  • S. 4 of the Tamil Nadu Buildings (Lease and Rent Control) Act 1960, as amended by Act 23 of 1973, hereinafter referred
  • S. 4 of the Rent Control Act,
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Equivalent Citations
citation codes
Case Number
Attorney(S)
Judges
Acts
  • S. 4 of the Tamil Nadu Buildings (Lease and Rent Control) Act 1960, as amended by Act 23 of 1973, hereinafter referred
  • S. 4 of the Rent Control Act,
Smart Summary

Concise Analytical Summary of the Opinion

Factual and Procedural Background

These revisions arise from an application filed by the petitioner in Civil Revision Petition No. 4845 of 1987 (the "landlady") for fixation of fair rent under S. 4 of the Tamil Nadu Buildings (Lease and Rent Control) Act, 1960 (as amended by Act 23 of 1973) (the Act).

The parties had agreed rent of Rs. 225 per mensem. The landlady sought fair rent of Rs. 750 per mensem; the tenant opposed. The Rent Controller fixed the rent at Rs. 396 per mensem. On appeal by both parties the appellate authority fixed the rent at Rs. 514 per mensem. Both the landlady and the tenant filed revisions before the court below because each was aggrieved by the appellate decision.

The subject property is non-residential, situated in Triplicane High Road (Quaid-e-millath Salai), with an extent of 702 sq. ft. The landlady disputed four principal findings made by the authorities below: (1) value of the land, (2) age of the building, (3) value of amenities, and (4) cost of construction. The court addressed each issue in turn and issued directions for calculation of the fair rent.

Legal Issues Presented

  1. What is the correct market value of the land (per ground) for the purpose of fixing fair rent?
  2. What is the appropriate age of the building to be adopted in the fair rent calculation?
  3. What percentage value should be allowed for amenities?
  4. What rate per square foot should be adopted as the cost of construction for computing fair rent (including whether Public Works Department or Mini Technical Hand Book rates are applicable)?
  5. Whether the fair rent should be apportioned among three floors as contended by the tenant or on the basis of two floors as claimed in the petition?

Arguments of the Parties

Landlady's Arguments

  • The market rate of land in the area is Rs. 2,40,000 per ground and the authorities ought to have fixed that rate. She produced Ex. P3 (sale deed of an adjacent property dated 26.12.1981) and an engineer's statement (Ex. P4) analysing Ex. P3.
  • The landlady's engineer estimated the cost of construction at Rs. 70 per sq. ft.
  • The landlady sought an amenities allowance of 22 1/2%.
  • Learned counsel relied on the Mini Technical Hand Book (issued by the Association of Engineers and Assistant Engineers of the Tamil Nadu Public Works Department) arguing that Public Works Department rates are a relevant factor under S. 4 of the Rent Control Act and that the court may adopt such rates (invoking I.A Emberumanar v. K. Ragliavan and related authority).

Tenant's Arguments

  • The tenant opposed the landlady's valuation evidence; the tenant filed no documentary evidence of land value but led oral evidence through an engineer (R.W.2).
  • The tenant's engineer estimated the age of the building at 80 years and gave evidence that in 1982–1983 the cost of construction was between Rs. 86 and 90 per sq. ft., and that this was not the P.W.D. rate (denying a suggested actual cost of Rs. 130 per sq. ft.).
  • The tenant asserted (in evidence for the first time) that there were three floors in the building and that fair rent should be apportioned among three floors; however, there was no plea in the counter-statement to that effect and the landlady denied the assertion.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
I.A. Emberumanar v. K. Ragliavan (1987-T.N.L.J. 307 = 1988-1-L.W. 568) Held that under S. 4 of the Rent Control Act the rate fixed by the Public Works Department (as reflected in the Mini Technical Hand Book) is a relevant factor and may be adopted in fixing fair rent. The court considered this authority in accepting that the Mini Technical Hand Book is a legitimate source for guidance on construction cost and relied on it when assessing cost per sq. ft., though the court applied evidence adduced in the present case to fix the precise rate.
The Collector of Madras, Accommodation Wing, Madras v. A.N. Gajendran (1988-2-L.W. 49) Reference to the Mini Technical Hand Book issued by the Public Works Department (reinforcing use of P.W.D. guidance). The court cited this authority as further support for consulting the Mini Technical Hand Book in assessing construction cost.
Dovo Tax Company v. T.R. Ramnath (1988-II-M.L.J. 297) Principle that fair rent is fixed for the building and the Rent Controller is free to fix fair rent in accordance with law, not constrained by parties' contentions. The court relied on this principle to justify that it is not bound by the rates or figures offered by the parties exclusively and may fix fair rent based on evidence and law.
N. Krishnaswamy Mudaliar v. Controller and Authorised Officer (1988-II-M.L.J. 384 = (1986) 99 L.W. 705) Affirmation that fair rent is for the building and references Supreme Court authority explaining that fair rent is an attribute of the building (i.e., payable by whoever is tenant). The court used this authority to reinforce that fair rent is to be fixed for the building itself and the court is not constrained solely by the parties' suggested figures.
Raval & Company v. K.C. Ramachandra and others (A.I.R. 1974 S.C. 818) Supreme Court passage stating that fair rent is fixed for the building and is an incident of the tenure regarding the building. The court quoted and relied on the passage (as extracted in N. Krishnaswamy Mudaliar) to support the proposition that fair rent is to be fixed for the building as such.

Court's Reasoning and Analysis

The court approached each contested component of the fair-rent calculation in sequence, applying evidentiary assessment and precedent cited in the record.

Value of Land

- The Rent Controller had fixed the rate at Rs. 1,20,000 per ground; the Appellate Authority fixed it at Rs. 2,00,000 per ground. The landlady produced Ex. P3 (a sale deed) which referenced an annual value of Rs. 5,460 for an extent of 405 sq. ft.; the Rent Controller multiplied that annual value by 20 to arrive at about Rs. 1,00,000. The landlady's engineer analysed Ex. P3 (Ex. P4) and computed a per-ground value of Rs. 2,86,000, while the landlady's adopted figure for the petition property was Rs. 2,40,000 per ground.

- The Appellate Authority's choice of Rs. 2,00,000 per ground was not supported by disclosed reasoning in the record. Given that Ex. P3 and the landlady's engineer's analysis were the only reliable documentary evidence, the court accepted the landlady's contention and fixed the land value at Rs. 2,40,000 per ground.

Age of the Building

- Competing estimates: landlady's engineer 40 years; tenant's engineer 80 years; courts below adopted 60 years. The court found no acceptable evidence to show the lower courts erred and therefore declined to interfere, adopting an age of 60 years as done below.

Amenities

- The landlady claimed 22.5% for amenities; courts below allowed 20%. On review, the court found no error in the courts below' conclusion and did not accept the higher figure; the 20% allowance for amenities was retained.

Cost of Construction

- The landlady's engineer assessed Rs. 70 per sq. ft.; the tenant's engineer said Rs. 60 per sq. ft.; courts below had adopted Rs. 50 per sq. ft. The landlady's counsel relied on the Mini Technical Hand Book (Public Works Department guidance) and authorities (including I.A. Emberumanar) to argue for adoption of a P.W.D.-linked figure (the Hand Book showing Rs. 90 per sq. ft. for the relevant year).

- The tenant's engineer (R.W.2) gave evidence that in 1982–1983 actual costs were between Rs. 86 and 90 per sq. ft. (and that this was not the P.W.D. rate). Balancing the Mini Technical Hand Book information and the witness evidence, the court fixed the cost of construction at Rs. 85 per sq. ft.

Number of Floors / Apportionment

- The tenant asserted there were three floors and sought apportionment accordingly. The court noted there was no plea in the tenant's counter-statement asserting three floors; the petition expressly stated the building comprised two floors (ground and first). The tenant raised the three-floor contention for the first time in evidence and the landlady denied it. The court rejected the tenant's late assertion and proceeded on the footing that the building comprises two floors.

Directions and Disposition

- The court directed the parties to file a memo of calculation adopting: land value Rs. 2,40,000 per ground; cost of construction Rs. 85 per sq. ft.; age adopted 60 years; amenities at 20%; building to be treated as two floors. The memo was to show the actual fair rent per mensem and be filed on or before 9th March 1994.

- The court allowed Civil Revision Petition No. 4846 of 1987 "to the extent indicated above" and dismissed Civil Revision Petition No. 1234 of 1989; each party to bear its respective costs.

Subsequent Mention and Final Fixation

- On subsequent mention, the petitioner filed the memo of calculation as directed; the respondent did not file a memo or any objection. The memo worked out the fair rent at Rs. 707 per month. The court fixed Rs. 707 per month as the fair rent for the petition premises with effect from "10.9.1082" (as recorded in the order). The record includes the notation "RR/KA/VCS".

Holding and Implications

Core Ruling:

  • Land value: Fixed at Rs. 2,40,000 per ground.
  • Age of building: Adopted as 60 years.
  • Amenities: Allowed at 20%.
  • Cost of construction: Fixed at Rs. 85 per sq. ft.
  • Number of floors: Building treated as comprising two floors (ground and first) for apportionment purposes.
  • Disposition of petitions: Civil Revision Petition No. 4846 of 1987 allowed to the extent indicated; Civil Revision Petition No. 1234 of 1989 dismissed; parties to bear their respective costs.
  • Final fair rent: Rs. 707 per month fixed as fair rent for the premises, with effect stated as from 10.9.1082 in the order.

Implications: The immediate consequence is that the components used to calculate fair rent were altered (land value and cost of construction increased from some earlier findings), and a monthly fair rent of Rs. 707 was fixed in the proceedings. The opinion applied existing authorities endorsing the relevance of P.W.D./Mini Technical Hand Book guidance and the principle that fair rent is for the building (not strictly the figures advocated by either party), but the court did not purport to create a new binding precedent beyond its application to the facts of this case.

Note: All statements in this summary are taken directly from and confined to the information contained in the provided opinion. No outside facts or inferences not supported by the text have been added.

    S.A.S Rahmath Nisha Begum v. S. Vijayakumar.

    These two revisions arise out of an application filed by the petitioner in CRP. No. 4845 of 1987, who is referred to herein as, “landlady” for fixation of their rent, under S. 4 of the Tamil Nadu Buildings (Lease and Rent Control) Act 1960, as amended by Act 23 of 1973, hereinafter referred to as the Act.

    2. The agreed rent was Rs. 225/- per mensem. The landlady claimed a sum of Rs. 750/- as fair rent and filed a petition. The tenant opposed the same. The Rent Controller fixed the rent at Rs. 396/- per mensem. On appeal by both parties, the rent was increased to Rs. 514/- per mensem by the appellate authority. These two revisions before me are filed by the landlady and the tenant, as both are aggrieved.

    3. The property is situate in Triplicane High Road, now known as Quaid-e-millath Salai. It is a non-residential building of an extent of 702 sq. ft. The landlady disputes the findings of the authorities below, on four matters: (1) value of the land (2) age of the building (3) value of amenities and (4) cost of construction. I will deal with them, one by one.

    4. Regarding the value of the land, the claim of the landlady is that the market rate of lands in the area is Rs. 2,40,000/- per ground and the authorities should have fixed at that rate. She produced Ex. P3, sale deed of an adjacent property, dated 26.12.1981 The property dealt with in that sale deed comprises of a building and land. The Rent Controller fixed the value of the land at the rate of Rs. 1,20,000/- per ground whereas the Appellate Authority fixed the value of the land at the rate of Rs. 2,00,000/- per ground. The tenant has not filed any documentary evidence. The landlady examined one engineer on her side as P.W 1 whereas the tenant also examined an engineer as R.W 2. The Rent Controller referred to Ex. P3 wherein the annual value mentioned is Rs. 5,460/-. He has multiplied it by 20 times, and held that the value comes to about Rs. 1,00,000/- He has also referred to the evidence of P.W 1 and observed that the said witness had admitted the value of the land and building at Rs. 1,00,000/- and above. The Rent Controller however overlooked that the annual value mentioned in Ex. P3. is only with reference to the extent of land as set out in that document, viz., 405 sq. ft. It for an extent of 405 sq. ft., the annual rental value is Rs. 5,460/-, it is argued by learned counsel for the landlady then, for an extent of 702 sq. ft., the value must be much more than Rs. 1,20,000/- as fixed by the Rent Controller. No doubt, there is considerable force in the argument. But the Appellate Authority has fixed the value of the land at the rate of Rs. 2,00,000/- per ground. The Appellate Authority has referred to Ex. P4, a statement prepared by the landlady's engineer, analysing the value of the land and building in Ex. P3. As per that statement, the value of the land per ground works out to Rs. 2,86,000/-. But the value adopted by the engineer for the petition property is only Rs. 2,40,000/- per ground. The Appellate Authority has proceeded to observe that the Rent Controller was in error in fixing the value at Rs. 1,20,000/- per ground, but arbitrarily fixed at Rs. 2,00,000/- per ground. The basis for fixing at Rs. 2,00000/- without accepting either the value adopted by the landlady or the value evident from Ex. P3, is not disclosed. In the circumstances, the contention of learned counsel for the landlady that the value of the land should have been fixed at the rate of Rs. 2,40,000/- per ground, is well-founded. In so far as the evidence adduced in this case is concerned, the only reliable evidence is the document under Ex. P3 and as analysed by the landlady's Engineer, the rate is Rs. 2,86,000/- per ground. In the circumstances, I accept the contention of the landlady and fix the value of the petition land at the rate of Rs. 2,40,000/- per ground.

    5. With reference to the age of the building, the landlady's engineer has estimated the age or the building at 40 years whereas the tenant's engineer has estimated the age of the building as 80 years. The authorities below have adopted the figure 60 for the age of the building. Nothing has been placed before me to show how the conclusion of the authorities below, is erroneous. In the absence of any acceptable evidence, I am not in a position to interfere with the findings given by the courts below. Hence, the age of the building, is to be adopted as 60 years, as done in the courts below.

    6. As regards the amenities, the landlady claimed 22.1/2%, but the courts below have granted only 20%. A perusal of the order shows that there is no error in the order of the court below. I do not accept the contention of the landlady's counsel that it ought to have fixed at 22 1/2% and not 20%. There is no material before me to interfere with the conclusion of the court below on this ground.

    7. The cost of construction has been worked out at Rs. 70/- per sq. ft., by the landlady's engineer whereas the tenant's engineer has worked out at Rs. 60/- per square feet. The courts have adopted Rs. 50/- per sq. ft. It is vehemently argued by learned counsel for the landlady that it is settled law that cost of construction should be worked out on the basis of Public Works Department's rates. He has produced before me the Mini Technical Hand Book, issued by Association of Engineers and Assistant Engineers of the Tamilnadu, Public Works Department. According to the above Mini Hand Book, the rate in the relevant year, is Rs. 90/- per sq. ft. Learned counsel invites my attention to the judgment of this (Court in I.A Emberumanar v. K. Ragliavan (1987-T.N.L.J 307 = 1988-1-L.W. 568). Chief Justice Chandurkar has held that under S. 4 of the Rent Control Act, when fair rent was sought to be fixed, the contemplation of the Act is that the rate fixed by the Public Works Department, as the cost of construction, is relevant factor. The learned Chief Justice referred to the Mini Technical Hand Book issued by the Association of Engineers and Assistant Engineers Association of the Tamil Nadu Public Works Department for guidance and held that the rate fixed therein could be adopted for the purpose of fixing the fair rent.

    8. In The Collector of Madras, Accommodation Wing, Madras v. A.N Gajendran, (1988-2-L.W. 49), the same learned Judge has once again referred to the said Mini Hand Book, issued by the Public Works Department.

    9. Learned counsel for the landlady contends that though the value adopted by the landlady's engineer in arriving at the fair rent for the purpose of of cot of construction was fixed at Rs. 70/- per sq. ft., nothing prevents this Court from fixing at Rs. 90/- per sq. ft., as evident from the Mini Technical Hand Book. Learned counsel submits that fair rent is for the building and the court is not bound by the statements of parties. Reliance is placed on Dovo Tax Company v. T.R. Ramnath (1988-II-M.L.J 297) and N. Krishnaswamy Mudaliar v. Controller and Authorised Officer (1988-II-M.L.J 384 = (1986)99 L.W 705). In the former case, the fair rent claimed by the party was Rs. 1,250/- per mensem. The court found that the fair rent for the building, will be Rs. 1,510/- per mensem and on that basis fixed the fair rent. The court said:

    “The fair rent is fixed for the building in question in accordance with the provisions of the Act. It is not fair rent for the landlord or for the tenant, but for the building, and as such, the Rent Controller is free to fix the fair rent as per law untrammelled by the contentions of the parties.”

    In the latter case, while referring to the judgment of the Supreme Court in Raval & Company v. K.C Ramachandra and others (A.I.R 1974 S.C 818), a passage therefrom is extracted and the following portion in the said passage as underlined by the learned Judge, is as follows:—

    “A close reading of the Act shows that the fair rent is fixed for the building and it is payable by whoever is the tenant, whether a contractual tenant or statutory tenant. What is fixed is not the fair rent payable by the tenant or to the landlord who applies for fixation of fair rent, but fair rent for the building, something like an incident of the tenure regarding the building.”

    10. Based on the said reasoning, the learned judge fixed the fair rent at Rs. 450/- per mensem though the landlady had mentioned that fair rent would be Rs. 300/- per mensem. In the present case, apart from the Mini Technical Hand Book produced by learned counsel for the landlord, there is an admission by the tenant's engineer who has given evidence as R.W 2. He has stated categorically that he is constructing buildings, and in 1982-1983, the cost of construction was between Rs. 86 and 90/- per sq. ft. He added that it was not the P.W.D rate. He denied the suggestion that actual cost in that year was Rs. 130/- per sq. ft. Taking into account the evidence of R.W 2 and the particulars found in the Mini Technical Hand Book, I fix the cost of construction at the rate of Rs. 85/- per sq. ft.

    11. It is argued by the tenant's counsel that there are three floors in the building, viz., ground floor, first floor and second floor and the fair rent has to be properly apportioned among the three floors. But there is no plea in the counter-statement filed by the tenant to the fair rent application to the effect that there are three floors. For the first time, in the evidence he said that there are three floors. A suggestion was made to the landlady and she has promptly denied the same. There is a categorical statement in the petition that the building consists of only two floors, viz., ground floor and first floor. In the circumstances, the case of the tenant that there are three floors cannot be accepted. Hence the courts below have held on the footing that the building comprises of two floors and fixed the fair rent on that basis. In the circumstances, the fair rent fixed by the courts below is altered. The basis of fixation of fair rent shall be that the land value is Rs. 2,40,000/- per ground. The cost of construction is Rs. 85/- per sq. ft. The parties are directed to file a memo of calculation on the above basis, showing the actual fair rent per mensem. The memo shall be filed on or before 9th March 1994. Civil Revision Petition No. 4846 of 1987 is allowed to the extent indicated above and Civil Revision Petition No. 1234 of 1989 is dismissed. The parties will bear their respective costs.

    The petition having/been posted this day for being mentioned subsequent to the order of this Court, dated 4.3.94 and made herein, in the presence of the aforesaid advocates, the court made the following order:—

    This matter is being posted today on the filing of the memo of calculation by the petitioner. As directed by me in my order dated 4.3.1994 the petitioner in the above Civil Revision Petition has filed a memo of calculation. The respondent has not filed any memo. Nor has he filed any objection to the memo filed by the petitioner. According to the said memo, the fair rent will work out to Rs. 707/- per month. The said amount is fixed as fair rent for the petition premises with effect from 10.9.1082

    RR/KA/VCS

    Use AI to get other relevant cases.

    Comments

    S.A.S Rahmath Nisha Begum v. S. Vijayakumar.
    (Mar 4, 1994)