Smart Summary

Factual and Procedural Background

On 14.1.1998 M/s DLF Industries Limited (DIL) filed three petitions (O.M.P. Nos. 20/98, 21/98 and 22/98) under Section 9 of the Arbitration and Conciliation Act, 1996 seeking injunction against the respondent bank(s) to restrain encashment of certain bank guarantees. DIL alleged that M/s Atul Limited (ATUL) was attempting a fraudulent and illegal invocation of those guarantees. The underlying contracts between DIL and ATUL had been novated in favour of State Bank of India (SBI), which, according to the petitions, had not sought invocation. DIL relied on Section 62 of the Indian Contract Act to contend there was no privity between DIL and ATUL after novation and that ATUL could not invoke the guarantees.

The petitions were listed before a learned Single Judge on 15.1.1998 and interim directions were agreed between counsel that encashment be subject to the petitions. The next day it was reported that banks had already issued cheques and the banks were directed not to clear them. ATUL opposed the petitions and raised a preliminary objection that Delhi courts lacked territorial jurisdiction because the contracts were made, negotiated and to be performed at Valsad, Gujarat, and the agreements contained clauses vesting jurisdiction in Valsad courts and specifying Valsad as the arbitration venue.

The learned Single Judge rejected ATUL's jurisdictional objection, holding inter alia that part of the cause of action arose in Delhi (bank guarantees were executed in Delhi) and relying on the Supreme Court decision in ABC Laminart Private Limited v. A.P. Agencies. Appeals followed. The Division Bench considered the matter, applied relevant Supreme Court authority (notably South East Asia Shipping Co. v. Nav Bharat Enterprises), concluded that Delhi had no territorial jurisdiction, and ordered the petitions to be returned for presentation to the appropriate court in Valsad. Directions were given for parties to appear before the District Judge, Valsad on 10.8.2000. The Division Bench disposed of the connected appeals as set out in the operative portion of the judgment.

Legal Issues Presented

  1. Whether the Courts at Delhi have territorial jurisdiction to entertain the Section 9 petitions filed by DIL concerning the encashment of bank guarantees.
  2. Whether the contractual clauses (arbitration venue at Valsad, clause 15 conferring jurisdiction on Courts at Valsad, and the penultimate clause deeming causes of action to have arisen at Valsad) operate as an ouster or exclusion clause that precludes jurisdiction of Delhi Courts.
  3. Whether the execution or invocation of bank guarantees in Delhi constitutes a part of the cause of action sufficient to found jurisdiction in Delhi notwithstanding the contract being made and performed at Valsad.

Arguments of the Parties

Appellant (DIL) — Principal Contentions

  • Delhi Courts have jurisdiction under Clauses (a) and (b) of Section 20 of the Code of Civil Procedure because: (a) banks furnishing the guarantees, (b) State Bank of India and (c) ATUL reside and work for gain in Delhi (as pleaded), and part of the cause of action arose in Delhi.
  • Almost all payments under the contracts were received in Delhi; contracts were monitored from DIL's registered office in Delhi; numerous meetings and correspondence occurred in Delhi; the bank guarantees were issued from Delhi and encashment demands were made in Delhi.
  • On novation, the contract stands with State Bank of India; SBI has not objected to jurisdiction. ATUL's objection is said to be meaningless after novation.
  • Clause 15 of the agreement (jurisdiction clause) does not exclude other courts because it does not use words such as "alone", "only" or "exclusive". The penultimate clause deeming the agreement entered into at Valsad is illegal and invalid, according to DIL.

Respondent (ATUL) — Principal Contentions

  • No part of the cause of action has arisen in Delhi; the intention of the parties must be gathered from the agreement's terms.
  • The arbitration clause specifies the venue as Valsad and the jurisdiction clause subjects disputes to Courts at Valsad. The penultimate clause deems all causes of action to have arisen within Valsad. Read together, these clauses indicate the parties intended Valsad courts to have exclusive jurisdiction.
  • The absence of the words "alone", "only" or "exclusive" does not prevent the tribunal from construing the clauses (arbitration clause, jurisdiction clause and penultimate clause) as excluding other courts by necessary implication.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
ABC Laminart Private Limited and another v. A.P. Agencies, Salem (AIR 1989 S.C. 1239) Construction of ouster/exclusion clauses: a stipulation that a contract is deemed made at a particular place provides the connecting factor of jurisdiction; omission of words like "alone" or "exclusive" may not be decisive when clauses read together indicate intent to exclude other fora. The Court relied on its ratio to read the arbitration clause, clause 15 (jurisdiction) and the penultimate clause together to infer the parties intended Valsad to be the forum; held that lack of explicit words such as "only" did not negate the exclusionary effect in the context of these three clauses.
South East Asia Shipping Company Limited v. Nav Bharat Enterprises Private Limited, 1996 (3) SCC 443 Execution or invocation of a bank guarantee at a place (e.g., Delhi) does not by itself constitute a cause of action if the main contract was executed and performance was to occur elsewhere (e.g., Bombay); cause of action is a "bundle of facts" and must include the acts which, if traversed, require proof. The Court held the facts of the present case squarely within this precedent: since the contracts were made and to be performed at Valsad, the fact that bank guarantees were executed in Delhi did not create a cause of action enabling original jurisdiction in Delhi. The precedent was applied in full force to deny Delhi jurisdiction.
R.S.D.V Finance Co. Pvt. Ltd. v. Shree Vallabh Glass Works Ltd., AIR 1993 SC 2094 When petitions are filed in a court that lacks territorial jurisdiction, the appropriate course in such cases is to order return of the petitions for presentation to the proper court (rather than dismissing them). The Court followed this principle and ordered that the petitions (OMP Nos. 20, 21 & 22 of 1998) be returned to the petitioner for presentation before the proper Court (District Judge, Valsad), rather than dismissing them on merits.
Karon Singh and Others v. Chaman Paswan and Others, AIR 1954 SC 340 Fundamental principle: a decree passed by a court without jurisdiction is a nullity; defect of jurisdiction (territorial, pecuniary or subject-matter) cannot be cured even by consent of parties. The Court relied on this principle to hold that continuation of an interim order by a court which it concluded lacks territorial jurisdiction would perpetuate an order of a court having no authority; thus the interim injunction could not be continued.
In Re Chunduru Venkata Subrahmanvam, AIR 1955 AP 74 High Court authority cited for the proposition that in circumstances where petitions are not entertainable, it is not permissible to extend an injunction while ordering return of petitions with liberty to file elsewhere. Mentioned as one of the High Court decisions supporting the principle that interim injunctions should not be continued when petitions are being returned for presentation in an appropriate court; used to justify refusal to continue interim relief.
Raunaq Int. Ltd. v. Mini Sea Foods, 1983 RLR 202 High Court authority supporting the proposition that injunctions should not be extended by a court that lacks territorial jurisdiction when ordering return of petitions. Cited among High Court decisions to support the Court's view that it could not continue the interim injunction after concluding it had no territorial jurisdiction.
R. Venkataswami Naidu v. M/s. South India Viscose Ltd., Coimbatore (AIR 1985 Madras 257) High Court authority on the impermissibility of extending injunctions by a court that has concluded it lacks jurisdiction and is returning petitions to proper fora. Relied upon as supporting authority for not continuing interim relief and for ordering return of the petitions.
Subbhash Chander Kamlesh Kumar v. State Of Punjab And Others (AIR 1990 Punjab And Hatyana 259) High Court authority cited for the same principle: injunctions should not be extended when petitions are being directed to be returned to appropriate courts for presentation. Used as additional support for the Court's decision not to continue the interim order and to order return of the petitions to the proper jurisdiction.

Court's Reasoning and Analysis

The Court's reasoning proceeded in logical steps, applying statutory and precedent authority strictly to the admitted facts:

  1. Identification of the central factual matrix: the contracts between DIL and ATUL were entered into and required to be performed at Valsad (erection and commissioning of TG set); separate agreements and bank guarantees were executed, and the bank guarantees in question were executed in Delhi and transmitted to ATUL at Valsad.
  2. Application of South East Asia Shipping Co. v. Nav Bharat (1996): the Court emphasized the principle that a "cause of action" is a bundle of facts which, with the applicable law, gives a right to claim relief. Merely because a bank guarantee was executed in Delhi and transmitted for performance elsewhere does not, of itself, create a cause of action enabling original jurisdiction in Delhi where the underlying contract was made and performance was to occur elsewhere. The Division Bench found the present facts squarely analogous and applied that decision in full force.
  3. Construction of the contractual clauses: the Court examined the arbitration clause (venue at Valsad), clause 15 (jurisdiction of Courts at Valsad) and the penultimate clause (agreement deemed entered into at Valsad; all causes of action deemed to have arisen within Valsad). Relying on ABC Laminart, the Court read these clauses together and concluded they indicate the parties' intention to have Valsad as the forum. The absence of explicit words such as "only" or "exclusive" did not prevent this reading; the maxim "expression unius est exclusio alterius" was held applicable in that context.
  4. Assessment of DIL's additional factual points (payments received in Delhi, meetings, correspondence, novation to SBI): the Court held these contentions did not override the contractual exclusion clause nor the application of the South East Asia Shipping ratio, particularly as the primary relief sought was an interim measure in respect of bank guarantees that were furnished pursuant to the agreements containing the exclusion clause.
  5. Procedural disposition: having concluded the Court lacked territorial jurisdiction, the Division Bench referred to Order 7 Rule 10A CPC and precedent (R.S.D.V Finance Co. v. Shree Vallabh Glass Works) to determine the proper procedural course — to order return of the petitions for presentation before the competent court rather than dismissing them. At the same time, the Court held it could not continue the interim order because doing so would perpetuate an order of a court without territorial jurisdiction. The Court cited Karon Singh and other High Court authorities to underscore the principle that orders passed without jurisdiction are nullities and cannot be continued.

Holding and Implications

Core Ruling: The Division Bench held that the petitions filed by DIL before the Delhi High Court were not entertainable in Delhi and ordered that the petitions be returned to the petitioner for presentation before the proper Court in Valsad.

Formal disposition in the appeals:

  • FAO(OS).37/99 is dismissed.
  • FAO(OS) Nos. 45, 46 and 47 of 1999 are partly allowed.
  • The impugned orders of the learned Single Judge (which had entertained the petitions) are set aside; OMP Nos. 20, 21 and 22 of 1998 are ordered to be returned forthwith to the petitioner.

Direct consequences and immediate implications for the parties:

  • Petitioner (DIL) must present the returned petitions before the District Court, Valsad, Gujarat; the parties were directed to appear in that court on 10.8.2000 (no fresh notice deemed necessary because parties were represented by counsel and apprised of the date).
  • The Division Bench refused to continue the interim injunction previously granted by the Single Judge because continuation would amount to an order of a court lacking territorial jurisdiction (such an order would be a nullity).
  • A copy of the judgment will be placed on the record of each appeal.

Broader precedent setting: The opinion applies and follows existing Supreme Court precedent (notably South East Asia Shipping and ABC Laminart) and High Court authorities; the judgment resolves the jurisdictional question on the facts before the Court but does not purport to create a new legal principle beyond applying those precedents.

    Dlf Industries Ltd v. Abn Amro Bank & Ors

    Devinder Gupta, J.— One of the questions for consideration in these four appeals is about the territorial jurisdiction of the Courts at Delhi to entertain the three petitions filed under Section 9 of the Arbitration and Conciliation Act, 1996 by M/s. DLF Industries Limited (hereinafter referred to as ‘DIL’).

    The facts in brief are that on 14.1.1998 three separate petitions i.e O.M.P Nos. 20/98, 21/98 and 22/98 were filed by DIL seeking injunction against the respondent Bank from encashing the bank guarantees. Inter alia, it was alleged that the petition was being filed against the fraudulent and illegal act of M/s. Atul Limited (hereinafter referred to as “ATUL”) in seeking encashment of bank guarantees issued by the Banks. The contracts between DIL and ATUL were novated in favour of State Bank of India, who has not sought invocation of bank guarantee in view of novation of contracts. In terms of Section 62 of the Indian Contract Act, the original contract need not be performed. As the contracts were novated in favour of State Bank of India, who is substituted in place of ATUL, there is no privity of contract left between DIL and ATUL in whose favour bank guarantees were issued. ATUL as such cannot invoke bank guarantees.

    The petitions came up before learned Single Judge on 15.1.1998 at about 5.00 p.m Since there was no time left to hear the matters, it was agreed amongst learned counsel for the ATUL and DIL that encashment of the bank guarantees shall be subject to decision in the petitions. However, on 16.1.1998 it was brought to the notice of learned Single Judge by learned counsel for ATUL that the concerned banks had already issued cheque. Considering the facts and circumstances, the concerned banks were directed not to clear the cheques.

    ATUL opposed the petitions. In addition of resisting the petitions on merits, a preliminary object was raised as regards Court's territorial jurisdiction to entertain and try the petitions. It was alleged that as per the terms of the contract arrived at between DIL and ATUL only the Courts situate at Valsad, Gujarat have jurisdiction to adjudicate upon the matter. It was alleged that the entire cause of action had arisen in Valsad, Gujarat. Major negotiations and discussions between DIL and ATUL relating to the basic agreements for erection and commissioning of 1B MW TG. Set took place in Valsad. The agreements were signed by DIL and ATUL at Valsad. The agreements were to be performed entirely at Valsad. Work was to be carried out at Valsad. Therefore, no cause of action had arisen out side Valsad. Even as per Memorandum of Understanding and the minutes of meeting dated 19.2.1997 conditions of the original contract remained unaltered and formed a part of new agreement between ATUL, State Bank of India and DIL. As such only Courts situate at Valsad, Gujarat have jurisdiction to adjudicate upon the matter.

    Learned Single Judge in the impugned order, which is the subject matter in these four appears, one of which is filed by DIL and the others by ATUL, turned down, the said preliminary objection. It was held that part of cause of action in all the three cases for four bank guarantees had arisen at Delhi; all the four bank guarantees were executed in Delhi; agreements arrived at between DIL and ATUL were not binding on the banks since the bank guarantees are independent contracts as in clause 15 of the agreements words like “alone” or “exclusive” were not there; therefore, in view of the decision of Supreme Court in ABC Laminart Private Limited and another v. A.P Agencies, Salem AIR 1989 S.C 1239, clause 15 of the agreement does not debar the institution of cases in Courts where a part of cause of action had arisen.

    Admitted facts are that a letter of intent was issued by ATUL on 1.2.1995, which was accepted by DIL through its letter dated 2.2 1995 for supply of 15 MW TG. Set (capable of generating 18 MW at 0.8 PP/on turn key basis) DIL requested and ATUL agreed to split this turn key contract into three parts by executing three separate agreements for supply; design and engineering; and erection and commissioning. Accordingly, three separate agreements were executed on 27.2.1995, 1.3.1995 and 3.3.1995 Under the said contracts, DIL agreed to commission the 18 MG TG set for commercial operation by 15.3.1996 The first agreement provided for a lumpsum amount of Rs. 135 lakhs to be paid by ATUL to DIL. Under the terms of payment, 10% advance was to be paid subject to DIL furnishing unconditional irrevocable bank guarantee for the said amount in a form acceptable to ATUL and valid upto the successful commissioning of 18 MW TG Set. Under the second and third agreements also, similar bank guarantees for different amounts were to be furnished. All agreements contain similar clause as regards Arbitration and Court's jurisdiction. The Arbitration clause reads:—

    “In case of any dispute that cannot be settled by mutual agreement, the matter may be referred to a three member Arbitration committee, one member each to be nominated by the PURCHASER and the SELLER and the third member i.e an Umpire to be nominated by these two members.

    All the provisions of the Indian Arbitration Act, 1940 and the rules made thereunder or any statutory modification thereof shall apply to the said Arbitration proceedings. The Venue of all arbitration shall be Valsad.”

    Clause 15 about Courts jurisdiction reads:—

    “Disputes of any nature that may arise in connection with the execution of this agreement, shall be governed by the Laws of India subject to the jurisdiction of Courts situate in Valsad, Gujarat.”

    The last para under Acceptance of Conditions, inter alia, says:—

    “That the Agreement shall be deemed to have been entered into at Valsad and all causes of action in relation to the agreement shall, therefore, be deemed to have arisen within the jurisdiction of the Court of Valsad District (Gujarat State) only.”

    Bank guarantees were furnished by DIL. When the same were sought to be invoked by ATUL, the aforementioned three petitions were filed in this Court by DIL, inter alia, alleging that as both the petitioner and the respondents work for gain in Delhi; the petitioner received almost all the payments under the contract in Delhi; the contracts were monitored from registered office in Delhi; a number of meetings between the parties were held in Delhi and the correspondences were exchanged from Delhi; the bank guarantee in question was issued by the Bank from Delhi and its encashment and payment has been sought from the Bank in Delhi, therefore, this Court has territorial jurisdiction.

    Mr. J.C Seth appearing for DIL while supporting the reasonings of learned Single Judge contended that Courts in Delhi have jurisdiction under Clauses (a) and (b) of Section 20 of the Code of Civil Procedure in as much the parties to the petition (a) as banks furnishing bank guarantee, (b) State Bank of India and (3) ATUL reside and work for gain in Delhi and also as a pa'rt of cause of action has arisen in Delhi. Almost all payments of few crores were received by DIL under the contracts in Delhi. Most of the meetings were also held in Delhi. Bank guarantees were issued and demand for encashment were made in Delhi. Correspondence between parties have exchanged from Delhi. On novation, the original contract with ATUL gets rescinded and the new contract is with State Bank of India. State Bank of India has not raised any objection as regards jurisdiction. Objection of ATUL is meaningless since ATUL is no more in picture. It was also contended that clause 15 of the agreement, which deals with Court's jurisdiction does not excluse jurisdiction of other Courts where a cause of action might arise since the clause does not use the words “alone”, “only” or “exclusive” etc. Penultimate clause, which provides for agreement shall be deemed to have been entered into at Valsad and all causes of action shall be deemed to have arisen within jurisdiction of Courts at Valsad is illegal and invalid.

    Dr. A.M Singhvi appearing for ATUL contended that no part of cause of action has arisen in Delhi and moreover intention of the parties have to be gathered from the terms of the agreement. The mere fact that the words “alone”, “exclusive” or the like are not mentioned in clause 15, are not used still the intention can be gathered from arbitration clause and the penultimate clause, which are part of the same agreement. Arbitration clause clearly provides that the venue of all arbitration shall be at Valsad and the penultimate clause state that all causes of action in relation to agreement shall be deemed to have arisen within the Court at Valsad District only. The words “the venue of all arbitration shall be Valsad,” in the arbitration clause and the words “subject to jurisdiction of Courts situate in Valsad, Gujarat” in the clause pertaining to Courts jurisdiction by necessary implication excludes jurisdiction of any other Court and the parties always intended that Courts at Valsad, Gujarat alone will have jurisdiction.

    Having considered the submissions made at the Bar, we are of the view that the matter is squarely covered by the decision of Supreme Court in South East Asia Shipping Company Limited v. Nav Bharat Enterprises Private Limited 1996 (3) SCC 443. It was held in that case that admittedly the contract between the parties was executed in Bombay; the performance of obligations and liabilities under the contract were also required to be done in Bombay and in furtherance of the execution of contract at Bombay; the bank guarantee executed at Delhi by the bank was transmitted to Bombay for performance of the contract; therefore, the execution of Bank Guarantee at Delhi or its invocation in Delhi do not constitute a cause of action to give rise to the respondent to lay suit on the original side of Delhi High Court. In the said case, M/s. Nav Bharat Enterprises Limited had filed a suit for permanent injunction in this Court seeking perpetual injunction against the bank not to pay any amount on the basis of the bank guarantee issued pursuant to the Charter Agreement arrived at between Nav Bharat Enterprises Limited and South East Asia Shipping Company Limited. The bank guarantee was executed in Delhi and had been furnished by. the bank to South East Asia Shipping Company Limited being the agent of Live Stock Express with whom M/s. Nav Bharat Enterprises Limited had entered into an agreement. Admittedly the contract was executed at Bombay. The performance of obligations and liabilities of the contract were also required to be done in Bombay. However, the bank guarantee was executed at Delhi and was transmitted to Bombay for performance of the contract. The petition was filed in this Court alleging that the cause of action arose at Delhi since the bank had accepted and issued bank guarantee at Delhi. Decision in A.B.C Laminart Private Limited's case (supra) was relied upon in the said case in support of the contention that the Courts at Delhi had jurisdiction since part of cause of action had arisen in Delhi. Such a submission was turned down. Supreme Court held:—

    “It is settled law that cause of action consists of bundle of facts which give cause to enforce the legal injury for redress in a Court of law. The cause of action means, therefore, every fact, which if traversed, it would be necessary for the plaintiff to prove in order to support his right to a judgement of the Court. In other words, it is a bundle of facts, which taken with the law applicable to them, gives the plaintiff a right to claim relief against the defendant. It must include some act done by the defendant since the absence of such an act no cause of action would possibly accrue or would arise. In view of the admitted position that contract was executed in Bombay, i.e, within the jurisdiction of the High Court of Bombay, performance of the contract was also to be done within the jurisdiction of the Bombay High Court; merely because bank guarantee was executed at Delhi and transmitted for performance to Bombay, it does not constitute a cause of action to give rise to the respondent to lay the suit on the original side of the Delhi High Court. The contention that the Division Bench was right in its finding and that since the bank guarantee was executed and liability was enforced from the bank at Delhi, the Court got jurisdiction, cannot be sustained.”

    In the instant case also on the admitted facts, the contracts between DIL and ATUL were at Valsad, Gujarat. Performance of obligations and liabilities under the contract were also required to be done wholly at Valsad, Gujarat, namely, the erection and commissioning of turbine generator set. The parties, namely, ATUL and DIL had also agreed that the disputes of any nature that may arise in connection with the execution of the agreement shall be governed by the Laws of India subject to jurisdiction of Courts situate in Valsad, Gujarat; the venue for arbitration in case of dispute between DIL and ATUL has to be Valsad. It is also admitted position that in furtherance of the execution of the contracts at Valsad, the bank guarantees were executed at Delhi and were transmitted to ATUL having its head office at Valsad, Gujarat: The mere fact that the bank guarantees were executed in Delhi and were transmitted from Delhi, in terms of the judgement of Supreme Court in South East Asia Shipping Company Limited's case (supra), it will not constitute a cause of action to DIL to lay its petitions on the original side of this Court. Judgment in South Asia Shipping Company Limited's case (supra) applies in full force to the facts of the present case.

    In A.B.C Laminart Pvt. Ltd.'s case (supra), it was held that when the Court has to decide the question of jurisdiction pursuant to an ouster clause it is necessary to construe the ousting expression or clause properly. Often the stipulation is that the contract shall be deemed to have been made at a particular place. This would provide the connecting factor for jurisdiction to the Courts of that place in the matter of any dispute on or arising out of that contract. In the light of the ratio of the said decision in case the clause relating to arbitration that Venue for arbitration shall be Valsad; and the clause on Courts jurisdiction that dispute of any nature shall be subject to jurisdiction of Courts at Valsad; and the penultimate clause that all causes of action shall be deemed to have arisen within the jurisdiction of Courts at Valsad District; are read together, they clearly indicate the intention of the parties. Even word like “alone”, “only” or “exclusive”, having not been used in clause 15 of the agreement will not make any difference. It is an appropriate case in view of the three clauses where the maxim “expression unius est exclusio alterius” expression of one is the exclusion of another apply with full force.

    Submission of learned counsel for DIL that since parties reside in Delhi or that State Bank of India in whose favour contract stand novated has no objection as regards jurisdiction and since payments were received in Delhi or even most of the meetings were held at Delhi, therefore, Delhi Courts will have jurisdiction since part of the cause of action has arisen in Delhi, have no force in view of the exclusion clause and particularly in view of the fact that the main purport of the petition is seeking of a relief of an interim measure with respect to the bank guarantees, which were furnished pursuant to the agreements, which contain the exclusion clause and pursuant to which agreements alone the bank guarantees were furnished.

    Learned counsel for DIL submitted that in case the Court would come to the conclusion that Courts at Delhi have no jurisdiction, instead of deciding the appeals, the main, petitions be ordered to be returned and DIL be directed to file the petition in a proper Court while maintaining statics quo for a specified time frame. He contends that similar directions for maintaining status quo have been made in a few cases by learned Single Judge of this Court.

    Learned counsel for ATUL though conceded that the course to be adopted in such circumstances would be to order return of the petitions for presentation to proper Court and not to dismiss the same but it will not be permissible to continue with the interim injunction since the same would be without jurisdiction.

    In view of the provisions of Order 7 Rule 10A C.P.C for which it is stated by learned counsel for DIL also that an application that effect was made before learned Single Judge, we are also of view that the petitions deserve to be ordered to be returned to DIL for presentation before the proper Court. This is a right course, which in view of the decision of the Supreme Court in R.S.D.V Finance Co. Pvt. Ltd. v. Shree Vallabh Glass Works Ltd., AIR 1993 SC 2094 in such like cases will have to be adopted but we are not convinced with the submission made on behalf of DIL by Mr. Seth that in the interest of justice interim order deserves to be continued. Continuance of such an order by this Court after concluding that the Courts at Delhi have no jurisdiction, will be continuation of the order of a Court having no territorial jurisdiction in the matter.

    It is a fundamental principle well established and as held in Karon Singh and Others v. Chaman Paswan and Others, AIR 1954 SC 340 that a decree passed by a Court without jurisdiction is a nullity. Its invalidity could be set up whenever and wherever it is sought to be enforced or relied upon even at the stage of execution and even in collateral proceedings. It was further held that a defect of jurisdiction, whether it is pecuniary or territorial or whether it is in respect of the subject matter of the action, strikes at the very authority of the Court to pass any decree and as such a defect cannot be cured even by consent of parties. We may also refer to a few decision of High Courts that in such circumstances it will not be permissible to extend the order of injunction even for a moment, while ordering return of petitions with liberty to the petitioner to file, the same in appropriate Court of competent jurisdiction, after this Court has come to the conclusion that the petitions are not entertainable. The decisions are In Re Chunduru Venkata Subrahmanvam AIR 1955 AP 74; Raunaq Int. Ltd. v. Mini Sea Foods 1983 RLR 202; R. Venkataswami Naidu v. M/s. South India Viscose Ltd., Coimbatore AIR 1985 Madras 257 And Mis. Subbhash Chander Kamlesh Kumar v. State Of Punjab And Others AIR 1990 Punjab And Hatyana 259.

    Consequently, FAO(OS).37/99 is dismissed. FAO(OS) Nos. 45, 46 and 47 of 1999 are partly allowed. The impugned orders passed by learned Single Judge are set aside holding that the petitions filed by DIL were not entertainable in this Court. The petitions, namely, OMP Nos. 20, 21 and 22 of 1998 are ordered to be returned to the petitioner forthwith.

    Parties will appear in the Court of District Judge, Valsad, Gujarat on 10.8.2000 Since the parties are represented through respective counsel, fresh notice need not be given to them and have been apprised of the date on which they will appear in the District Court, Valsad.

    A copy of the judgment will be placed on the record of each appeal.