uncitral Code. The model law itself was drafted by experts in the field of arbitral commercial law. In these circumstances leading experts are of the view that Courts should give due regard to the specific expression used in the model law and as adopted by the Legislatures of the adopting State. An important indication in holding what is an award, flows from the expression in matter with respect to which it may make a final arbitral award. In other words it must be in respect of claims or counter claims which have been subject matter of submission or reference to the arbitral tribunal. The various expressions used and as to what would constitute an award came up for consideration before this court in Anuptech Equipments Private Ltd. v. Ganpati Co-operative Housing Society Ltd., Mumbai, AIR 1999 Bom. 219. Referring to the various expressions it has been held that the perusal of the various provisions would show that Act uses three different expressions which are arbitral award, order and decision. In Anuptech Equipments Pvt. Ltd. (supra) the issue was of challenge to an order passed under S. 25(a) terminating the arbitral proceedings for failure to file statement, considering the expression “Award” this is what was observed:—

    “What that means is that the expression order and award are distinct and different. One is termination of proceedings without deciding the merits of the matter, the other is termination on merits. Thus it is clear that looking at the Act itself there is no provision to challenge certain orders or decisions.”

    After considering the further scheme of the Act including provision like S. 32 this court observed that it is clear that the expression order and award are distinct and different.

    The expression “award” in its widest amplitude could have been read to mean the termination of the arbitral reference or the proceedings before the arbitral Tribunal as has been held in same jurisdictions referred to earlier. That, however, is not the position in so far as the Act of 1996 is concerned as S. 32 of the Act as noted earlier provides for termination of the arbitral proceedings either by an arbitral award or by the Arbitral Tribunal under sub-sec. (2). Section 32 does not include within it for example termination of arbitral proceedings by the Arbitral Tribunal under S. 16(5) which pertains to jurisdiction with respect to the existence or the validity of the arbitration agreement. Therefore, an order culminating in termination of arbitral proceedings with respect to the existence of validity of the arbitration agreement is not an award. The expression “award” therefore, must mean something different from mere termination of proceedings. The award whether interim award or final considering the judgment of the Apex Court in Satwant Singh Sodhi (AIR 1999 SC 2040) (supra) the English judgments and the scheme of the Act of 1996 must mean the final determination of a claim, part of a claim or counter claim by the Arbitral Tribunal of a submission to the Arbitral Tribunal. That decision must be supported by reasons in terms of S. 31(3) unless otherwise provided for. It does not mean that a final or interim determination of a claim or part of the claim unsupported by reasons is not an award. It is an award which may be subject to challenge under S. 34. The award must be signed by the Arbitrators or by the majority of the Arbitrators. Considering S. 31(2) it must result in the Tribunal being rendered functus officio in respect of the subject matter of the Award made by it and to that extent. It cannot further decide that part of the claim or counter-claim which it has adjudicated. Under the scheme of the Act of 1996 mere closure or termination of proceedings does not culminate into an Award. To sum up merely answering an issue which may arise before the Arbitral Tribunal and deciding it resulting in termination of the proceedings by itself would not amount to an award. For example the issue of jurisdiction which has to be decided under S. 16 yet does not form part of the expression “award”, though in a challenge to an award where proceedings are continued rejecting the challenge to arbitrability or otherwise that order can be challenged whilst challenging the Award under S. 34 of the Act of 1996. The decision or order to be an award must result in final determination of the claim, part of the claim and/or counterclaim referred or submitted to arbitration and must normally meet the other requirements of S. 31 for which signing the award is mandatory. Only then can the Award be said to be either interim or final. All other orders or decisions would not fall within the expression award and consequently S. 34 would not be attracted.

    This view is further fortified by the judgment of the Apex Court in the case of Sanshin Chemicals Industry v. Oriental Carbons & Chemicals Ltd., (2001) 3 SCC 341 : (AIR 2001 SC 1219). In that matter the issue before the Apex court was whether an incorrect decision as to venue of arbitration which had a bearing on the procedure ultimately followed in arbitral proceedings would be covered under S. 34(2). The Apex Court on arguments advanced and considering S. 34 and S. 2(c) noted as under:—

    “….. and an award being a final determination of a particular issue or claim in the arbitration and the issue regarding venue being of seminal importance for adjudication of the rights of the parties, the conclusion is irresistible that such decision by the Joint Committee of Arbitrators, must be held to be an interim award and as such amenable to be reviewed under S. 34 of the Act and consequently, the High Court committed serious error in holding to the contrary.”

    On behalf of the respondents in that case it was contended that to fall under the expression “award” and for that matter a decision to become an award, must be a determination of a particular issue or claim in the arbitration. Answering the issue the Court held that a decision which does not decide the claim would not amount to an Award and observed as under:—

    “The ultimate arbitral award could be assailed on the grounds indicated in sub-sec. (2) of S. 34 and an erroneous decision on the question of venue, which ultimately affected the procedure that has been followed in the arbitral proceeding, could come within the sweep of S. 34(2)………..”

    It is, therefore, clear that every order or decision is not an Award. An order or decision in the course of proceedings which are continuing and in respect of which no remedy is provided under the Act could normally be challenged while challenging the Award under S. 34, provided the challenge was available under S. 34(2) of the Act. In the instant case the order rejecting the application under S. 27 is a decision and/or order. It is not definitely an interim award. It would, therefore, be open to the petitioner if finally aggrieved by an award to challenge the Award in which the order has merged, under S. 34(2) if in law a challenge would be available under S. 34(2) of the Act.

    8. With the above discussion petition stands rejected. However, in the circumstances of the case there shall be no order as to costs.

    Parties/Authorities to act on an ordinary copy of this order duly authenticated by the Associate/personal Secretary of this court.

    Petition dismissed.