AMICUS AI
Citation Codes
Equivalent Citations
citation codes
Case Number
Disposition
Attorney(S)
Judges
Acts
  • Article 3
  • Article 1Definitions
  • Article 4
  • Article 2Licences, permits & conditions precedent
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Equivalent Citations
citation codes
Case Number
Disposition
Attorney(S)
Judges
Acts
  • Article 3
  • Article 1Definitions
  • Article 4
  • Article 2Licences, permits & conditions precedent
Smart Summary

Factual and Procedural Background

The appellant (Gujarat Urja Vikas Nigam Ltd. – “GUVNL”) and the first respondent executed a Power Purchase Agreement (PPA) dated 31-5-2010 for a 15 MW solar photovoltaic project with a Scheduled Commercial Operation Date (COD) of 29-5-2011. A Supplemental PPA dated 24-3-2011 changed the project site and expressly provided that non-availability of the transmission system would not excuse delay or liquidated-damage liability.

When the project was not commissioned on the scheduled COD, GUVNL invoked Article 4.3 of the PPA to claim liquidated damages (LD). The Gujarat Electricity Regulatory Commission limited LD liability to the period 29-5-2011 to 30-9-2011, reasoning that the State transmission utility (GETCO) had delayed construction of the evacuation line. The Appellate Tribunal for Electricity affirmed that ruling (2013 SCC OnLine APTEL 131). GUVNL filed the present civil appeals challenging the curtailed period of liability.

Legal Issues Presented

  1. Whether the period for which the first respondent is liable to pay liquidated damages should be confined to 29-5-2011 to 30-9-2011, as held by the Commission and the Appellate Tribunal, or extended further.
  2. Whether regulatory bodies could depart from the express terms of the PPA and Supplemental PPA in determining LD liability.

Arguments of the Parties

Appellant’s Arguments (GUVNL)

  • The LD period should extend until 13-3-2012, the actual date of commissioning certified by Gujarat Energy Development Agency (GEDA).
  • Clause 2.3 of the Supplemental PPA obliges the respondent to pay LD even where transmission lines are unavailable.

First Respondent’s Arguments

  • The delay beyond 30-9-2011 was attributable to GETCO’s failure to provide the 66 kV transmission line within four months, and therefore LD should not run beyond that date.
  • The Supplemental PPA clause was allegedly accepted under compulsion and should not govern in the factual circumstances.

Table of Precedents Cited

No precedents were cited in the provided opinion.

Court's Reasoning and Analysis

The Court began by emphasizing that the parties are bound by the contractual text of both the original PPA and the Supplemental PPA. It held that the Commission and the Appellate Tribunal erred in “travelling beyond” these documents when they limited LD liability to 30-9-2011.

Key contractual provisions reviewed:

  • Article 1 definitions fixing Scheduled COD at 29-5-2011.
  • Article 4.3 imposing LD for delay at specified daily rates up to one year.
  • Supplemental PPA clause 2.3, explicitly preserving LD liability even if the evacuation system was unavailable by Scheduled COD.

Documentary evidence considered:

  • A certificate dated 31-12-2011 from the Chief Electrical Inspector granting permission to energise the respondent’s switchyard, confirming readiness of the plant-side installations.
  • GEDA’s commissioning certificate stating that the plant was “ready for generation on 31-12-2011 but for the 66 kV transmission line,” with formal commissioning occurring on 13-3-2012.

From these documents, the Court inferred that the respondent had completed all obligations within its control by 31-12-2011; delay thereafter was due solely to GETCO’s transmission-line completion. Balancing contractual strictness with equitable considerations, the Court concluded that LD should run from 29-5-2011 to 31-12-2011.

Holding and Implications

Appeals Allowed; Order of the Appellate Tribunal Modified. The first respondent is liable to pay liquidated damages for the period 29-5-2011 to 31-12-2011. The parties must make the necessary financial adjustments forthwith.

Implications: The decision directly alters the quantum of LD payable between the parties but sets no new legal precedent beyond reinforcing that regulatory bodies must honor the explicit terms of a PPA unless compelling reasons dictate otherwise.

    Gujarat Urja Vikas Nigam Limited v. Acme Solar Technologies (Gujarat) Private Limited And Others

    Order

    1. The liability of the first respondent to pay liquidated damages under the PPA by and between the appellant and the first respondent has been determined Petition No. 1235 of 2012 2013 SCC OnLine APTEL 131 by the Gujarat Electricity Regulatory Commission, Ahmedabad (hereinafter referred to as “the State Commission”) and the Appellate Tribunal for Electricity (hereinafter referred to as “the Appellate Tribunal”) to be from 29-5-2011 (scheduled commercial operation date) to 30-9-2011. Aggrieved, the present appeals have been filed.

    2. The above recital would sufficiently indicate that the liability of the first respondent to pay liquidated damages is not in dispute. The only question is one of the period of time during which this liability would run. The appellant contends that the said liability should be up to 13-3-2012 which is the date certified by Gujarat Energy Development Agency (“GEDA”, for short) to be the date of actual commissioning of the solar/power plant set up by the first respondent.

    3. To effectively answer the question which has arisen, as identified above, it will be necessary to notice a few provisions of the power purchase agreement (for short “PPA”) dated 31-5-2010 executed by and between the parties. The relevant clauses thereof which are self-explanatory may thus be extracted below:

    “Article 1
    Definitions
    “Commercial operation date” with respect to the project shall mean the date on which the solar photovoltaic grid interactive power plant is available for commercial operation (certified by GEDA) and such date as specified in a written notice given at least ten days in advance by the power producer to Guvnl.
    ***
    “Scheduled COD” or “Scheduled Commercial Operation Date” means 29-5-2011.
    ***
    Article 2
    Licences, permits & conditions precedent
    2.1***
    2.3 Power producer will be allowed to migrate to Government of India's Jawaharlal Nehru National Solar Mission (Jnnsm). However, if the Government of India/its agency(ies) do not allow the migration to its Jawaharlal Nehru National Solar Mission, power producer shall have to ensure commencement of supply of power on scheduled commercial operation date (COD) as per the terms and conditions of this agreement. In case power producer fails to commence the supply of power on scheduled COD, it shall be liable to pay to Guvnl liquidated damages as per Article 4.
    Article 3
    Construction and operation
    ***
    4.1 Obligations of the power producer:
    (i) The power producer shall obtain all statutory approvals, clearances and permits necessary for the project at his cost in addition to these approvals as listed in Schedule 3.
    (ii) The power producer shall construct, operate and maintain the project during the term of PPA at his cost and risk including the interconnection facilities.
    (iii) The power producer shall sell all available capacity from identified solar photovoltaic grid interactive power plants to the extent of contracted capacity on first priority basis to Guvnl and not to sell to any third party.
    (iv) The power producer shall seek approval of Getco in respect of interconnection facilities.
    (v) The power producer shall approach Getco for laying transmission line from its switchyard to nearest sub-station of Getco. Further, power producer shall ensure the injection of power at not lower than 66 kV level. Power producer shall also install RTUs to enable SLDC to monitor the injection of power.
    (vi) The power producer shall undertake at its own cost maintenance of the interconnection facilities as per the specifications and requirements of Getco, as notified to the power producer, in accordance with prudent utility practices.
    (vii) The power producer shall operate and maintain the Project in accordance with prudent utility practices. Further, power producer shall submit forecast for availability of power to SLDC as per Regulation of Hon'ble GERC/CERC.
    (viii) The power producer shall be responsible for all payments on account of any taxes, cesses, duties or levies imposed by the GoG or its competent statutory authority on the land, equipment, material or works of the Project or on the electricity generated or consumed by the Project or by itself or on the income or assets owned by it.
    (ix) To procure start-up power required for the plant from respective Discom.
    (x) Power producer shall continue to hold at least 51% of equity from the date of signing of this agreement up to a period of 2 years after achieving commercial operation date of project and 26% of equity for a period of 3 years thereafter.
    (xi) Fulfilling all other obligations undertaken by him under this agreement.
    (xii) The power producer shall ensure that no fossil fuel viz. coal, gas, lignite, naphtha, wood, etc. shall be used except during barring gear operation.
    ***
    4.3 Liquidated damages for delay in commissioning the Project/solar photovoltaic grid interactive power plant beyond scheduled commercial operation date.
    If the payment is not commissioned by its scheduled commercial operation date other than the reasons mentioned below, the power producer shall pay to the Guvnl liquidated damages for delay @ Rs 10,000 per day per mW for delay of first 60 days and Rs 15,000 per day per mW thereafter. Liquidated damage is payable up to delay period of 1 year from scheduled commercial operation date. If the power producer fails to make payment of the liquidated damages for a period exceeding 30 days, Guvnl shall be entitled to invoke the bank guarantee to recover the liquidated damages amount. In case of delay of more than 1 year, Guvnl assumes no obligation and has right to terminate the power purchase agreement by giving 1 month termination notice:
    1. The project cannot be commissioned by scheduled commercial operation date because of force majeure event: or
    2. The power producer is prevented from performing its obligations because of material default on part of Guvnl.
    3. Power producer is unable to achieve commercial operation on scheduled commercial operation date because of delay in transmission facilities/evacuation system for reasons solely attributable to Getco.
    ***
    Schedule 3
    Approvals
    1. Consent from Getco for the evacuation scheme for evacuation of the power generated by the 15 mW solar photovoltaic grid interactive power projects.
    2. Approval of the Electrical Inspectorate, Government of Gujarat for commissioning of the transmission line and the solar photovoltaic grid interactive power converters installed at the project site.
    3. Certificate of commissioning of the solar photovoltaic grid interactive power project issued by GEDA.
    4. Permission from all other statutory and non-statutory bodies required for the project.
    5. Clearance from the Airport Authority of India, if required.
    6. Clearance from the Department of Forests, Ecology and Environment, if required.”

    4. It will also be necessary to note, at this stage, another fact which would have relevance to the issue in controversy. Respondent 1 despite signing the PPA dated 31-5-2010 entered into a supplemental power purchase agreement (“supplemental PPA”, for short) dated 24-3-2011 with regard to change of the site. Clause 2.3 of the supplemental PPA dated 24-3-2011, which is relevant, is extracted below:

    “2.3 As per the PPA dated 31-5-2010, scheduled commercial operation date of Solar Power Project is 29-5-2011. Since M/s Astgpl has changed the location of the Solar Power Project after lapse of significant time, non-availability of transmission system shall not be considered as a ground for non-levy of liquidated damages. M/s Astgpl shall pay liquidated damages even in case of non-availability of transmission system for evacuation of power by scheduled commercial operation date.”

    Therefore, in terms of the supplemental PPA dated 24-3-2011 the first respondent had agreed to pay liquidated damages “even in case of non-availability of transmission system for evacuation of power by scheduled commercial operation date”.

    5. A reading of the impugned judgment of the State Commission and the Appellate Tribunal would seem to indicate that based on certain letters by the first respondent a finding was recorded that Gujarat Energy Transmission Corporation Ltd. (“Getco”, for short) which was responsible for providing transmission lines at the new site had failed to do so within four months of the award of the work of construction under the supplemental PPA dated 24-3-2011 (June 2011) and, therefore, the liability of the respondent to pay the liquidated damages should be limited to 30-9-2011.

    6. Insofar as Clause 2.3 of the supplemental PPA dated 24-3-2011 is concerned, the findings of the forums below appear to be that in the circumstances of the case, the first respondent had no option but to sign the supplemental PPA containing the aforesaid clause. Accordingly, the impugned findings with regard to the extent of liability have been arrived at.

    7. We have taken note of the elaborate arguments advanced on behalf of the rival parties. When the parties were bound by the terms and conditions of the PPA dated 31-5-2010 and supplemental PPA dated 24-3-2011 we do not think that it was proper on the part of either the State Commission or the Appellate Tribunal to travel beyond the said terms and conditions to determine the liability of the first respondent to pay liquidated damages or the period thereof. However, in this regard, we have taken note of the communication/certificate issued by the Office of the Chief Electrical Inspector dated 31-12-2011 (a mandatory requirement under Clause 3 Schedule 2 extracted above) to the first respondent which goes on to recite that upon inspection of the electrical installation and associated equipments at switchyard of the first respondent at the new site, permission is granted to energise the above electrical installations along with associated equipments. This would indicate that the switchyard of the first respondent was ready for being energised on 31-12-2011.

    8. Regard must also be had to the certificate of commissioning issued by GEDA which is another mandatory requirement in terms of the terms and conditions of PPA dated 31-5-2010. In the said certificate, though the date of commissioning is mentioned as 13-3-2012, it has also been certified that the plant was ready for generation on 31-12-2011 but for the 66 kV transmission line. Reading the aforesaid two certificates/communications issued by the office of the Chief Electrical Inspector and GEDA it will be abundantly clear that the switchyard and the electrical installations required to be set up by Respondent 1 were ready for commissioning on 31-12-2011 though the actual commissioning thereof had to await the completion of the transmission lines which was made available by Getco and accordingly were charged on 13-3-2012.

    9. Having regard to the totality of the aforesaid facts we are of the view that in the facts of the present case (notwithstanding Clause 2.3 of the supplemental PPA dated 24-3-2011) it would be just and proper to hold that Respondent 1 is liable to pay liquidated damages to the appellant from 29-5-2011 to 31-12-2011. The order of the Appellate Tribunal upholding the order of the State Commission, accordingly, stands modified in terms of the present order. Necessary adjustment between the parties will be carried out forthwith.

    10. The appeals are allowed in the above terms and to the extent indicated.