(1) Each information source shall have a dedicated area on the page for displaying information (a portlet).
Explanation. For the purposes of this rule, it is clarified that inspections carried out by the Indian Bureau of Mines or the State Government or an authorised officer of the Director, Atomic Minerals Directorate for Exploration and Research, as the case may be, and the response of the mine owner or manager to the inspection shall be construed as one information source.
(2) Identification of the different information sources, user categories, preparation of the standard process sheets or templates, configuring and customizing the presentation of the content and other details in this regard as well the role of the administrator for addition of information to the portal or deletion from the portal shall be decided by the Controller General in consultation with the Central Government.
Form A
(See Rule 7)
(Notice of commencement of Reconnaissance or prospecting operations)
| IMPORTANT INSTRUCTIONS FOR FILLING THE FORM |
| |
This Form, duly filled in must reach the concerned authorities as prescribed within the rule, within fifteen days of the commencement of Reconnaissance or prospecting operations by online or E-mail. |
| |
This should be sent to the Regional Controller in whose territorial jurisdiction the mineral concession falls as notified from time to time by the Controller General, Indian Bureau of Mines, under Rule 66 of the Mineral Conservation Development Rules, 2016. |
| |
The form should be digitally signed by the concerned person. |
| 1. |
Type of Mineral Concession |
Reconnaissance Permit |
|
| |
|
Prospecting Licence |
|
| |
|
Prospecting License-cum-Mining Lease |
|
| 2. |
IBM Registration Number |
|
| 3. |
Unique IBM Concession Number |
Reconnaissance Permit |
| |
|
Prospecting License |
| |
|
Prospecting License-cum-Mining Lease |
| 4. |
Name of the mineral or minerals for which Reconnaissance Permit or prospecting license or prospecting license cum mining lease has been granted: |
| |
(Information will be system generated. Linked with Entry 5 and 6 of Form K .) |
| 5. |
Name and address of the permit holder or licensee: |
| |
(Information will be system Generated. Linked with Entry 5 and 6 of Form K .) |
| 6. |
Particulars of Mineral Concession |
| |
(Information will be system Generated. Linked with Entry 5 and 6 of Form K .) |
| 7. |
Location of the Mineral Concession |
| |
(Information will be system Generated. Linked with Entry 5 and 6 of Form K .) |
| 8. |
Particulars of Geologist employed for the Reconnaissance Permit or Geologist and Mining Engineer employed for the Prospecting Licenced area: |
| |
(i) Name and address: |
| |
(ii) E-mail address: |
| |
(iii) Phone Number and Mobile Number: |
| |
(iv) Qualification: |
| |
(v) Date of Appointment: |
| |
(vi) Nature of Appointment: |
Whole Time |
| |
|
Part Time |
| 9. |
Date of commencement of Reconnaissance Operation or prospecting operations: |
Place:
Date:
Signature
Name in full:
Designation: Owner-Geologist-Mining Engineer
Form B
[See Rule 9(1), 9(3) and 9(4)]
(Progress Report of the Reconnaissance Operations or Prospecting Operations carried out for the Year )
| IMPORTANT INSTRUCTIONS FOR FILLING THE FORM |
| |
This Form, duly filled in must reach the concerned authorities within forty five days after expiration of twelve months from the date of execution of Reconnaissance Permit-Prospecting license deed or the expiry of Reconnaissance permit-prospecting licence or prospecting license cum mining lease, whichever is earlier or within the period of thirty days from the date of abandonment of Reconnaissance - prospecting operations by online or Email. |
| |
This should be sent to the Regional Controller in whose territorial jurisdiction the mineral concession falls as notified from time to time by the Controller General, Indian Bureau of Mines, under Rule 66 of the Mineral Conservation Development Rules, 2016. |
| |
The form should be digitally signed by the concerned person. |
| 1. |
Type of Mineral Concession |
Reconnaissance Permit |
|
| |
|
Prospecting Licence |
|
| |
|
Prospecting License-cum-Mining Lease |
|
| 2. |
IBM Registration Number |
|
| 3. |
Unique IBM Concession Number |
Reconnaissance Permit |
| |
|
Prospecting License |
| |
|
Prospecting License-cum-Mining Lease |
| 4. |
Name of the mineral or minerals for which Reconnaissance Permit or prospecting license or prospecting license cum mining lease has been granted: |
| |
(Information will be system generated. Linked with Entry 5 and 6 of Form K .) |
| 5. |
Name and address of the permit holder or licensee: |
| |
(Information will be system Generated. Linked with Entry 5 and 6 of Form K .) |
| 6. |
Particulars of Mineral Concession |
| |
(Information will be system Generated. Linked with Entry 5 and 6 of Form K .) |
| 7. |
Location of the Mineral Concession |
| |
(Information will be system Generated. Linked with Entry 5 and 6 of Form K .) |
| 8. |
Status of reconnaissance prospecting operation |
|
| |
Please tick-mark the boxes whichever is applicable |
In Progress |
[ ] |
| |
|
Completed |
[ ] |
| |
|
Abandoned |
[ ] |
| 9. |
If reconnaissance-prospecting operation is completed |
|
| |
or abandoned, date of such completion or abandonment |
|
| 10. |
Total surface area covered by reconnaissance |
|
| |
prospecting work (hectares) as on date |
|
| 11. |
Reconnaissance survey work done |
|
|
| |
(A brief description of the work involved along with particulars of the machines and instruments used would be given against each of the following items) |
| |
(i) Regional Survey |
|
| |
(ii) Aerial-photo-geological work |
|
| 12. |
Geological Mapping including area covered and scale |
|
| |
(i) Geophysical |
|
| |
(ii) Geochemical |
|
| |
(iii) Test drilling : Number, area of influence meterage and sampling |
|
| |
(iv) Nature and structure of the ore body |
|
| |
(v) Analysis of the ores or minerals |
|
| 13. |
Completion of prospecting work during the year: |
|
| 14. |
(a) Pitting |
| |
|
(i) Number of pits |
|
|
| |
|
(ii) Depth (metres) |
Average |
|
|
| |
|
|
Maximum |
|
|
| |
|
|
Minimum |
|
|
| |
(b) Trenching |
| |
|
(i) Number of trenches |
|
|
|
| |
|
(ii) Length (metres) Average |
Maximum |
|
|
| |
|
|
Minimum |
|
|
| |
(c) Drilling |
|
Surface |
Underground |
| |
|
(i) Number of boreholes completed during the year. |
|
|
| |
|
(ii) Number of boreholes in progress, if any |
|
|
| |
|
(iii) Total annual drilling (metres) |
|
|
| |
(d) Particulars of drilling machines: |
Type |
Make |
Capacity |
Number of drills |
| |
(e) Exploratory mining, if any: |
| |
|
(1) Number of levels |
|
| |
|
(2) Total development (metres) |
|
| |
|
(3) Mode of entry |
|
| |
|
(4) Quantity of ore produced with grade |
|
| |
(f) Number of samples analysed: |
| |
|
(1) Main constituent (please specify) |
|
| |
|
(2) Complete analysis |
|
| 15. |
If abandoned |
| |
|
(iii) Date of abandonment |
|
| |
|
(iv) Reasons for abandonment |
|
Note: Please enclose a geological report describing the reconnaissance prospecting operations undertaken so far along with the detailed geological plans and sections showing locations of (a) boreholes, (b) pits, (c) trenches, (d) shafts, (e) underground exploratory workings, (f) outcrops, (g) ore zones, (h) faults, (i) folds and other geological features.
The Report shall contain in the borehole logs and interpretation and the inferences drawn as a result of the study of the geology of the area and the interpretation of the borehole cores, pits, trenches, assay data, reserves of ore and contain results of complete analysis of at least two representative samples of ore and the blocks proposed for mining operations. The report shall also contain the results of any beneficiation study carried out on the ores or minerals of the area.
Place:
Date:
Signature
Name in full:
Designation:
Owner-Geologist-Mining Engineer
Form C
[See Rules 20, 29 and 49]
(Notice of intimation of opening-reopening of mine-change in the name of mine)
| IMPORTANT INSTRUCTIONS FOR FILLING THE FORM |
| |
This Form, duly filled in must reach the concerned authorities as prescribed within the rule, within fifteen days of the opening or reopening and within thirty days in case of change in the name of mine, by online or Email. |
| |
This should be sent to the Regional Controller in whose territorial jurisdiction the mineral concession falls as notified from time to time by the Controller General, Indian Bureau of Mines, under Rule 66 of the Mineral Conservation Development Rules, 2016. |
| |
The form should be digitally signed by the concerned person. |
| 1. |
IBM Registration Number |
|
| 2. |
Mining Lease Code |
|
| 3. |
Mine Code |
|
| 4. |
Name of mine-Old name of mine (in case of change in name) |
|
| 5. |
Name and address of the lessee-owner |
| |
(Information will be system generated. Linked with Entry 3 of Form K .) |
| 6. |
Date of opening-reopening of mine |
|
| 7. |
In case of reopening, date of discontinuation |
|
| 8. |
Particulars of the Mining Lease (ML) |
| |
(Information will be system generated. Linked with Entry 4 of Form K ) |
| 9. |
Location of the Mining Lease |
| |
(Information will be system generated. Linked with Entry 4 of Form K ) |
| 10. |
Name and address of previous owner |
| |
if any and the date of abandonment of Mine |
| |
Name |
Address |
E-mail |
Mobile No. |
| |
|
|
|
|
| 11. |
Name and address of Agent of Mine |
| |
Name |
Address |
E-mail |
Mobile No. |
| |
|
|
|
|
| 12. |
Particulars of Mining Engineer employed in the mine: |
| |
(Information will be system Generated. Linked with Entry 8 and 9 of Form H .) |
| 13. |
Particulars of Geologist employed in the mine |
| |
(Information will be system Generated. Linked with Entry 8 and 9 of Form H .) |
| 14. |
Particulars of Manager employed in the mine |
| |
(Information will be system Generated. Linked with Entry 8 and 9 of Form H .) |
| |
|
|
|
|
| 15. |
Letter No. and date through which the mining |
|
| |
plan was approved by the Indian Bureau of |
|
| |
Mines or State Government concerned |
|
Place
Date:
Signature
Name in full:
Designation: Owner-Agent-Mining Engineer-Manager
Form D
[See Rule 21(2)]
(Notice of intention of abandonment of mine or part of the mine)
| IMPORTANT INSTRUCTIONS FOR FILLING THE FORM |
| |
This Form, duly filled in must reach the concerned authorities as prescribed within the rule, within ninety days of the of the date of intention of abandonment, by online or Email. |
| |
This should be sent to the Regional Controller in whose territorial jurisdiction the Mining lease area falls as notified from time to time by the Controller General, Indian Bureau of Mines, under Rule 66 of the Mineral Conservation Development Rules, 2016. |
| |
The form should be digitally signed by the concerned person. |
| 1. |
IBM Registration Number |
|
| 2. |
Mining Lease Code |
|
| 3. |
Mine Code |
|
| 4. |
Name of mine |
|
| 5. |
Name and address of the lessee-owner |
| |
(Information will be system generated. Linked with Entry 3 of Form K .) |
| 6. |
Particulars of the Mining Lease (ML) |
| |
(Information will be system generated. Linked with Entry 4 of Form K ) |
| 7. |
Location of the Mining Lease |
| |
(Information will be system generated. Linked with Entry 4 of Form K ) |
| 8. |
Letter No. and date through which the Final Mine Closure |
| |
plan was approved by the Indian Bureau of Mines or State Government concerned |
|
| 9. |
Date of abandonment |
|
| 10. |
Reasons for abandonment |
[Please tick whichever is applicable] |
| |
i. Lack of demand |
|
| |
ii. Exhaustion of ore-mineral |
|
| |
iii. Un-economic operations |
|
| |
iv. Unable to obtain forest clearance |
|
| 11. |
Up to date Total Resources of Mineral(s) in Mining Lease area (in tonne) as per UNFC: |
| |
(A) |
Mineral Reserve |
|
|
| |
|
(i) Proved Reserve (111) |
| |
|
(ii) Probable Reserve (121 and 122) |
| |
(B) |
Remaining Resources |
| |
|
(i) Feasibility Mineral Resources (211) |
| |
|
(ii) Pre Feasibility Mineral Resources (221 and 222) |
| |
|
(iii) Measure Mineral Resources (331) |
| |
|
(iv) Indicated Mineral Resources (332) |
| |
|
(v) Inferred Mineral Resources (333) |
| |
|
(vi) Reconnaissance Mineral Resources (334) |
| |
(C) |
Total Resources (A + B) = (tonnes) |
| 12. |
Number of workers employed in the mine: |
Male |
Female |
| |
(a) |
Company labour |
| |
(b) |
Contract labour |
| |
(c) |
Total |
Place:
Date:
Signature
Name in full:
Designation: Owner-Agent-Mining Engineer-Manager
Form E
[See Rule 28(1) and 28(2)]
(Notice of temporary discontinuance of mine)
| IMPORTANT INSTRUCTIONS FOR FILLING THE FORM |
| |
This Form, duly filled in must reach the concerned authorities as prescribed within the rule, within one hundred and twenty days of temporary discontinuance of work in the mine, by online or Email. If the discontinuance is due to natural calamity beyond the control of the lessee or Government Orders, this notice shall be sent within fifteen days of such occurrence by online or E mail. |
| |
This should be sent to the Regional Controller in whose territorial jurisdiction the Mining lease area falls as notified from time to time by the Controller General, Indian Bureau of Mines, under Rule 66 of the Mineral Conservation Development Rules, 2016. |
| |
The form should be digitally signed by the concerned person. |
| 1. |
IBM Registration Number |
|
| 2. |
Mining Lease Code |
|
| 3. |
Mine Code |
|
| 4. |
Name of mine |
|
| 5. |
Name and address of the lessee-owner |
| |
(Information will be system generated. Linked with Entry 3 of Form K .) |
| 6. |
Particulars of the Mining Lease (ML) |
| |
(Information will be system generated. Linked with Entry 4 of Form K ) |
| 7. |
Location of the Mining Lease |
| |
(Information will be system generated. Linked with Entry 4 of Form K ) |
| 8. |
Date of temporary discontinuance |
|
| 9. |
Reasons for temporary discontinuance |
[Please tick whichever is applicable] |
| |
(i) Lack of demand |
|
| |
(ii) Non-availability of labour |
|
| |
(iii) Rains |
|
| |
(iv) Transport bottleneck |
|
| |
(v) Strike-Lockour |
|
| |
(vi) Operations becoming un-economic |
|
| |
(vii) Other reasons (specify) |
|
| 10. |
Probable date of re-opening of the mine |
|
Place:
Date:
Signature
Name in full:
Designation: Owner-Agent-Mining Engineer-Manager
Form F
[See Rule 30(2)]
(Notice of commencement of stoping)
| IMPORTANT INSTRUCTIONS FOR FILLING THE FORM |
| |
This Form, duly filled in must reach the concerned authorities as prescribed within the rule, within sixty days before the commencement of stoping operations, by online or E mail. |
| |
This should be sent to the Regional Controller in whose territorial jurisdiction the Mining lease area falls as notified from time to time by the Controller General, Indian Bureau of Mines, under Rule 66 of the Mineral Conservation Development Rules, 2016. |
| |
The form should be digitally signed by the concerned person. |
| |
Information in respect of Items 8 and 9(a) should be accompanied by (i) underground composite plan, (ii) longitudinal section, (iii) geological-assay plan of the levels at which stoping is proposed including one level above and below, and (iv) transverse sections at reasonable intervals for the portion covered under (iii) above. |
| 1. |
IBM Registration Number |
|
| 2. |
Mining Lease Code |
|
| 3. |
Mine Code |
|
| 4. |
Name of mine |
|
| 5. |
Name and address of the lessee-owner |
| |
(Information will be system generated. Linked with Entry 3 of Form K .) |
| 6. |
Particulars of the Mining Lease (ML) |
| |
(Information will be system generated. Linked with Entry 4 of Form K ) |
| 7. |
Location of the Mining Lease |
| |
(Information will be system generated. Linked with Entry 4 of Form K ) |
| 8. |
Section-pit number |
|
| |
(This is applicable in cases where the main mine is divided into more than one district-section-pit.) |
|
| 9. |
Date on which it is proposed to commence stoping |
|
| 10. |
Extent of development in the mine: |
|
| |
(a) Number of shafts-inclines-and its width-depth-length |
. |
| |
(b) Maximum depth and development |
. |
| |
(c) Number of levels with their extent |
. |
| |
(d) Total meterage of development |
. |
| |
(e) Total number of blocks developed including the total tonnage and grade (excluding blocks already stoped out and already permitted for stoping) |
.. |
| 11. |
Details of the blocks applied for stoping |
|
| |
(a) Number and size of each block, their levels tonnage and grade |
.. |
| |
(b) Method of stoping to be adopted |
|
| |
(i) |
A description of the method with stope preparation sequence of operation appropriate drawings to illustrate the and extraction |
.. |
| |
(ii) |
Rate of stoping contemplated in each block (monthly) |
.. |
| |
(iii) |
Estimated recovery from each block |
.. |
| |
(iv) |
Estimated dilution |
.. |
| |
(v) |
Estimated tonnage and grade of ore to be extracted |
|
| 12. |
Is this a first application for stoping for this mine? If not, the following details may be furnished |
|
| |
(i) |
Date of previous application(s) for stoping |
.. |
| |
(ii) |
Date and reference of permission or refusal by this department (mention blocks and their levels) |
.. |
| |
(iii) |
Have all the blocks for which stoping permission was granted, been stoped out? If not, mention the specific blocks that are remaining to be stoped out, indicating the state of stoping operations therein: |
.. |
| 13. |
Rate of development and programme of forming additional stope blocks simultaneously with the proposed stoping |
.. |
| 14. |
List of enclosures |
.. |
Place:
Date:
Signature
Name in full:
Designation: Owner-Agent-Mining Engineer-Manager
Form F-1
[See Rule 45(5)(b)(i)]
For the month of 20
MONTHLY RETURN
[To be used for minerals other than Copper, Gold, Lead, Pyrites, Tin, Tungsten, Zinc and precious and semi-precious stones]
| To |
|
| (i) |
The Regional Controller of Mines |
| |
Indian Bureau of Mines |
| |
..Region, |
| |
PIN: |
| (Please address to Regional Controller of Mines in whose territorial jurisdiction the mines falls as notified from time to time by the Controller General, Indian Bureau of Mines under Rule 62 of the Mineral Conservation and Development Rules, 1988) |
| (ii) |
The State Government |
Part I
(General and Labour)
| 1. Details of the Mine: |
|
| (a) Registration number allotted by Indian Bureau of Mines (to give registration number of the Lessee-Owner) |
|
| (b) Mine Code (allotted by Indian Bureau of Mines) |
|
| (c) Name of the Mineral |
|
| (d) Name of Mine |
|
| (e) Name(s) of other mineral(s), if any, produced from the same mine |
|
| (f) Location of the Mine: |
|
| Village |
|
| Post Office |
|
| Tahsil-Taluk |
|
| District |
|
| State |
|
| PIN Code |
|
| Fax No.: |
E-mail: |
| Phone No.: |
Mobile: |
| 2. Name and address of Lessee-Owner (along with fax no. and e-mail): |
| Name of Lessee-Owner |
|
| Address |
|
| District |
|
| State |
|
| PIN Code |
|
| Fax No.: |
E-mail: |
| Phone No.: |
Mobile: |
| 3. Details of Rent-Royalty - Dead Rent-DMF-NMET amount paid in the month |
| (i) Rent paid (`) |
|
| (ii) Royalty paid (`) |
|
| (iii) Dead Rent paid (`) |
|
| (iv) Payment made to the DMF (`) |
|
| (v) Payment made to the NMET (`) |
|
| 4. Details on working of mine: |
| (i) |
Number of days the mine worked: |
|
| (ii) |
Reasons for work stoppage in the mine during the month (due to strike, lockout, heavy rain, non-availability of labour, transport bottleneck, lack of demand, uneconomic operations, etc.) and the number of days of work stoppage for each reason separately |
Reasons |
No of days |
5. Average Daily Employment and Total Salary-Wages paid #:
| Work place |
Direct |
Contract |
Total Salary-Wages (`) |
| Male |
Female |
Male |
Female |
Direct |
Contract |
| Below ground |
|
|
|
|
|
|
| Opencast |
|
|
|
|
|
|
| Above ground |
|
|
|
|
|
|
| Total |
|
|
|
|
|
|
# To include all employees exclusive to the mine and attached factory, workshop or mineral dressing plant at the mine site
Part II
(Production, Despatches and Stocks)
(To be submitted separately for each mineral)
(Unit of Quantity in Tonnes)
1. Type of ore produced:
(Applicable for Iron ore only; tick mark whichever is applicable)
(a) Hematite
(b) Magnetite
2. Production and Stocks of ROM ore at Mine-head
| Category |
Opening stock |
Production |
Closing stock |
| (a) Open Cast workings |
|
|
|
| (b) Underground Workings |
|
|
|
| (c) Dump workings |
|
|
|
| 3(i) Grade-wise ROM ore despatches from mine head ($): |
| Grade of ROM@ |
Despatches from mine-head |
Ex-mine Price (`) |
| |
|
|
($): Applicable for iron ore and chromite only. For other minerals data of dispatches to be reported in 3(ii)
3(ii) Grade-wise Production, Dispatches, Stocks and Ex-mine prices:
| Grades** |
Opening stock at mine-head |
Production |
Despatches from mine-head |
Closing stock at mine-head |
Ex-mine price (`-Tonne) |
| |
|
|
|
|
|
3(iii) In case the mineral is being pulverized in own factory, please give the following particulars (*):
| Grade** |
Total quantity of mineral Pulverized (in tonnes) |
Total quantity of pulverized mineral produced (for each mesh size) |
Total Quantity of pulverized mineral sold during the month |
| |
|
Mesh size |
Quantity (tonne) |
Mesh size |
Quantity (tonne) |
Ex-factory Sale value (`) |
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
3(iv) Average cost of pulverization (*) : ` . per tonne.
(*): Not applicable for Iron ore, Manganese ore, Bauxite and Chromite
4. Details of deductions made from sale value for computation of Ex-mine price (`-Tonne)
| Deduction claimed # |
Amount (in `-Tonne) |
Remarks |
| (a) Cost of transportation (indicate loading station and distance from mine in remarks) |
|
|
| (b) Loading and unloading charges |
|
|
| (c) Railway freight, if applicable (indicate destination and distance) |
|
|
| (d) Port handling charges-export duty (indicate name of port) |
|
|
| (e) Charges for sampling and analysis |
|
|
| (f) Rent for the plot at Stocking yard |
|
|
| (g) Other charges (specify clearly) |
|
|
| Total (a) to (g) |
|
|
# Not applicable for captive dispatches and ex-mine sales
5. Sales-Dispatches effected for Domestic Purposes and for Exports:
| Grade (^) |
Nature of Despatch (indicate whether Domestic Sale or Domestic Transfer or Captive consumption or Export) |
For Domestic Purposes |
For export |
| Registration number as allotted by the Indian Bureau of Mines to the buyer ## |
Consignee name ## |
Quantity |
Sale value (`) |
Country |
Quantity |
F.O.B. Value (`) |
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
(^): To indicate the grades of ores as mentioned below (see @ and **)
## To indicate separately if more than one buyer.
Note. Mine owners are required to substantiate domestic sale value-FOB value for each grade of ore quoted above with copy of invoices (not to be submitted with the return; to be produced whenever required).
6. Give reasons for increase-decrease in production-nil production, if any, during the month compared to the previous month.
(a)
(b)
(c)
7. Give reasons for increase-decrease in grade wise ex-mine price, if any, during the month compared to the previous month.
(a)
(b)
(c)
I certify that the information furnished above is correct and complete in all respects.
| Place: |
Signature |
| Date: |
Name in full: Designation: Owner-Agent-Mining Engineer-Manager |
@ Grades of ROM ore dispatched:
| |
|
|
| MINERAL |
GRADES |
|
| Iron ore |
(a) Below 51% Fe ROM |
|
| (b) 51% to below 55% Fe ROM |
|
| (c) 55% to below 58% Fe ROM |
|
| (d) 58% to below 60% Fe ROM |
|
| (e) 60% to below 62% Fe ROM |
|
| (f) 62% to below 65% Fe ROM |
|
| (g) 65% and above Fe ROM |
|
| Chromite |
(a) Below 40% Cr2O3 ROM |
|
| (b) 40% to below 52 % Cr2O3 ROM |
|
| (c) 52% and above Cr2O3 ROM |
|
**Grades of minerals to be reported in the above tables are as given below. (If separate grades are not mentioned below, report the mineral name against grade):
| MINERAL |
GRADES |
| Iron ore |
(i) Lumps: |
| (a) Below 51% Fe |
| (b) 51% to below 55% Fe |
| (c) 55% to below 58% Fe |
| (d) 58% to below 60% Fe |
| (e) 60% to below 62% Fe |
| (f) 62% to below 65% Fe |
| (g) 65% and above Fe |
| (ii) Fines: |
| (a) Below 51% Fe |
| (b) 51% to below 55% Fe |
| (c) 55% to below 58% Fe |
| (d) 58% to below 60% Fe |
| (e) 60% to below 62% Fe |
| (f) 62% to below 65% Fe |
| (g) 65% and above Fe |
| (iii) Concentrates |
| (iv) Calibrated Lump Ore (CLO) (Quantity already reported in Lumps should not be reported against CLO) |
| (a) Below 62% Fe (CLO any size) |
| (b) 62% to below 65% Fe (5-18 mm size CLO) |
| (c) 62% to below 65% Fe (10-40 mm size CLO) |
| (d) 62% to below 65% Fe (CLO others) |
| (e) 65% and above Fe (5-18 mm size CLO) |
| (f) 65% and above Fe (10-40 mm size CLO) |
| (g) 65% and above Fe (CLO others) |
| Manganese Ore |
(i) Ore |
| (a) Below 25% Mn |
| (b) 25% to below 35% Mn |
| (c) 35% to below 46% Mn |
| (d) 46% and above Mn |
| (e) Dioxide ore |
| (ii) Concentrates |
| Bauxite |
(i) For use in alumina and aluminium extraction (Please also furnish the actual averages of the ore falling within the following ranges of grades): |
| (a) Below 40% Al2O3 |
| (b) 40% to below 45% Al2O3 |
| (c) 45% to below 50% Al2O3 |
| (d) 50% to below 55% Al2O3 |
| (e) 55% to below 60% Al2O3 |
| (f) 60% and above Al2O3 |
| (ii) For use other than alumina and aluminium metal extraction |
| (a) Cement |
| (b) Abrasive |
| (c) Refractory |
| (d) Chemical |
| Chromite |
(i) Lumps |
| (a) Below 40% Cr2O3 |
| (b) 40% to below 52 % Cr2O3 |
| (c) 52% and above Cr2O3 |
| (ii) Fines |
| (a) Below 40% Cr2O3 |
| (b) 40% to below 52 % Cr2O3 |
| (c) 52% and above Cr2O3 |
| (iii) Concentrates |
| Asbestos |
(a) Amphibole |
| (b) Chrysotile |
| Fluorite-Fluorspar |
(a) 80% and above CaF2 |
| (b) 70% to below 80% CaF2 |
| (c) 30% to below 70% CaF2 |
| (d) Below 30% CaF2 |
| Graphite |
(a) With 80% or more fixed carbon |
| (b) With 40 % or more fixed carbon but less than 80% fixed carbon |
| (c) With 20% or more fixed carbon but less than 40% fixed carbon |
| (d) With less than 20% fixed carbon |
| Kyanite |
(a) 40% and above Al2O3 |
| (b) Below 40% Al2O3 |
| Limestone |
(a) LD Grade (less than 1.5% silica content) |
| (b) SMS |
| (c) BF |
| (d) Chemical |
| (e) Cement |
| Rock Phosphate-Phosphorite |
(a) Above 30% P2O5 |
| (b) Above 25% to 30% P2O5 |
| (c) Above 20% to 25% P2O5 |
| (d) Upto 20% P2O5 |
Form F-2
[See Rule 45(5)(b)(ii)]
For the month of 20
MONTHLY RETURN
[To be used for minerals Copper, Gold, Lead, Pyrites, Tin, Tungsten and Zinc]
To
| (i) |
The Regional Controller of Mines |
| |
Indian Bureau of Mines |
| |
..Region, |
| |
PIN: |
| (Please address to Regional Controller of Mines in whose territorial jurisdiction the mines falls as notified from time to time by the Controller General, Indian Bureau of Mines under Rule 62 of the Mineral Conservation and Development Rules, 1988) |
| (ii) |
The State Government |
Part I
(General and Labour)
1. Details of the Mine:
| (a) Registration number allotted by Indian Bureau of Mines (to give registration number of the Lessee-Owner) |
|
| (b) Mine Code (allotted by Indian Bureau of Mines) |
|
| (c) Name of the Mineral |
|
| (d) Name of Mine |
|
| (e) Name(s) of other mineral(s), if any, produced from the same mine |
|
| (f) Location of the Mine: |
|
| Village |
|
| Post Office |
|
| Tahsil-Taluk |
|
| District |
|
| State |
|
| PIN Code |
|
| Fax No.: |
E-mail: |
| Phone No.: |
Mobile: |
2. Name and address of Lessee-Owner (along with fax no. and e-mail):
| Name of Lessee-Owner |
|
| Address |
|
| District |
|
| State |
|
| PIN Code |
|
| Fax No.: |
E-mail: |
| Phone No.: |
Mobile: |
3. Details of Rent Royalty Dead Rent DMF NMET amount paid in the month
| (i) Rent paid (`) |
|
| (ii) Royalty paid (`) |
|
| (iii) Dead Rent paid (`) |
|
| (iv) Payment made to the DMF (`) |
|
| (v) Payment made to the NMET (`) |
|
4. Details on working of mine:
| (i) Number of days the mine worked: |
|
| (ii) Reasons for work stoppage in the mine during the month (due to strike, lockout, heavy rain, non-availability of labour, transport bottleneck, lack of demand, uneconomic operations, etc.) and the number of days of work stoppage for each reason separately |
Reasons |
No of days |
5. Average Daily Employment and Total Salary-Wages paid #:
| Work place |
Direct |
Contract |
Total Salary-Wages (`) |
| Male |
Female |
Male |
Female |
Direct |
Contract |
| Below ground |
|
|
|
|
|
|
| Opencast |
|
|
|
|
|
|
| Above ground |
|
|
|
|
|
|
| Total |
|
|
|
|
|
|
# To include all employees exclusive to the mine and attached factory, workshop or mineral dressing plant at the mine site
Part II
(PRODUCTION, DESPATCHES AND STOCKS)
(To be submitted separately for each mineral)
(Unit of Quantity in Tonnes; indicate unit of quantity if not in tonnes)
1. Production and Stocks of ROM ore
| |
Opening stocks |
Production |
Closing stocks |
| Quantity |
Metal content/grade |
Quantity |
Metal content/grade |
Quantity |
Metal content/grade |
| A. From Underground workings |
|
|
|
|
|
|
| (i) From Development |
|
|
|
|
|
|
| (ii) From Stoping |
|
|
|
|
|
|
| B. From Opencast workings |
|
|
|
|
|
|
| Total |
|
|
|
|
|
|
2. Ex-mine price of the ore produced (` per unit):
3. Recoveries at Concentrator-Mill-Plant:
| Opening stocks of the Ore at concentrator-plant |
Ore received from the mine |
Ore treated |
| Quantity |
Metal content-grade |
Quantity |
Metal content-grade |
Quantity |
Metal content-grade |
| |
|
|
|
|
|
| |
|
|
|
|
|
| Concentrates * Obtained |
Tailings |
Closing stocks of concentrates at the concentrator-plant |
| Quantity |
Metal content/grade |
Value (`) |
Quantity |
Metal content/grade |
Quantity |
Metal content/grade |
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
*In case of any leaching method adopted, give quantity recovered and grade contained separately.
4. Recovery at the Smelter-Mill-Plant:
| Opening Stocks of the concentrates at the smelter-plant |
Concentrates received from concentrator-plant |
Concentrates received from other sources (specify) |
Concentrates sold (if any) |
| Quantity |
Metal content/grade |
Quantity |
Metal content/grade |
Quantity |
Metal content/grade |
Quantity |
Metal content/grade |
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| Concentrates treated |
Closing stocks of concentrate at the Smelter-Plant |
Metals(*) recovered (specify) |
Other by-products, if any, recovered |
| Quantity |
Metal content/grade |
Quantity |
Metal content/grade |
Quantity |
Grade |
Value (`) |
Quantity |
Grade |
Value (`) |
| |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
(*) Please give category-wise break-up viz. blister, fire refined copper, cathodes, electrolytic copper wire bars, lead ingots, zinc cathodes, zinc dross, gold, tungsten etc.
5. Sales during the month:
| Metal-Product |
Opening stocks of Metals-Products |
Place of sale |
Metals-Products sold(@) |
Closing stocks of Metals-Products |
| Quantity |
Grade |
Quantity |
Grade |
Value (#) ( ) |
Quantity |
Grade |
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
Note:
(#) Please give ex-plant sale value.
(@) Please give category-wise break-up of metals and other products sold.
6. Details of deductions made from sale value for computation of Ex-mine price (`-Unit)
| Deduction claimed # |
Amount (in `-Unit) |
Remarks |
| (a) Cost of transportation (indicate loading station and distance from mine in remarks) |
|
|
| (b) Loading and unloading charges |
|
|
| (c) Railway freight, if applicable (indicate destination and distance) |
|
|
| (d) Port Handling charges-export duty (indicate name of port) |
|
|
| (e) Charges for sampling and analysis |
|
|
| (f) Rent for the plot at Stocking yard |
|
|
| (g) Other charges (specify clearly) |
|
|
| Total (a) to (g) |
|
|
# Not applicable for captive dispatches and ex-mine sales
7. Sales-Dispatches of ore and concentrates effected for Domestic Purposes and for Exports:
| Grade (ore-Conc.) |
Nature of Despatch (indicate whether Domestic Sale or Domestic Transfer or Captive consumption or Export) |
For Domestic Purposes |
For export |
| |
|
Registration number as allotted by the Indian Bureau of Mines to the buyer ## |
Consignee name ## |
Quantity |
Sale value (`) |
Country |
Quantity |
F.O.B. Value (`) |
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
## To indicate separately if more than one buyer.
Note. Mine owners are required to substantiate domestic sale value-FOB value for each grade quoted above with copy of invoices (not to be submitted with the return; to be produced whenever required).
8. Give reasons for increase-decrease in production-nil production, if any, during the month compared to the previous month.
(a)
(b)
(c)
9. Give reasons for increase-decrease in grade wise ex-mine price, if any, during the month compared to the previous month.
(a)
(b)
(c)
I certify that the information furnished above is correct and complete in all respects.
| Place: |
Signature |
| Date: |
Name in full: |
| |
Designation: Owner-Agent-Mining Engineer-Manager |
| |
|
Form F-3
[See Rule 45(5)(b)(iii)]
For the month of 20
MONTHLY RETURN
[To be used for precious and semi-precious stones]
To
| (i) |
The Regional Controller of Mines |
| |
Indian Bureau of Mines |
| |
.Region, |
| |
PIN: |
(Please address to Regional Controller of Mines in whose territorial jurisdiction the mines falls as notified from time to time by the Controller General, Indian Bureau of Mines under Rule 62 of the Mineral Conservation and Development Rules, 1988)
| (ii) |
The State Government |
Part I
(General and Labour)
1. Details of the Mine:
| (a) Registration number allotted by Indian Bureau of Mines (to give registration number of the Lessee-Owner) |
|
| (b) Mine Code (allotted by Indian Bureau of Mines) |
|
| (c) Name of the Mineral |
|
| (d) Name of Mine |
|
| (e) Name(s) of other mineral(s), if any, produced from the same mine |
|
| (f) Location of the Mine: |
|
| Village |
|
| Post Office |
|
| Tahsil-Taluk |
|
| District |
|
| State |
|
| PIN Code |
|
| Fax No.: |
E-mail: |
| Phone No.: |
Mobile: |
| 2. Name and address of Lessee-Owner (along with fax no. and e-mail): |
|
| Name of Lessee-Owner |
|
| Address |
|
| District |
|
| State |
|
| PIN Code |
|
| Fax No.: |
E-mail: |
| Phone No.: |
Mobile: |
| 3. Details of Rent-Royalty Dead Rent DMF NMET amount paid in the month |
|
| (i) Rent paid (`) |
|
| (ii) Royalty paid (`) |
|
| (iii) Dead Rent paid (`) |
|
| (iv) Payment made to the DMF (`) |
|
| (v) Payment made to the NMET (`) |
|
| 4. Details on working of mine: |
|
| (i) Number of days the mine worked: |
|
| (ii) Reasons for work stoppage in the mine during the month (due to strike, lockout, heavy rain, non-availability of labour, transport bottleneck, lack of demand, uneconomic operations, etc.) and the number of days of work stoppage for each reason separately |
Reasons |
No. of days |
5. Average Daily Employment and Total Salary-Wages paid #:
| Work place |
Direct |
Contract |
Total Salary-Wages (`) |
| Male |
Female |
Male |
Female |
Direct |
Contract |
| Below ground |
|
|
|
|
|
|
| Opencast |
|
|
|
|
|
|
| Above ground |
|
|
|
|
|
|
| Total |
|
|
|
|
|
|
# To include all employees exclusive to the mine and attached factory, workshop or mineral dressing plant at the mine site
Part II
(Production, Despatches and Stocks)
(To be submitted separately for each mineral)
1. R.O.M. production:
| Category |
Unit of quantity |
Quantity |
| (a) Opencast workings |
|
|
| (b) Underground workings |
|
|
2. Production, stocks and dispatches
| |
Gem Variety |
Industrial |
Others |
| Rough and uncut stones |
Cut and Polished Stones |
|
|
| No. of stones |
Qty @ |
No. of stones |
Qty @ |
No. of stones |
Qty @ |
No. of stones |
Qty @ |
| A. Opening stocks |
|
|
|
|
|
|
|
|
| B. Production |
|
|
|
|
|
|
|
|
| (i) From Opencast Working |
|
|
|
|
|
|
|
|
| (ii) From underground working |
|
|
|
|
|
|
|
|
| TOTAL (Production) |
|
|
|
|
|
|
|
|
| C. Despatches |
|
|
|
|
|
|
|
|
| D. Closing Stocks |
|
|
|
|
|
|
|
|
| E. Ex-mine Price (`) |
|
|
|
|
@:The Unit of quantity viz. Carats-Grams-Kilogram etc., as the case may be, should be indicated under quantity.
3. Details of deductions made from sale value for computation of Ex-mine price (`-Unit)
| Deduction claimed# |
Amount (in `-Unit) |
Remarks |
| (a) Cost of transportation (indicate loading station and distance from mine in remarks) |
|
|
| (b) Loading and unloading charges |
|
|
| (c) Railway freight, if applicable (indicate destination and distance) |
|
|
| (d) Port handling charges-export duty (indicate name of port) |
|
|
| (e) Charges for sampling and analysis |
|
|
| (f) Rent for the plot at stocking yard |
|
|
| (g) Other charges (specify clearly) |
|
|
| Total (a) to (g) |
|
|
# Not applicable for captive dispatches and ex-mine sales
4. Sales-Dispatches effected for Domestic Purposes and for Exports:
| Grade (*) |
Nature of Despatch (indicate whether Domestic Sale or Domestic Transfer or Captive consumption or Export) |
For Domestic Purposes |
For export |
| Registration number as allotted by the Indian Bureau of Mines to the buyer ## |
Consignee name ## |
Quantity |
Sale value (`) |
Country |
Quantity |
F.O.B. Value (`) |
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
*: To indicate rough and uncut stones, cut and polished stones, industrial, others
## To indicate separately if more than one buyer.
Note. Mine owners are required to substantiate domestic sale value-FOB value for each grade of ore quoted above with copy of invoices (not to be submitted with the return; to be produced whenever required).
5. Give reasons for increase-decrease in production-nil production, if any, during the month compared to the previous month.
(a)
(b)
(c)
6. Give reasons for increase-decrease in grade wise ex-mine price, if any, during the month compared to the previous month.
(a)
(b)
(c)
I certify that the information furnished above is correct and complete in all respects.
| Place: |
Signature |
| Date: |
Name in full: |
| |
Designation: Owner-Agent-Mining Engineer-Manager. |
Form G-1
[See Rule 45(5)(c)(i)]
For the Financial Year 1st April, 20 to 31st March, 20 .
ANNUAL RETURN
[To be used for minerals other than Copper, Gold, Lead, Pyrites, Tin, Tungsten, Zinc and precious and semi-precious stones]
To
| (i) |
The Regional Controller of Mines |
| |
Indian Bureau of Mines |
| |
.Region, |
| |
PIN: |
| |
(Please address to Regional Controller of Mines in whose territorial jurisdiction the mines falls as notified from time to time by the Controller General, Indian Bureau of Mines under Rule 62 of the Mineral Conservation and Development Rules, 1988) |
| (ii) |
The State Government |
Part I
(General)
1. Details of Mine:
| (a) Registration number allotted by Indian Bureau of Mines (to give registration number of the Lessee-Owner) |
|
| (b) Mine Code (allotted by Indian Bureau of Mines) |
|
| (c) Name of the Mineral |
|
| (d) Name of Mine |
|
| (e) Name(s) of other mineral(s), if any, produced from the same mine |
|
| 2. Location of the Mines: |
|
| Village |
|
| Post Office |
|
| Tahsil-Taluk |
|
| District |
|
| State |
|
| PIN Code |
|
| Fax No.: |
E-mail: |
| Phone No.: |
Mobile: |
3. Name and address of Lessee-Owner (along with fax no. and e-mail):
| Name of Lessee-Owner |
|
| Address |
|
| District |
|
| State |
|
| PIN Code |
|
| Fax No.: |
E-mail: |
| Phone No.: |
Mobile: |
| 4. Registered Office of the Lessee: |
|
| 5. Director in charge: |
|
| 6. Agent: |
|
| 7. Manager: |
|
| 8. Mining Engineer in charge: |
|
| 9. Geologist in charge: |
|
| 10. Transferor (previous owner), if any, and date of transfer: |
|
11. Particulars of area operated-Lease
(Furnish information on items (i) to (vi) lease-wise in case mine workings cover more than one lease)
(i) Lease number allotted by the State Government
(ii) Area under lease (hectares):
| Under Forest |
|
| Outside Forest |
|
| Total |
|
| (iii) Date of execution of mining lease deed |
|
| (iv) Period of lease |
|
| (v) Area for which surface rights are held (hectares) |
|
| Under Forest |
|
| Outside Forest |
|
| Total |
|
| (vi) Date and period of renewal (if applicable) |
|
| (vii) In case there is more than one mine in the same lease area, indicate name of mine and mineral produced |
|
| 12. Lease area (surface area) utilisation as at the end of year (hectares): |
Under forest |
Outside forest |
Total |
| (i) Already exploited and abandoned by opencast (O-C) mining |
|
|
|
| (ii) Covered under current (O-C) Workings |
|
|
|
| (iii) Reclaimed-rehabilitated |
|
|
|
| (iv) Used for waste disposal |
|
|
|
| (v) Occupied by plant, buildings, residential, welfare buildings and roads |
|
|
|
| (vi) Used for any other purpose (specify) |
|
|
|
| (vii) Work done under progressive mine closure plan during the year |
|
|
|
| 13. Ownership-exploiting Agency of the mine: (Public Sector-Private Sector-Joint Sector) |
|
|
|
Part II
(Employment and Wages)
1. Number of supervisory staff employed at the mine
| Description |
Wholly employed |
Partly employed |
| (i) Graduate Mining Engineer |
|
|
| (ii) Diploma Mining Engineer |
|
|
| (iii) Geologist |
|
|
| (iv) Surveyor |
|
|
| (v) Other administrative and technical supervisory staff |
|
|
| Total: |
|
|
| 2. (i) Number of days the mine worked: |
|
|
| (ii) No. of shifts per day: |
|
|
| (iii) Indicate reasons for work stoppage in the mine during the year (due to strike, lockout, heavy rain, non-availability of labour, transport bottleneck, lack of demand, uneconomic operations, etc.) and the number of days of work stoppage for each of the factors separately. |
Reasons |
No. of days |
| |
|
| |
|
| |
|
| |
|
3. Employment and salary-wages paid #:
Maximum number of persons employed on any one day during the year:
(i) In workings below ground on (date) ..(a) (number)
(ii) In all in the mine on (date) ..(a) (number)
| Classification |
Total number of man days worked during the year |
No. of days worked during the year |
Average daily number of persons employed |
Total Wages-Salary for the year (`) |
| Direct |
Contract |
Total |
Male |
Female |
Total |
| (1) |
2(A) |
2(B) |
2(C) |
(3) |
4(A) |
4(B) |
4(C) |
(5) |
| Below Ground |
|
|
|
|
|
|
|
|
| Opencast |
|
|
|
|
|
|
|
|
| Above Ground |
|
|
|
|
|
|
|
|
| Total: |
|
|
|
|
|
|
|
|
# To include all employees exclusive to the mine and attached factory, workshop or mineral dressing plant at the mine site
Part II-A
(Capital Structure)
1. Value of Fixed Assets* (` )
(in respect of the mine, beneficiation plant, mine work-shop, power and water installation)
In case this information is furnished as combined information in another mine's return please specify Mine Code-Mine Name:
| Description |
At the beginning of the year (`) |
Additions during the Year (`) |
Sold or discarded during the year (`) |
Depreciation during the year (`) |
Net closing Balance (`) (2+3)- (4+5) |
Estimated market value** (`) |
| 1 |
2 |
3 |
4 |
5 |
6 |
7 |
| (i) Land*** |
|
|
|
|
|
|
| (ii) Building: |
| Industrial |
|
|
|
|
|
|
| Residential |
|
|
|
|
|
|
| (iii) Plant and Machinery including transport equipment |
|
|
|
|
|
|
| (iv) Capitalised Expenditure such as pre-production exploration, development, major overhaul and repair to machinery etc. (As prescribed under Income Tax Act) |
|
|
|
|
|
|
| Total: |
|
|
|
|
|
|
* In case the fixed assets are common to more than one mine, furnish combined information for all such mines together in any one of the mine's return. In the returns for other mines, give only a cross reference to the particular mine's return where-in the information is included.
** Optional and may be furnished in respect of items (i), (ii) and (iii) if the mine owner desires.
*** Including any non-recurring expenditure incurred on the acquisition of land.
2. Source of Finance (at the end of the year):
| (i) Paid up Share Capital (`) |
|
| (ii) Own Capital (`) |
|
| (iii) Reserve and Surplus (All Types) (`) |
|
| (iv) Long Term loans outstanding (#) (`) |
|
| Name of the Institution-Source |
Amount of Loan (`) |
Rate of Interest |
| |
|
|
(#) Indicate the names of the lending institutions such as State Finance Corporation, Industrial Development and other Public Corporations, Co-operative Banks, Nationalised Banks and other sources along with the amount of loan from each source and the rate of interest at which loan has been taken.
3. Interest and Rent (`)
(i) Interest paid during the year
(ii) Rents (excluding surface rent) paid during the year
Part III
(Consumption of Materials)
1. Quantity and cost of material consumed during the year
| Description |
Unit |
Quantity |
Value (`) |
| (i) Fuel |
| (a) Coal |
Tonnes |
|
|
| (b) Diesel Oil |
Ltrs. |
|
|
| (c) Petrol |
Ltrs. |
|
|
| (d) Kerosene |
Ltrs. |
|
|
| (e) Gas |
Cu.M. |
|
|
| (ii) Lubricant |
| (a) Lubricant oil |
Ltrs. |
|
|
| (b) Grease |
Kgs. |
|
|
| (iii) Electricity |
| (a) Consumed |
Kwh |
|
|
| (b) Generated |
Kwh |
|
|
| (c) Sold |
Kwh |
|
|
| (iv) Explosives (furnish full details in Part IV) |
| (v) Tyres |
Nos. |
|
|
| (vi) Timber and Supports |
|
| (vii) Drill rods and kits |
Nos. |
|
|
| (viii) Other spares and stores |
|
| 2. Royalty, Rents and Payments made to DMF and NMET (`): |
| X |
Paid for current year |
Paid towards past arrears |
| (a) Royalty |
|
|
| (b) Dead rent |
|
|
| (c) Surface rent |
|
|
| (d) Payment made to DMF |
|
|
| (e) Payment made to NMET |
|
|
| 3. Compensation paid for felling trees during the year (`) |
|
| 4. Depreciation on fixed assets (`) |
|
| 5. Taxes and cesses |
| X |
Amount in Rupees paid during the year to: |
| X |
Central Govt. |
State Govt. |
| (i) Sales Tax |
|
|
| (ii) Welfare cess |
|
|
| (iii) Other taxes and cesses |
|
|
| (a) Mineral cess |
|
|
| (b) Cess on dead rent |
|
|
| (c) Others (please specify) |
|
|
6. Other expenses (`):
| (i) Overheads |
|
| (ii) Maintenance |
|
| (iii) Money value of other benefits paid to workmen |
|
| (iv) Payment made to professional agencies |
|
Part IV
(Consumption of Explosives)
| Licensed capacity of magazine: (specify unit separately in kg-tonne, numbers, metres) |
Item |
Unit |
Capacity |
| |
|
|
| |
|
|
| |
|
|
| Classification of Explosives |
Unit |
Quantity consumed during the year |
Estimated requirement during the next year |
| Small dia. (up to 32 mm) |
Large dia. (above 32 mm) |
Small dia. (up to 32 mm) |
Large dia. (above 32 mm) |
| 1. Gun Powder |
Kg. |
|
|
|
|
| 2. Nitrate Mixture |
Kg. |
X |
X |
X |
X |
| a. Loose ammonium nitrate |
|
|
|
|
|
| b. Ammonium nitrate in cartridged form |
|
|
|
|
|
| 3. Nitro compound |
Kg. |
|
|
|
|
| 4. Liquid Oxygen soaked cartridges |
Kg. |
|
|
|
|
| 5. Slurry explosives (Mention different trade names) |
Kg. |
|
|
|
|
| 6. Detonators |
Nos. |
X |
X |
X |
X |
| (i) Ordinary |
|
|
|
|
|
| (ii) Electrical |
|
X |
X |
X |
X |
| (a) Ordinary |
|
|
|
|
|
| (b) Delay |
|
|
|
|
|
| 7. Fuse |
Mts |
X |
X |
X |
X |
| (a) Safety Fuse |
|
|
|
|
|
| (b) Detonating Fuse |
|
|
|
|
|
| 8. Plastic ignition cord |
Mts |
|
|
|
|
| 9. Others (specify) |
(Mention the unit) |
|
|
|
|
Different sizes of soaked liquid oxygen cartridges to be reported in equivalent kg. as per manufacturer's instruction.
Part V
(General Geology and Mining)
(Items 2 and 3 to be submitted separately for each mineral)
1. Exploration
1 (i) Exploration activities during the year:
| |
|
At the beginning of the year |
During the year |
Cumulative |
Grid spacing-Dimension |
| Drilling |
No of holes |
|
|
|
|
| Metrage |
|
|
|
|
| Pitting |
No of pits |
|
|
|
|
| Excavation (in m3) |
|
|
|
|
| Trenching |
No of trenches |
|
|
|
|
| Excavation (in m3) |
|
|
|
|
| Length covered (in metre) |
|
|
|
|
| Expenditure on exploration (`) |
|
|
|
X |
1 (ii) Any other exploration activity during the year:
2. Reserves and Resources estimated (in tonnes).
| Classification |
|
Code |
At the beginning of the Year 1-4-20 . as per latest approved mining plan-scheme |
Assessed during the year |
Depletion of reserves during the year |
Balance resources as on 31-3-20 . |
| (1) |
|
(2) |
(3) |
(4) |
(5) |
(6) = (3+4-5) |
| A. Mineral Reserve |
|
| 1. Proved Mineral Reserve |
|
111 |
|
|
|
|
| 2. Probable mineral Reserve |
|
121 |
|
|
|
|
| |
|
122 |
|
|
|
|
| 3. Total Reserves |
|
|
|
|
|
|
| B. Remaining Resources |
|
| 1. Feasibility mineral Resource |
|
211 |
|
|
|
|
| 2. Pre-feasibility mineral resource |
|
221 |
|
|
|
|
| |
|
222 |
|
|
|
|
| 3. Measured mineral resource |
|
331 |
|
|
|
|
| 4. Indicated mineral resource |
|
332 |
|
|
|
|
| 5. Inferred mineral resource |
|
333 |
|
|
|
|
| 6. Reconnaissance mineral resource |
|
334 |
|
|
|
|
| 7. Total remaining Resources |
|
|
|
|
|
|
| Total (A+B) |
|
|
|
|
|
|
3. Sub-grade-Mineral Reject (in tonnes)
(Information to be given in respect of mineral fractions generated and stacked-dumped below cut-off grade and above threshold value, if prescribed, having no immediate sale value)
| Generation of sub-grade mineral reject (in tones) |
At the beginning of the year |
Generated during the year |
Disposed during the year |
Total stacked at the end of the year |
Average grade of the mineral reject generated |
| from unprocessed ore |
|
|
|
|
|
| from processed ore |
|
|
|
|
|
4. Overburden and Waste (in m3)
(Information to be given in respect of overburden-waste and mineral fractions generated below threshold value, if prescribed)
| At the beginning of the year |
Generated during the year |
Disposed in dumps during the year |
Backfilled during the year |
Total at the end of the year |
| |
|
|
|
|
5. Trees planted-survival rate
| Description |
Within lease area |
Outside lease area |
| (i) Number of trees planted during the year |
|
|
| (ii) Survival rate in percentage |
|
|
| (iii) Total no. of trees at the end of the year |
|
|
6. Type of Machinery: Give the following information for the types of machinery in use such as hoist, fans, drills, loaders, excavators, dumpers, haulages, conveyors, pumps, etc.
| Type of machinery |
Capacity of each type of machinery |
Unit (in which capacity is reported) |
No. of machinery |
Electrical-Non-electrical (specify) |
Used in opencast underground (specify) |
| |
|
|
|
|
|
7(i) Details of mineral Treatment Plant, if any: Give a brief description of the process capacity of the machinery deployed and its availability. (Submit Flow Sheet and Material Balance of the Plant separately).
(ii) Furnish following information:
| Item |
Tonnage |
Average Grade |
| Feed: |
|
|
| Concentrates-processed products: |
(mention name) |
|
|
| |
|
|
|
| By-products-Co-products: |
(mention name) |
|
|
| |
|
|
|
| Tailings: |
|
|
Part VI (PRODUCTION, DESPATCHES AND STOCKS)
(To be submitted separately for each mineral)
(Unit of Quantity in Tonnes)
1. Type of ore produced:
(Applicable for Iron ore only; tick mark whichever is applicable)
(a) Hematite
(b) Magnetite
2. Production and Stocks of ROM ore at Mine-head
| Category |
Opening stock |
Production |
Closing stock |
| (a) Open Cast workings |
|
|
|
| (b) Underground Workings |
|
|
|
| (c) Dump workings |
|
|
|
3(i) Grade-wise ROM ore despatches from mine head ($):
| Grade of ROM@ |
Despatches from mine-head |
Ex-mine Price (`) |
| |
|
|
($): Applicable for iron ore and chromite only. For other minerals data of dispatches to be reported in 3(ii)
3(ii) Grade-wise Production, Despatches, Stocks and Ex-mine prices:
| Grades** |
Opening stock at mine-head |
Production |
Despatches from mine-head |
Closing stock at mine-head |
Ex-mine price ( -Tonne) |
| |
|
|
|
|
|
| |
|
|
|
|
|
| |
|
|
|
|
|
| |
|
|
|
|
|
3(iii) In case the mineral is being pulverized in own factory, please give the following particulars (*):
| Grade** |
Total quantity of mineral Pulverized (in tonnes) |
Total quantity of pulverized mineral produced (for each mesh size) |
Total Quantity of pulverized mineral sold during the year |
| Mesh size |
Quantity (tonne) |
Mesh size |
Quantity (tonne) |
Ex-factory Sale value ( ) |
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
3(iv) Average cost of pulverization (*) : ` . per tonne.
(*): Not applicable for Iron ore, Manganese ore, Bauxite and Chromite
4. Details of deductions made from sale value for computation of Ex-mine price (`- Tonne)
| Deduction claimed # |
Amount (in `-Tonne) |
Remarks |
| (a) Cost of transportation (indicate loading station and distance from mine in remarks) |
|
|
| (b) Loading and unloading charges |
|
|
| (c) Railway freight, if applicable (indicate destination and distance) |
|
|
| (d) Port handling charges-export duty (indicate name of port) |
|
|
| (e) Charges for sampling and analysis |
|
|
| (f) Rent for the plot at Stocking yard |
|
|
| (g) Other charges (specify clearly) |
|
|
| Total (a) to (g) |
|
|
# Not applicable for captive dispatches and ex-mine sales
5. Sales-Despatches effected for Domestic Purposes and for Exports:
| Grade (^) |
Nature of Despatch (indicate whether Domestic Sale or Domestic Transfer or Captive consumption or Export) |
For Domestic Purposes |
For export |
| Registration number as allotted by the Indian Bureau of Mines to the buyer ## |
Consignee name ## |
Quantity |
Sale value (`) |
Country |
Quantity |
F.O.B. Value (`) |
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
(^): To indicate the grades of ores as mentioned below (see @ and **)
## To indicate separately if more than one buyer.
Note Mine owners are required to substantiate domestic sale value-FOB value for each grade of ore quoted above with copy of invoices (not to be submitted with the return; to be produced whenever required).
6. Give reasons for increase-decrease in production-nil production, if any, during the year compared to the previous year.
a.
b.
7. Give reasons for increase-decrease in grade wise ex-mine price, if any, during the year compared to the previous year.
a.
b.
Part VII
COST OF PRODUCTION
Cost of production per tonne of ore-mineral produced
| Sl. No. |
Item |
Cost per tonne (`) |
| (i) |
Direct Cost |
|
| |
(a) Exploration |
|
| |
(b) Mining |
|
| |
(c) Beneficiation(Mechanical Only) |
|
| (ii) |
Over-head cost |
|
| (iii) |
Depreciation |
|
| (iv) |
Interest |
|
| (v) |
Royalty |
|
| (vi) |
Payments made to DMF |
|
| (vii) |
Payments made to NMET |
|
| (viii) |
Taxes |
|
| (ix) |
Dead Rent |
|
| (x) |
Others (specify) |
|
| |
Total |
|
Note: Information given under Part VII will be kept confidential. The Government, however, will be free to utilize the information for general studies without revealing the identity of the firm.
VERIFICATION
I certify that the information furnished above is correct and complete in all respects.
| Place: |
Signature |
| Date: |
|
| |
Name in full: |
| |
Designation: Owner-Agent-Mining Engineer-Manager |
@Grades of ROM ore dispatched:
| MINERAL |
GRADES |
|
| Iron ore |
(a) Below 51% Fe ROM |
|
| (b) 51% to below 55% Fe ROM |
|
| (c) 55% to below 58% Fe ROM |
|
| (d) 58% to below 60% Fe ROM |
|
| (e) 60% to below 62% Fe ROM |
|
| (f) 62% to below 65% Fe ROM |
|
| (g) 65% and above Fe ROM |
|
| Chromite |
(a) Below 40% Cr2O3 ROM |
|
| (b) 40% to below 52 % Cr2O3 ROM |
|
| (c) 52% and above Cr2O3 ROM |
|
**Grades of minerals to be reported in the above tables are as given below. (If separate grades are not mentioned below, report the mineral name against grade):
| MINERAL |
GRADES |
| Iron ore |
(i) Lumps: |
| (a) Below 51% Fe |
| (b) 51% to below 55% Fe |
| (c) 55% to below 58% Fe |
| (d) 58% to below 60% Fe |
| (e) 60% to below 62% Fe |
| (f) 62% to below 65% Fe |
| (g) 65% and above Fe |
| (ii) Fines: |
| (a) Below 51% Fe |
| (b) 51% to below 55% Fe |
| (c) 55% to below 58% Fe |
| (d) 58% to below 60% Fe |
| (e) 60% to below 62% Fe |
| (f) 62% to below 65% Fe |
| (g) 65% and above Fe |
| (iii) Concentrates |
| (iv) Calibrated Lump Ore (CLO) (Quantity already reported in Lumps should not be reported against CLO) |
| (a) Below 62% Fe (CLO any size) |
| (b) 62% to below 65% Fe (5-18 mm size CLO) |
| (c) 62% to below 65% Fe (10-40 mm size CLO) |
| (d) 62% to below 65% Fe (CLO others) |
| (e) 65% and above Fe (5-18 mm size CLO) |
| (f) 65% and above Fe (10-40 mm size CLO) |
| (g) 65% and above Fe (CLO others) |
| Manganese Ore |
(i) Ore |
| (a) Below 25% Mn |
| (b) 25% to below 35% Mn |
| (c) 35% to below 46% Mn |
| (d) 46% and above Mn |
| (e) Dioxide ore |
| (ii) Concentrates |
| Bauxite |
(i) For use in alumina and aluminium extraction (Please also furnish the actual averages of the ore falling within the following ranges of grades): |
| (a) Below 40% Al2O3 |
| (b) 40% to below 45% Al2O3 |
| (c) 45% to below 50% Al2O3 |
| (d) 50% to below 55% Al2O3 |
| (e) 55% to below 60% Al2O3 |
| (f) 60% and above Al2O3 |
| (ii) For use other than alumina and aluminium metal extraction |
| (a) Cement |
| (b) Abrasive |
| (c) Refractory |
| (d) Chemical |
| Chromite |
(i) Lumps |
| (a) Below 40% Cr2O3 |
| (b) 40% to below 52 % Cr2O3 |
| (c) 52% and above Cr2O3 |
| (ii) Fines |
| (a) Below 40% Cr2O3 |
| (b) 40% to below 52 % Cr2O3 |
| (c) 52% and above Cr2O3 |
| (iii) Concentrates |
| Asbestos |
(a) Amphibole |
| (b) Chrysotile |
| Fluorite-Fluorspar |
(a) 80% and above CaF2 |
| (b) 70% to below 80% CaF2 |
| (c) 30% to below 70% CaF2 |
| (d) Below 30% CaF2 |
| Graphite |
(a) With 80% or more fixed carbon |
| (b) With 40 % or more fixed carbon but less than 80% fixed carbon |
| (c) With 20% or more fixed carbon but less than 40% fixed carbon |
| (d) With less than 20% fixed carbon |
| Kyanite |
(a) 40% and above Al2O3 |
| (b) Below 40% Al2O3 |
| Limestone |
(a) LD Grade (less than 1.5% silica content) |
| (b) SMS |
| (c) BF |
| (d) Chemical |
| (e) Cement |
| Rock Phosphate-Phosphorite |
(a) Above 30% P2O5 |
| (b) Above 25% to 30% P2O5 |
| (c) Above 20% to 25% P2O5 |
| (d) Upto 20% P2O5 |
Form G-2
[See Rule 45(5)(c)(ii)]
For the Financial Year 1st April, 20 to 31st March, 20 .
ANNUAL RETURN
[To be used for minerals Copper, Gold, Lead, Pyrites, Tin, Tungsten and Zinc]
To
| (i) |
The Regional Controller of Mines |
| |
Indian Bureau of Mines |
| |
.Region, |
| |
PIN: |
| |
(Please address to Regional Controller of Mines in whose territorial jurisdiction the mines falls as notified from time to time by the Controller General, Indian Bureau of Mines under Rule 62 of the Mineral Conservation and Development Rules, 1988) |
| (ii) |
The State Government |
Part I
(General)
| 1. Details of Mine: |
|
| (a) Registration number allotted by Indian Bureau of Mines (to give registration number of the Lessee-Owner) |
|
| (b) Mine Code (allotted by Indian Bureau of Mines) |
|
| (c) Name of the Mineral |
|
| (d) Name of Mine |
|
| (e) Name(s) of other mineral(s), if any, produced from the same mine |
|
| 2. Location of the Mines: |
|
| Village |
|
| Post Office |
|
| Tahsil-Taluk |
|
| District |
|
| State |
|
| PIN Code |
|
| Fax No.: |
E-mail: |
| Phone No.: |
Mobile: |
3. Name and address of Lessee-Owner (along with fax no. and e-mail):
| Name of Lessee-Owner |
|
| Address |
|
| District |
|
| State |
|
| PIN Code |
|
| Fax No.: |
E-mail: |
| Phone No.: |
Mobile: |
| 4. Registered Office of the Lessee: |
|
| 5. Director in charge: |
|
| 6. Agent: |
|
| 7. Manager: |
|
| 8. Mining Engineer in charge: |
|
| 9. Geologist in charge: |
|
| 10. Transferor (previous owner), if any, and date of transfer: |
|
11. Particulars of area operated-Lease
(Furnish information on items (i) to (vi) lease-wise in case mine workings cover more than one lease)
(i) Lease number allotted by the State Government
(ii) Area under lease (hectares):
| Under Forest |
|
| Outside Forest |
|
| Total |
|
| (iii) Date of execution of mining lease deed |
|
| (iv) Period of lease |
|
| (v) Area for which surface rights are held (hectares) |
|
| Under Forest |
|
| Outside Forest |
|
| Total |
|
| (vi) Date and period of renewal (if applicable) |
|
| (vii) In case there is more than one mine in the same lease area, indicate name of mine and mineral produced |
|
| 12. Lease area (surface area) utilisation as at the end of year (hectares): |
Under forest |
Outside forest |
Total |
| (i) Already exploited and abandoned by opencast (O-C) mining |
|
|
|
| (ii) Covered under current (O-C) Workings |
|
|
|
| (iii) Reclaimed-rehabilitated |
|
|
|
| (iv) Used for waste disposal |
|
|
|
| (v) Occupied by plant, buildings, residential, welfare buildings and roads |
|
|
|
| (vi) Used for any other purpose (specify) |
|
|
|
| (vii) Work done under progressive mine closure plan during the year |
|
|
|
| 13. Ownership-exploiting Agency of the mine: (Public Sector-Private Sector-Joint Sector) |
|
|
|
Part II
(Employment and Wages)
1. Number of supervisory staff employed at the mine
| Description |
Wholly employed |
Partly employed |
| (i) Graduate Mining Engineer |
|
|
| (ii) Diploma Mining Engineer |
|
|
| (iii) Geologist |
|
|
| (iv) Surveyor |
|
|
| (v) Other administrative and technical supervisory staff |
|
|
| Total: |
|
|
| 2. (i) Number of days the mine worked: |
|
|
| (ii) No. of shifts per day: |
|
|
| (iii) Indicate reasons for work stoppage in the mine during the year (due to strike, lockout, heavy rain, non-availability of labour, transport bottleneck, lack of demand, uneconomic operations, etc.) and the number of days of work stoppage for each of the factors separately. |
Reasons |
No. of days |
| |
|
| |
|
| |
|
| |
|
3. Employment and salary-wages paid #:
Maximum number of persons employed on any one day during the year:
(i) In workings below ground on (date) ..(a) (number)
(ii) In all in the mine on (date) ..(a) (number)
| Classification |
Total number of man days worked during the year |
No. of days worked during the year |
Average daily number of persons employed |
Total Wages-Salary for the year (`) |
| Direct |
Contract |
Total |
Male |
Female |
Total |
| (1) |
2(A) |
2(B) |
2(C) |
(3) |
4(A) |
4(B) |
4(C) |
(5) |
| Below Ground |
|
|
|
|
|
|
|
|
| Opencast |
|
|
|
|
|
|
|
|
| Above Ground |
|
|
|
|
|
|
|
|
| Total: |
|
|
|
|
|
|
|
|
# To include all employees exclusive to the mine and attached factory, workshop or mineral dressing plant at the mine site
Part II-A
(Capital Structure)
1. Value of Fixed Assets* (` )
(in respect of the mine, beneficiation plant, mine work-shop, power and water installation)
In case this information is furnished as combined information in another mine's return please specify Mine Code-Mine Name:
| Description |
At the beginning of the year (`) |
Additions during the Year (`) |
Sold or discarded during the year (`) |
Depreciation during the year (`) |
Net closing Balance (`) (2+3)- (4+5) |
Estimated market value** (`) |
| 1 |
2 |
3 |
4 |
5 |
6 |
7 |
| (i) Land*** |
|
|
|
|
|
|
| (ii) Building: |
| Industrial |
|
|
|
|
|
|
| Residential |
|
|
|
|
|
|
| (iii) Plant and Machinery including transport equipment |
|
|
|
|
|
|
| (iv) Capitalised Expenditure such as pre-production exploration, development, major overhaul and repair to machinery etc. (As prescribed under Income Tax Act) |
|
|
|
|
|
|
| Total: |
|
|
|
|
|
|
* In case the fixed assets are common to more than one mine, furnish combined information for all such mines together in any one of the mine's return. In the returns for other mines, give only a cross reference to the particular mine's return where-in the information is included.
** Optional and may be furnished in respect of items (i), (ii) and (iii) if the mine owner desires.
*** Including any non-recurring expenditure incurred on the acquisition of land.
2. Source of Finance (at the end of the year):
| (i) Paid up Share Capital (`) |
|
| (ii) Own Capital (`) |
|
| (iii) Reserve and Surplus (All Types) (`) |
|
| (iv) Long Term loans outstanding (#) (`) |
|
| Name of the Institution-Source |
Amount of Loan (`) |
Rate of Interest |
| |
|
|
(#) Indicate the names of the lending institutions such as State Finance Corporation, Industrial Development and other Public Corporations, Co-operative Banks, Nationalised Banks and other sources along with the amount of loan from each source and the rate of interest at which loan has been taken.
3. Interest and Rent (`)
| (i) Interest paid during the year |
|
| (ii) Rents (excluding surface rent) paid during the year |
|
Part III
(Consumption of Materials)
1. Quantity and cost of material consumed during the year
| Description |
Unit |
Quantity |
Value (`) |
| (i) Fuel |
| (a) Coal |
Tonnes |
|
|
| (b) Diesel Oil |
Ltrs. |
|
|
| (c) Petrol |
Ltrs. |
|
|
| (d) Kerosene |
Ltrs. |
|
|
| (e) Gas |
Cu.M. |
|
|
| (ii) Lubricant |
| (a) Lubricant oil |
Ltrs. |
|
|
| (b) Grease |
Kgs. |
|
|
| (iii) Electricity |
| (a) Consumed |
Kwh |
|
|
| (b) Generated |
Kwh |
|
|
| (c) Sold |
Kwh |
|
|
| (iv) Explosives (furnish full details in Part IV) |
| (v) Tyres |
Nos. |
|
|
| (vi) Timber and Supports |
|
| (vii) Drill rods and kits |
Nos. |
|
|
| (viii) Other spares and stores |
|
2. Royalty, Rents and Payments made to DMF and NMET (`):
| X |
Paid for current year |
Paid towards past arrears |
| (a) Royalty |
|
|
| (b) Dead rent |
|
|
| (c) Surface rent |
|
|
| (d) Payment made to DMF |
|
|
| (e) Payment made to NMET |
|
|
| 3. Compensation paid for felling trees during the year (`) |
|
| 4. Depreciation on fixed assets (`) |
|
5. Taxes and cesses
| X |
Amount in Rupees paid during the year to: |
| X |
Central Govt. |
State Govt. |
| (i) Sales Tax |
|
|
| (ii) Welfare cess |
|
|
| (iii) Other taxes and cesses |
|
|
| (a) Mineral cess |
|
|
| (b) Cess on dead rent |
|
|
| (c) Others (please specify) |
|
|
6. Other expenses (`):
| (i) Overheads |
|
| (ii) Maintenance |
|
| (iii) Money value of other benefits paid to workmen |
|
| (iv) Payment made to professional agencies |
|
| Part IV (Consumption of Explosives) |
| Licensed capacity of magazine: (specify unit separately in kg-tonne, numbers, metres) |
Item |
Unit |
Capacity |
| |
|
|
| |
|
|
| |
|
|
| Classification of Explosives |
Unit |
Quantity consumed during the year |
Estimated requirement during the next year |
| Small dia. (up to 32 mm) |
Large dia. (above 32 mm) |
Small dia. (up to 32 mm) |
Large dia. (above 32 mm) |
| 1. Gun Powder |
Kg. |
|
|
|
|
| 2. Nitrate Mixture |
Kg. |
X |
X |
X |
X |
| a. Loose ammonium nitrate |
|
|
|
|
|
| b. Ammonium nitrate in cartridged form |
|
|
|
|
|
| 3. Nitro compound |
Kg. |
|
|
|
|
| 4. Liquid Oxygen soaked cartridges |
Kg. |
|
|
|
|
| 5. Slurry explosives (Mention different trade names) |
Kg. |
|
|
|
|
| 6. Detonators |
Nos. |
X |
X |
X |
X |
| (i) Ordinary |
|
|
|
|
|
| (ii) Electrical |
|
X |
X |
X |
X |
| (a) Ordinary |
|
|
|
|
|
| (b) Delay |
|
|
|
|
|
| 7. Fuse |
Mts |
X |
X |
X |
X |
| (a) Safety Fuse |
|
|
|
|
|
| (b) Detonating Fuse |
|
|
|
|
|
| 8. Plastic ignition cord |
Mts |
|
|
|
|
| 9. Others (specify) |
(Mention the unit) |
|
|
|
|
Different sizes of soaked liquid oxygen cartridges to be reported in equivalent kg. as per manufacturer's instruction.
Part V
(General Geology and Mining)
(Items 2 and 3 to be submitted separately for each mineral)
1. Exploration
1 (i) Exploration activities during the year:
| |
|
At the beginning of the year |
During the year |
Cumulative |
Grid spacing-Dimension |
| Drilling |
No of holes |
|
|
|
|
| Metrage |
|
|
|
|
| Pitting |
No. of pits |
|
|
|
|
| Excavation (in m3) |
|
|
|
|
| Trenching |
No. of trenches |
|
|
|
|
| Excavation (in m3) |
|
|
|
|
| Length covered (in metre) |
|
|
|
|
| Expenditure on exploration (`) |
|
|
|
X |
1 (ii) Any other exploration activity during the year:
2. Reserves and Resources estimated (in tonnes).
| Classification |
Code |
At the beginning of the Year 1-4-20 . |
Assessed during the year |
Depletion of reserves during the year |
Balance resources as on 31-3-20 . |
| (1) |
(2) |
(3) |
(4) |
(5) |
(6) = (3+4-5) |
| A. Mineral Reserve |
| 1. Proved Mineral Reserve |
111 |
|
|
|
|
| 2. Probable mineral Reserve |
121 |
|
|
|
|
| |
122 |
|
|
|
|
| 3. Total Reserves |
|
|
|
|
|
| B. Remaining Resources |
| 1. Feasibility mineral Resource |
211 |
|
|
|
|
| 2. Pre-feasibility mineral resource |
221 |
|
|
|
|
| |
222 |
|
|
|
|
| 3. Measured mineral resource |
331 |
|
|
|
|
| 4. Indicated mineral resource |
332 |
|
|
|
|
| 5. Inferred mineral resource |
333 |
|
|
|
|
| 6. Reconnaissance mineral resource |
334 |
|
|
|
|
| 7. Total remaining Resources |
|
|
|
|
|
| Total (A+B) |
|
|
|
|
|
3. Sub-grade-Mineral Reject (in tonnes)
(Information to be given in respect of mineral fractions generated and stacked-dumped below cut-off grade and above threshold value, if prescribed, having no immediate sale value)
| At the beginning of the year |
Generated during the year |
Disposed during the year |
Total stacked at the end of the year |
Average grade of the mineral reject generated |
| |
|
|
|
|
4. Overburden and Waste (in m3)
(Information to be given in respect of overburden-waste and mineral fractions generated below threshold value, if prescribed)
| At the beginning of the year |
Generated during the year |
Disposed in dumps during the year |
Backfilled during the year |
Total at the end of the year |
| |
|
|
|
|
5. Trees planted-survival rate
| Description |
Within lease area |
Outside lease area |
| (i) Number of trees planted during the year |
|
|
| (ii) Survival rate in percentage |
|
|
| (iii) Total no. of trees at the end of the year |
|
|
6. Type of Machinery: Give the following information for the types of machinery in use such as hoist, fans, drills, loaders, excavators, dumpers, haulages, conveyors, pumps, etc.
| Type of machinery |
Capacity of each type of machinery |
Unit (in which capacity is reported) |
No. of machinery |
Electrical-Non-electrical (specify) |
Used in opencast underground (specify) |
| |
|
|
|
|
|
7(i) Details of mineral Treatment Plant, if any: Give a brief description of the process capacity of the machinery deployed and its availability. (Submit Flow Sheet and Material Balance of the Plant separately).
(ii) Furnish following information:
| Item |
Tonnage |
Average Grade |
| Feed: |
|
|
| Concentrates-processed products: |
(mention name) |
|
|
| |
|
|
|
| By-products-Co-products: |
(mention name) |
|
|
| |
|
|
|
| Tailings: |
|
|
Part VI (PRODUCTION, DESPATCHES AND STOCKS)
(To be submitted separately for each mineral)
(Unit of Quantity in Tonnes; indicate unit of quantity if not in tonnes)
1. Production and Stocks of ROM ore
| |
Opening stocks |
Production |
Closing stocks |
| Quantity |
Metal content/grade |
Quantity |
Metal content/grade |
Quantity |
Metal content/grade |
| A. From Underground workings |
|
|
|
|
|
|
| (i) From Development |
|
|
|
|
|
|
| (ii) From Stoping |
|
|
|
|
|
|
| B. From Opencast workings |
|
|
|
|
|
|
| Total |
|
|
|
|
|
|
2. Ex-mine price of the ore produced (` per unit):
3. Recoveries at Concentrator-Mill-Plant:
| Opening stocks of the Ore at concentrator-plant |
Ore received from the mine |
Ore treated |
| Quantity |
Metal content-grade |
Quantity |
Metal content-grade |
Quantity |
Metal content-grade |
| |
|
|
|
|
|
| |
|
|
|
|
|
| Concentrates * Obtained |
Tailings |
Closing stocks of concentrates at the concentrator-plant |
| Quantity |
Metal content/grade |
Value (`) |
Quantity |
Metal content-grade |
Quantity |
Metal content-grade |
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
*In case of any leaching method adopted, give quantity recovered and grade contained separately.
4. Recovery at the Smelter-Mill-Plant:
| Opening Stocks of the concentrates at the smelter-plant |
Concentrates received from concentrator-plant |
Concentrates received from other sources (specify) |
Concentrates sold (if any) |
| Quantity |
Metal content-grade |
Quantity |
Metal content-grade |
Quantity |
Metal content-grade |
Quantity |
Metal content-grade |
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| Concentrates treated |
Closing stocks of concentrate at the Smelter-Plant |
Metals (*) recovered (specify) |
Other by-products, if any, recovered |
| Quantity |
Metal content/grade |
Quantity |
Metal content/grade |
Quantity |
Grade |
Value (`) |
Quantity |
Grade |
Value (`) |
| |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
(*) Please give category-wise break-up viz. blister, fire refined copper, cathodes, electrolytic copper wire bars, lead ingots, zinc cathodes, zinc dross, gold, tungsten etc.
5. Sales during the month:
| Metal-Product |
Opening stocks of Metals-Products |
Place of sale |
Metals-Products sold(@) |
Closing stocks of Metals-Products |
| Quantity |
Grade |
Quantity |
Grade |
Value (#) (`) |
Quantity |
Grade |
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
Note:
(#) Please give ex-plant sale value.
(@) Please give category-wise break-up of metals and other products sold.
6. Details of deductions made from sale value for computation of Ex-mine price (`-Unit)
| Deduction claimed # |
Amount (in `-Unit) |
Remarks |
| (a) Cost of transportation (indicate loading station and distance from mine in remarks) |
|
|
| (b) Loading and unloading charges |
|
|
| (c) Railway freight, if applicable (indicate destination and distance) |
|
|
| (d) Port Handling charges-export duty (indicate name of port) |
|
|
| (e) Charges for sampling and analysis |
|
|
| (f) Rent for the plot at Stocking yard |
|
|
| (g) Other charges (specify clearly) |
|
|
| Total (a) to (g) |
|
|
# Not applicable for captive dispatches and ex-mine sales
7. Sales-Dispatches of ore and concentrates effected for Domestic Purposes and for Exports:
| Grade (ore-Conc.) |
Nature of Despatch (indicate whether Domestic Sale or Domestic Transfer or Captive consumption or Export) |
For Domestic Purposes |
For export |
| |
|
Registration number as allotted by the Indian Bureau of Mines to the buyer ## |
Consignee name ## |
Quantity |
Sale value (`) |
Country |
Quantity |
F.O.B. Value (`) |
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
## To indicate separately if more than one buyer.
Note. Mine owners are required to substantiate domestic sale value-FOB value for each grade quoted above with copy of invoices (not to be submitted with the return; to be produced whenever required).
8. Give reasons for increase-decrease in production-nil production, if any, during the year compared to the previous year.
(a)
(b)
9. Give reasons for increase-decrease in grade wise ex-mine price, if any, during the year compared to the previous year.
(a)
(b)
(c)
Part VII
COST OF PRODUCTION
Cost of production per tonne of ore-mineral produced
| Sl. No. |
Item |
Cost per tonne (`) |
| (i) |
Direct Cost |
|
| |
(a) Exploration |
|
| |
(b) Mining |
|
| |
(c) Beneficiation (Mechanical Only) |
|
| (ii) |
Over-head cost |
|
| (iii) |
Depreciation |
|
| (iv) |
Interest |
|
| (v) |
Royalty |
|
| (vi) |
Payments made to DMF |
|
| (vii) |
Payments made to NMET |
|
| (viii) |
Taxes |
|
| (ix) |
Dead Rent |
|
| (x) |
Others (specify) |
|
| |
Total |
|
Note: Information given under Part VII will be kept confidential. The Government, however, will be free to utilize the information for general studies without revealing the identity of the firm.
VERIFICATION
I certify that the information furnished above is correct and complete in all respects.
| Place: |
Signature |
| Date: |
Name in full: |
| |
Designation: Owner-Agent-Mining Engineer-Manager |
Form G-3
[See Rule 45(5)(c)(ii)]
For the Financial Year 1st April, 20 to 31st March, 20 .
ANNUAL RETURN
[To be used for precious and semi-precious stones]
To
| (i) |
The Regional Controller of Mines |
| |
Indian Bureau of Mines |
| |
.Region, |
| |
PIN: |
| |
(Please address to Regional Controller of Mines in whose territorial jurisdiction the mines falls as notified from time to time by the Controller General, Indian Bureau of Mines under Rule 62 of the Mineral Conservation and Development Rules, 1988) |
| (ii) |
The State Government |
Part-I (General)
| 1. Details of Mine: |
|
| (a) Registration number allotted by Indian Bureau of Mines (to give registration number of the Lessee-Owner) |
|
| (b) Mine Code (allotted by Indian Bureau of Mines) |
|
| (c) Name of the Mineral |
|
| (d) Name of Mine |
|
| (e) Name(s) of other mineral(s), if any, produced from the same mine |
|
2. Location of the Mine:
| Village |
|
| Post Office |
|
| Tahsil-Taluk |
|
| District |
|
| State |
|
| PIN Code |
|
| Fax No.: |
E-mail: |
| Phone No.: |
Mobile: |
3. Name and address of Lessee-Owner (along with fax no. and e-mail):
| Name of Lessee-Owner |
|
| Address |
|
| District |
|
| State |
|
| PIN Code |
|
| Fax No.: |
E-mail: |
| Phone No.: |
Mobile: |
| 4. Registered Office of the Lessee: |
|
| 5. Director in-charge: |
|
| 6. Agent: |
|
| 7. Manager: |
|
| 8. Mining Engineer in-charge: |
|
| 9. Geologist in-charge: |
|
| 10. Transferor (previous owner), if any, and date of transfer: |
|
11. Particulars of area operated-Lease
(Furnish information on items (i) to (vi) lease-wise in case mine workings cover more than one lease)
(i) Lease number allotted by the State Government
(ii) Area under lease (hectares):
| Under Forest |
|
| Outside Forest |
|
| Total |
|
| (iii) Date of execution of mining lease deed |
|
| (iv) Period of lease |
|
| (v) Area for which surface rights are held (hectares) |
|
| Under Forest |
|
| Outside Forest |
|
| Total |
|
| (vi) Date and period of renewal (if applicable) |
|
| (vii) In case there is more than one mine in the same lease area, indicate name of mine and mineral produced |
|
| 12. Lease area (surface area) utilisation as at the end of year (hectares): |
Under forest |
Outside forest |
Total |
| (i) Already exploited and abandoned by opencast (O-C) mining |
|
|
|
| (ii) Covered under current (O-C) Workings |
|
|
|
| (iii) Reclaimed-rehabilitated |
|
|
|
| (iv) Used for waste disposal |
|
|
|
| (v) Occupied by plant, buildings, residential, welfare buildings and roads |
|
|
|
| (vi) Used for any other purpose (specify) |
|
|
|
| (vii) Work done under progressive mine closure plan during the year |
|
|
|
| 13. Ownership-exploiting Agency of the mine: (Public Sector-Private Sector-Joint Sector) |
|
Part II (Employment and Wages)
1. Number of supervisory staff employed at the mine
| Description |
Wholly employed |
Partly employed |
| (i) Graduate Mining Engineer |
|
|
| (ii) Diploma Mining Engineer |
|
|
| (iii) Geologist |
|
|
| (iv) Surveyor |
|
|
| (v) Other administrative and technical supervisory staff |
|
|
| Total: |
|
|
| 2. (i) Number of days the mine worked: |
|
|
| (ii) No. of shifts per day: |
|
|
| (iii) Indicate reasons for work stoppage in the mine during the year (due to strike, lockout, heavy rain, non-availability of labour, transport bottleneck, lack of demand, uneconomic operations, etc.) and the number of days of work stoppage for each of the factors separately. |
Reasons |
No. of days |
3. Employment and salary-wages paid #:
Maximum number of persons employed on any one day during the year:
(i) In workings below ground on (date) ..(a) (number)
(ii) In all in the mine on (date) ..(a) (number)
| Classification |
Total number of man days worked during the year |
No. of days worked during the year |
Average daily number of persons employed |
Total Wages-Salary for the year (`) |
| Direct |
Contract |
Total |
Male |
Female |
Total |
| (1) |
2(A) |
2(B) |
2(C) |
(3) |
4(A) |
4(B) |
4(C) |
(5) |
| Below Ground |
|
|
|
|
|
|
|
|
| Opencast |
|
|
|
|
|
|
|
|
| Above Ground |
|
|
|
|
|
|
|
|
| Total: |
|
|
|
|
|
|
|
|
# To include all employees exclusive to the mine and attached factory, workshop or mineral dressing plant at the mine site
Part II-A
(Capital Structure)
1. Value of Fixed Assets* (` )
(in respect of the mine, beneficiation plant, mine work-shop, power and water installation)
In case this information is furnished as combined information in another mine's return please specify Mine Code-Mine Name:
| Description |
At the beginning of the year (`) |
Additions during the Year (`) |
Sold or discarded during the year (`) |
Depreciation during the year (`) |
Net closing Balance (`) (2+3) (4+5) |
Estimated market value** (`) |
| 1 |
2 |
3 |
4 |
5 |
6 |
7 |
| (i) Land*** |
|
|
|
|
|
|
| (ii) Building: |
| Industrial |
|
|
|
|
|
|
| Residential |
|
|
|
|
|
|
| (iii) Plant and Machinery including transport equipment |
|
|
|
|
|
|
| (iv) Capitalised Expenditure such as pre-production exploration, development, major overhaul and repair to machinery etc. (As prescribed under Income Tax Act) |
|
|
|
|
|
|
| Total: |
|
|
|
|
|
|
* In case the fixed assets are common to more than one mine, furnish combined information for all such mines together in any one of the mine's return. In the returns for other mines, give only a cross reference to the particular mine's return where-in the information is included.
** Optional and may be furnished in respect of items (i), (ii) and (iii) if the mine owner desires.
*** Including any non-recurring expenditure incurred on the acquisition of land.
2. Source of Finance (at the end of the year):
| (i) Paid up Share Capital (`) |
|
| (ii) Own Capital (`) |
|
| (iii) Reserve and Surplus (All Types) (`) |
|
| (iv) Long Term loans outstanding (#) (`) |
|
| Name of the Institution-Source |
Amount of Loan (`) |
Rate of Interest |
| |
|
|
(#) Indicate the names of the lending institutions such as State Finance Corporation, Industrial Development and other Public Corporations, Co-operative Banks, Nationalised Banks and other sources along with the amount of loan from each source and the rate of interest at which loan has been taken.
3. Interest and Rent (`)
| (i) Interest paid during the year |
|
| (ii) Rents (excluding surface rent) paid during the year |
|
Part III
(Consumption of Materials)
1. Quantity and cost of material consumed during the year
| Description |
Unit |
Quantity |
Value (`) |
| (i) Fuel |
| (a) Coal |
Tonnes |
|
|
| (b) Diesel Oil |
Ltrs. |
|
|
| (c) Petrol |
Ltrs. |
|
|
| (d) Kerosene |
Ltrs. |
|
|
| (e) Gas |
Cu.M. |
|
|
| (ii) Lubricant |
| (a) Lubricant oil |
Ltrs. |
|
|
| (b) Grease |
Kgs. |
|
|
| (iii) Electricity |
| (a) Consumed |
Kwh |
|
|
| (b) Generated |
Kwh |
|
|
| (c) Sold |
Kwh |
|
|
| (iv) Explosives (furnish full details in Part IV) |
| (v) Tyres |
Nos. |
|
|
| (vi) Timber and Supports |
|
| (vii) Drill rods and kits |
Nos. |
|
|
| (viii) Other spares and stores |
|
2. Royalty, Rents and Payments made to DMF and NMET (`):
| X |
Paid for current year |
Paid towards past arrears |
| (a) Royalty |
|
|
| (b) Dead rent |
|
|
| (c) Surface rent |
|
|
| (d) Payment made to DMF |
|
|
| (e) Payment made to NMET |
|
|
| 3. Compensation paid for felling trees during the year (`) |
|
| 4. Depreciation on fixed assets (`) |
|
5. Taxes and cesses
| X |
Amount in Rupees paid during the year to: |
| X |
Central Govt. |
State Govt. |
| (i) Sales Tax |
|
|
| (ii) Welfare cess |
|
|
| (iii) Other taxes and cesses |
|
|
| (a) Mineral cess |
|
|
| (b) Cess on dead rent |
|
|
| (c) Others (please specify) |
|
|
6. Other expenses (`):
| (i) Overheads |
|
| (ii) Maintenance |
|
| (iii) Money value of other benefits paid to workmen |
|
| (iv) Payment made to professional agencies |
|
Part IV
(Consumption of Explosives)
| Licensed capacity of magazine: (specify unit separately in kg-tonne, numbers, metres) |
Item |
Unit |
Capacity |
| |
|
|
| |
|
|
| |
|
|
| Classification of Explosives |
Unit |
Quantity consumed during the year |
Estimated requirement during the next year |
| Small dia. (up to 32 mm) |
Large dia. (above 32 mm) |
Small dia. (up to 32 mm) |
Large dia. (above 32 mm) |
| 1. Gun Powder |
Kg. |
|
|
|
|
| 2. Nitrate Mixture |
Kg. |
X |
X |
X |
X |
| a. Loose ammonium nitrate |
|
|
|
|
|
| b. Ammonium nitrate in cartridged form |
|
|
|
|
|
| 3. Nitro compound |
Kg. |
|
|
|
|
| 4. Liquid Oxygen soaked cartridges |
Kg. |
|
|
|
|
| 5. Slurry explosives (Mention different trade names) |
Kg. |
|
|
|
|
| 6. Detonators |
Nos. |
X |
X |
X |
X |
| (i) Ordinary |
|
|
|
|
|
| (ii) Electrical |
|
X |
X |
X |
X |
| (a) Ordinary |
|
|
|
|
|
| (b) Delay |
|
|
|
|
|
| 7. Fuse |
Mts |
X |
X |
X |
X |
| (a) Safety Fuse |
|
|
|
|
|
| (b) Detonating Fuse |
|
|
|
|
|
| 8. Plastic ignition cord |
Mts |
|
|
|
|
| 9. Others (specify) |
(Mention the unit) |
|
|
|
|
Different sizes of soaked liquid oxygen cartridges to be reported in equivalent kg. as per manufacturer's instruction.
Part V
(General Geology and Mining)
(Items 2 and 3 to be submitted separately for each mineral)
1. Exploration
1 (i) Exploration activities during the year:
| |
|
At the beginning of the year |
During the year |
Cumulative |
Grid spacing-Dimension |
| Drilling |
No of holes |
|
|
|
|
| Metrage |
|
|
|
|
| Pitting |
No of pits |
|
|
|
|
| Excavation (in m3) |
|
|
|
|
| Trenching |
No of trenches |
|
|
|
|
| Excavation (in m3) |
|
|
|
|
| Length covered (in metre) |
|
|
|
|
| Expenditure on exploration (`) |
|
|
|
X |
1 (ii) Any other exploration activity during the year:
2. Reserves and Resources estimated (in tonnes).
| Classification |
Code |
At the beginning of the Year 1-4-20 . |
Assessed during the year |
Depletion of reserves during the year |
Balance resources as on 31-3-20 . |
| (1) |
(2) |
(3) |
(4) |
(5) |
(6) = (3+4 5) |
| A. Mineral Reserve |
|
| 1. Proved Mineral Reserve |
111 |
|
|
|
|
| 2. Probable mineral Reserve |
121 |
|
|
|
|
| |
122 |
|
|
|
|
| 3. Total Reserves |
|
|
|
|
|
| B. Remaining Resources |
|
| 1. Feasibility mineral Resource |
211 |
|
|
|
|
| 2. Pre-feasibility mineral resource |
221 |
|
|
|
|
| |
222 |
|
|
|
|
| 3. Measured mineral resource |
331 |
|
|
|
|
| 4. Indicated mineral resource |
332 |
|
|
|
|
| 5. Inferred mineral resource |
333 |
|
|
|
|
| 6. Reconnaissance mineral resource |
334 |
|
|
|
|
| 7. Total remaining Resources |
|
|
|
|
|
| Total (A+B) |
|
|
|
|
|
3. Sub-grade-Mineral Reject (in tonnes)
(Information to be given in respect of mineral fractions generated and stacked-dumped below cut-off grade and above threshold value, if prescribed, having no immediate sale value)
| At the beginning of the year |
Generated during the year |
Disposed during the year |
Total stacked at the end of the year |
Average grade of the mineral reject generated |
| |
|
|
|
|
4. Overburden and Waste (in m3)
(Information to be given in respect of overburden-waste and mineral fractions generated below threshold value, if prescribed)
| At the beginning of the year |
Generated during the year |
Disposed in dumps during the year |
Backfilled during the year |
Total at the end of the year |
| |
|
|
|
|
5. Trees planted-survival rate
| Description |
Within lease area |
Outside lease area |
| (i) Number of trees planted during the year |
|
|
| (ii) Survival rate in percentage |
|
|
| (iii) Total no. of trees at the end of the year |
|
|
6. Type of Machinery: Give the following information for the types of machinery in use such as hoist, fans, drills, loaders, excavators, dumpers, haulages, conveyors, pumps, etc.
| Type of machinery |
Capacity of each type of machinery |
Unit (in which capacity is reported) |
No. of machinery |
Electrical-Non-electrical (specify) |
Used in opencast underground (specify) |
| |
|
|
|
|
|
7(i) Details of mineral Treatment Plant, if any: Give a brief description of the process capacity of the machinery deployed and its availability. (Submit Flow Sheet and Material Balance of the Plant separately).
(ii) Furnish following information:
| Item |
Tonnage |
Average Grade |
| Feed: |
|
|
| Concentrates-processed products: |
(mention name) |
|
|
| |
|
|
|
| By-products-Co-products: |
(mention name) |
|
|
| |
|
|
|
| Tailings: |
|
|
Part VI (PRODUCTION, DESPATCHES AND STOCKS)
(To be submitted separately for each mineral)
1. R.O.M. production:
| Category |
Unit of quantity |
Quantity |
| (a) Opencast workings |
|
|
| (b) Underground workings |
|
|
2. Production, stocks and dispatches
| |
Gem Variety |
Industrial |
Others |
| Rough and uncut stones |
Cut and Polished Stones |
|
|
| No. of stones |
Qty @ |
No. of stones |
Qty @ |
No. of stones |
Qty @ |
No. of stones |
Qty @ |
| A. Opening stocks |
|
|
|
|
|
|
|
|
| B. Production |
|
|
|
|
|
|
|
|
| (i) From Opencast Working |
|
|
|
|
|
|
|
|
| (ii) From underground working |
|
|
|
|
|
|
|
|
| TOTAL (Production) |
|
|
|
|
|
|
|
|
| C. Despatches |
|
|
|
|
|
|
|
|
| D. Closing Stocks |
|
|
|
|
|
|
|
|
| E. Ex-mine Price (`) |
|
|
|
|
@: The Unit of quantity viz. Carats-Grams-Kilogram etc., as the case may be, should be indicated under quantity.
3. Details of deductions made from sale value for computation of Ex-mine price (`-Unit)
| Deduction claimed# |
Amount (in `-Unit) |
Remarks |
| (a) Cost of transportation (indicate loading station and distance from mine in remarks) |
|
|
| (b) Loading and unloading charges |
|
|
| (c) Railway freight, if applicable (indicate destination and distance) |
|
|
| (d) Port handling charges-export duty (indicate name of port) |
|
|
| (e) Charges for sampling and analysis |
|
|
| (f) Rent for the plot at stocking yard |
|
|
| (g) Other charges (specify clearly) |
|
|
| Total (a) to (g) |
|
|
# Not applicable for captive dispatches and ex-mine sales
4. Sales-Dispatches effected for Domestic Purposes and for Exports:
| Grade (*) |
Nature of Despatch (indicate whether Domestic Sale or Domestic Transfer or Captive consumption or Export) |
For Domestic Purposes |
For export |
| Registration number as allotted by the Indian Bureau of Mines to the buyer ## |
Consignee name ## |
Quantity |
Sale value (`) |
Country |
Quantity |
F.O.B. Value (`) |
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
*: To indicate rough and uncut stones, cut and polished stones, industrial, others
## To indicate separately if more than one buyer.
Note. Mine owners are required to substantiate domestic sale value-FOB value for each grade of ore quoted above with copy of invoices (not to be submitted with the return; to be produced whenever required).
5. Give reasons for increase-decrease in production-nil production, if any, during the month compared to the previous month.
(a)
(b)
6. Give reasons for increase-decrease in grade wise ex-mine price, if any, during the month compared to the previous month.
(a)
(b)
Part VII COST OF PRODUCTION
Cost of production per unit of ore-mineral produced\
| Sl. No. |
Item |
Cost per unit (`) |
| (i) |
Direct Cost |
|
| |
(a) Exploration |
|
| |
(b) Mining |
|
| |
(c) Beneficiation(Mechanical Only) |
|
| (ii) |
Over-head cost |
|
| (iii) |
Depreciation |
|
| (iv) |
Interest |
|
| (v) |
Royalty |
|
| (vi) |
Payments made to DMF |
|
| (vii) |
Payments made to NMET |
|
| (viii) |
Taxes |
|
| (ix) |
Dead Rent |
|
| (x) |
Others (specify) |
|
| |
Total |
|
Note: Information given under Part VII will be kept confidential. The Government, however, will be free to utilize the information for general studies without revealing the identity of the firm.
VERIFICATION
I certify that the information furnished above is correct and complete in all respects.
| Place: |
Signature |
| Date: |
Name in full: |
| |
Designation: Owner-Agent-Mining Engineer-Manager |
Form H
(See Rule 46)
(Notice of certain appointment-resignation-termination-change of address)
IMPORTANT INSTRUCTIONS FOR FILLING THE FORM
| |
This Form, duly filled in must reach the concerned authorities as prescribed within the rule, within fifteen days of new appointment or termination from employment or change in address of Agent, Mining Engineer, Geologist or Manager, by online or Email. |
| |
This should be sent to the Regional Controller in whose territorial jurisdiction the mineral concession falls as notified from time to time by the Controller General, Indian Bureau of Mines, under Rule 66 of the Mineral Conservation Development Rules, 2016. |
| |
The form should be digitally signed by the concerned person. |
| 1. |
IBM Registration Number |
|
| 2. |
Type of mineral concession |
RP (o)- PL (o)- PL-cum-ML (o)- ML (o) |
| 3. |
Unique number of R.P-PL- |
|
|
| |
PL cum-ML |
|
|
| 4. |
Mining Lease Code |
|
|
| |
|
|
|
| 5. |
Mine Code |
|
|
| 6. |
Name and address of the mineral Concession holder |
|
|
| |
(Information will be system generated. Linked with Entry 3 of Form K ) |
| 7. |
Particulars of the Mineral concession |
| |
(Information will be system generated. Linked with Entry 4-5-6 of Form K ) |
| 8. |
Location of the Mining Lease |
| |
(Information will be system generated. Linked with Entry 4 -5 -6 of Form K ) |
| 9. |
Please indicate whether notice is given in respect of: |
| |
(a) |
New appointment |
|
|
| |
(b) |
Resignation-termination of employment |
|
|
| |
(c) |
Change of address: |
|
|
10. In case of appointment of Agent-Mining Engineer-Geologist-Manager, please indicate
| |
Name |
Designation |
Address |
Qualification |
University-Institution from which passed |
E-mail |
Mobile No. |
Date of appointment |
| |
|
|
|
|
|
|
|
|
11. If the appointment is that of a Mining Engineer or a Geologist, please indicate:
| |
(Please tick mark whichever is applicable) |
| |
(i) Whether appointment is: |
Whole time |
|
|
| |
|
Part time |
|
|
| (ii) |
Names, locations and ownership of all other mines |
|
| |
Prospecting Licence which he will supervise: |
|
|
12. In case of resignation-termination of employment of Agent-Mining Engineer-Geologist-Manager, please indicate:
| Name |
Designation |
Date of resignation-termination of employment |
| |
|
|
[In case the vacancy so created has been filled in, please furnish the particulars of the same in Columns 7 and 9(a)]
13. In case of change of address of the Lessee-Agent-Mining Engineer-Geologist-Manager, please indicate:
| Name |
Designation |
Present Address |
Date of change of address |
| |
|
|
|
Place:
Date:
Signature
Name in full:
Designation: Owner-Agent-Mining Engineer-Manager
Form I
(See Rule 47)
(Notice of sinking shafts and boreholes)
IMPORTANT INSTRUCTIONS FOR FILLING THE FORM
| |
This Form, duly filled in must reach the concerned authorities as prescribed within the rule, within fifteen days after the commencement of sinking shafts-boreholes, by online or Email. |
| |
This should be sent to the Regional Controller in whose territorial jurisdiction the mineral concession falls as notified from time to time by the Controller General, Indian Bureau of Mines, under Rule 66 of the Mineral Conservation Development Rules, 2016. |
| |
The form should be digitally signed by the concerned person. |
| 1. |
Type of Mineral Concession --- |
Mining Lease |
|
| |
|
Prospecting Licence |
|
| |
|
Prospecting License-cum-Mining Lease |
|
| 2. |
IBM Registration Number |
|
| 3. |
Unique IBM Concession Number |
Prospecting License |
|
| |
|
Prospecting License-cum-Mining Lease |
|
| 4. |
Mining Lease Code |
|
|
| 5. |
Mine Code |
|
|
| |
|
|
|
| 6. |
Name of the mineral or minerals for which prospecting license or prospecting license cum mining lease-mining lease has been granted: (Information will be system generated. Linked with Entry 4 and 5 of Form K .) |
| 7. |
Name and address of the mineral concession holder (Information will be system Generated. Linked with Entry 4 and 5 of Form K .) |
| 8. |
Particulars of mineral concession (Information will be system generated. Linked with Entry 4 and 5 of FORM K .) |
| 9. |
Location of the Mineral Concession (Information will be system generated. Linked with Entry 4 and 5 of FORM K .) |
| 10. |
Number of shafts-boreholes intended to be sunk or extended |
| |
(Attach a plan on a scale not less than 1 centimetre = 40 metres indicating the precise location of the shaft-borehole). |
|
| 11. |
Purpose for which each of the shafts-boreholes is intended to be sunk or extended |
|
| 12. |
Type of shaft(s)-contemplated and its-their dimension(s) |
|
| 13. |
Type of drill used and size of core to be obtained. |
|
| 14. |
Intended depth up to which shaft-boreholes is to be extended |
|
| 15. |
If the shaft-borehole commences from underground the depth of the level at which the shaft-borehole is sunk |
|
| 16. |
Name and qualification of the geologist or mining engineer in charge of the operation. |
|
| 17. |
Date of commencement of proposed shaft sinking-drilling operation. |
|
| Place: |
|
| Date: |
|
| |
Signature Name in full: Designation: Owner-Geologist-Mining Engineer |
Form J
[See Rule 48(1)]
(Particulars to be recorded in respect of each bore-hole-pit-shaft).
| 1. |
Type of Mineral Concession --- |
Mining Lease |
|
| |
|
Prospecting Licence |
|
| |
|
Prospecting License-cum-Mining Lease |
|
| 2. |
IBM Registration Number |
|
| 3. |
Unique IBM Concession Number |
Prospecting License |
|
| |
|
Prospecting License-cum-Mining Lease |
|
| 4. |
Mining Lease Code |
|
| 5. |
Mine Code |
|
| 6. |
Name of the mineral or minerals for which prospecting license or prospecting license cum mining lease-mining lease has been granted: (Information will be system generated. Linked with Entry 4 and 5 of Form K .) |
| 7. |
Name and address of the mineral concession holder (Information will be system Generated. Linked with Entry 4 and 5 of Form K .) |
| 8. |
Particulars of mineral concession (Information will be system generated. Linked with Entry 4 and 5 of FORM K .) |
| 9. |
Location of the Mineral Concession (Information will be system generated. Linked with Entry 4 and 5 of FORM K .) |
| 10. |
Type and make of the drill and size of core |
|
| 11. |
Bore hole-pit number and its location |
| |
(a) Reduced levels at the collar of the borehole-pit. |
.. |
| |
(b) Inclination and bearing of the hole |
.. |
| |
(c) Altitude of the formation |
.. |
| 12. |
Duration of drilling-pitting |
|
| |
(a) Date of commencement |
.. |
| |
(b) Date of completion |
.. |
| 13. |
Total length of the bore hole-pit-shaft |
.. |
| 14. |
Purpose of drilling-pitting-shaft: |
.. |
| 15. |
Total operating expenditure incurred (in Rs): |
.. |
| 16. |
Details of intersection (as given below): |
|
| Sl. No. |
RUN DETAILS |
Size of core-pit-shaft |
Percentage recovery of core |
Lithology |
Analysis details (Major Radicals a b c d) |
Remarks |
| |
From (in metres) |
To (in meters) |
Width (in meters) |
True width (in meters) |
| |
|
|
|
|
|
|
|
|
|
Place:
Date:
Signature
Name in full:
Designation: Owner-Geologist-Mining Engineer
Form K
[See Rule 45(1)]
(Application for registration under Rule 45 of MCDR for undertaking mining or prospecting or reconnaissance operations, or trading or storage or end use or export of minerals)
| IMPORTANT INSTRUCTIONS FOR FILLING THE FORM |
| |
If there is any change after registration in any of the fields, the form may be updated accordingly and informed to the Controller General, Indian Bureau of Mines. |
| |
Application to be filed through the respective Regional Office of Indian Bureau of Mines, under whose jurisdiction the State or Union territory in which the mining or prospecting or reconnaissance operations or trading or storage or end use or export of minerals is being undertaken, falls. |
| |
The form should be digitally signed by the concerned signing authority |
| 1. |
Category of applicant: (Please tick mark below) |
| |
Individual |
| |
Association of individuals |
| |
Firm |
| |
Company registered under Companies Act. |
| 2. |
Type of business-activity: (Please tick mark options given below, multiple options permitted) |
| |
Reconnaissance |
| |
Prospecting |
| |
Mining |
| |
Trading of minerals |
| |
Storage of minerals |
| |
End-user of minerals (including consumption from captive mines) |
| |
Export of minerals (also mention IE Code) |
| 3. |
Details of the applicant: |
| |
[Please tick mark Government Company () or Others ()] |
| |
(a) In case of individual applicant (includes owner, agent, mining engineer or manager of every mine): |
| (i) |
Name |
Shri - Smt. (First name) - (Middle name) - (Last name) |
| (ii) |
Position in mine (please tick mark the option) |
Owner Agent Mining engineer Manager |
| (iii) |
Address |
(Door number-building number-plot number) |
| |
Block |
(street number - block number) |
| |
Taluka |
|
| |
District |
|
| |
State - U.T. |
|
| |
Pin code |
|
| |
E-mail |
|
| (iv) |
Telephone |
Office: Fax: Residence: Mobile: |
| (v) |
PAN number |
|
| (vi) |
AADHAR number |
|
| (vii) |
Passport number |
|
(b) In case of association of individuals:
| (i) |
Name of Association, or name of the Signing authority of association |
|
| (ii) |
Address |
(Door number-building number-plot number) |
| |
Block |
(street number - block number) |
| |
Taluka |
|
| |
District |
|
| |
State - U.T. |
|
| |
Pin code |
|
| |
E-mail |
|
| (iii) |
Telephone |
Office: Fax: Residence: Mobile: |
| (iv) |
Details of Associates |
Name |
PAN number |
Aadhar Number |
Citizenship |
Passport number |
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| (v) |
Details of nominated owner under Section 76 of the Mines Act, 1952 |
Name |
|
| Designation |
|
| Address |
|
| Phone No. |
Office: Residence: Mobile: E mail: |
| PAN No. |
|
| Passport No. |
|
(c) In case of a Firm:
| (i) |
Name of Firm |
|
| (ii) |
Address |
(Door number-building number-plot number) |
| |
Block |
(street number - block number) |
| |
Taluka |
|
| |
District |
|
| |
State - U.T. |
|
| |
Pin code |
|
| |
E-mail |
|
| (iii) |
Telephone |
Office: Fax: Residence: Mobile: |
| (iv) |
Details of partners in the Firm |
Name of partner |
PAN Number |
Aadhar Number |
Citizenship |
Passport Number |
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
Firm Type (Tick) |
Registered-Unregistered |
| (v) |
Registration number of Firm (as registered under Indian Partnership Act, 1932) |
|
| PAN No. |
TIN No. |
TAN No. |
| |
|
|
| (vi) |
Name of the State where registered |
|
| (vii) |
Date of registration |
(dd-mm-yyyy) |
| (viii) |
Details of nominated owner under Section 76 of the Mines Act, 1952 |
Name |
|
| Designation |
|
| Address |
|
| Phone Number |
Office: Residence: Mobile: E-mail: |
| PAN No. |
|
| Passport No. |
|
(d) In case of a company:
| (i) |
Name of Company |
|
| (ii) |
Registered Address |
|
| |
|
|
| |
|
|
| |
|
|
| |
State - U.T. |
|
| |
Pin code |
|
| |
E-mail |
|
| (iii) |
Telephone |
Office: |
| |
|
Fax: |
| |
|
Mobile: |
| (iv) |
Details of Directors in the Company |
Name |
PAN Number |
Aadhar Number |
Citizenship |
Passport Number |
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| (v) |
Registration number of Company (as registered under Companies Act, 2013) |
|
| TAN No. |
TIN No. |
| |
|
| (vi) |
Name of the State where registered |
|
| (vii) |
Date of registration |
(dd-mm-yyyy) |
| (viii) |
Details of nominated owner under Section 76 of the Mines Act, 1952 |
Name |
|
| Designation |
|
| Address |
|
| Phone no. |
Office: Residence: Mobile: E-mail: |
| PAN No. |
|
| Passport No. |
|
| |
|
|
|
(e) State License Details (only for a State License Holder under Section 23-C of MMDR Act, 1957
| State License No. |
State |
Area of Business-District |
Date of Isssue |
Valid up to (dd/mm/yyyy) |
Issuing Authority |
Name of Minerals |
| |
|
|
|
|
|
|
4. Please give details of mines held at the time of applying for registration if any, or update the information due to any changes after registration, by the Individual-Association of Individuals Firms or Company.
| Sl. No. |
Name of the mine |
Lease Code assigned by IBM |
Mine code assigned by IBM |
| |
|
|
|
| |
|
|
|
| |
Location of Mining Lease area |
Area held under ML (in ha.) |
Name of Mine-rals |
Date of Regis-tration of ML |
Period of Lease |
| From |
To |
| Mine Code |
Village |
Taluka |
District |
State |
Topo sheet number |
Cadas-tral Survey or Khasra Number |
Lati-tude (dd mm ss) |
Longi-tude (dd mm ss) |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
5. Please give details of prospecting licence - prospecting licence cum mining lease held at the time of applying for registration, if any, or update the information due to any changes after registration, by the Individual-Association of Individuals - Firms or Company.
| Location of PL-PL cum ML area |
Area held under PL-PL cum ML (in ha.) |
Name of Mine-rals |
Date of grant |
Period |
Date of execu-tion of license-Compo-sit Lice-nce |
| Unique Number assig-ned by IBM |
Village |
Taluka |
District |
State |
Topo sheet num-ber |
Cadas-tral Survey or Khasra Num-ber |
Lati-tude (dd mm ss) |
Longi-tude (dd mm ss) |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
6. Please give details of reconnaissance licence held at the time of applying for registration, if any, or update the information due to any changes after registration, by the Individual-Association of Individuals - Firms or Company.
| Location of RP |
Area held under RP (in ha) |
Name of Mine-rals |
Date of grant |
Period |
Date of execu-tion of licence |
| Unique Number assig-ned by IBM |
Village |
Taluka |
District |
State |
Topo sheet num-ber |
Cadas-tral Survey or Khasra Num-ber |
Lati-tude (dd mm ss) |
Longi-tude (dd mm ss) |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
7. If engaged in mineral trading-storage and export, please give details of storage facilities owned at the time of applying for registration or update the information due to any changes after registration.
| |
Location(s) of area used for storage |
Area Owned held under rent (In hectres) |
Mineral Name |
Remarks |
| Sl. No. |
Village |
Taluka |
District |
State |
Latitude (ddmmss) |
Longitude (ddmmss) |
|
|
| |
|
|
|
|
|
|
|
|
8. If engaged in production or manufacturing through a mineral based industry, please give details of mineral consumption or update the information due to any changes after registration.
| |
Location(s) of plant where mineral is used |
Name of the plant |
Mineral consumed |
Average consum-ption per year |
Remarks |
| Sl. No. |
Village |
Taluka |
District |
State |
Latitude (ddmmss) |
Longitude (ddmmss) |
|
|
|
|
| |
|
|
|
|
|
|
|
|
VERIFICATION
I, S-o - D-o - W-o . age occupation resident of village-town-city post office .. police station taluka .. district state- . certify that the information furnished above is complete and correct in all respects.
Place:
Date:
Signature:
Name in full:
| Not to be filled by the applicant |
|
| (For internal use of the Indian Bureau of Mines) |
|
| Registration Number assigned by IBM: |
|
Form L
[See Rule 45(6)(a)]
For the month of 20
MONTHLY RETURN
IMPORTANT INSTRUCTIONS FOR FILLING THE FORM
| |
This Form, duly filled in must reach the concerned authorities as prescribed within the rule, before the tenth day of every month in respect of the preceding month, through online. |
| |
This should be sent to the Regional Controller in whose territorial jurisdiction the mineral concession falls as notified from time to time by the Controller General, Indian Bureau of Mines, under Rule 66 of the Mineral Conservation Development Rules, 2016. |
| |
The form should be digitally signed by the concerned person. |
| |
Quantity to be reported in tonnes. If not please specify the unit. |
| |
Value to be reported in rupees only. |
| |
Registration number means the registration number allotted by Indian Bureau of Mines to the lessee-owner or to a trader-stockist-end-use mineral based industry exporter. |
| |
Ore grade for various minerals, as given in the form, to be strictly used while reporting. |
| |
Registration No (allotted by IBM) |
|
| |
Name and Address |
|
| |
Plant Name-Storage location, if available |
|
| |
Latitude and Longitude |
|
| |
Name of activity(s) reported |
(a) |
Trading |
|
| |
(Tick whichever is-are applicable) |
(b) |
Export |
|
| |
|
(c) |
End-use |
|
| |
|
(d) |
Storage |
|
2. DETAILS OF THE ACTIVITY
(Quantity to be reported in tonnes. If not please specify the unit)
(a) Trading Activity
| Mineral-Ore |
Grade of mineral ore# |
Opening stock |
Ore purchased during the month (within the country) |
| |
|
Quantity |
Registration number as allotted by the Indian Bureau of Mines to the supplier (to indicate separately if more than one supplier) |
Quantity |
Value (in `) |
| |
|
|
|
|
|
| |
|
|
|
|
|
| Ore imported during the month |
Ore dispatched during the month |
Closing stock |
| Country |
Quantity |
Value (in `) |
Registration number as allotted by the Indian Bureau of Mines to the buyer (to indicate separately if more than one buyer) |
Quantity |
Value (in `) |
Quantity |
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
(b) Export of ore
| Mineral-Ore |
Grade of mineral ore# |
Opening stock |
Ore purchased during the month for export (from within the country) |
| |
|
Quantity |
Registration number as allotted by the Indian Bureau of Mines to the supplier (to indicate separately if more than one supplier) |
Quantity |
Value (in `) |
| |
|
|
|
|
|
| |
|
|
|
|
|
| Ore imported during the month |
Ore exported during the month |
Closing stock |
| Country |
Quantity |
Value (in `) |
Country |
Quantity |
Value (in `) |
Quantity |
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
(c) End-use mineral based activity
| Mineral-Ore |
Grade of mineral-ore# |
Opening stock |
Ore procured during the month (within the country) |
Ore imported during the month |
| |
|
Quantity |
Registration number as allotted by the Indian Bureau of Mines to the supplier (to indicate separately if more than one supplier) |
Quantity |
Value (in `) |
Country |
Quantity |
Value (in `) |
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| Ore consumed during the month |
Ore dispatched during the month |
Closing stock |
| Quantity |
Value (in `) |
Registration number as allotted by the Indian Bureau of Mines to the buyer#(to indicate separately if more than one buyer) |
Quantity |
Value (in `) |
Quantity |
| |
|
|
|
|
|
| |
|
|
|
|
|
(d) Storage Activity
| Mineral-Ore |
Grade of mineral-ore# |
Opening stock |
Ore received during the month (within the country) |
| |
|
Quantity |
Registration number as allotted by the Indian Bureau of Mines to the supplier (to indicate separately if more than one supplier) |
Quantity |
Value (in `) |
| |
|
|
|
|
|
| Ore imported during the month |
Ore dispatched during the month |
Closing stock |
| Country |
Quantity |
Value (in `) |
Registration number as allotted by the Indian Bureau of Mines to the person-company to whom ore dispatched (to indicate separately if more than one person-company) |
Quantity |
Value (in `) |
Quantity |
| |
|
|
|
|
|
|
VERIFICATION
I, . S-o - D-o - W-o age occupation . resident of village-town-city post office police station . taluka .. district . state .. certify that the information furnished above is complete and correct in all respects.
| Place: |
Signature: |
| Date: |
Name in full: |
# Grades of minerals to be reported in the above tables are as given below. (If separate grades are not mentioned below, report the mineral name against grade):
| MINERAL |
GRADES |
| Iron ore |
(i) Lumps: |
| (a) Below 51% Fe |
| (b) 51% to below 55% Fe |
| (c) 55% to below 58% Fe |
| (d) 58% to below 60% Fe |
| (e) 60% to below 62% Fe |
| (f) 62% to below 65% Fe |
| (g) 65% and above Fe |
| (ii) Fines: |
| (a) Below 51% Fe |
| (b) 51% to below 55% Fe |
| (c) 55% to below 58% Fe |
| (d) 58% to below 60% Fe |
| (e) 60% to below 62% Fe |
| (f) 62% to below 65% Fe |
| (g) 65% and above Fe |
| (iii) Concentrates |
| (iv) Calibrated Lump Ore (CLO) |
| (Quantity already reported in Lumps should not be reported against CLO) |
| (a) Below 62% Fe (CLO any size) |
| (b) 62% to below 65% Fe (5-18 mm size CLO) |
| (c) 62% to below 65% Fe (10-40 mm size CLO) |
| (d) 62% to below 65% Fe (CLO others) |
| (e) 65% and above Fe (5-18 mm size CLO) |
| (f) 65% and above Fe (10-40 mm size CLO) |
| (g) 65% and above Fe (CLO others) |
| (v) ROM ore |
| (a) Below 51% Fe |
| (b) 51% to below 55% Fe |
| (c) 55% to below 58% Fe |
| (d) 58% to below 60% Fe |
| (e) 60% to below 62% Fe |
| (f) 62% to below 65% Fe |
| (g) 65% and above Fe |
| Manganese Ore |
(i) Ore |
| (a) Below 25% Mn |
| (b) 25% to below 35% Mn |
| (c) 35% to below 46% Mn |
| (d) 46% and above Mn |
| (e) Dioxide ore |
| (ii) Concentrates |
| Bauxite |
(i) For use in alumina and aluminium extraction |
| (a) Below 40% Al2O3 |
| (b) 40% to below 45% Al2O3 |
| (c) 45% to below 50% Al2O3 |
| (d) 50% to below 55% Al2O3 |
| (e) 55% to below 60% Al2O3 |
| (f) 60% and above Al2O3 |
| (ii) For use other than alumina and aluminium metal extraction |
| (a) Cement |
| (b) Abrasive |
| (c) Refractory |
| (d) Chemical |
| Chromite |
(i) Lumps |
| (a) Below 40% Cr2O3 |
| (b) 40% to below 52 % Cr2O3 |
| (c) 52% and above Cr2O3 |
| (ii) Fines |
| (a) Below 40% Cr2O3 |
| (b) 40% to below 52 % Cr2O3 |
| (c) 52% and above Cr2O3 |
| (iii) Concentrates |
| (iv) ROM ore |
| (a) Below 40% Cr2O3 |
| (b) 40% to below 52 % Cr2O3 |
| (c) 52% and above Cr2O3 |
| Asbestos |
(a) Amphibole |
| (b) Chrysotile |
| Fluorite-Fluorspar |
(a) 80% and above CaF2 |
| (b) 70% to below 80% CaF2 |
| (c) 30% to below 70% CaF2 |
| (d) Below 30% CaF2 |
| Graphite |
(a) With 80% or more fixed carbon |
| (b) With 40 % or more fixed carbon but less than 80% fixed carbon |
| (c) With 20% or more fixed carbon but less than 40% fixed carbon |
| (d) With less than 20% fixed carbon |
| Kyanite |
(a) 40% and above Al2O3 |
| (b) Below 40% Al2O3 |
| Limestone |
(a) LD Grade (less than 1.5% silica content) |
| (b) SMS |
| (c) BF |
| (d) Chemical |
| (e) Cement |
| Rock Phosphate-Phosphorite |
(a) Above 30% P2O5 |
| Above 25% to 30% P2O5 |
| Above 20% to 25% P2O5 |
| Up to 20% P2O5 |
| Precious and semiprecious stones |
(a) Rough and uncut stones |
| (b) Cut and polished stones |
| (c) Industrial |
| (d) Others |
Form M
[See Rule 45(6)(b)]
For the financial year 1st April, 20 .. to 31st March, 20 .
ANNUAL RETURN
IMPORTANT INSTRUCTIONS FOR FILLING THE FORM
| |
This Form, duly filled in must reach the concerned authorities as prescribed within the rule, before the first day of July of each year for the preceding financial year, through online. |
| |
This should be sent to the Regional Controller in whose territorial jurisdiction the mineral concession falls as notified from time to time by the Controller General, Indian Bureau of Mines, under Rule 66 of the Mineral Conservation Development Rules, 2016. |
| |
The form should be digitally signed by the concerned person. |
| |
Quantity to be reported in tonnes. If not please specify the unit. |
| |
Value to be reported in rupees only. |
| |
Registration number means the registration number allotted by Indian Bureau of Mines to the lessee-owner or to a trader-stockist-end-use mineral based industry exporter. |
| |
Ore grade for various minerals, as given in the form, to be strictly used while reporting. |
| |
Item 5 related to raw materials consumed may be filled up by all end use industry and iron and steel industry also. |
| |
Registration No (allotted by IBM) |
|
| |
Name and Address |
|
| |
Plant Name-Storage location, if available |
|
| |
Latitude and Longitude |
|
| |
Name of activity(s) reported |
(a) |
Trading |
|
| |
(Tick whichever is-are applicable) |
(b) |
Export |
|
| |
|
(c) |
End-use |
|
| |
|
(d) |
Storage |
|
2. DETAILS OF THE ACTIVITY
(Quantity to be reported in tonnes. If not please specify the unit)
(a) Trading Activity
| Mineral-Ore |
Grade of mineral ore# |
Opening stock |
Ore purchased during the year (within the country) |
| |
|
Quantity |
Registration number as allotted by the Indian Bureau of Mines to the supplier (to indicate separately if more than one supplier) |
Quantity |
Value (in `) |
| |
|
|
|
|
|
| |
|
|
|
|
|
| Ore imported during the month |
Ore dispatched during the month |
Closing stock |
| Country |
Quantity |
Value (in `) |
Registration number as allotted by the Indian Bureau of Mines to the buyer (to indicate separately if more than one buyer) |
Quantity |
Value (in `) |
Quantity |
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
(b) Export of ore
| Mineral-Ore |
Grade of mineral ore# |
Opening stock |
Ore purchased during the year for export (from within the country) |
| |
|
Quantity |
Registration number as allotted by the Indian Bureau of Mines to the supplier (to indicate separately if more than one supplier) |
Quantity |
Value (in `) |
| |
|
|
|
|
|
| |
|
|
|
|
|
| Ore imported during the year |
Ore exported during the year |
Closing stock |
| Country |
Quantity |
Value (in `) |
Country |
Quantity |
Value (in `) |
Quantity |
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
(c) End-use mineral based activity
| Mineral-Ore |
Grade of mineral-ore# |
Opening stock |
Ore procured during the year (within the country) |
Ore imported during the year |
| |
|
Quantity |
Registration number as allotted by the Indian Bureau of Mines to the supplier (to indicate separately if more than one supplier) |
Quantity |
Value (in `) |
Country |
Quantity |
Value (in `) |
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| Ore consumed during the year |
Ore dispatched during the year |
Closing stock |
| Quantity |
Value (in `) |
Registration number as allotted by the Indian Bureau of Mines to the buyer (to indicate separately if more than one buyer) |
Quantity |
Value (in `) |
Quantity |
| |
|
|
|
|
|
| |
|
|
|
|
|
(d) Storage Activity
| Mineral-Ore |
Grade of mineral-ore# |
Opening stock |
Ore received during the year (within the country) |
| |
|
Quantity |
Registration number as allotted by the Indian Bureau of Mines to the supplier (to indicate separately if more than one supplier) |
Quantity |
Value (in `) |
| |
|
|
|
|
|
| Ore imported during the month |
Ore dispatched during the month |
Closing stock |
| Country |
Quantity |
Value (in `) |
Registration number as allotted by the Indian Bureau of Mines to the person-company to whom ore dispatched (to indicate separately if more than one person-company) |
Quantity |
Value (in `) |
Quantity |
| |
|
|
|
|
|
|
| NOTE: |
| (a) Only end-use mineral based industry to respond to Section 3 to 6 |
| (b) Information to be given separately for each industry and each unit |
| 3. INFORMATION REGARDING END-USE MINERAL BASED INDUSTRIES (OTHER THAN IRON AND STEEL INDUSTRY) |
| (i) Name of Industry: |
|
Name of Plant: |
| (ii) (a) State: |
(b) District: |
(c) Location: |
| (iii) Details on products manufactured with their capacities and production: |
| Products |
Annual installed capacity during the year (in tonnes) |
Production (in tonnes) |
| Previous financial year |
Present financial year |
| (1) |
(2) |
(3) |
(4) |
| FINISHED PRODUCTS |
|
|
|
| (i) |
|
|
|
| (ii) |
|
|
|
| |
|
|
|
| INTERMEDIATE PRODUCTS |
|
|
|
| (i) |
|
|
|
| (ii) |
|
|
|
| BY-PRODUCTS |
|
|
|
| (i) |
|
|
|
| (ii) |
|
|
|
| Expansion programme undertaken and progress made during the year: |
| (iv) Expansion programme-Plan envisaged for future: |
| (v) Research and Development programme carried out during the year (give details): |
| 4. INFORMATION REGARDING IRON AND STEEL INDUSTRY |
| (i) Name of Plant: |
| (ii) (a) State: |
(b) District: |
(c) Location: |
| (iii) Products manufactured with their capacity and production: |
| Products |
Installed capacity (in tonnes) |
Production (in tonnes) |
Remarks |
| Previous financial year |
Present financial year |
| (a) Sinter (i) Self fluxing (ii) Ordinary |
|
|
|
|
| (b) Pellets |
|
|
|
|
| (c) Coal (i) Clean coal (ii) Coke (own production) |
|
|
|
|
| (d) Pig iron (i) Hot metal (total) (ii) Hot metal for own consumption. (iii) Pig iron for sale |
|
|
|
|
| (e) Sponge Iron |
|
|
|
|
| (f) Hot Briquetted Iron |
|
|
|
|
| (g) Steel (i) Liquid Steel-Crude Steel (ii) Total Saleable Steel (a) Semi-finished Steel (b) Finished Steel |
|
|
|
|
| (h) Tin plates |
|
|
|
|
| (i) Sulphuric acid |
|
|
|
|
| (j) Refractories-bricks |
|
|
|
|
| (k) Fertilizers |
|
|
|
|
| (l) Any other product-by-product |
|
|
|
|
| Coke purchased (in tonnes) |
previous year |
|
present year |
|
| (iv) Expansion programme undertaken and progress made during the year: |
| (v) Expansion programme-Plan envisaged for future: |
| (vi) Research and Development programme carried out during the year (give details): |
| 5. DETAILS OF RAW MATERIALS CONSUMED IN PRODUCTION [including Electricity (in KWh), Coal and Petroleum products] |
| Raw Material |
Actual Consumption* |
Estimated Requirement* |
| Mineral-Ore-Metal-Ferro-alloy |
Physical Specification |
Chemical Specification |
Previous financial year |
Present financial year |
| |
|
|
Indigenous |
Imported |
Indigenous |
Imported |
Next financial year |
Next to Next financial year |
| (1) |
(2) |
(3) |
(4) |
(5) |
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
* Quantity to be reported in tonnes. If not please specify the unit.
6. SOURCE OF SUPPLY
| Type@ |
Mineral-Ore-Metal-Ferro-alloy |
Indigenous |
| Name and address of supplier |
Source of supply (mine or area) |
Indicate the distance of mine rail to plant (in km) |
Transportation cost per unit by Rail-Road |
Quantity* |
Price per unit at factory site (in `) |
| Mine Code |
District |
Mode |
Cost per unit (in `) |
|
|
| |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| Imported |
| Name and complete address of supplier (country wise) |
Quantity purchased* |
Cost per unit at factory site (in `) |
| Address |
Country |
| |
|
|
|
| |
|
|
|
@ Indigenous-Imported; * Quantity to be reported in tonnes. If not please specify the unit.
VERIFICATION
I, .. S-o - D-o - W-o .. age occupation resident of .. village-town-city post office . police station .. taluka district .. state certify that the information furnished above is complete and correct in all respects.
| Place: |
Signature: |
| Date: |
Name in full: |
# Grades of minerals to be reported in the above tables are as given below. (If separate grades are not mentioned below, report the mineral name against grade):
| MINERAL |
GRADES |
| Iron ore |
(i) Lumps: |
| (a) Below 51% Fe |
| (b) 51% to below 55% Fe |
| (c) 55% to below 58% Fe |
| (d) 58% to below 60% Fe |
| (e) 60% to below 62% Fe |
| (f) 62% to below 65% Fe |
| (g) 65% and above Fe |
| (ii) Fines: |
| (a) Below 51% Fe |
| (b) 51% to below 55% Fe |
| (c) 55% to below 58% Fe |
| (d) 58% to below 60% Fe |
| (e) 60% to below 62% Fe |
| (f) 62% to below 65% Fe |
| (g) 65% and above Fe |
| (iii) Concentrates |
| (iv) Calibrated Lump Ore (CLO) |
| (Quantity already reported in Lumps should not be reported against CLO) |
| (a) Below 62% Fe (CLO any size) |
| (b) 62% to below 65% Fe (5-18 mm size CLO) |
| (c) 62% to below 65% Fe (10-40 mm size CLO) |
| (d) 62% to below 65% Fe (CLO others) |
| (e) 65% and above Fe (5-18 mm size CLO) |
| (f) 65% and above Fe (10-40 mm size CLO) |
| (g) 65% and above Fe (CLO others) |
| (v) ROM ore |
| (a) Below 51% Fe |
| (b) 51% to below 55% Fe |
| (c) 55% to below 58% Fe |
| (d) 58% to below 60% Fe |
| (e) 60% to below 62% Fe |
| (f) 62% to below 65% Fe |
| (g) 65% and above Fe |
| Manganese Ore |
(i) Ore |
| (a) Below 25% Mn |
| (b) 25% to below 35% Mn |
| (c) 35% to below 46% Mn |
| (d) 46% and above Mn |
| (e) Dioxide ore |
| (ii) Concentrates |
| Bauxite |
(i) For use in alumina and aluminium extraction |
| (a) Below 40% Al2O3 |
| (b) 40% to below 45% Al2O3 |
| (c) 45% to below 50% Al2O3 |
| (d) 50% to below 55% Al2O3 |
| (e) 55% to below 60% Al2O3 |
| (f) 60% and above Al2O3 |
| (ii) For use other than alumina and aluminium metal extraction |
| (a) Cement |
| (b) Abrasive |
| (c) Refractory |
| (d) Chemical |
| Chromite |
(i) Lumps |
| (a) Below 40% Cr2O3 |
| (b) 40% to below 52% Cr2O3 |
| (c) 52% and above Cr2O3 |
| (ii) Fines |
| (a) Below 40% Cr2O3 |
| (b) 40% to below 52% Cr2O3 |
| (c) 52% and above Cr2O3 |
| (iii) Concentrates |
| (iv) ROM ore |
| (a) Below 40% Cr2O3 |
| (b) 40% to below 52% Cr2O3 |
| (c) 52% and above Cr2O3 |
| Asbestos |
(a) Amphibole |
| (b) Chrysotile |
| Fluorite-Fluorspar |
(a) 80% and above CaF2 |
| (b) 70% to below 80% CaF2 |
| (c) 30% to below 70% CaF2 |
| (d) Below 30% CaF2 |
| Graphite |
(a) With 80% or more fixed carbon |
| (b) With 40% or more fixed carbon but less than 80% fixed carbon |
| (c) With 20% or more fixed carbon but less than 40% fixed carbon |
| (d) With less than 20% fixed carbon |
| Kyanite |
(a) 40% and above Al2O3 |
| (b) Below 40% Al2O3 |
| Limestone |
(a) LD Grade (less than 1.5% silica content) |
| (b) SMS |
| (c) BF |
| (d) Chemical |
| (e) Cement |
| Rock Phosphate-Phosphorite |
(a) Above 30% P2O5 |
| (b) Above 25% to 30% P2O5 |
| (c) Above 20% to 25% P2O5 |
| (d) Up to 20% P2O5 |
| Precious and semiprecious stones |
(a) Rough and uncut stones |
| (b) Cut and polished stones |
| (c) Industrial |
| (d) Others |
Form N
(See Rule 50)
(Notice of transfer of Prospecting License cum Mining Lease or Mining Lease)
IMPORTANT INSTRUCTIONS FOR FILLING THE FORM
| |
This Form, duly filled in must reach the concerned authorities as prescribed within the rule, within thirty days of the date of such transfer, by online or Email. |
| |
This should be sent to the Regional Controller in whose territorial jurisdiction the mineral concession falls as notified from time to time by the Controller General, Indian Bureau of Mines, under Rule 66 of the Mineral Conservation Development Rules, 2016. |
| |
The form should be digitally signed by the concerned person. |
| 1. |
Type of Mineral Concession --- |
Mining Lease |
|
| |
|
Prospecting License-cum-Mining Lease |
|
| 2. |
IBM Registration Number |
|
| |
|
|
| 3. |
Unique IBM Concession Number of Prospecting License-cum-mining lease |
| |
(Field will be disabled if the case is that of ML) |
|
| 4 |
Mining Lease Code |
|
|
| 5. |
Mine Code |
|
|
| 6. |
Name of the mineral or minerals for which prospecting license cum mining lease mining lease has been granted: |
| |
(Information will be system generated. Linked with Entry 4 and 5 of Form K .) |
| 7. |
Name and address of the mineral concession holder |
| |
(Information will be system Generated. Linked with Entry 4 and 5 of Form K .) |
| 8. |
Particulars of mineral concession |
| |
(Information will be system generated. Linked with Entry 4 and 5 of FORM K .) |
| 9. |
Location of the Mineral Concession |
| |
(Information will be system generated. Linked with Entry 4 and 5 of FORM K .) |
| 10. |
Name and address of the Transferee or Assignee |
| Name |
Address |
E-mail |
PAN Number |
Aadhar Number |
Passport number |
Mobile number |
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| 11. |
Letter number and date of transfer order issued by State Government |
|
| Place: |
|
| Date: |
|
| |
Signature |
| |
Name in full: |
| |
Designation: Owner-Geologist-Mining Engineer |