The Judgment of the Court was delivered by
A.K Patnaik, J.— Leave granted. The facts very briefly are that the appellant owns a sugar mill situated at Phagwara, and Respondent 1, Board is supplying electricity to the sugar mill. In 1989, the appellant installed a TG set of 3187.500 kW capacity to meet some of its electricity demand and applied for approval of its TG set to Respondent 1. By Memo dated 8-12-1992, the Chief Engineer, Commercial of Respondent 1 granted permission to the appellant for installation of 2 no. TG sets subject to some conditions. On 9-12-1992, however, the Flying Squad, Jalandhar of Respondent 1 visited the sugar mill of the appellant and checked the electricity connection at the sugar mill. Pursuant to the report submitted by the Flying Squad, the Sub-Divisional Officer (Suburban), Phagwara of Respondent 1 issued a demand notice dated 10-12-1992 to the appellant stating inter alia that the TG set and stand-by load had not been sanctioned by Respondent 1 and the appellant was liable for an excess unsanctioned load of 4904.127 kW for load surcharge at the rate of Rs 1000 per kW, which worked out to Rs 49,04,127.
2. The appellant made a representation to the Sub-Divisional Officer (Suburban), Phagwara and to the Chief Engineer, Commercial of Respondent 1 against the demand of load surcharge of Rs 49,04,127. When there was no response from the aforesaid two authorities of Respondent 1, the appellant filed a writ petition CWP No. 370 of 1993 before the High Court of Punjab and Haryana at Chandigarh challenging the demand of load surcharge of Rs 49,04,127.
3. The Division Bench of the High Court held in its order dated 30-3-1993 that Respondent 1 could charge for the excess load which was to be the sum of the rated capacities of all the energy consuming apparatus in the consumer's installation, but from the impugned order of the High Court or from the documents filed by Respondent 1 before the High Court along with its written reply, there is nothing to show that the TG set having the capacity of 3187.5 kW was an energy consuming apparatus. The Division Bench further held in its order dated 30-3-1993 that for the purpose of charging for the excess load, the load of the stand-by machinery was to be excluded and, therefore, the load to the extent of 2226.330 kW of the stand-by apparatus in the order impugned before the High Court could not be included. For the aforesaid reasons, the Division Bench quashed the demand of load surcharge of Rs 49,04,127 leaving it to Respondent 1 to pass afresh appropriate order, if so advised, with liberty to the appellant to challenge the same, if required.
4. Thereafter, by a fresh demand notice dated 1-6-1993, the Sub-Divisional Officer (Distribution), Suburban Sub-Division, Phagwara, raised the very same demand of Rs 49,04,127 for the unauthorised TG set load of 3187.500 kW and stand-by load of 2226.330 kW totalling to 6520.155 kW at the rate of Rs 1000 per kW. The appellant filed a second writ petition CWP No. 7299 of 1993 challenging the aforesaid demand. The learned Single Judge, who heard and disposed of the writ petition, held in his order dated 1-4-2009 CWP No. 7299 of 1993 that the finding of the Division Bench of the High Court in earlier writ petition CWP No. 370 of 1993 that the stand-by load of 2226.330 kW could not be included in the demand for excess load was binding on Respondent 1 and hence the demand of excess load on account of the stand-by load could not be raised again by Respondent 1. Regarding the connected load of the TG set, the learned Single Judge of the High Court referred to the earlier order dated 21-8-2008 of the learned Single Judge in which it was recorded that the learned counsel for the appellant had very fairly stated that he would accept the decision of the Dispute Settlement Committee of Respondent 1 and as the Dispute Settlement Committee had decided the matter against the appellant, the addition on account of the load connected on the TG set could not be faulted with.
5. Aggrieved, the appellant filed Letters Patent Appeal No. 304 of 2009 before the Division Bench of the High Court, but by the impugned order dated 1-5-2009 LPA No. 304 of 2009 the Division Bench dismissed the appeal after holding that there was no infirmity in the findings returned by the learned Single Judge on the basis of the statement made by the counsel for the appellant and the report submitted by the Dispute Settlement Committee. The appellant filed a review application RA No. 6 of 2009 before the Division Bench, but by the impugned order dated 31-7-2009 RA-LPA No. 6 of 2009 the Division Bench dismissed the review application. Aggrieved, the appellant has filed this appeal by way of special leave under Article 136 of the Constitution challenging the orders of the Division Bench of the High Court in the letters patent appeal and the review application.
6. The learned counsel for the appellant submitted that the only ground on which the learned Single Judge in Oswal Agro Mills Ltd. v. Punjab SEB CWP No. 7299 of 1993 declined to quash the demand for the excess connected load of the TG set was that the learned counsel for the appellant had agreed before the learned Single Judge on 21-8-2008 that he would accept the decision of the Dispute Settlement Committee of Respondent 1 on this aspect of the matter. He submitted that a reading of the order dated 21-8-2008 of the learned Single Judge would show that the learned counsel for the appellant had only agreed to accept the decision of the Dispute Settlement Committee of Respondent 1 on the question whether with the aid of a device called a bus coupler, intertransferability of load could be effected between the TG set of the appellant and the energy supplied by Respondent 1. He submitted that the learned counsel for the appellant, therefore, had not agreed before the learned Single Judge on 21-8-2008 to accept the decision of the Dispute Settlement Committee of Respondent 1 with regard to the legality of the demand for the excess load on account of the TG set.
7. The learned counsel further submitted that it will be clear from the Memo dated 8-12-1992 issued by the Chief Engineer, Commercial, that Respondent 1 had permitted installation of the two TG sets subject to certain conditions and, therefore, the load of the TG set had been permitted/sanctioned by the competent authority of Respondent 1 Board and the appellant could not be charged any load surcharge at the additional rate of Rs 1000 per kW for 3187.500 kW connected load of the TG set under Commercial Circular No. 12 of 1989.
8. The learned counsel appearing for the respondents, on the other hand, submitted that the Memo dated 8-12-1992 of the Chief Engineer, Commercial of Respondent 1 would show that the appellant was permitted installation of 2 no. TG sets subject to certain conditions which were to be complied with by the appellant and if the conditions were to be (sic not) complied with, the appellant was liable for prosecution under Section 58 read with Section 43 of the Electricity Act, 1910 and the unauthorised TG sets were to be disconnected after giving 24 hours' notice and were not allowed to be run till its sanction is obtained from the competent authority of Respondent 1.
9. The learned counsel submitted that the permission was only given for installation of TG set and not for the bus coupler and yet on 9-12-1992 when the flying squad of Respondent 1 entered the sugar mill of the appellant, they found that the TG turbo bus and the supply of Respondent 1 were electrically connected through the LT bus coupler and there was intertransferability of load. He submitted that, therefore, the TG set of the appellant was found as unauthorised load for which the appellant was liable for load surcharge at the additional rate of Rs 1000 per kW. He submitted that the learned Single Judge and the Division Bench of the High Court were, therefore, right in rejecting the challenge of the appellant to the demand of Rs 26,77,797 towards load surcharge for the TG set at the rate of Rs 1000 per kW.
10. The first question that we have to decide is whether on 21-8-2008 the learned counsel for the appellant had agreed before the learned Single Judge to accept the decision of the Dispute Settlement Committee of Respondent 1 on the legality of the demand of the unauthorised load of the TG set and, therefore, the learned Single Judge and the Division Bench of the High Court were right in taking a view that the appellant was not entitled to challenge the demand of load surcharge for the authorised load in respect of the TG set.
11. The order dated 21-8-2008 of the learned Single Judge in CWP No. 7299 of 1993, which records the submission of the learned counsel of the appellant, is extracted hereinbelow:
“Present: Mr Rahul Sharma, Advocate for the petitioner.
Mr H.S Riar, Advocate with Mr D.P.S Kahlon, Advocate for the respondents.
1. Arguments in part-heard. The dispute in this petition primarily relates to the question, whether with the aid of a device called a bus coupler, intertransferability of load could be effected between the captive generation apparatus of the petitioner and the energy supplied by the respondent Board. This is a disputed question of fact.
2. At this stage the learned counsel for the petitioner has very fairly stated that he would accept the decision of the Dispute Settlement Committee of the respondent Board on this aspect of the matter. Let the Dispute Settlement Committee of the respondent Board, after hearing both the parties, give an opinion on the question whether the bus coupler installed by the petitioner would permit intertransferability of the load between the turbo generator set of the petitioner and PSEB. Let the representatives of both the parties appear before the Dispute Settlement Committee in this regard on 28-8-2008.
3. The matter is adjourned for two weeks i.e 8-9-2008. Copy of this order be given to both the learned counsel under the signatures of the Reader of this Court.
sd/-
Ajay Tewari
Judge
21-8-2008.”
12. It will be clear from the aforesaid order dated 21-8-2008 that the learned Single Judge was of the opinion that the dispute between the parties was on the question whether with the aid of a device called a bus coupler, intertransferability of load could be effected between the captive generation apparatus of the appellant and the energy supplied by Respondent 1 and he was also of the opinion that this dispute was on a question of fact and accordingly the learned counsel for the appellant had stated very fairly that he would accept the decision of the Dispute Settlement Committee of Respondent 1 on this aspect of the matter. Hence, the learned counsel for the appellant had not agreed before the learned Single Judge of the High Court that he would accept the decision of the Dispute Settlement Committee of Respondent 1 on the legality of the demand for the extra load on account of the TG set. In fact, we find from the proceedings of the Dispute Settlement Committee that the Dispute Settlement Committee has also not decided on the legality of the demand for the extra load on account of the TG set, but has only decided that with the aid of a device called a bus coupler, intertransferability of load could be effected between the captive generation apparatus of the appellant and the energy supplied by Respondent 1. In our considered opinion, therefore, the legality of the demand for the extra load on account of the TG set should have been decided by the learned Single Judge or the Division Bench after taking into account the finding of the Dispute Settlement Committee that with the aid of a device called a bus coupler, intertransferability of load can be effected between the TG set of the appellant and the energy supplied by Respondent 1.
13. The next question that we have to decide is whether the appellant is liable for the demand of load surcharge for the unauthorised load in the notice dated 1-6-1993 issued by the Sub-Divisional Officer of Respondent 1 keeping in view the finding of the Dispute Settlement Committee of Respondent 1 that with the aid of bus coupler, intertransferability of load can be effected between the captive generation apparatus of the appellant and the energy supplied by Respondent 1 Board.
14. The justification of the demand made by Respondent 1 is given in the demand notice dated 1-6-1993 of the Sub-Divisional Officer of Respondent 1 in which demand for load surcharge has been raised. The relevant extract from the demand notice dated 1-6-1993 containing the justification of the demand is extracted hereinbelow:
“1. Total load running on PSEB system as checked by enforcement staff on 9-12-1992: 1106.325 kW
2. As agreed by your representative Shri Ramesh Chand who was present at the time of spot checking, the TG set load which also includes the running stand-by load which was taken on the basis of details of load given to the Board as per A/A form along with test reports submitted earlier and not on the basis of RC set capacity: 3187.500 kW
3. Stand-by load on TG set: 2226.330 kW
Total: 6520.155 kW
In addition to above, as per checking of enforcement staff on 9-2-1992 and your representative Shri Ramesh Chander Sharma present at the time of checking, the total load was accepted so this load is unauthorised. It is also made clear that under PSEB Circular No. 12/89, General Condition 14 and as per Clause 8(b) of Tariff Schedule, the stand-by load until sanctioned by the Board is unauthorised. Your attention is invited to your registered Letter No. 2922 dated 26-8-1989 addressed to the Member (Commercial), PSEB, Patiala in which you had mentioned that new schedule of tariff for sugar mills would tend to increase difficulties and also admitted that keeping this in view approximately Rs 35/40 lakhs are required to be deposited for running the 4434 kW on TG set, expenses of which are not bearable. Keeping this in view the Board has issued special instruction to the sugar mills vide Circular No. CC23/90 along with some condition, the compliance of which is not fulfilled by you. As a result of this a load of 4904.127 kW was declared unauthorised after checking by XEN Enforcement on 9-12-1992. Keeping in view the unauthorised load you are requested to deposit Rs 49,04,127 as per Board Circular No. CC 12/89, Clause 2C 23/90 @ Rs 1000 per kW. Since it is your second default you have already deposited Rs 33,347 on 23-5-1991 towards the first default.”
15. It is apparent from what has been extracted from the demand notice dated 1-6-1993 of the Sub-Divisional Officer of Respondent 1 that the unauthorised load comprised the TG set load of 3187.500 kW and the stand-by load of 2226.330 kW. So far as the stand-by load of 2226.330 kW is concerned, the demand for unauthorised load has been set aside by the learned Single Judge by order dated 1-4-2009 in Oswal Agro Mills Ltd. v. Punjab SEB CWP No. 7299 of 1993 and the order dated 1-4-2009 CWP No. 7299 of 1993 has not been challenged by the respondents either before the Division Bench of the High Court or before this Court. In fact, we find that the Sub-Divisional Officer of Respondent 1 has issued a fresh demand notice dated 12-6-2009 to the appellant pursuant to the order dated 1-4-2009 of the learned Single Judge in Oswal Agro Mills Ltd. v. Punjab SEB CWP No. 7299 of 1993 restricting the demand of Rs 26,77,797 for the unauthorised load on account of the TG set.
16. Hence, we are to examine whether the reasons given in the demand notice dated 1-6-1993 of the Sub-Divisional Officer of Respondent 1 for the unauthorised load of the TG set are legal.
17. From the aforesaid extract of the demand notice dated 1-6-1993 of the Sub-Divisional Officer of Respondent 1, we find that the reason for the demand for unauthorised load of the TG set is that Respondent 1 Board has issued special instruction to sugar mills vide Circular No. CC23/90 along with some conditions, compliance of which have not been fulfilled by the appellant and as a result the load on account of TG set was declared unauthorised after checking by XEN Enforcement on 9-12-1992. We have examined Circular No. CC 23/90 and we find that by the said circular issued by the Chief Engineer, Commercial of Respondent 1, all concerned were informed that Respondent 1 has decided to regularise the load of the sugar mills fed from TG sets after recovering ACD worked out according to the capacity of TG sets. In Para 3 of the circular, the working details for regularising the load of the sugar mills from the supply of Respondent 1 Board and TG sets have been given and at the end of the circular it is mentioned that necessary action for regularising total load of the sugar mills may be taken accordingly. Pursuant to the said circular, the appellant applied for regularisation of load of two TG sets and by Memo dated 8-12-1992 issued by the Chief Engineer, Commercial of Respondent 1, the appellant was permitted to install two TG sets subject to certain conditions.
18. The Memo dated 8-12-1992 issued by the Chief Engineer, Commercial of Respondent 1 is extracted hereinbelow:
“Punjab State Electricity Board
From,
The Chief Engineer, Commercial,
Tariff and Billing Directorate, PSEB,
The Mall, Patiala 147001
To,
M/s Oswal Agro Mills Ltd.
Sugar Division,
G.T Road,
Phagwara (Punjab)
Memo No. 64192.Com/54.Indl./Jall
Dated 8-12-1992
Subject: Permission for installation of 2 no. TG sets of 3730 kVA and 500 kVA capacity.
Reference: Your letter regarding permission for installation of 2 no. TG sets.
You are hereby permitted to install 2 no. TG sets of 3750 kVA capacity of make Jyoti Vadodars, 420 volts of 1500 RPM kVA, TG set of Crompton make 400 volts and 375 RPM, subject to the following conditions:
(i) All relevant provisions of the Electricity Rules, 1956 shall be complied with by you and test report of the installation shall be furnished.
(ii) That the generating set will be operated whenever called upon to do so by the Punjab State Electricity Board for meeting your demand or for giving suitable relief to the Board's system by meeting the demand of the other consumers also, depending upon the prevailing situation.
(iii) Foolproof arrangements to be approved by SE/DS concerned shall be provided to avoid mixing of the Board's supply with that to be generated by the generating sets. It shall be ensured that the nature of the PSEB supply is isolated ruing (sic) changeover to TG sets supply.
(iv) That after obtaining receipts of this permission you will give notice of not less than 7 (seven) days to the District Magistrate concerned in terms of Section 30 of the Electricity Act, 1910 intimating the nature and purpose of supply.
(v) That the separate notice of not less than 7 (days) shall also be given to the Chief Electrical Inspector to the Government, Punjab as laid down in Section 30 of the Electricity Act, 1910. Notice shall also be accompanied by the following documents:
(a) Particulars of the electrical installation and plan thereof.
(b) A copy of the notice sent to the District Magistrate.
(c) An attested copy of the consent received from the Punjab State Electricity Board.
(d) Original challan of the prescribed inspection fee under the following head of account:
-043 - Taxes and duties on electricity fee under the Indian Electricity Rules.
(e) Test report from a licensed wiring contractor in token of his having carried out the job and tested the installation for safety.
(f) A single line key diagram indicating the arrangement of connecting the generator installation to the existing electrical installation.
(vi) That suitable energy meter shall be installed to comply with the requirement of Rule 6 of the Punjab Electricity Duty Rules, 1958. The meter shall be got tested from the nearest PSEB laboratory.
(vii) That in case you fail to comply with the above provision you shall make yourself liable for prosecution under Section 58 read with Section 43 of Electricity Act, 1910. The unauthorised TG sets shall be disconnected after giving 24 hours' notice and shall not be allowed to run till its sanction is obtained from the competent authority. In case you do not disconnect the TG sets or apply for regularisation of TG sets, your connection shall be disconnected after giving 24 hours' notice in writing for contravening the provisions of the said Act and Clause 19 of the PSEB Abridged Conditions of Supply. Supply in such cases shall not be restored unless you disconnect the TG sets and furnish test report for sanction of electric installation or comply with the above provisions.”
19. Thus, on 9-12-1992 when the Flying Squad, Jalandhar, of Respondent 1 visited the sugar mill of the appellant, the Chief Engineer, Commercial of Respondent 1 had already permitted installation of TG sets in the sugar mill of the appellant. If the appellant had refused to comply with the conditions mentioned in Circular No. CC 23/90 for regularisation of the load of the sugar mill fed from the TG sets, the Chief Engineer, Commercial, would not have granted such permission in the Memo dated 8-12-1992. Alternatively, even if the appellant had refused to comply with some conditions in Circular No. CC 23/90, the Chief Engineer, Commercial did not consider such refusal to disentitle the appellant for regularisation of the installation of the TG sets and permitted the installation of the TG sets by the Memo dated 8-12-1992.
20. We further find from the aforesaid extract from the demand notice dated 1-6-1993 that for the unauthorised load, a demand has been made at the rate of Rs 1000 per kW in accordance with Clause 8(b) of the Schedule of Tariff applicable to the sugar mill of the appellant as notified in Commercial Circular No. 12/89. Clause 8(b) of the Schedule of Tariff as notified in Commercial Circular No. 12/89 is extracted hereinbelow:
“Schedule of Tariff
(i) Schedule LS — Large industrial power supply
1-7***
8.***
‘8(b) If the connected load of a consumer exceeds the sanctioned connected load, the excess load shall be unauthorised load. Such excess of the connected load shall be charged load surcharge at an additional rate of Rs 1000 per kW for each subsequent default.’”
It will be clear from Clause 8(b) of the Schedule of Tariff that if the connected load of a consumer exceeds the sanctioned connected load, the excess load shall be unauthorised load and such excess connected load shall be charged at the additional rate of Rs 1000 per kW for each subsequent default. If, therefore, any load is sanctioned by the appropriate authority of Respondent 1 Board, such load cannot be held to be unauthorised load or excess load liable to surcharge at the rate of Rs 1000 per kW. As we have already found, on 8-12-1992, the Chief Engineer, Commercial, has sanctioned or permitted or regularised the installation of two TG sets and hence the load of 3187.500 kW of the TG set detected on 19-12-1992 was a sanctioned load and was not an unauthorised load for which the appellant can be charged load surcharge at the rate of Rs 1000 per kW under Clause 8(b) of the Schedule of Tariff.
21. Once we hold that the load of the TG sets was sanctioned and authorised, the appellant could not be held liable for load surcharge under Clause 8(b) of the Schedule of Tariff for the load of the TG set, even if by the aid of bus coupler, intertransferability of load could be effected between the TG set of the appellant and the energy supplied by Respondent 1 Board. For the consumption of energy from the supply of Respondent 1, the appellant was liable for every unit of energy consumed to Respondent 1. For demand of energy, the appellant being a sugar mill was also liable for demand charges with minimum contract demand of not less than the capacity of the distribution transformer(s) installed by the appellant and not 60% of the connected load as stated in Commercial Circulars Nos. 12/89 and 23/90. What the learned Single Judge and the Division Bench of the High Court failed to appreciate is that the appellant was separately liable for energy charges and demand charges to Respondent 1 for consumption of energy and demand of energy respectively under the Schedule of Tariff and the levy of load surcharge at the additional rate of Rs 1000 per kW was only meant for a load of the consumer which was unauthorised or not sanctioned and if a particular load of a consumer is sanctioned or authorised, load surcharge at additional rate of Rs 1000 per kW could not be levied under Clause 8(b) of the Schedule of Tariff.
22. The learned counsel for the respondents vehemently submitted that the permission to install the TG sets granted by the Memo dated 8-12-1992 by the Chief Engineer, Commercial of Respondent 1 was subject to various conditions mentioned in the Memo dated 8-12-1992 and these conditions have not been fulfilled by the appellant. The learned counsel for the respondents is right that since the permission to install the TG sets was granted by the Memo dated 8-12-1992 subject to various conditions, the load of the TG sets installed could not be said to be sanctioned or authorised if the conditions in the Memo dated 8-12-1992 were not fulfilled. It was, therefore, open to the respondents to treat the load of the TG set as unauthorised on the ground that the conditions in the Memo dated 8-12-1992 permitting the installation of the TG sets were not fulfilled. But neither in the first demand notice dated 10-12-1992 nor in the second demand notice dated 1-6-1993 of the Sub-Divisional Officer of Respondent 1 raising the demand for unauthorised load for the TG set, is there any mention that the demand for unauthorised load was being raised because the appellant had not fulfilled the conditions mentioned in the Memo dated 8-12-1992 of the Chief Engineer, Commercial of Respondent 1. In the demand notice dated 10-12-1992 of the Sub-Divisional Officer of Respondent 1, the only reason given for raising the demand for unauthorised load was that the TG set load “has not yet been sanctioned by the Board”. After the High Court quashed the first demand notice dated 10-12-1992 in CWP No. 370 of 1993, leaving it to Respondent 1 to pass afresh an appropriate order, the Sub-Divisional Officer issued the second demand notice dated 1-6-1993, but in this lengthy second demand notice also it has not been stated that the demand for unauthorised load for the TG set was being made because the appellant has not fulfilled the conditions mentioned in the Memo dated 8-12-1992 of the Chief Engineer, Commercial of Respondent 1. In fact, in the two demand notices dated 10-12-1992 and 1-6-1993 no reference at all has been made to the Memo dated 8-12-2002 of the Chief Engineer, Commercial of Respondent 1.
23. In the result, these appeals are allowed. The impugned orders CWP No. 7299 of 1993, LPA No. 304 of 2009, RA-LPA No. 6 of 2009 of the learned Single Judge and the Division Bench of the High Court are set aside and the demand raised against the appellant in the demand notice dated 1-6-1993 and the demand notice dated 12-6-2009 for unauthorised load of the TG set is quashed. The parties shall bear their own costs.