Translate
Text Highlighter

Bookmark

PDF

Share

Report a problem
AMICUS AI
Citation Codes
Equivalent Citations
citation codes
Case Number
Attorney(S)
Judges
Acts
  • S. 37 of the Arbitration and Conciliation Act, 1996 (hereinafter referred to as the Act)
  • Act of 1996, has repealed Arbitration Act, 1940 and the Foreign Award Act, 1961
  • provisions of the 1940 Act. Section 5 of the 1996 Act
  • provisions of S. 39 of the Arbitration Act, 1940
  • ARBITRATION AND CONCILIATION ACT 1996
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Equivalent Citations
citation codes
Case Number
Attorney(S)
Judges
Acts
  • S. 37 of the Arbitration and Conciliation Act, 1996 (hereinafter referred to as the Act)
  • Act of 1996, has repealed Arbitration Act, 1940 and the Foreign Award Act, 1961
  • provisions of the 1940 Act. Section 5 of the 1996 Act
  • provisions of S. 39 of the Arbitration Act, 1940
  • ARBITRATION AND CONCILIATION ACT 1996
Smart Summary

Structured Summary of the Opinion — Maintainability of Appeals under S.37 of the Arbitration and Conciliation Act, 1996

Factual and Procedural Background

Disputes arose between the parties and they entered into a Memorandum of Understanding dated 8 January 1999 agreeing that differences would be referred to arbitration by Hon'ble Mr. Justice A. M. Ahmadi as sole arbitrator. Arbitral proceedings commenced and, during those proceedings, applications under Section 17 of the Arbitration and Conciliation Act, 1996 (seeking interim directions relating to disclosure of shareholding structure, board composition and restraint on dealing in shares) were filed by the respondents (Vikram Kapur and Rajiv Kapur).

The sole arbitrator appointed representatives of M/s. Ernst & Young (who engaged S. R. Batliboi & Co. staff) to review accounts and submit a report. After receipt of the report dated 13 June 2001 and subsequent procedural exchanges, two orders/findings of the sole arbitrator dated 19-8-2001 and 10-9-2001 (refusing to permit certain examinations and accepting that the review was carried out by representatives of Ernst & Young/S.R. Batliboi) became the subject-matter of two appeals purportedly filed under Section 37 of the Act (FAO 449/2001 and FAO 450/2001).

The Court confined the proceeding to the preliminary question of the maintainability of the appeals under Section 37 and heard counsel at length on whether the impugned orders were appealable under that provision.

Legal Issues Presented

  1. Whether the orders/findings dated 19-8-2001 and 10-9-2001 made by the sole arbitrator qualify as orders granting or refusing an interim measure of protection under Section 17(1) of the Arbitration and Conciliation Act, 1996 and are therefore appealable under Section 37 of the Act.
  2. Whether the impugned orders are instead procedural orders (for example under Section 19 read with Section 26 regarding appointment and examination of experts) and thus not appealable under Section 37.

Arguments of the Parties

Appellant's Arguments

  • The appeals were brought under Section 37 of the Act because the orders stemmed from proceedings initiated under Section 17 and thus constituted interim measures of protection appealable under Section 37(2)(b).
  • Reference was made to various applications (including the respondents' application dated 7-4-2001 under Section 17 and other applications by both sides) and to multiple hearings to show the orders dated 19-8-2001 and 10-9-2001 arose in the context of Section 17 proceedings.
  • The appellant argued that the sole arbitrator's finding that the report was that of Ernst & Young and that S. R. Batliboi & Co. were representatives of Ernst & Young was erroneous and prejudicial:
    • That the arbitrator misread the appellant's consent regarding appointment of Ernst & Young as amounting to consent to appointment of representatives.
    • The arbitrator wrongly concluded, relying on Manoj Gupta's statement, that S. R. Batliboi & Co. were registered representatives of Ernst & Young International with the Institute of Chartered Accountants.
    • Declining the appellant's request to examine Jayesh Desai (author/supervisor) prejudiced the appellant.
  • The appellant contended the impugned findings were final on the validity of the report and highly prejudicial — amounting to an effective decision on the interim matter.

Respondents' Arguments

  • The respondents objected to maintainability: none of the impugned orders can be characterized as granting or refusing to grant an interim measure under Section 17 of the Act.
  • The respondents submitted that the impugned orders were procedural orders made under Section 19 read with Section 26 (relating to experts), and by no stretch could they be treated as orders under Section 17(1).
  • In short, the respondents argued the appeals were not covered by the limited categories of appeal provided in Section 37 and were therefore not maintainable.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
United India Insurance Co. Ltd. v. Kumar Texturisers, AIR 1999 Bombay 118 Illustrates that the 1996 Act aims to minimise judicial supervision and that courts can intervene only where remedies are provided by the Act (reference to S.5 and the object of limiting court intervention). The Court relied on this principle to emphasise the restrictive supervisory role of courts under the 1996 Act when interpreting Section 37, reinforcing that appeals must fall within the categories the Act specifies.
Union of India v. A. S. Dhupia, AIR 1972 Delhi 108 (Full Bench) Interpreted qualifying words in the predecessor provision (S.39 of the 1940 Act) — that the phrase "and from no other orders" narrows the scope of appealable orders. The Court applied the analogy to S.37 of the 1996 Act, holding that the restrictive language means appeals lie only from the orders specified in S.37 and not from other orders of an arbitral tribunal.
Union of India v. Mahindra Supply Co., AIR 1962 SC 256 Supreme Court authority on interpretation of restricting words in appeal provisions (as referenced in the opinion to explain the effect of qualifying language limiting appeals). The Court used this authority to support the view that the qualifying words in Section 37 must be read to limit appeals to those expressly provided for, disallowing appeals from other arbitral tribunal orders.

Court's Reasoning and Analysis

The Court confined the contested question to the maintainability of the appeals under Section 37 and undertook a textual and purposive interpretation of the relevant provisions of the 1996 Act, with attention to the Act's object of minimizing judicial intervention (Section 5).

Key elements of the Court's step-by-step analysis:

  1. The Court set out the statutory text of Section 37 and Section 17 and noted the limited categories of appeal provided by Section 37: appeals from certain court orders (Section 37(1)) and from specified orders of an arbitral tribunal (Section 37(2)(a) and (b)), namely acceptance of certain pleas under Section 16 and granting or refusing interim measures under Section 17.
  2. The Court emphasized the restrictive scheme — including the phrase "and from no others" in Section 37(1) and analogous limiting interpretation developed under the 1940 Act — and rejected the appellant's contention that the absence of identical qualifying words in subsection (2) allowed a broader right of appeal from any prejudicial arbitral ruling.
  3. The Court considered the procedural history and the substance of the impugned orders dated 19-8-2001 and 10-9-2001. It analyzed whether those orders were, in substance, orders granting or refusing interim measures under Section 17(1). The Court concluded they were not: at best they were observations or procedural rulings (for example, relating to appointment and examination of experts under Section 26 and the conduct of the review), and the arbitrator remained open to further consideration of objections.
  4. The Court held that even if the impugned observations were prejudicial or might influence later orders, prejudice alone does not convert a non-Section-17 procedural ruling into an appealable interim-measure order under Section 37. The appropriate remedy would be to challenge any future, concrete order granting or refusing an interim measure based on those observations.
  5. Accordingly, allowing appeals against such intermediate observations would undermine the statutory scheme and the Act's object of minimizing court intervention. The Court therefore found the appeals to be misconceived and not maintainable under Section 37.

The Court also referred to Section 26 (expert appointment by the arbitral tribunal) as relevant to characterising the impugned steps as procedural rather than as interim measures under Section 17.

Holding and Implications

Holding:

The appeals are dismissed as not maintainable under Section 37 of the Arbitration and Conciliation Act, 1996.

Direct consequences and orders:

  • Each appeal is dismissed and the appellants are ordered to pay costs of Rs. 10,000 in each appeal, to be deposited with the Delhi State Legal Authority within four weeks.
  • Interim orders dated 19-9-2001 are vacated.

Broader implications (as articulated by the Court):

  • The decision reinforces a restrictive reading of Section 37 consistent with Section 5 of the Act: appeals lie only from the orders expressly specified in Section 37 (i.e., certain court orders and, in respect of arbitral tribunals, acceptance of specified pleas under Section 16 and grant/refusal of interim measures under Section 17).
  • The Court cautioned against allowing appeals from procedural or intermediate arbitral observations merely because they may be prejudicial; such practice would frustrate the Act's object of minimizing court intervention in arbitral proceedings.

The Court indicated that if, in future, the arbitrator makes a concrete order under Section 17 based on the disputed observations, the appellants would be entitled to challenge that specific order under Section 37 as applicable.

Appeals dismissed.

    Arun Kapur v. Vikram Kapur And Others

    These two appeals purportedly under S. 37 of the Arbitration and Conciliation Act, 1996 (hereinafter referred to as the Act) purportedly because that is the precise question which this Court is called upon to answer, have been filed by the above named appellant against the orders/directions/findings/observations dated 19-8-2001 and 10-9-2000 made by the sole arbitrator Mr. Justice A. M. Ahmadi (former Chief Justice of India) in pending arbitral proceedings in relation to certain disputes which have arisen between the parties. As an objection has been raised about the very maintainability of these appeals before this Court at the very outset, the counsel for the parties have been heard at length on this question and, therefore, this order is confined to the question of maintainability of the appeal under the said provision of law.

    2. Before coming to the real controversy between the parties, it is necessary to refer to the background leading to the orders/findings of the sole arbitrator which are sought to be assailed in these appeals. Disputes having arisen between the parties, the parties entered into a Memorandum of Understanding (hereinafter referred to as the MOU) dated 8th January, 1999 which, inter alia, stipulated that in case of difference of opinion on any matter and if a settlement is not arrived at, the matter will be referred to the arbitration by Hon'ble Mr. Justice A. M. Ahmadi (former Chief Justice of India) as the sole arbitrator. Pursuant to the said MOU, the arbitral proceedings commenced before the sole arbitrator.

    3. During the course of the proceedings, an application dated 7-4-2001 under S. 17 of the Act was moved on behalf of the respondents Vikram Kapur and Rajiv Kapur for a direction on the appellant herein to disclose the share holding structure and the composition of the Board of Directors of Limrose and for restraining the said Company through the appellants from dealing with or in any way encumbering, selling, alienating, parting, mortgaging or otherwise dealing with the shares of Atlas Cycles Industries Ltd. held by Limrose.

    4. At the 25th hearing held on 12th May, 2001 before the Sole Arbitrator, Mr. O.P Khaitan, counsel for the respondents referred to his note dated 8th May, 2001 wherein several concerns arising out of the statutory auditors papers have been raised. The learned Arbitrator after going through the record of the Malanpur Unit in support of the allegations and on the basis of the same, held the view that the discrepancies pointed out by Mr. Khaitan, prima facie, called for an explanation by the appellant Mr. Arun Kapur who was In-charge of the Malanpur Unit during the relevant period. A request was also made on behalf of the respondents that an expert may be appointed to look into those aspects and submit his report to the arbitrator. On the request of the counsel for the appellant, the learned Arbitrator deferred the circulation of the minutes of the Meeting for three days. On 14th May, 2001, the sole arbitrator received a fax message from the appellant stating that he had no objection if an independent expert from the firm of M/s. Ernst and Young was appointed to scrutinise the accounts in respect of which the respondent's counsel had circulated notes based on the report of the statutory auditors. As it was not objected to from the side of the respondents, the arbitrator appointed representative of M/s. Ernst and Young to look into the accounts sheet supplied by the statutory auditor and the notes filed by the counsel of the respondents and directed them to submit the report within a month. Each group was asked to deposit a sum of Rs. 15,000/- with M/s. Ernst and Young as initial payment, subject to paying their charges when the report was submitted. The arbitrator also directed that the representatives will evolve his/her own procedure and were free to discuss the matter singally or jointly with the members of the Malanpur family as he/she may feel necessary but will take independent view and will not be guided by any group of the two groups.

    5. To carry out the assignment/review as directed by the sole arbitrator, M/s. Ernst and Young appointed S/Shri Manoj Gupta, Prashant Shekhar and Rahul Singh of M/s. S. R. Batliboi and Company visited the Malanpur Unit between 28th May to 2nd June, 2001. The work plan was, however, supervised and reviewed by Shri Jayesh Desai (Director of Ernst and Young), who submitted the report dated 13th June, 2001 to the sole arbitrator. On 15th June, 2001, the sole arbitrator forwarded a copy of the said report to the appellant for his perusal and comments, if any, by 23rd June, 2001. It appears that the appellant offered his comments/objections to the said report by fax on 20-6-2001, but a hard copy thereof was furnished to counsel for the respondent only at the time of 29th hearing held on 10th July, 2001. The same were forwarded to M/s. Ernst and Young for their remarks. It appears that the subsequent hearings scheduled for 17th July, 2001 and 21st July, 2001, 27th July, 2001 and 1st August, 2001 could not take place for one or the other reason.

    6. At the 30th hearing held on 9th August, 2001, an application dated 8-8-2001 was filed on behalf of the appellant praying for modification of orders dated 12-4-2001, 24-4-2001, 12-5-2001 and 26-7-2001 and for sine die adjournments of the proceedings. During the course of the said hearing, another application was moved on behalf of the appellant to examine Shri Jayesh Desai of M/s. Ernst and Young who forwarded the report and S/Shri Prashant Shekhar and Rahul Singh who assisted Shri Manoj Gupta in the task undertaken by him, the said application was heard and disposed of by the learned sole Arbitrator with the following order/observation:—

    “At the end an application was given by counsel for Shri Arun Kapur to examine Shri Jayesh Desai who forwarded the report and Shri Prashant Shekhar and Shri Rahul Singh who assisted Shri Manoj Gupta in the task undertaken by him at the request of M/s. Ernst and Young. Not a single question was put to Shri Manoj Gupta in relation to the role of Shri Jayesh Desai. All that was urged in support of the application was that he had observed on p. 4 of the report that the work was planned, supervised and reviewed by him. However, it is abundantly clear that the entire exercise of investigation and review of accounting system, etc. was undertaken by Shri Manoj Gupta and his assistant. Therefore, I see no need to call Shri Jayesh Desai for questioning since Shri Manoj Gupta who is the sole architect of the report is questioned. So also I see no point in calling at those who merely assisted Shri Manoj Gupta in collection and collation of the data. It would unnecessarily protract the proceedings. It must be remembered that M/s. Ernst and Young were appointed by consent of all concerned to resolve the doubt in regard to siphoning of money. Since Shri Arun Kapur had levelled allegations against the statutory auditors, he was given an option to name an independent auditor and he had communicated the name of M/s. Ernst and Young, vide his fax dated 1-5-2001. He must have known that Shri Manoj Gupta was looking into the accounts and had visited Malanpur on 28th May, 2001. He raised no objection until the report was admitted. I have, therefore, not the least hesitation in spurning the request made in this behalf by counsel for Shri Arun Kapur.”

    The above order/observation is the subject-matter of FAO 449/2001.

    7. Subsequently in the meeting held on 10th September, 2001 a controversy was raised from the side of the appellant that the work assigned to M/s. Ernst and Young was in fact not carried out by the staffers of the said concern but by a different concern, M/s. Batliboi and Company. The said question was answered by the sole arbitrator with the following finding/observation:—

    “The hearing on the Report of Ernst and Young was taken up on 19th August, 2001. The Report at page 4 states that Ernst and Young had appointed Manoj Gupta, Prashant Shekhar and Rahul Singh of S. R. Batliboi and Co., who were experience in such specialized review processes, to carry out the review. Mr. Sundram desired to question Jayesh Desai under whose supervision the review was undertaken but since there was no advance notice the said Jayesh Desai was not present. Manoj Gupta was present and he was questioned at length and his examination was recorded in question and answer form. The trend of questioning was to question the report on the ground that the expert appointed by consent was Ernst and Young and of Batliboi and Co. It appears from his examination that S. R. Batliboi and Co. is the representative of Ernst and Young Pvt. Ltd. in India and they both are part of Ernst and Young International. He has stated that S. R. Batliboi and Co. are registered as representative of Ernst and Young International with the Institute of Chartered Accountants since Manoj Gupta is a partner in S. R. Batliboi and Co. a Chartered Accountant firm, which is a representative of Ernst and Young International, the parent body, I do not see what objection there could be to him and his team mates carrying out the review entrusted to them by Ernst and Young. In fact even on earlier occasions Manoj Gupta did not represent Ernst and Young at the hearing vide minutes dated 18th May, 2001. On that day there was some discussion for a lump sum settlement instead of an investigation by a representative of Ernst and Young but the discussion did not yield any result whereupon the representative of Ernst and Young who was present (Manoj Gupta) was asked to expedite the process. No objection was raised by Arun Kapur or his counsel at that time. The object comes only after the report indicts him. No objections was raised even after Manoj Gupta and his team has visited Malanpur on May, 2001.”

    The above finding/observation is the subject-matter of FAO 450/2001.

    8. I have heard Shri A. Sundaram, senior advocate on behalf of the appellant and Shri Prag Tripathi, senior advocate on behalf of the respondents and have given my thoughtful consideration to their respective submissions. The foremost objection put forward from the side of the respondent is about the maintainability of these appeals under S. 37 of the Act. This objection is based on the submission that none of the above referred orders can be said to be an order granting or refusing to grant an interim measure under S. 17 of the Act. Chapter IX of the Act deals with the appeals and S. 37 with the appealable orders and it reads as under:—

    37. Appealable orders - (1) An appeal shall lie from the following orders (and from no others) to the Court authorised by law to hear appeals from original decrees of the court passing the order, namely:—

    (a) granting or refusing to grant any measure under S. 9;

    (b) setting aside or refusing to set aside an arbitral award under S. 34.

    (2) An appeal shall also lie to a court from an order of the arbitral tribunal -

    (a) accepting the plea referred to in sub-sec. (2) or sub-sec. (3) of S. 16;

    (b) granting or refusing to grant an interim measure under S. 17.

    Section 17 of the Act is a part of Chapter IV about the jurisdiction of arbitral tribunals and is couched in the following terms:—

    “17. Interim measures ordered by arbitral tribunal - (i) Unless otherwise agreed by the parties, the arbitral tribunal may, at the request of a party, order a party to take any interim measure of protection as the arbitral tribunal may consider necessary in respect of the subject matter of the dispute.

    (2) The arbitral tribunal may require a party to provide appropriate security in connection with a measure ordered under sub-sec. (1).”

    9. The answer to the question whether these appeals are maintainable or not under S. 37 of the Act will solely depend on the answer to the question whether the order/findings of the sole arbitrator dated 19-8-2001 and 10-9-2001 are the orders made under S. 17(1) of the Act. In order to show that these orders are appealable orders under S. 37 of the Act, the learned counsel for the appellant has extensively referred to various proceedings taken up before the sole arbitrator and more especially those commencing with an application dated 7th April, 2001 filed on behalf of the respondents Vikram Kapur and Rajiv Kapur under the provisions of S. 17 of the Act seeking certain directions in relation to the Board of Directors and affairs of Limrose. This was followed by another application dated 9-4-2001 by the abovenamed respondents praying to the arbitrator to give directions for the removal of appellant Arun Kapur from the membership of the JMC and in the alternative to pass an order directing that the strength of the JMC be enhanced to six members comprising of two members from each one of the family. Reference has also been made to an application on behalf of the appellant Arun Kapur under S. 17 of the Act praying for a direction to ensure full cooperation and to provide all records for an independent verification of records and assets of M/s Atlas Cycle Industries Ltd. Milton Cycle Industries Ltd. and Roamer Engineering Works Pvt. Ltd. Reference was also made to certain subsequent applications dated 24-2-2001 and 13-10-2001 made on behalf of the respondent Vikram Kapur and Rajiv Kapur praying the sole arbitrator to pass such directions in the matter. According to the learned counsel for the appellant all these applications are under S. 17 of the Act.

    10. Learned counsel for the appellant has then referred to the proceedings of the sole arbitrators pertaining to 23rd hearing held on 5th May, 2000, 24th hearing held on 9th May, 2001, 25th hearing held on 18th May, 2001, 27th hearing held on 12th June, 2001, 29th hearing held on 10th July, 2001, 30th hearing held on 9th August, 2001, 31st hearing held on 19th August, 2001 and that of the 33rd hearing held on 10th September, 2001 in order to show that the orders/finding which came to be made on 19-8-2001 and 10-9-2001 are nothing but are orders of interim measure of protection made by the arbitral tribunal under S. 17(1) of the Act. As against this, the contention of learned counsel for the respondents is that the said orders are procedural orders made by the arbitral tribunal under S. 19 read with S. 26 of the Act and by no stretch of imagination they can be termed orders made under S. 17(1) of the Act. Section 26 of the Act relating to the appointment of an expert by arbitral tribunal is also relevant in this context and it provides as under:—

    “26. Expert appointment by arbitral tribunal -(1) Unless otherwise agreed by the parties, the arbitral tribunal may -

    (a) appoint one or more experts to report to it on specific issues to be determined by the arbitral tribunal, and

    (b) require a party to give the expert any relevant information or to produce, or to provide access to, any relevant documents, goods or other property for his inspection.

    (2) Unless otherwise agreed by the parties, if a party so requests or if the arbitral tribunal considers it necessary, the expert shall, after delivery of his written or oral report, participate in an oral hearing where the parties have the opportunity to put questions to him and to present expert witnesses in order to testify on the points at issue.

    (3) Unless otherwise agreed by the parties, the expert shall, on the request of a party, make available to that party for examination all documents, goods or other property in the possession of the expert with which he was provided in order to prepare his report.

    11. Learned counsel for the appellant has further argued that the findings of the sole arbitrator rejecting the objections of the appellant in respect of the report dated 13-6-2001 being that of Ernst and Young, for appointment of whom, the appellant had agreed and holding that it was the report of the Ernst and Young, is an erroneous finding which goes to the root of the matter and has the effect of almost deciding the fate of arbitral reference pending before the arbitrator. Similarly, it is argued that the finding of the sole arbitrator holding that on the spot review carried out by the team headed by Shri Manoj Gupta of M/s Batliboi and Co. is in fact a review carried out by the representation of M/s Ernst and Young is also contrary to the factual and legal position. Further that declining the request of the appellant for examination of Jayesh Desai of M/s Ernst and Young, author of the report dated 13-6-2001 has greatly prejudiced the appellant. According to him, all these findings and orders are liable to be set aside on the following grounds:—

    (A) Although the appellant had given his consent for appointment of M/s Ernst and Young for the purpose of carrying out the review to clear certain concerns/doubts raised from the side of the respondent in their note dated 8th May, 2001 concerning the accounts of Malanpur Unit, but the sole arbitrator of his own had misread the said consent of the appellant as for appointment of an expert or representatives of M/s Ernst and Young.

    (B) The sole arbitrator relying upon the statement of Shri Manoj Gupta had wrongly concluded that M/s Batliboi and Co. are registered representative of Ernst and Young International in India with the Institute of Chartered Accountant and M/s Batliboi and Co., a Chartered Accountant Firm, is the representative of Ernst and Young International, the parent body is, therefore, deemed to be the representative of M/s Ernst and Young.

    12. It is not necessary to go into the question of correctness or otherwise of the said orders/findings at this stage. The said question can only be considered if this Court comes to conclusion that the orders/findings of the sole arbitrator under appeal are orders made under S. 17 of the Act and are appealable ones under S. 37 of the Act. This question has to be examined keeping in view the scheme and object of the Act and certain provisions of the 1940 Act. Section 5 of the 1996 Act reads as under:—

    “5. Extent of judicial intervention. --Notwithstanding anything contained in any other law for the time being in force, in matters governed by this part, no judicial authority shall intervene except where so provided in this part.”

    It is, therefore, manifest that one of the main object of the Act is to minimise the supervisory role of the Courts in the arbitral process. This has been so held in the case of United India Insurance Co. Ltd. v. Kumar Texturisers AIR 1999 Bombay 118 in the following words at page 118-119:—

    “It is therefore clear that a Court can intervene only in the event of a remedy is provided under the Act. The Arbitration and Conciliation Act, 1996 which hereinafter shall be referred to as the Act of 1996, has repealed Arbitration Act, 1940 and the Foreign Award Act, 1961 as also another legislation. One of the main objects of the Act is to minimise the supervisory role of Courts in the arbitral process. The question which has arisen, therefore, will have to be decided by considering S. 5 and the object for which the Act of 1996 has been enacted.”

    “The Court can intervene also on an application under S. 14(2) of the Act of 1996. In other words, a conjoint reading of S. 5, S. 34, S. 37 and S. 14(2) of the Act of 1996 will show that the Court can intervene only in cases covered by S. 14, S. 34 and S. 37.”

    13. The provisions of S. 37 take generally the form of S. 39 of the 1940 Act, but they are materially different from the said provision and it must be with a view to minimise the supervisory role of the Court in arbitral process which is in consonance with the spirit of the Act as contained in S. 5. sub-sec. 1(a) and (b) of S. 37 provide for appeals against the order of Courts granting or refusing to grant interim measures under S. 9 and setting aside or refusing to set aside an award under S. 34. Sub-sec. (1) emphasise that appeal shall not lie against any other orders. This is a major departure from the 1940 Act whereas sub-sec. (1) provides for an appeal from Court orders specified therein, sub-sec. (2) provides for an appeal to the Court from an order of an arbitral tribunal (a) accepting the plea referred to in sub-sec. (2) or sub-sec. (3) of S. 16; and (b) granting and refusing to grant interim measure under S. 17. The words “and from no other orders” appearing in sub-sec. (1) of S. 37 are analogous to the provisions of S. 39 of the Arbitration Act, 1940 and came to be interpreted by a Full Bench of this Court in the case of Union of India v. A. S. Dhupia, AIR 1972 Delhi 108 FB and Hon'ble Supreme Court in the case of Union of India v. Mahindra supply Company, AIR 1962 SC 256 and the Supreme Court held that these words qualify the expression, “an appeal shall lie from the following orders”, would qualify S. 39(2) as well, therefore, by the same analogy the expression “and from no others” used in S. 37(1) of the Act would equally qualify S. 37 (2) and 37 (3) of the Act. A conjoint reading of S. 5 and S. 37 makes it abundantly clear that the only orders against which appeals would lie are the orders specifically mentioned in S. 37(1) in case of original decrees passed by a Court and S. 37 (2) in respect of orders passed by an arbitral tribunal. The contention of the learned counsel for the appellant that the qualifying words used in sub-sec. (1) being absent in sub-sec. (2) of S. 37 and therefore an appeal can also lie from an order of the arbitral tribunal even if the said order is strictly not one falling under clause (a) or (b) has no merits and is liable to rejection because it goes against the very spirit and object of the Act. If this contention of the appellant is accepted, it would mean that an appeal would lie from each and every order of the arbitral tribunal which has even the slightest effect of causing prejudice to one or the other party. This Court is of the clear opinion that a Court will be competent to entertain the appeals from an order of the arbitral tribunal falling under Clause (a) or Clause (b) of sub-sec. (2) of S. 37 of the Act and from no others.

    14. Now coming back to the question if the two orders or any one of them which are subject matter of these appeals can be said to be orders which can qualify for being termed as orders relating to an “interim measure of protection”. Learned counsel for the appellant has strenuously urged that as the impugned orders came to be passed during the course of the proceedings which were initiated on the application of the respondents under S. 17 and also the application made on behalf of the appellant, are necessarily orders of interim measure of protection made under S. 17. His next submission is that the orders are final at least on the question of the validity of the purported report of Ernst and Young and are highly prejudicial to the interest of the appellants and amount to almost deciding the said interim measure of protection. According to him the appellants cannot be asked to wait for the making of further orders relating to interim measure of protection by the Arbitrator. On the other hand, counsel for the respondent has urged that the impugned orders cannot be called to be orders relating to an interim measure of protection by any stretch of imagination.

    15. On a consideration of the respective contentions put forth on behalf of the parties and having gone through the various proceedings before the sole arbitrator, this Court is of the considered view that neither the order/finding dated 19-8-2001 nor the order/finding dated 10-9-2001 can even remotely be said as order passed under S. 17 of the Act. At best the sole arbitrator has made certain observation which will show that he is still open to consider the objections raised on behalf of the appellant. Even if for the sale of arguments it/is assumed that the observations/findings of the sole arbitrator are final and prejudicial to the interest of the appellants and may have a bearing on the orders which might be passed in the proceedings under S. 17 of the Act, this Court is of the view that by itself is no ground to entertain the appeal. It might be open to the appellant to challenge the said findings/observations of the sole arbitrator if an order of interim measure as contemplated by S. 17 of the Act basing on the said observations/findings is made by the sole arbitrator at some future date. The appellant has rushed to this Court under certain misapprehension about the orders of interim measure which might be passed by the sole arbitrator. The appellant cannot be allowed to short-circuit the proceedings before arbitral tribunal by approaching this court with appeals against certain orders/observations which do not lie under the provisions of the Act. If appeals against such arbitral findings/observation are entertained, it would be contrary to the scheme and objects of the Act and will frustrate the very object of the legislation where the emphasis is on minimising the judicial intervention.

    16. Thus having considered the matter in its entirety and for the foregoing reasons, this Court has no hesitation in holding that none of the appeals are against the arbitral order granting or refusing to grant any interim measure under S. 17 and therefore the present appeals under S. 37 before this Court are wholly misconceived and not maintainable. The appeals stand accordingly dismissed with costs of Rs. 10,000/- in each appeal to be deposited with the Delhi State Legal Authority within a period of four weeks. Interim orders dated 19-9-2001 are hereby vacated.

    Appeals dismissed.