37 Miss. Code R. § 1-7501-04001-1302 : Transportation and Highways — Mississippi Department of Transportation — Maintenance — Underground Utility Crossings —PERMIT REQUIREMENTS —1-7501-04001-1302 TEXT PDF Additional Service Lines - Service lines being installed from an existing distribution line located within MDOT right-of-way are required to be covered under a separate permit application. This includes any and all encroachments or work to be performed on rightof-way. 37 Miss. Code. R. § 1-7501-04001-1302 Amended 5/27/2021