AMICUS AI
Citation Codes
Equivalent Citations
citation codes
Case Number
Attorney(S)
Judges
Acts
  • Land Acquisition, Rehabilitation and Resettlement Act, 2013 (hereinafter referred to as the Act 2013)
  • Land Acquisition Rehabilitation and Resettlement Act, 2013 (Act No. 30 of 2013) (in short New Act)
  • LAND ACQUISITION ACT 1894
  • Section 114(1) of the 2013 Act repeals 1894 Act. Sub-section (2) of Section 114,
  • Section 50(7) of the M.P Nagar Tatha Gram Nivesh Adhiniyam, 1973
  • Section 4(1) read with Section 17 (1) of the Old Act
  • Section 1 (3) of the New Act, the Central Government
  • Section 11 of the said Land Acquisition Act
  • LAND ACQUISITION ACT
  • SECTION 6 GENERAL CLAUSES ACT 1897
  • provisions of Section 24 of the New Act,
  • sub-section (sub-section (2) of Section 24).
  • under:14. Section 31(1) of the 1894 Act
  • SECTION 6 A GENERAL CLAUSES ACT
  • Section 31 of the Old Act.13. Para 2
  • award.8. Section 24 of the New Act
  • V (Sections 31-34) of the 1894 Act.
  • Sections 32 and 33.18.1894 Act
  • Section 114(2) of the 2013 Act,
  • Section 24(2) land acquisition
  • Section 31 of the Old Act.12.
  • Section 31(2) of the 1894 Act
  • Section 24(2) of the 2013 Act
  • Section 24 (2) of the New Act
  • Section 4 (1) of the Old Act
  • provision in Section 31(2)
  • Section 4 notification.8.
  • Order XX Rule 1 of CPC
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Equivalent Citations
citation codes
Case Number
Attorney(S)
Judges
Acts
  • Land Acquisition, Rehabilitation and Resettlement Act, 2013 (hereinafter referred to as the Act 2013)
  • Land Acquisition Rehabilitation and Resettlement Act, 2013 (Act No. 30 of 2013) (in short New Act)
  • LAND ACQUISITION ACT 1894
  • Section 114(1) of the 2013 Act repeals 1894 Act. Sub-section (2) of Section 114,
  • Section 50(7) of the M.P Nagar Tatha Gram Nivesh Adhiniyam, 1973
  • Section 4(1) read with Section 17 (1) of the Old Act
  • Section 1 (3) of the New Act, the Central Government
  • Section 11 of the said Land Acquisition Act
  • LAND ACQUISITION ACT
  • SECTION 6 GENERAL CLAUSES ACT 1897
  • provisions of Section 24 of the New Act,
  • sub-section (sub-section (2) of Section 24).
  • under:14. Section 31(1) of the 1894 Act
  • SECTION 6 A GENERAL CLAUSES ACT
  • Section 31 of the Old Act.13. Para 2
  • award.8. Section 24 of the New Act
  • V (Sections 31-34) of the 1894 Act.
  • Sections 32 and 33.18.1894 Act
  • Section 114(2) of the 2013 Act,
  • Section 24(2) land acquisition
  • Section 31 of the Old Act.12.
  • Section 31(2) of the 1894 Act
  • Section 24(2) of the 2013 Act
  • Section 24 (2) of the New Act
  • Section 4 (1) of the Old Act
  • provision in Section 31(2)
  • Section 4 notification.8.
  • Order XX Rule 1 of CPC
Smart Summary

Factual and Procedural Background

This opinion addresses an application (I.A No. 109/2014) for dismissal of an appeal filed on 6.1.2014. The appeal concerned land acquisition proceedings initiated under the Land Acquisition Act, 1894 ("Old Act") and was heard partially on 22.11.2013 and finally in early December 2013, after which it was reserved for orders. The landowner filed an application seeking a re-hearing opportunity fixed for 16.5.2014. Subsequent adjournments were granted to verify whether compensation had been deposited with the Reference Court and whether possession of the land was taken. The appellant filed counter affidavits and replies through several dates culminating in the final submissions on 27.10.2014.

The dispute concerns land acquisition proceedings initiated in 1994 under the Old Act, with an award passed in 1997. The acquisition was challenged by writ petitions, resulting in setting aside the acquisition proceedings and award in 1998. Meanwhile, the Right to Fair Compensation and Transparency in Land Acquisition Rehabilitation and Resettlement Act, 2013 ("New Act") came into force on 1.1.2014, repealing the Old Act and re-enacting the law relating to land acquisition. The central issue involves whether the acquisition proceedings under the Old Act have lapsed under Section 24(2) of the New Act due to the passage of more than five years without possession or payment of compensation.

Legal Issues Presented

  1. Whether the land acquisition proceedings initiated under the Land Acquisition Act, 1894, and culminating in an award passed more than five years prior to the commencement of the 2013 Act, but without physical possession taken or compensation paid or deposited, shall be deemed to have lapsed under Section 24(2) of the Right to Fair Compensation and Transparency in Land Acquisition Rehabilitation and Resettlement Act, 2013?
  2. Whether the compensation amount deposited in the government treasury can be considered as payment of compensation under Section 31 of the Old Act for the purposes of Section 24(2) of the New Act?
  3. Whether the judgment in Arjun Singh v. Mohindra Kumar, holding that parties have no further rights after hearing is completed, applies to the present case?
  4. Whether the provisions of Section 114(2) of the 2013 Act and Section 6 of the General Clauses Act, 1897, affect the lapse of acquisition proceedings initiated under the Old Act?

Arguments of the Parties

Appellant's Arguments

  • Once the hearing is completed, parties have no further rights or privileges, and the court may deliver judgment after an interval as per Order XX Rule 1 of CPC.
  • Relied on the judgment of the Hon'ble Apex Court in Arjun Singh v. Mohindra Kumar (1984 Supp SCC 62; AIR 1984 SC 993) to argue for dismissal of the respondent's application.
  • Claimed compensation had been deposited with the Land Acquisition Officer and pointed to a status-quo order passed by the court.

Respondent No. 1's Arguments

  • The appeal was not treated as heard since the application was pending, so the cited decision in Arjun Singh is not applicable.
  • Acquisition proceedings were initiated under the Old Act with an award passed on 14.3.1997, but possession was never taken and compensation neither paid nor deposited in court as required by Section 31 of the Old Act.
  • Under Section 24(2) of the New Act, acquisition proceedings initiated under the Old Act lapse if five or more years have passed since the award without possession or payment of compensation.
  • The compensation deposited in the government treasury is not equivalent to payment or deposit in court under Section 31 of the Old Act.
  • Relied on Apex Court decisions including Pune Municipal Corporation v. Harakchand Misrimal Solanki (2014) 3 SCC 183, Union of India v. Shiv Raj (2014) 6 SCC 564, and Bharat Kumar v. State of Haryana (2014) 6 SCC 586 to support the interpretation of Section 24(2) of the New Act and the requirement of deposit/payment of compensation.
  • Argued that the provisions of Section 114(2) of the 2013 Act and Section 6 of the General Clauses Act, 1897, do not prevent the lapse of acquisition proceedings under the New Act.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Arjun Singh v. Mohindra Kumar, AIR 1964 SC 993 Parties have no further rights or privileges after hearing is completed; judgment may be delivered later under Order XX Rule 1 CPC. Held that this precedent is not applicable as the appeal was not treated as heard in the present case.
Pune Municipal Corporation v. Harakchand Misrimal Solanki, (2014) 3 SCC 183 Clarified mandatory nature of Section 31 of the 1894 Act regarding payment or deposit of compensation; interpretation of "paid" under Section 24(2) of the 2013 Act. Applied to hold that compensation is deemed "paid" only if deposited in court or offered, not merely tendered or deposited in government treasury; acquisition proceedings lapse if conditions of Section 24(2) are met.
Union of India v. Shiv Raj, (2014) 6 SCC 564 Confirmed application of Section 24(2) of the 2013 Act and clarified that period spent in litigation cannot be excluded from the five-year period. Followed to support dismissal of appeal and lapse of acquisition proceedings where conditions under Section 24(2) are satisfied.
Bharat Kumar v. State of Haryana, (2014) 6 SCC 586 Reiterated that acquisition proceedings stand quashed if possession not taken or compensation not paid/deposited within prescribed period under the 2013 Act. Used to reinforce the conclusion that the subject proceedings have lapsed under Section 24(2) of the 2013 Act.
Madras and Southern Mahratta Railway Co. Ltd. v. Bezwada Municipality, AIR 1944 PC 71 Principle that a proviso cannot exclude express terms of the main enactment by implication. Applied to reject contention that proviso in Section 24(2) of the 2013 Act could override the lapse of proceedings.
CIT v. Indo Mercantile Bank Ltd., AIR 1959 SC 713 Support for the principle regarding effect of provisos vis-à-vis main enactments. Reinforced the legal interpretation limiting the proviso's effect in the 2013 Act.
J.E.D Ezra v. Secretary of State for India, (1902-1903) 7 CWN 249 Original Act did not require observance of principles of natural justice prior to amendment incorporating Section 5-A. Referenced in context of procedural history and amendments in land acquisition law.
Balaji Nagar Residential Association v. State of Tamil Nadu, decided 10.9.2014 Clarified interpretation of proviso in Section 24(2) of the 2013 Act and emphasized benefit to land-losers. Applied to confirm that lapse under Section 24(2) occurs where possession not taken or compensation not paid, notwithstanding partial compensation to some land holdings.

Court's Reasoning and Analysis

The court analyzed the applicability of Section 24(2) of the Right to Fair Compensation and Transparency in Land Acquisition Rehabilitation and Resettlement Act, 2013 ("New Act") which deems land acquisition proceedings initiated under the Land Acquisition Act, 1894 ("Old Act") to have lapsed if an award was made five or more years before the commencement of the New Act but physical possession of the land has not been taken or compensation has not been paid.

The court examined the facts that the award was passed on 14.3.1997, more than five years before the New Act came into force on 1.1.2014, and that neither physical possession of the land was taken nor compensation was paid or deposited in court as required by Section 31 of the Old Act. The court rejected the appellant’s contention that compensation deposited in the government treasury sufficed as payment under Section 31, relying on authoritative precedents which held that only deposit in court or payment to the landowners satisfies the requirement.

The court distinguished the appellant’s reliance on Arjun Singh v. Mohindra Kumar, holding that the appeal had not been treated as heard, and thus that precedent was inapplicable. The court further interpreted the non-obstante clause in Section 24(2) to mean that the lapse provision applies notwithstanding any award under the Old Act.

The court also considered the effect of Section 114 of the 2013 Act and Section 6 of the General Clauses Act, 1897, concluding that these provisions do not prevent the legal fiction of lapse under Section 24(2) from operating once its conditions are fulfilled.

Relying on multiple Supreme Court precedents, the court affirmed that the land acquisition proceedings must be deemed lapsed because the statutory conditions for lapse were met: the award was made more than five years before the New Act commenced, possession was not taken, and compensation was neither paid nor deposited in court.

Holding and Implications

I.A No. 109/2014 is allowed and the appeal is disposed of accordingly.

The court held that the land acquisition proceedings initiated under the Land Acquisition Act, 1894, and subject to an award made more than five years prior to the commencement of the Right to Fair Compensation and Transparency in Land Acquisition Rehabilitation and Resettlement Act, 2013, have lapsed under Section 24(2) of the 2013 Act due to non-taking of possession and non-payment or non-deposit of compensation in court.

The Government is free to initiate fresh land acquisition proceedings in accordance with the provisions of the 2013 Act. No orders as to costs were made. The decision does not set a new precedent but applies settled principles to the facts of the case.

    Indore Development Authority Petitioner v. Shailendra

    1. Heard on I.A No. 109/2014, which is an application for dismissal of the appeal.

    2. This application has been filed on 6.1.2014 As per record the case was heard in part on 22.11.2013 and in the first week of December it was finally heard and reserved for orders. Thereafter, an application (I.A No. 109/2014) has been filed by the land owner to grant an opportunity to the other side fixed the case for re-hearing on 16.5.2014 On 16.5.2014, 5.8.2014, 13.8.2014 and 10.9.2014, time was granted to the appellant to verify whether the amount has been deposited with the Reference Court or not as well as the factum regarding taking possession. On 29.9.2014 again at the instant of appellant the case was adjounred for 27.10.2014 On 27.10.2014 reply of IDA and counter reply of respondent No. 1 was taken on record and 3 days time was granted to the appellant to file counter affidavit.

    3. The contention of the learned counsel for the appellant is that where the hearing is completed the parties have no further rights or privileges in the matter and it is only for the convenience of the Court that Order XX Rule 1 of CPC permits the judgment to be delivered after an interval after the hearing is completed. In support of her contention she placed reliance on a judgment of Hon'ble Apex Court in the matter of Arjun Singh v. Mohindra Kumar 1984 Supp SCC 62 : AIR 1984 SC 993 and prays for dismissal of the application filed by the respondent No. 1.

    4. Learned counsel for the respondent no. 1 has submitted that on 6.1.2014 application was filed and thereafter the appeal was listed for consideration of application and the case was not treated as heard and thus, the aforesaid decision will not applicable in the present facts and circumstances of the case.

    5. We have perused the para 19 of the aforesaid judgment.

    6. I.A No. 109/2014 has been filed on the ground that during pendency of writ appeal, the Parliament has enacted “Right to Fair Compensation and Transparency in Land Acquisition Rehabilitation and Resettlement Act, 2013” (Act No. 30 of 2013) (in short “New Act”) which has received the assent of the President of India on 27.9.2013 This new Act repeals the Land Acquisition Act, 1894 (which shall be referred hereinafter as “Old Act”) and re-enacts the law relating to land acquisition. The New Act has come into force w.e.f 1.1.2014 by the Central Government.

    7. Learned counsel for the respondent No. 1 submits that proceedings for acquisition were initiated vide notification under Section 4 (1) of the Old Act on 23.12.1994 and declaration under Section 6 of the Old Act was published on 17.3.1995 and have culminated in an award under Section 11 of the Old Act passed on 14.3.1997 by the Collector, Indore. It is further submitted that Writ Petition was filed on 31.7.1997 and was allowed on 21.1.1998 there by setting-aside the acquisition proceedings including award.

    8. Section 24 of the New Act which came into force w.e.f 1.1.2014 reads as under:—

    (24) Land acquisition process under Act No. 1 of 1894 shall be deemed to have lapsed in certain cases.-

    (1) Notwithstanding anything contained in this Act, in any case of land acquisition proceedings initiated under the Land Acquisition Act, 1894.

    (a) where no award under Section 11 of the said Land Acquisition Act has been made, then, all provisions of this Act relating to the determination of compensation shall apply; or

    (b) where an award under said section 11 has been made, then such proceedings of the said Land Acquisition Act, as if the said Act has not been repealed.

    (2) Notwithstanding anything contained in sub-section (1), in case of land acquisition proceedings initiated under the Land Acquisition Act, 1894, where an award under the said Section 11 has been made five years or more prior to the commencement of this Act but the physical possession of the land has not been taken or the compensation has not been paid the said proceedings shall be deemed to have lapsed and the appropriate Government, if it so chooses, shall initiate the proceedings of such land acquisition afresh in accordance with the provisions of Act:

    Provided that where award has been made and compensation in respect of a majority of land holdings has not been deposited in the account of the beneficiaries, then, all beneficiaries specified in the notification for acquisition under section 4 of the said Land Acquisition Act, shall be entitled to compensation in accordance with the provisions of this Act.”

    9. As per learned counsel for the respondent No. 1 the final scheme under Section 50(7) of the M.P Nagar Tatha Gram Nivesh Adhiniyam, 1973 was published on or about 14.4.1989 The notification under Section 4(1) read with Section 17 (1) of the Old Act was published on 23.12.1994 The award under Section 11 of the Old Act was passed on or about 14.3.1997 After passing of the award till the date of filing of the application neither the possession of the land in question has been taken nor any compensation has been paid to the land owners nor has been deposited in the Court in terms of Section 31 of the Old Act.

    10. In exercise of the powers under Section 1 (3) of the New Act, the Central Government has published a notification in the Gazette of India (extra-ordinary) Part-II Section 3(ii) dated 19.12.2013 pg 1 thereby appointing the date of enforcement of New Act as 1.1.2014

    11. It is submitted that by reason of provisions of Section 24 of the New Act, the respondent No. 1 filed an application for dismissal of the appeal because the appellant has not taken possession of the land in question even after expiry of the five years from the date of the award nor till today the compensation has been paid or has been deposited as per Section 31 of the Old Act.

    12. It has been contended by the learned counsel for the respondent no. 1 that in view of the non-obstante clause in subsection (2) of Section 24, notwithstanding an award passed under Section 11 of the Old Act in respect of acquisition proceedings under challenge, such proceedings cannot continue under the provisions of new Act because the award was made on 14.3.1997, ie., more than five years earlier and undisputedly, physical possession of the land has not been taken as yet. It has further been contended that proceedings have lapsed because the alleged compensation has not been actually paid to the land owner or is deposited in the court as per requirement of Section 31 of the Old Act.

    13. Para 2 to 5 of the Counter Affidavit dated 27.10.2014 are relevant which reads as under:—

    2. That, the appellant IDA framed a scheme no. 124-‘A’ and ‘B’ for constructing a Link Road which was published under Section 50(7) on 4.3.1989, considering the necessity due to increase in traffic.

    3. That, the major part of road has already been constructed but since there was a stay order in writ petition and then a status-quo order in writ appeal, the appellant was unable to take any further step regarding the land in dispute thought the land was acquired.

    4. That, the respondents have participated in award and had also challenged the award by filing a reference. The amount of award was available for the respondents.

    5. That, due to non completion of a part of road which is to be constructed on the land in dispute the very object of Scheme is not being fulfilled and thereafter problem is increasing day-by-day due to the un-constructed part of the land.

    14. In reply Smt. Chaphekar, learned counsel has submitted that compensation has been deposited with the land Acquisition officer and has drawn our attention to the status-quo order passed by this court but in the affidavit filed on 27.10.2014, it is not where stated that possession of the land in question has been taken by the State Government or by the appellant. Thus, we find merit in the contention raised by the respondent no. 1.

    15. In the case of Arjun Singh v. Mohinder Kumar, AIR 1964, SC 993, the hearing was completed and therefore, the Apex Court has held that the parties have no further rights or privileges in the matter and it is only by the convenience of the Court that order XX Rule I CPC the judgment to be delivered after an interval after a hearing is completed. The judgment of the Apex Court in the case of Arjun Singh v. Mohinder Kumar (Supra) will not be applicable in the present facts and circumstances of the case.

    16. The question raised by the respondent no. 1 is well settled by the Apex Court in the case of Pune Municipal Corporation v. Harakchand Misrimal Solanki, (2014) 3 SCC 183. Para 14 to 21 are relevant which reads as under:—

    “14. Section 31(1) of the 1894 Act enjoins upon the Collector, on making an award under Section 11, to tender payment of compensation to persons interested entitled thereto according to award. It further mandates the Collector to make payment of compensation to them unless prevented by one of the contingencies contemplated in sub-section (2). The contingencies contemplated in Section 31(2) are: (i) the persons interested entitled to compensation do not consent to receive it (ii) there is no person competent to alienate the land and (iii) there is dispute as to the title to receive compensation or as to the apportionment of it. If due to any of the contingencies contemplated in Section 31(2), the Collector is prevented from making payment of compensation to the persons interested who are entitled to compensation, then the Collector is required to deposit the compensation in the court to which reference under Section 18 may be made.

    15. Simply put, Section 31 of the 1894 Act makes provision for payment of compensation or deposit of the same in the court. This provision requires that the Collector should tender payment of compensation as awarded by him to the persons interested who are entitled to compensation. If due to happening of any contingency as contemplated in Section 31(2), the compensation has not been paid, the Collector should deposit the amount of compensation in the court to which reference can be made under Section 18.

    16. The mandatory nature of the provision in Section 31(2) with regard to deposit of the compensation in the court is further fortified by the provisions contained in Sections 32, 33 and 34. As a matter of fact, Section 33 gives power to the court, on an application by a person interested or claiming an interest in such money, to pass an order to invest the amount so deposited in such government or other approved securities and may direct the interest or other proceeds of any such investment to be accumulated and paid in such manner as it may consider proper so that the parties interested therein may have the benefit therefrom as they might have had from the land in respect whereof such money shall have been deposited or as near thereto as may be.

    17. While enacting Section 24(2), Parliament definitely had in its view Section 31 of the 1894 Act. From that one thing is clear that it did not intend to equate the word “paid” to “offered” or “tendered”. But at the same time, we do not think that by use of the word “paid”, Parliament intended receipt of compensation by the landowners/persons interested. In our view, it is not appropriate to give a literal construction to the expression “paid” used in this sub-section (sub-section (2) of Section 24). If a literal construction were to be given, then it would amount to ignoring procedure, mode and manner of deposit provided in Section 31(2) of the 1894 Act in the event of happening of any of the contingencies contemplated therein which may prevent the Collector from making actual payment of compensation. We are of the view, therefore, that for the purposes of Section 24(2), the compensation shall be regarded as “paid” if the compensation has been offered to the person interested and such compensation has been deposited in the court where reference under Section 18 can be made on happening of any of the contingencies contemplated under Section 31(2) of the 1894 Act. In other words, the compensation may be said to have been “paid” within the meaning of Section 24(2) when the Collector (or for that matter Land Acquisition Officer) has discharged his obligation and deposited the amount of compensation in court and made that amount available to the interested person to be dealt with as provided in Sections 32 and 33.18.1894 Act being an expropriatory legislation has to be strictly followed. The procedure, mode and manner for payment of compensation are prescribed in Part V (Sections 31-34) of the 1894 Act. The Collector, with regard to the payment of compensation, can only act in the manner so provided. It is settled proposition of law (classic statement of Lord Roche in Nazir Ahmad[1]) that where a power is given to do a certain thing in a certain way, the thing must be done in that way or not at all. Other methods of performance are necessarily forbidden.

    19. Now, this is admitted position that award was made on 31.01.2008 Notices were issued to the landowners to receive the compensation and since they did not receive the compensation, the amount (Rs. 27 crores) was deposited in the government treasury. Can it be said that deposit of the amount of compensation in the government treasury is equivalent to the amount of compensation paid to the landowners/persons interested? We do not think so. In a comparatively recent decision, this Court in Agnelo Santimano Fernandes [2], relying upon the earlier decision in Prem Nath Kapur [3], has held that the deposit of the amount of the compensation in the state's revenue account is of no avail and the liability of the state to pay interest subsists till the amount has not been deposited in court.

    20. From the above, it is clear that the award pertaining to the subject land has been made by the Special Land Acquisition Officer more than five years prior to the commencement of the 2013 Act. It is also admitted position that compensation so awarded has neither been paid to the landowners/persons interested nor deposited in the court. The deposit of compensation amount in the government treasury is of no avail and cannot be held to be equivalent to compensation paid to the landowners/persons interested. We have, therefore, no hesitation in holding that the subject land acquisition proceedings shall be deemed to have lapsed under Section 24(2) of the 2013 Act.

    21. The argument on behalf of the Corporation that the subject land acquisition proceedings have been concluded in all respects under the 1894 Act and that they are not affected at all in view of Section 114(2) of the 2013 Act, has no merit at all, and is noted to be rejected. Section 114(1) of the 2013 Act repeals 1894 Act. Sub-section (2) of Section 114, however, makes Section 6 of the General Clauses Act, 1897 applicable with regard to the effect of repeal but this is subject to the provisions in the 2013 Act. Under Section 24(2) land acquisition proceedings initiated under the 1894 Act, by legal fiction, are deemed to have lapsed where award has been made five years or more prior to the commencement of 2013 Act and possession of the land is not taken or compensation has not been paid. The legal fiction under Section 24(2) comes into operation as soon as conditions stated therein are satisfied. The applicability of Section 6 of the General Clauses Act being subject to Section 24(2), there is no merit in the contention of the Corporation.”

    17. Similar view is taken by the Apex Court in the case of Union of India v. Shiv Raj, (2014) 6 SCC 564.

    18. In the case of Bharat Kumar v. State of Haryana, (2014) 6 SCC 586, the Apex Court has taken similar view in para 6 to 10 which reads as under:—

    “6. In view of the majority opinion, as is evident from the order dated 11.5.2007, the proceedings in such an eventuality stood quashed by the impugned judgment and order. Hence, these appeals.

    7. Shri. P.P Malhotra, learned Additional Solicitor General, Ms. Geeta Luthra and Shri. Sanjay Poddar, learned Senior Counsel, have addressed a large number of legal and factual issues and also submitted that the judgment and order of the High Court are not sustainable in the eyes of law. Therefore, the question quashing the land acquisition proceedings in such circumstances did not arise. More so, the commencement of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (hereinafter referred to as the Act 2013) would not take away the proceedings initiated under the Act 1894 by operation of law as provided under Section 24 of the Act 2013. In the instant case, in case, the appeals succeed on the main ground as to whether the successor officer could submit the report on 5A objections there could be no prohibition for the appellants to proceed with the land acquisition proceedings initiated in 1980. The objections raised were vague and had been in respect of limitation and were not specific in nature. None of the writ petitioners had raised the issue about violation of principles of natural justice in the writ petitions, though some of them amended their writ petitions but at a subsequent stage. Some of the writ petitions had been filed by persons who came into possession of the land subsequent to Section 4 notification.

    8. On the contrary, Shri. Mukul Rohatgi, Shri. Shyam Diwan and Shri. Vinay Bhasin, learned senior counsel appearing on behalf of the respondents, have vehemently opposed the appeals contending that in view of the fact that the acquisition proceedings stood quashed finally by the impugned judgment dated 11.5.2007 and a period of 7 years has lapsed and the possession is still with the tenure holders. In view of the Act 2013 coming into force, the proceedings have lapsed by virtue of the provisions contained in Section 24 of the said Act. The issues raised herein on behalf of the Union of India had not been raised before the High Court. Amendments were allowed by the High Court in a very large number of writ petitions about violation of principles of natural justice i.e the objections under Section 5-A were not disposed of in accordance with law.

    9. We have considered the rival submissions made by the learned counsel for the parties and perused the record.

    10. Section 5-A of the Act 1894 was not there in the original statute. In J.E.D Ezra v. Secy. of State for India (1902-1903) 7 CWN 249, the Calcutta High Court expressed its inability to grant relief to the owner of the property whose land was sought to be acquired without giving any opportunity of hearing observing that there was no provision in the Act requiring observance of the principles of natural justice. It was subsequent to the said judgment that the Act was amended incorporating Section 5-A w.e.f 1.1.1924 The Statement of Objects and Reasons for the said amendment provided that the original Act did not oblige the Government to enquire into and consider any objection of the persons interested nor the Act provided for right of hearing to the person whose interest stands adversely affected.”

    19. Recently, the Apex Court in the case of Shri. Balaji Nagar Residential Association v. State of T.N decided on 10.9.2014 has held thus:—

    11. It was faintly suggested by Mr. Subramonium Prasad, learned AAG for the State of Tamil Nadu that the proviso may come to the rescue of the State and save the proceedings from suffering lapse if it is held that since there was an award leading to payment of compensation in respect of some of the land holdings only, therefore all the beneficiaries may now be entitled to compensation in accordance with the provisions of the 2013 Act. This contention could have been considered with some more seriousness if physical possession of the land had been taken but since that has not been done, the proviso dealing only with compensation cannot be of any help to the State. Therefore, we are not required to go deeper into the effect and implications of the proviso which prima facie appears to be for the benefit of all the land holders in a case where the award is subsisting because the proceedings have not lapsed and compensation in respect of majority of land holdings has not been deposited in the account of the beneficiaries. There is nothing in the language of the proviso to restrict the meaning of the words used in Section 24(2) mandating that the proceedings shall be deemed to have lapsed if the award is five years or more than five years old but the physical possession of the land has not been taken over or the compensation has not been paid. The law is trite that when the main enactment is clear and unambiguous, a proviso can have no effect so as to exclude from the main enactment by implication what clearly falls within its express terms, as held by Privy Council in the case of Madras and Southern Mahratta Railway Co. Ltd. v. Bezwada Municipality AIR 1944 PC 71 and by this Court in the case of CIT v. Indo Mercantile Bank Ltd. AIR 1959 SC 713.

    12. The judgment of three Judges' Bench in the case of Harakchand Misirimal (supra) has been followed by another Bench of three Judges in the case of Union of India v. Shivraj (2014) 6 SCC 564. In paragraphs 25 and 26 of that judgment, this Court took notice of a clarification issued by the Government of India, Ministry of Urban Development, Delhi Division dated 14.03.2014 Part of the circular extracted in that case clearly shows that the period of five years or more in Section 24(2) of the 2013 Act has been prescribed with a view to benefit the land-losers and the period spent in litigation due to challenge to the award or the land acquisition proceedings cannot be excluded.

    13. From the discussions made above, it is amply clear that though there is lack of clarity on the issue whether compensation has been paid for majority of land holdings under acquisition or not, there is no dispute that physical possession of the lands belonging to the appellants under consideration in these appeals has not been taken by the State or any other authority on its behalf and more than five years have elapsed since the making of the award dated 30.11.2006 and 01.01.2014 when the 2013 Act came into force. Therefore, the conditions mentioned in Section 24(2) of the 2013 Act are satisfied for allowing the plea of the appellants that the land acquisition proceedings must be deemed to have lapsed in terms of Section 24(2) of the 2013 Act. The appeals are disposed of accordingly. It goes without saying that the Government of Tamil Nadu shall be free, if it so chooses to initiate proceedings of such land acquisition afresh in accordance with the provisions of 2013 Act. In the facts and circumstances of the case there shall be no order as to costs.

    20. In the case in hand, there is no dispute that the physical possession of the lands belonging to the respondent No. 1 has not been taken by the State or any other authority on its behalf and more than 5 years have elapsed since the making of the award dated 14.3.1997 and on 1.1.2014 when the new Act came into force. It is also not in dispute that after passing of the award till today no compensation has been paid to the land owners nor has been deposited in the court in terms of Section 31 of the Old Act. Therefore, the conditions mentioned in Section 24 (2) of the New Act are satisfied for allowing the plea of the respondent No. 1 that the land acquisition proceedings must be deemed to have lapsed in terms of Section 24(2) of the New Act.

    21. For the above reasons, I.A No. 109/2014 is allowed. The appeal is disposed of accordingly. It goes without saying that the Government of M.P shall be free, if it so chooses to initiate proceedings for such land acquisition a-fresh in accordance with the provisions of New Act. In the facts and circumstances of the case there shall be no orders as to costs.

    Use AI to get other relevant cases.

    Comments

    Indore Development Authority Petitioner v. Shailendra
    (Nov 3, 2014)