  • Section 26(6) of the Indian Electricity Act, 1910,
  • provisions of Section 26(6). Clause VI (3)
  • Section 26(4). Section 26(6)
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Equivalent Citations
citation codes
Case Number
Attorney(S)
Judges
Acts
  • Section 26(6) of the Indian Electricity Act, 1910,
  • provisions of Section 26(6). Clause VI (3)
  • Section 26(4). Section 26(6)
Smart Summary

Structured Summary of the Opinion

Factual and Procedural Background

The petitioner is an electricity consumer who operates an ice factory and held Service Connection No. 303768/9 for a 15 Horse Power load. By letter dated 29 June 1979 (Annexure A) the petitioner was called upon to pay Rs. 18,123.87 as a revised demand for the period 11 September 1974 to June 1979. A further demand of Rs. 8,113.50 was subsequently raised for the period June 1979 to January 1980; a consolidated demand of Rs. 26,249.37 was then issued (Annexure C). On the petitioner's failure to pay, recovery proceedings were initiated treating the demand as arrears of land revenue and a notice was issued by the Tahsildar (Annexure E). The petitioner filed this petition under Article 226 of the Constitution seeking quashing of Annexures A and C and the Tahsildar's notice (Annexure E).

Relevant factual content includes that meters installed at the petitioner's premises belonged to the Electricity Board; the petitioner had been paying bills based on meter readings. The Board replaced meters on 31 May 1978 and 28 March 1979, observed disturbed digital figures, installed a new check meter on 31 March 1979, and revised billing for the period 11 September 1974 to June 1979 based on the check meter's readings. The petitioner, through his lawyer, replied on 7 July 1979 (Annexure B), contending the earlier meters were not defective, were illegally removed, and that the Board could not make a revised demand without referring the matter to the Electrical Inspector under Section 26(6) of the Indian Electricity Act, 1910.

Legal Issues Presented

  1. Whether the Electricity Board could remove the meters and unilaterally revise bills without first referring the dispute as to the correctness of the meters to the Electrical Inspector under Section 26(6) of the Indian Electricity Act, 1910.
  2. Whether a unilateral estimate or revision by the Board of consumption for a multi‑year period was permissible when Section 26(6) limits an Electrical Inspector's estimate of consumption (if a meter is found incorrect) to a period not exceeding six months.
  3. Whether non-payment of a revised bill that is issued without prior reference to the Electrical Inspector can justify the Board exercising powers under Section 24 (such as disconnection), i.e., whether Section 24 applies where the bill itself is invalid in law.

Arguments of the Parties

Petitioner's Arguments

  • The meters earlier installed at his premises were not defective and were illegally removed by the Board.
  • The Board could not make any revised demand without referring the dispute about the correctness of the meters to the Electrical Inspector under Section 26(6) of the Indian Electricity Act, 1910.

Respondents' Arguments

  • It was for the petitioner to make a reference to the Electrical Inspector if he disputed the revised bill; reliance was placed on Section 24 and related provisions permitting the Board to disconnect supply if charges are not paid after notice.
  • The respondents relied on Clause VI(3) of the Schedule to the Act (a general provision) and on a decision of the Allahabad High Court in S. E. Board v. Prakash Talkies (AIR 1977 All 460) to support that the petitioner should have made a reference and that the Board was not obliged to refer before sending the revised bill.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
S. E. Board v. Prakash Talkies, AIR 1977 All 460 Relied on by respondents to support the proposition that the petitioner should have made a reference to the Electrical Inspector and that the Board was not obliged to refer before issuing a revised bill. The court found this precedent inapplicable here because the dispute in Prakash Talkies concerned use of energy for a different purpose and was not a dispute covered by Section 26(6) of the Act; therefore it had no bearing on the present question.
K. S. Upadhya v. State Electricity Board, U.P., AIR 1977 All 185 Relied on as authority more in point on the issues concerning meter disputes and reference to the Electrical Inspector. The court stated that this decision supports the conclusion reached by it (i.e., that the Board should have acted in conformity with Section 26(6) and related provisions).

Court's Reasoning and Analysis

The court's analysis proceeded from the statutory scheme in the Indian Electricity Act, 1910, especially Section 26 and Section 24, and the relevant proviso and explanation.

  1. Interpretation of Section 26:
    • Section 26(1) — energy supplied shall be ascertained by a correct meter; the licensee (the Board) is under a duty to supply and maintain the meter.
    • Section 26(2) — licensee must keep the meter correct; if in default, consumer ceases to be liable to pay hire of the meter during the default.
    • Section 26(4) — licensee or an authorized person may, at reasonable times, inspect, test, take off and remove any meter; if the meter is found otherwise than correct, reasonable expenses can be recovered from the consumer; disputes as to such expenses are to be referred to the Electrical Inspector whose decision is final. A proviso restricts the power to remove a meter where a dispute under Section 26(6) has arisen until that dispute is determined.
    • Section 26(6) — where a dispute arises whether a meter is correct, the matter must be decided by the Electrical Inspector on application of either party; if the Inspector finds the meter incorrect, he shall estimate the energy supplied during such time (not exceeding six months) as he considers the meter was incorrect; except as provided, the meter register is, in the absence of fraud, conclusive.
    • Explanation — a meter is deemed correct if it registers within prescribed limits of error.
  2. Application of the statutory scheme to the facts:
    • The court concluded that a dispute whether a meter is correct can only be resolved by the Electrical Inspector under Section 26(6), and the proviso to Section 26(4) prevents removal of the meter until the Inspector decides such a dispute.
    • In the instant case the Board unilaterally removed the meters and installed a check meter but did not refer the dispute to the Electrical Inspector. The Board then issued a revised bill for a five‑year period based on the check meter's readings.
    • The court reasoned that the Board's actions were unlawful for multiple reasons set out in the opinion:
      1. The Board contravened the proviso to Section 26(4) by removing the meters without an Electrical Inspector's determination of the dispute.
      2. The Board effectively decided the meters were incorrect, a determination that can be made only by the Electrical Inspector under Section 26(6).
      3. The Board estimated the quantity consumed for the disputed period; such an estimate can be made only by the Electrical Inspector under Section 26(6), not by the Board unilaterally.
      4. The Board's revised bill covered a period of five years, whereas Section 26(6) authorizes the Electrical Inspector to estimate at most a six‑month period. A five‑year revision was therefore unjustified.
  3. Interaction with Section 24 and disconnection powers:
    • Section 24 permits a licensee to disconnect supply where a person neglects to pay any charge after notice; Section 24(2) prevents exercise of such powers where a difference required to be determined by an Electrical Inspector has been referred to the Inspector before the notice.
    • The court explained that Section 24's disconnection power applies only when the bill demanding the charge is valid in law. If a bill is issued on an estimate basis on the ground the meter was incorrect without referring the matter to the Electrical Inspector, the bill is bad and non‑payment of such a bill cannot authorise the Board to disconnect under Section 24.
    • The court clarified that although either party may apply to the Electrical Inspector under Section 26(6), in practice the party disputing the meter reading must make the reference if it wishes to avoid the conclusive effect of the meter register (absent fraud). Until the Inspector gives a contrary decision the meter reading is conclusive.
  4. Treatment of Clause VI(3) of the Schedule and precedents:
    • The respondents' reliance on Clause VI(3) of the Schedule was addressed: the court held the Clause is a general provision and does not apply to disputes for which the Act contains a specific provision (i.e., Section 26(6) covers meter correctness disputes).
    • The court rejected the applicability of S. E. Board v. Prakash Talkies because that dispute did not arise under Section 26(6) (it concerned use of energy for another purpose) and therefore had no bearing on the present controversy.
    • The court noted that K. S. Upadhya v. State Electricity Board, U.P. supports the court's conclusion in this matter.

Holding and Implications

Holding: The court found that the petitioner had succeeded in establishing the invalidity of the demand notice Annexure-A (the revised demand of Rs. 18,123.87 for the period 11 September 1974 to June 1979).

Implications:

  • The direct effect is that Annexure-A was held invalid by the court on the statutory grounds set out in the reasoning (procedure under Section 26(4) and (6) not followed; only the Electrical Inspector may determine meter correctness and estimate consumption for up to six months).
  • The court expressly noted that the petitioner failed to point out any defect in respect of the demand of Rs. 8,113.50 for the period June 1979 to January 1980; no invalidity was established in respect of that demand in the opinion as provided.
  • The opinion emphasizes that a bill issued on an estimate basis because the Board alleges meter incorrectness, without prior determination by the Electrical Inspector as required by Section 26(6), is legally invalid and cannot support disconnection under Section 24.
  • No broader or novel legal principle beyond the interpretation and application of the statutory provisions (Sections 24 and 26 and the relevant proviso and schedule clause) is announced; the court applied existing statutory rules and distinguished an earlier decision relied on by the respondents. The opinion does not state that a new precedent was laid down beyond the application of the Act to these facts.

This summary is based exclusively on the content of the provided opinion and does not add information that is not present in that text.

    Hamidullah Khan v. The Chairman, Madhya Pradesh Electricity Board And Others

    1. The petitioner is a consumer of electricity. He runs an ice factcty for which he obtained service connection No. 303768/9 of 15 Horse Power load. By letter dated 29th June, 1979 (Annexure A) the petitioner was called upon to pay Rs. 18,123.87, being the revised demand for the period from 11th Sept., 1974 to June, 1979 on account of charges for consumption of electricity as explained in letter dated 30th June, 1979 (Annexure R-2). There was thereafter a further demand of Rs. 8,113.50 for the period from June, 1979 to Jan, 1980. A consolidated demand of Rs. 26,249.37 was then issued which is Annexure-C. On the failure of the petitioner to pay this amount, proceedings for recovery of the demand as arrears of land revenue were started. A notice was issued by the Tahsildar which is Annexure E. By this petition under Article 226 of the Constitution, the petitioner seeks quashing of the demands Annexure A and C and the notice Annexure-E.

    2. It is not in dispute that there was a meter installed by the Electricity Board for ascertaining the amount of energy supplied to the petitioner. The meter belonged to the Board. The petitioner was paying the bills which were sent in accordance with the meter reading. The revised demand of Rs. 18,123.87 for the period from 11th Sept., 1974 to June, 1979 was issued for the reasons indicated by the Divisional Engineer in his letter dated 30th June, 1979 which is Annexure R-2. It is stated therein that meters installed in the petitioner's premises were replaced on 31st May, 1978 and 28th March, 1979 and as they were not recording the consumption correctly and digital figures were found disturbed, a new check meter was installed on 31st March, 1979 and the billing for the period from 11th Sept., 1974 to June, 1979 was revised on the basis of consumption recorded by the new meter. When the petitioner revised the revised demand, he gave a reply through his lawyer on 7th July, 1979 which is Annexure-B. In this reply, he contended that the meters earlier installed were not defective and they ware illegally removed. It was further stated that the Board could not make any revised demand without referring the matter to the Electrical Inspector. Learned counsel for the petitioner has repeated the same contentions before us and has argued that in the absence of any decision by the Electrical Inspector under Section 26(6) of the Indian Electricity Act, 1910, it was not open to the Board to make a revised demand.

    3.Section 26(1) provides that in the absence of an agreement to the contrary, the amount of energy supplied to a consumer shall be ascertained by means of a correct meter and the licensee shall, if required by the consumer, cause the consumer to be supplied with such a meter. The Board is a licencee for purposes of the Act. The meter was the property of the licensee. It is the duty of the licensee under Section 26(2) to keep the meter correct and in default of doing so, the consumer ceases to be liable to pay for the hire of the meter for so long as the default continues. Section 26(4) empowers the licensee or any person duly authorised by the licensee at any reasonable time and on informing the consumer of the intention to have access to and he at liberty to inspect and test and for that purpose, to take of and remove any meter. All reasonable expenses of and incidental to such inspecting, testing, taking off and removing, if the meter is found to be otherwise than correct, can be recovered from the consumer and where any difference or dispute arises as to the amount of such reasonable expenses, the matter is to be referred to an Electrical Inspector whose decision is final. There is, however, an important proviso to Section 26(4) which restricts the power to take off or remove the meter if a difference or dispute of the nature described in Section 26(6) has arisen until the matter has been determined as therein provided. Section 26(6) reads as follows:--

    'Where any difference or dispute arises as to whether any meter referred to in Sub-section (1) is or is not correct, the matter shall he decided, upon the application of either party, by an Electrical Inspector; and where the meter has, in the opinion of such Inspector ceased to he correct, such Inspector shall estimate the amount of energy supplied to the consumer or the electrical quantity contained in the supply, during such time, not exceeding six months, as the meter shall not, in the opinion of such Inspector, have been correct; but save as aforesaid the register of the meter shall, in the absence of fraud, be conclusive proof of such amount of quantity:

    Provided that before either a licensee or a consumer applies to the Electrical Inspector under this sub-section, he shall give to the other party not less than seven days' notice of his intention so to do."

    There is an explanation contained in Section 26 which says that a meter shall be deemed to be correct if it registers the amount of energy supplied, or the electric quantity contained in the supply, within the prescribed limits of error.

    4. A reading of Section 26(6) makes it clear that a dispute whether a meter is correct or incorrect an be resolved only by the Electrical Inspector. The Electrical Inspector can be moved for this purpose by either the consumer or the Board. In case the Inspector finds that the meter was not correct, he has further to estimate the amount of energy supplied to the consumer during the period in the opinion of the Inspector the meter was not correct but no exceeding six months. In case of a dispute relating to the correctness of the meter, the Board cannot even remove the meter till the dispute is decided by the Electrical Inspector. This, as earlier noticed, is specifically provided in the proviso to Section 26(4). Section 26(6) further declares that except as provided therein, the register of the meter shall, in the absence of fraud be conclusive proof of the amount or quantity of the electrical energy supplied to the consumer.

    5. The Board, in the instant case, unilaterally removed the meters and installed a check meter. The case of the Board was that the meters earlier installed were not recording the consumption properly for the actual energy availed of by the petitioners and the digital figures were disturbed. The dispute, therefore, related to the correctness of the meters and the Board could not have removed the meters without getting the dispute determined by the Electrical Inspector. Even after removal of the meters and installation of a check meter, the Board did not make any reference to the Electrical Inspector. The Board sent a revised bill for five years i.e. for the period from 11th Sept., 1974 to June, 1979. The demand so made was clearly illegal for various reasons. First, the Board removed the meters without referring the dispute about the correctness of the meters to the Electrical Inspector and contravened the proviso to Section 26(4). Secondly, the Board itself decided that the meters installed were incorrect when such a decision could be given only by the Electrical Inspector. Thirdly,the Board illegally estimated the quantity consumed for the period during which, according to the Board, the meters installed were not giving correct reading. Such an estimate could be made only by the Electrical Inspector under Section 26(6) and not by the Board unilaterally. Fourthly, the revised bill for a period of five years was wholly unjustified for even when the matter is referred to the Electrical Inspector, under Section 26(6), the revised estimate can cover only a period of six months and not beyond that.

    6. The learned counsel appearing for the respondents drew our attention to Section 24 and submitted that it was for the petitioner to make a reference to the Electrical Inspector in case he disputed the revised bill issued by the Board. Section 24(1) provides that where any person neglects to pay any charge for energy on any sum other than a charge for energy due from him to a licensee in respect of the supply of energy to him, the licensee may, after giving not less than seven clear days' notice in writing to such person and without prejudice to his right to recover such charge or other sum by suit, cut off the supply and may discontinue the supply until such charge or other sum, together with any expenses incurred by him in cutting of and reconnecting the supply are paid but no longer. section 24(2) then provides that where any difference or dispute which by or under this Act is required to be determined by an Electrical Inspector has been referred to the Inspector before notice has been given by the licensee, the licensee shall not exercise the powers conferred by this section until the Inspector has given his decision Now, Section 24(1) which empowers the Board to disconnect the supply in case the consumer neglects to pay the charges can apply only when the bill issued by the Board demanding the charge is valid in law. It is in such cases that the Board has power to cut off the supply unless the consumer had made a reference to the Electrical Inspector before notice was issued to the consumer. The correct position may be explained by taking two examples. If the Board makes a demand in accordance with the meter reading, the demand would be valid. If in such a case, the consumer disputes the correctness of the meter, he cannot stop the Board from disconnecting the supply unless before the issue of the notice, he had referred the dispute to the Electrical Inspector. However, if the consumer has paid the bills in accordance with the meter reading and the Board issues revised bills on the Plea that the meter was not correct which fact is disputed by the consumer, it would be for the Board to refer the matter to the Electrical Inspector for getting a decision on the question whether the meter was correct and also for getting the quantity of energy consumed during the period the meter is found to be not correct estimated. The meter reading, subject to the decision of the Electrical Inspector and in the absence of fraud, is conclusive proof of the amount of quantity of the electrical energy consumed. This, as earlier noticed, is specifically stated in Section 26(6). It is, therefore, the party who wants to challenge the meter reading that has to make the reference to the Electrical Inspector. Till the Electrical Inspector decides that the meter was incorrect, the reading is conclusive and final between the parties. It is true that it is provided in Section 26(6) that either party can refer a dispute to the Electrical Inspector but a party who accepts the meter reading as correct need not do so. It is the party who disputes the meter reading that must go to the Electrical Inspector for in the absence of a contrary decision by the Electrical Inspector, the meter reading is conclusive. If a bill is issued on estimate basis on the ground that the meter was incorrect without having that matter decided by the Electrical Inspector, the bill itself would be bad and invalid in law and non-payment of such a bill cannot authorise the Board to discontinue energy under Section 24.

    7. The learned counsel for the respondents also referred to us Clause VI (3) of the Schedule to the Act which reads as follows :--

    "Where any difference or dispute arises as to the amount of energy to be taken or guaranteed as aforesaid, or as to the cost of any service-line or as to the sufficiency of the security offered by any owner or occupier or as to the position of the meter board or as to the improper use of energy, or as to any alleged defect in any wires, fittings, works or apparatus or as to the amount of the expenses incurred under the third proviso the Sub-clause (1), the matter shall be referred to an Electrical Inspector and decided by him."

    The learned counsel argued on the basis of the aforesaid provision that the licensee should have made a reference to the Electrical Inspector. Now, Clause VI (3) of the Schedule will not apply to a dispute for which a specific provision is made in the Act. The reference of a dispute to the Electrical Inspector on the question whether a meter is defective is specifically covered by the provisions of Section 26(6). Clause VI (3) of the Schedule which is a general provision will have no application to a dispute to which Section 26(6) applies. Apart from that, Clause VI (3) does not say as to which party has to apply for a reference to the Electrical Inspector. Now, We have already pointed out that a meter reading; except in case of fraud, is conclusive as provided in Section 26(6). The conclusive nature of the meter rending is only subject to the decision of the Electrical Inspector given on reference under Section 26(6). It, therefore, stands to reason that the person who accepts the meter reading has not to make a reference to the Electrical Inspector for the simple reason that until the Electrical Inspector has given a contrary decision, the meter reading would be binding on both the parties. The party who challenges the meter reading will have to make a reference to the Electrical Inspector.

    The learned counsel for the respondents relied upon a decision of the Allahabad High Court in S. E. Board v. Prakash Talkies, AIR 1977 All 460 in support of the submission that it was for the petitioner to make a reference to the Electrical Inspector and the Board was not obliged to make any reference to him before sending the revised bill. The dispute in that case was not covered by Section 26(6). The dispute in that case was that energy supplied for one purpose had been utilized for another purpose. The case of Prakash Talkies, therefore, has no bearing on the question before us. The case more in point is K. S. Upadhya v. State Electricity Board, U. P., AIR 1977 All 185, which supports the conclusion reached by us.

    8-9. The learned counsel for the petitioner has thus succeeded in establishing the invalidity of the demand notice Annex.-A. He has, however, failed to point out any defect with respect to the demand of Rupees 8,113.50 which is for the period from June, 1979 to Jan., 1980.