Summary of Opinion by Markandeya Katju, C.J.

Court-author: Markandeya Katju, C.J. — Source text provided (no date supplied in the text).

Factual and Procedural Background

The respondent No. 1, Indian Railway Catering & Tourism Corporation Ltd. (IRCTC), advertised on 27.6.2005 for sealed bids to operate and manage on-board catering services on 22 trains, including Train No. 3351-52 (Dhanbad/Tata-Alleppy Express). The petitioner and respondent No. 3 (M/s Ambuja Hotel & Real Estate Pvt. Ltd.) submitted bids: respondent No. 3 was the highest bidder (Rs. 79.13 lakhs) and the petitioner was second highest.

The letter of award dated 18.10.2005 directed respondent No. 3 to deposit Rs. 14.21 lakhs as security deposit and Rs. 79.13 lakhs as annual licence fee by 26.10.2005. Respondent No. 3 did not deposit as directed by that date; a show cause notice was issued on 31.10.2005. Respondent No. 3 explained it had already deposited amounts (Rs. 78 lakhs) for other train contracts (Tapti-Ganga Express) whose contracts could not be handed over due to a status-quo order of the Orissa High Court. IRCTC (respondent No. 1) extended deadlines by letter dated 10.11.2005 (security deposit to 14.11.2005 and licence fee to 20.11.2005). Respondent No. 3 subsequently paid the balance (telegraphic transfer on 24.11.2005) and IRCTC issued an office order dated 25.11.2005 awarding the licence for Train No. 3351-52 to respondent No. 3.

The petitioner challenged IRCTC's decision by way of a writ petition seeking direction that IRCTC not deviate from tender terms and general conditions in awarding the contract to respondent No. 3. An interim order had been granted earlier (29.11.2005). Respondents filed counter-affidavits. The court considered the completeness of the tender document annexed to the petition and the applicability of specific clauses of the tender (notably clauses 5.2, 5.5, 7.1, 7.2 and 7.9).

Legal Issues Presented

  1. Whether IRCTC violated the terms of the tender (specifically clause 7.1) by granting extensions and ultimately awarding the contract to respondent No. 3 despite respondent No. 3's initial failure to deposit security and licence fee within the stipulated period.
  2. Whether clause 7.9 of the general conditions (permitting variation of tender conditions by agreement) was applicable and, if so, whether it permitted IRCTC to grant the extensions and accept late payment.
  3. Whether the petitioner is entitled to relief under Article 226 of the Constitution despite having not annexed the entire tender document and whether the petitioner has come to court with clean hands.
  4. Whether the High Court should exercise its discretionary writ jurisdiction to interfere with IRCTC's administrative decision in the circumstances of this case.

Arguments of the Parties

Petitioner's Arguments

  • Clause 5.2 and 7.1 (and related tender conditions) required award of licence to the highest bidder and mandated deposit of security and licence fee within the stipulated time; respondent No. 3 failed to comply with clause 7.1 and therefore could not validly obtain the contract.
  • Respondent No. 3's failure to deposit security money and licence/concession fee (including earlier default in respect of another train) meant respondent No. 3 should have been debarred under clause 5.5 from participating in future projects for one year; thus its bid for Train No. 3351-52 should have been rejected.
  • The petitioner requested IRCTC to reject respondent No. 3's bid (letters dated 26.10.2005, annexures P4 & P5), but IRCTC proceeded to favor respondent No. 3.
  • Relied on Supreme Court decisions (W.B. State Electricity Board v. Patel Engg. Co. Ltd and R.D. Shetty v. International Airport Authority of India) in support of strict compliance with tender conditions.

Respondent No. 1 & 2 (IRCTC) Arguments

  • Although clause 7.1 appears mandatory, the answering respondents contend they require some flexibility to meet operational exigencies and that limited extensions may be granted for bona fide reasons.
  • Extension of time in the present case was granted due to peculiar facts and to avoid the cost and administrative burden of re-tendering; such extension was reasonable and bona fide.
  • Cost of re-tendering would impose unnecessary burden on the exchequer; small and reasonable extensions avoid that burden.

Respondent No. 3 (M/s Ambuja Hotel & Real Estate Pvt. Ltd.) Arguments

  • Respondent No. 3 was the highest bidder and had deposited security amount and licence fee for two other trains in time and was ready to start those trains from 1.11.2005.
  • Respondent No. 3 requested extension for the remaining trains (including Train No. 3351-52) because the amounts already deposited related to contracts which could not be handed over due to a status-quo order (Tapti-Ganga Express); IRCTC granted the extension (letter dated 10.11.2005).
  • Respondent No. 3 relied on clause 7.9 of the general conditions which allows variation of the agreement where agreed by IRCTC; respondent No. 3 contended clause 7.9 permitted the relaxation granted and accused the petitioner of suppressing clause 7.9 by not annexing the full tender document.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Master Marine Services (P) Ltd. v. Metcalfe & Hodgkinson (P) Ltd. and Another (2005) 6 SCG 138 Held that award of a contract is essentially a commercial transaction; the awarding authority may choose its method and grant relaxation for bona fide reasons if tender permits; courts should exercise discretion under Article 226 with caution and only in furtherance of public interest. The court relied on this principle to support the position that IRCTC could grant limited relaxation for bona fide administrative reasons and that judicial interference under Article 226 should be cautious; used to justify refusal to interfere in the present case.
Air India Ltd. v. Cochin International Airport Ltd. (cited within Master Marine) Reviewed law relating to award of contracts by the State and public sector corporations and characterized such awards as commercial transactions; recognized freedom to grant relaxation for bona fide reasons where tender permits. Referenced (via Master Marine) to underline that contractual relaxations may be permissible in commercial procurement and that courts should consider public interest before interfering.
Raunaq International Ltd. v. IVR Construction Ltd. and Ors. (1999) 1 SCC 492 Referenced as following the view that discretion should be exercised cautiously in interference with contract awards (as part of the line of authority). Cited as part of the judicial line supporting restraint in exercising writ jurisdiction to disturb administrative decisions in contract awards.
Directorate of Education v. Educomp Datamatics (2004) 4 SCC 19 Referenced as another authority aligning with the principle of restraint in interference with contract awards and the commercial nature of such transactions. Used to support the proposition that courts should exercise discretion cautiously and consider larger public interest in deciding whether to interfere.
W.B. State Electricity Board v. Patel Engg. Co. Ltd. (2001) 2 SCC 451 Relied upon by the petitioner (context: adherence to tender conditions and mandatory requirements). The court noted the petitioner's reliance on this decision but concluded that clause 7.9 and the facts rendered the petitioner's argument insufficient to warrant interference.
R.D. Shetty v. International Airport Authority of India (1979) 3 SCC 489 Relied upon by the petitioner (context: principles governing tenders and public contracts). The court acknowledged petitioner's reliance but held that the permissive clause 7.9 and the peculiar facts did not justify relief to the petitioner.
Chandra Singh and Ors. v. State of Rajasthan and Anr. (2003 (6) SCC 543) Affirms that writ jurisdiction under Article 226 is discretionary. Employed to reinforce the court's conclusion that even if mandatory provisions are claimed to be violated, the High Court retains discretion whether to interfere; the court refused to exercise that discretion in the present case.

Court's Reasoning and Analysis

The court's analysis proceeded along two main thrusts: (1) procedural deficiency by the petitioner (failure to disclose the entire tender document), and (2) the substantive permissibility of IRCTC's action under the tender terms and established principles governing judicial interference in contract awards.

First, the court observed that the petitioner did not annex the entire tender document to the writ petition and had selectively quoted clause 7.1 without disclosing clause 7.9. Clause 7.9 (which the petitioner had suppressed) permits variations of the agreement where such variations are endorsed or incorporated in a formal instrument and signed by the parties. The court held that the absence of clause 7.9 from the materials put before it meant the petitioner had not come with clean hands. The court emphasized the duty of a petitioner to file the entire tender document and noted that if the entire document had been before the court, the interim order granted earlier might not have been made. On this basis alone the petition was liable to be dismissed.

Second, on the substantive question, the court construed clause 7.9 as authorizing variation of tender conditions where IRCTC consents; this means the tender conditions can be varied by agreement of the parties (i.e., variations are not unilateral). Given clause 7.9, the court found that limited extensions granted by IRCTC were within the ambit of the tender conditions where agreed (or where IRCTC, as the authority, chose to relax conditions for bona fide administrative reasons).

The court further examined the factual matrix: respondent No. 3 had earlier deposited substantial payments in respect of other trains (Tapti-Ganga Express) but could not be handed over those contracts due to a status-quo order; this justified the representation to IRCTC for adjustment and a reasonable extension. Respondent No. 3 completed payment by telegraphic transfer on 24.11.2005 and IRCTC issued the award on 25.11.2005.

The court applied authorities (notably Master Marine and allied cases) to reiterate that award of contracts is a commercial decision and that courts must exercise caution before interfering under Article 226; judicial intervention should be reserved for cases where overwhelming public interest requires it. The court also relied on the settled principle that writ jurisdiction is discretionary (Chandra Singh). The court rejected the petitioner's submission that a violation of a mandatory condition necessarily removes judicial discretion; instead it held that even where a mandatory provision is said to be violated, the High Court may reasonably choose not to exercise its discretion to interfere.

Holding and Implications

Holding: The writ petition is DISMISSED and the interim order previously granted is vacated.

Implications:

  • The immediate effect is that IRCTC's award of the licence for Train No. 3351-52 to respondent No. 3 (M/s Ambuja Hotel & Real Estate Pvt. Ltd.) stands and the petitioner's challenge fails.
  • The court dismissed the petition on the ground that the petitioner had not come with clean hands by failing to file the entire tender document (notably clause 7.9) and on the exercise of judicial discretion under Article 226 in view of the peculiar facts and the permissive clause 7.9.
  • The opinion does not purport to lay down a new precedent; it applies existing principles (as reflected in cited authorities) to the facts and emphasizes judicial restraint in interfering with administrative contract awards when bona fide administrative reasons and tender provisions permitting variation exist.

Note: This summary is based exclusively on the text of the provided opinion. No facts or holdings beyond those expressly stated in the opinion have been added.

    Poorvanchal Caterers & Anr, v. Indian Railway Catering And Tourism Corporation Ltd

    Markandeya Katju, C. J.:— This writ petition has been filed for a direction that the respondent No. 1, the Indian Railway Catering & Tourism Corporation Ltd be directed not to deviate from the terms of the tender and general conditions of the licence in awarding the contract to operate and manage on board catering services on Train No. 3351-52 to respondent No. 3.

    2. As stated in para 4 of the writ petition, the respondent No. 1 advertised in the National Newspapers on 27.6.2005 inviting bids in sealed cover for operation and management of catering and onboard services on as many as 22 trains including the train No. 3351-52, Dhanbad/Tata-Alleppy Express (herein after referred to as the “train”). A true copy of the advertisement is annexure P1 to the writ petition.

    3. The petitioner submitted its bid within time in response to the said advertisement Clause 5.2 of the general conditions of licence stated that the licence to manage catering services will normally be awarded to the party quoting the highest amount of licence fee subject to fulfillment of the terms and conditions of the licence.

    4. Clause 7.1 & 7.2 of the same state as under:—

    “7.1 Acceptance of award of Licence and submission of Security Deposit:

    Successful parties would be given 7 (seven) days time, or less time as the case may be, from the date of issue of the letter of award of Licence for payment of the Security Deposit and the first installment of Licence fee and to convey his acceptance of award of Licence. In case the Licensee fails to accept the offer of award of Licence, the Licensee shall be debarred from participating in the future projects of IRECTC for a period of one year.”

    “7.2 Submission of Licence Fee/Securitv Deposit:

    The Licensee shall deposit the Licence Fee as intimated by IRCTC within the stipulated period and Licensee would be allowed 15 (fifteen) days or less time as advised by IRCTC, from the date of issue of letter for award of Licence, to provide on board and catering services in train.”

    5. It is alleged in para 4 (xiv) of the petition that the respondent No. 3 M/s Ambuja Hotel & Real Estate Pvt. Ltd. was the highest bidder and was directed to deposit the security money and the licence fee within the time stipulated in the letter of award. However, respondent No. 3 failed to deposit the security money and licence fee till 10.11.2005, even after having been granted several opportunities to deposit the same. It is alleged that respondent No. 3 had earlier defaulted in depositing the security money and licence/concession fee with respect to train No. 2429-30, letter of award for which had been issued to respondent No. 3 earlier.

    6. Clause 5.5 of the general conditions prescribed that a successful bidder will be debarred from participating in the bidding process of future projects of respondent No. 1 for a period of one year if he refuses to accept the offer of award of licence. It is alleged that respondent No. 3 having defaulted once was liable to be debarred from participating in future projects of the IRCTC for a period of one year and in the instant case was debarred from bidding for the train in question i.e 3351-3352 as well.

    7. Clause 4 of the letter issued by respondent No. 1 to respondent No. 3 dated 10.11.2005 makes it clear that respondent No. 3 had sought extension of time to deposit the amount by 20.11.2005 and the respondent No. 1, in response, has directed the respondent No. 3 to first accept the award of licences in respect of train Nos. 2429-2430 and 3351-3352 along with payment of security deposit latest by 14.11.2005 and the licence/concession fee by 20.11.2005 It is alleged that this leads to an inevitable conclusion that in the matter of award of licence to the respondent No. 3, the respondent No. 1 by granting extension time and again has violated clause 7.1 of the general conditions of the tender. True copy of the letter dated 10.11.2005 is annexure P3 to the writ petition.

    8. The petitioner requested the respondent No. 1 to reject the bid of respondent No. 3 for having defaulted, vide letter dated 26.10.2005, Annexures P4 & P5. However, it is alleged that respondent No. 1 was bent upon granting the contract to respondent No. 3, and hence this petition.

    9. A counter affidavit has been filed by respondents No. 1 & 2 and we have perused the same. In para (II) of the preliminary submissions in the counter affidavit, it is stated that though clause 7.1 is couched in a mandatory form, the answering respondents have to be given some leverage in order to meet the operational exigencies. Even otherwise, the extension of time granted in the present case has been done keeping in mind the peculiar facts and circumstances of the case. It is submitted that the cost of re-tendering would cause unnecessary burden on the exchequer, which can be avoided by allowing small and reasonable extensions, as has been done in the present case.

    10. The respondent No. 3 was the highest bidder quoting an amount of Rs. 79.13 lakhs. The petitioner was the second highest bidder. Respondent No. 1 despatched the letter dated 18.10.2005 informing the respondent No. 3 that it has been decided to award the licence for the management of on-board catering services on Train No. 3351-52 to the said respondent No. 3. He was further asked to deposit Rs. 14.21 lakhs towards security deposit and Rs. 79.13 lakhs towards annual licence fee on or before 26.10.2005 True copy of the letter dated 18.10.2005 in this connection is annexure R-1.

    11. It appears that the respondent No. 3 vide letter dated 26.10.2005 deposited a sum of Rs. 78 lakhs towards train Nos. 9045-46, 9047-48 Tapti-Ganga Express but the said contract could not be handed over to respondent No. 3 in view of an order of status-quo passed by the Orissa High Court dated 6.10.2005 in a writ petition. The said order was extended from time to time vide annexure R-4 to the counter affidavit.

    12. On 31.10.2005 the respondent No. 1 issued a show cause notice to respondent No. 3 stating that it had failed to deposit the security deposit and annual licence fee in respect of train No. 3351-52 in terms of the letter dated 18.10.2005, and it should accept the award of the licence and pay the amount; failing which respondent No. 1 would take suitable action as per the terms and conditions of the tender. However, it appears that a representation was made by respondent No. 3 stating that in view of the fact that the respondent No. 3 had already deposited an amount of Rs. 78 lakhs in respect of Tapti-Ganga Express whose contract could not be handed over to the said respondent No. 3, the respondent No. 1 may kindly extend the time for depositing the amount in respect of train No. 3351-52. Hence respondent No. 1 by letter dated 10.11.2005 extended the time for payment of security deposit for the said train No. 3351-52 till 14.11.2005 and the time for paying the licence fee till 20.11.2005 True copy of the letter dated 10.11.2005 is annexure as 5A to the writ petition. Thereafter on 22.11.2005 respondent No. 3 pursuant to meetings with respondent No. 1 made a written representation to adjust the licence fee deposited towards Tapti-Ganga Express in respect of train No. 3351-52. Copy of letter of respondent No. 3 dated 22.11.2005 is annexed as R-6 to the writ petition. Thereafter on 24.11.2005 respondent No. 3 deposited the balance amount payable in respect of train No. 3351-52 by telegraphic transfer. A true copy of the letter dated 24.11.2005 is annexure as R-7 to the writ petition.

    13. In para 4 (ix), it is alleged that in view of the peculiar circumstances of the case and in view of the fact that respondent No. 1 could not hand over the contract in respect of Tapti-Ganga Express for which respondent No. 3 had made full payment it had been decided to accept the representation of respondent No. 3 and award the licence of Train No. 3351-52 to respondent No. 3. The said decision was taken on 25.11.2005 and copy of the said office order dated 25.11.2005 is annexure as R-8.

    14. In para 4 (xiii), it is alleged that the 7- day time period stipulated in clause 7.1 cannot be read in such a rigid manner so as to bar the answering respondents from taking a decision as may be required by administrative exigencies. In this case the cost of re-tendering would cause an unnecessary burden on the exchequer. This could be avoided by allowing small and reasonable extensions, as has been done in the present case.

    15. A counter affidavit has also been filed by respondent No. 3 and we have perused the same. It is stated that undoubtedly the respondent No. 3 was the highest bidder in the contract. It is alleged in para 4 (iv) that the security amount as well as licence fee with regard to two trains had already been deposited by respondent No. 3 within time, and they were ready to start those train from 1.11.2005 As regards the other two trains, which included the present train No. 3351-52, the respondent No. 3 requested the respondent No. 1 for extending the time to deposit the security money and the licence fee due to the difficulties referred to above. The respondent No. 1 in response to the letter dated 7.11.2005 wrote a letter dated 10.11.2005 to respondent No. 3 stating that it had decided to extend the time for depositing the security till 14.11.2005 and the licence fee by 20.11.2005 True copy of the letter dated 10.11.2005 is annexure as CA-6 to the counter affidavit.

    16. The respondent No. 3 complied with the directions in the letter dated 10.11.2005, and accordingly respondent No. 1 appointed respondent No. 3 as the licencee to provide catering services in train Nos. 3351-52 w.e.f 1.12.2005 vide annexure CA-7 to the counter affidavit.

    17. The respondent No. 3 has relied on clause 7.9 of the general conditions which gives the right to the parties to vary the agreement on certain conditions. Learned counsel for respondent No. 3 has contended that clause 7.9 has not been annexed to the writ petition, and hence the petitioner has concealed relevant facts by not annexing the entire tender document with the writ petition. Hence he has not come with clean hands.

    18. After hearing learned counsel for the parties we are of the opinion that there is no merit in this petition. It appears that the entire tender document was not annexed by the petitioner. Hence clause 7.9 was not before us when we granted the interim order dated 29.11.2005 in this case.

    19. In our opinion, it was the duty of the petitioner to file the entire tender document and not merely the quoted portion of it in para 4(II) of the writ petition. Had the entire document been before us, it is quite possible that we may not have passed the interim order dated 29.11.2005 Hence, in our opinion the petitioner has not come with clean hands and the writ petition is liable to be dismissed on this ground alone.

    20. The said clause 7.9 of the general conditions reads as follows:—

    “Verbal or written arrangements other than the agreement”

    21. Except as here by other wise provided any verbal or written arrangements abandoning varying or supplementing this agreement or any of the terms hereof shall be deemed conditional and shall not be binding on the IRCTC unless until the same is endorsed on, the agreement or incorporated in a formal instrument and signed by the party(s).”

    22. A perusal of the above clause 7.9 shows that the tender conditions can be varied but that can only be done if the IRCTC agrees to the variation. In other words, clause 7.9 means that the person getting the contract, cannot change the tender conditions unilaterally and without the consent of the IRCTC. This itself means that if both the parties are agreed the tender conditions can be varied.

    23. It is surprising that in the writ petition, clause 7.9 which is of vital importance has not been disclosed but was suppressed.

    24. We cannot approve this kind of practice in filing writ petitions. In our opinion, clause 7.9 which was a vital condition, should have been disclosed to us by filing the entire tender document. The petitioner quoted only clause 7.1 and suppressed the other clauses in the tender conditions, and hence he has not come with clean hands to this Court.

    25. It is well settled that since writ is a discretionary jurisdiction a writ petition is liable to be dismissed if the petitioner does not come with clean hands.

    26. Moreover, in Master Marine Services (P) Ltd. v. Metcalfe & Hodgkinson (P) Ltd and Another (2005) 6 SCG 138 the Supreme Court observed:

    “The law relating to award of contract by the State and public sector corporations was reviewed in Air India Ltd. v. Cochin International Airport Ltd. and it was held that the award of a contract, whether by a private party or by a State, is essentially a commercial transaction. It can choose its own method to arrive at a decision and it is free to grant any relaxation for bona fide reasons, if the tender conditions permit such a relaxation. It was further held that the State, its corporations, instru-mentalities and agencies have the public duty to be fair to all concerned. Even when some defect is found in the decision-making process, the court must exercise its discretionary powers under Article 226 with great caution and should exercise it only in furtherance of public interest and not merely on the making out of a legal point. The court should always keep the larger public interest in mind in order to decide whether its intervention is called for or not. Only when it comes to a conclusion that overwhelming public interest requires interference, the court should interfere”.

    27. This view has followed the decision in Raunaq International Ltd. v. IVR Construction Ltd. and Ors. (1999) 1 SCC 492, and in Directorate of Education v. Educomp Datamatics (2004) 4 SCC 19 : 2004 (74) DRJ 434.

    28. Mr. Krishnamani, learned counsel for the petitioner submitted that clause 7.1 was a mandatory condition and since respondent No. 3 did not comply with it he could not get the contract. He submitted that Rs. 14.21 lakhs towards security deposit and Rs. 79.13 lakhs towards annual licence fee was to be deposited on or before 26.10.2005 vide annexure R-1 to the counter affidavit of respondent No. 1 which is the copy of the letter dated 18.10.2005 issued by respondent No. 1 to respondent No. 3 stating that it has been decided to award the contract for train No. 3351-52 to respondent No. 3.

    29. Mr. Krishnamani submitted that the security money was deposited only on 14.11.2005 and the annual licence fee was paid on 24.11.2005 Hence he submitted that clause 7.1 to the tender conditions was violated. He has relied on the decisions of the Supreme Court in W.B State Electricity Board v. Patel Engg. Co. Ltd (2001) 2 SCC 451 and R.D Shetty v. Internaional Airport Authority of India (1979) 3 SCC 489.

    30. As already pointed out by us, clause 7.9 permits relaxing the terms of the contract, which was done in this case. Moreover, we are of the opinion that the authorities have to be given some leverage in order to meet operational exigencies. As observed by the Supreme Court in Master Marine Services (P) Ltd. v. Metcalfe and Hodgkinson (P) Ltd. (supra), even when some defect is found in the decision making process the Court need not interfere in its discretionary jurisdiction under Article 226. to the peculiar facts and circumstances of the present case the action of the respondent No. 1 cannot be faulted and we are not inclined to exercise our discretion under Article 226. These peculiar facts were that respondent No. 3 had paid the entire money in respect of Train Nos. 9045-46 and 9047-48 (Tapti-Ganga Express) but the contract could not be handed over to respondent No. 3 in view of the status quo order passed by the Orissa High Court which was extended from time to time (though the same has now been vacated by the Supreme Court on 14.12.2005).

    31. Respondent No. 1 had issued a show cause notice on 31.10.2005 to respondent No. 3 but on the representation made by the respondent No. 3 that it had already deposited the amount of Rs. 55,64,000/- in respect of Tapti-Ganga Express, but the contract could not be handed over to it, it wanted extension of time to make the payments. The respondent No. 1 by letter dated 10.11.2005 extended the time for payment of security deposit till 14.11.2005 and the time for paying licence fee till 20.11.2005 Thereafter on 22.11.2005, respondent No. 3 pursuant to meetings with respondent No. 1 made a written representation to adjust the licence fee deposited with regard to Tapti-Ganga Express in respect of Train No. 3351-52. Thereafter on 24.11.2005 respondent No. 3 deposited the balance amount payable in respect of Train No. 3351-52 by telegraphic transfer. The aforesaid adjustments were de-hors the sum of Rs. 57/- lacs in respect of bills of respondent No. 4 pending with IRCTC, in respect of Tapti Ganga Express.

    32. Apart from the fact that Clause 7.9 permits variation in the tender conditions, we are also of the opinion that this is not a fit case for interference under Article 226 of the Constitution.

    33. It is well settled that writ jurisdiction is discretionary jurisdiction vide Chandra Singh and Ors. v. State of Rajasthan and Anr. 2003 (6) SCC 543. Hence, even if there is violation of law we are not bound to interfere.

    34. Mr. Krishnamani, learned counsel for the petitioner submitted that if a mandatory condition is violated the court exercising writ jurisdiction has no discretion in the matter, and it must interfere. We do not agree. The question whether to exercise our discretion under Article 226 or not arises only in cases where a mandatory provision of law is said to be violated. Where the provision is directory this question would not even arise, because a directory provision is not enforceable. Hence to say that we have no discretion in writ jurisdiction when a mandatory provision is being violated would really mean that we have no discretion at all under Article 226. This is clearly an untenable position, and has only to be stated to be rejected. The correct position in law is that even when a mandatory provision is violated the High Court under Article 226 is not bound to interfere on the facts of the case, though of course this discretion must not be exercised arbitrarily but in a reasonable manner taking into account the facts of that particular case.

    35. The petition is dismissed. Interim order is vacated.