Structured Summary of the Opinion (R. Banumathi, J.)

Factual and Procedural Background

The appellant, Bharat Petroleum Corporation Limited (BPCL), appealed against an order of the learned Single Judge in OP No. 295 of 2000 (dated 31.10.2003) that had set aside an arbitral award. The first respondent is a physically handicapped ex-serviceman who was granted an LPG distributorship in 1996 for the Saligramam area. Customer complaints and market backlog arose. A shortage of 249 cylinders led BPCL to raise a debit note of Rs. 3,73,500 on 31.07.1994; part-payment was later made by the distributor, but a balance remained due. On 28.01.1997, BPCL officers found the godown and showroom closed with customers waiting; BPCL terminated the distributorship by a letter dated 21.02.1997 invoking Clause 27(g) and 27(n) of the distributorship agreement. The distributor challenged termination; Mr. S.K. Dutta was appointed sole arbitrator and issued an award (dated 15.09.1999) upholding termination. The first respondent then filed a Section 34 petition under the Arbitration Act to set aside that award. The Single Judge set aside the award, finding BPCL had not followed Marketing Discipline Guidelines (MDG) and that termination violated principles of natural justice and MDG. BPCL appealed to the court that delivered this opinion.

Legal Issues Presented

  1. Whether the learned Single Judge was justified in setting aside the arbitral award under Section 34 of the Arbitration and Conciliation Act, 1996?
  2. Whether a distributorship agreement that is determinable in nature can be specifically ordered to be restored (i.e., whether restoration of distributorship is an available relief)?

Arguments of the Parties

Appellant's Arguments (BPCL)

  • BPCL contended that the irregularities committed by the distributor fell squarely within Clause 27(g) and 27(n) of the distributorship agreement and that the arbitrator correctly held termination was justified.
  • It was argued that interference with an arbitral award under Section 34 is very limited and, where an arbitrator acts within the terms of reference and the contract, a court should not set aside the award.
  • Relying on Indian Oil Corporation Ltd. v. Amritsar Gas Service, BPCL submitted that where a contract is determinable in nature, restoration of distributorship (specific performance) is not an appropriate relief and the Single Judge erred in ordering restoration.

Respondent's Arguments (First Respondent / Distributor)

  • The first respondent explained delayed payments as due to financial problems and contended that such delay was at best a minor offence not warranting termination.
  • The respondent argued the arbitrator failed to consider the Marketing Discipline Guidelines (MDG) and that, given the nature of the irregularities and the MDG and natural justice concerns, the Single Judge correctly set aside the award and ordered restoration of distributorship.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Indian Oil Corporation Limited v. Amritsar Gas Service (1991 (1) Arb. LR 97 (SC)) The distributorship agreement being determinable in nature falls under Section 14(1)(c) of the Specific Relief Act and restoration (specific performance) is not an appropriate relief; the only relief may be compensation for the notice period. The court applied this principle to hold that the Single Judge was wrong to order restoration of distributorship; because the agreement is determinable (Clause 28), specific enforcement/restoration was not permissible and Indian Oil was directly analogous.
Oil & Natural Gas Corporation Ltd. v. Saw Pipes Ltd. ((2003) 5 SCC 705 : AIR 2003 SC 2629) An award contrary to substantive law, the Arbitration Act, or the terms of the contract may be patently illegal and thus susceptible to interference under Section 34; public policy in Section 34 must be given a wide meaning (including patent illegality). The court invoked Saw Pipes to explain the grounds on which an arbitral award may be set aside but concluded the arbitrator had acted according to contract terms and there was no patent illegality warranting interference in this case.
Ispat Engineering & Foundry Works v. Steel Authority of India Ltd. ((2001) 6 SCC 347) Court should not reappraise evidence or examine documentary/oral evidence to find errors of law committed by arbitrator; courts cannot substitute their own evaluation for that of the arbitrator. The court relied on this line of authority to emphasise limited judicial review and to refuse to re-evaluate evidential findings on which the arbitrator acted.
Union of India v. Bungo Steel Furniture (Pr.) Ltd. (AIR 1967 SC 1032) — cited within Ispat Part of the jurisprudence restricting courts from investigating merits in place of arbitrators (supporting non-reappraisal principle). Used as part of the chain of authority to support the proposition that a court cannot reappraise evidence to overturn an arbitral award.
McDermott International Inc. v. Burn Standard Co. Ltd. ((2006) 4 MLJ 456) The 1996 Act contemplates minimal supervisory role for courts; intervention is limited to circumstances such as fraud, bias, violation of natural justice — courts cannot correct errors of arbitrators. The court cited this authority to reinforce that judicial interference with arbitral awards is limited and should be invoked only in the few specified circumstances.
Renusagar (1994 Supp (1) SCC 644) — cited in Saw Pipes Earlier, a narrower meaning was given to "public policy"; Saw Pipes revisited and expanded the concept. Referenced in the court's discussion of Saw Pipes to explain the evolution and breadth of "public policy" under Section 34.

Court's Reasoning and Analysis

The court proceeded through a structured legal analysis drawing upon the factual findings, the arbitration award, the terms of the distributorship agreement, and governing statutory and precedential law:

  1. The court reviewed the arbitrator's findings: the distributor admitted delays in payments (default) and shortages of cylinders; the arbitrator concluded BPCL was within its rights to terminate under Clause 27(g) (default in payment beyond 4 days of demand) and Clause 27(n) (acts prejudicial to BPCL's interest or good name), and found termination not wrongful.
  2. The court examined the contractual terms: Clause 27 lists events permitting termination forthwith, including non-payment (27(g)) and acts prejudicial to BPCL's interest (27(n)); Clause 28 permits termination by either party on 30 days' notice, demonstrating the determinable nature of the distributorship.
  3. On the factual matrix, the court observed: payments purportedly due on various dates in 1996 were in truth paid only by demand drafts on 20.02.1997, 22.02.1997 and 03.03.1997; the distributor admitted delayed payment; a substantial shortage of cylinders was acknowledged and a debit note issued; there was a civil dispute involving a third party (G. Mallika) who allegedly took control of the godown and documents, affecting effective control and distribution.
  4. The court accepted the arbitrator's conclusion that the civil dispute and loss of control over operations would disrupt supply and consumer service — conduct that could be prejudicial to BPCL's interests and thus fall within Clause 27(n). The arbitrator's consideration of these facts was treated as a merits-based evaluation within his remit.
  5. The court then addressed the Single Judge's reliance on Marketing Discipline Guidelines (MDG). Applying Section 28(3) of the Arbitration Act (arbitral tribunal must decide in accordance with the terms of the contract and take into account trade usage), the court held that the arbitrator had examined the matter according to the contract and that general MDG could not prevail over the express contract terms between the parties. Therefore, the Single Judge erred in displacing the arbitrator's contract-based analysis with the MDG.
  6. The court surveyed the law governing interference with arbitral awards: Section 34 permits setting aside awards on specified grounds; Saw Pipes clarified that awards contrary to substantive law, the Act or the terms of the contract may be patently illegal and subject to interference, and that "public policy" can be given a wide meaning (including patent illegality). However, the court emphasized that reappraisal of evidence is not permissible (Ispat and other precedents) and that court intervention is limited (McDermott) to enumerated circumstances (fraud, bias, violation of natural justice).
  7. The court found no patent illegality or violation sufficient to set aside the award. It concluded that the arbitrator decided the matter in accordance with the contract terms and within his authority; the Single Judge's reliance on MDG and determination that delay was only a "minor offence" (warranting progressive discipline rather than termination) was not tenable against the contract-based findings.
  8. Separately, the court considered the Single Judge's order restoring distributorship. Applying the Indian Oil v. Amritsar Gas Service precedent and Section 14(1)(c) of the Specific Relief Act, the court determined that the distributorship agreement — terminable by either party under Clause 28 — was determinable in nature and not specifically enforceable by ordering restoration. Restoration was therefore not an appropriate remedy.
  9. Synthesizing the above, the court concluded that the learned Single Judge's decision to set aside the arbitral award and to order restoration was unsustainable: the award was confirmed.

Holding and Implications

Holding: The appeal is allowed; the order of the learned Single Judge in OP No. 295 of 2000 dated 31.10.2003 is set aside and the arbitral award dated 15.09.1999 is confirmed. No costs were awarded.

Implications:

  • The direct effect is that BPCL's termination of the distributorship (as upheld by the arbitrator) stands and the restoration ordered by the Single Judge is vacated.
  • The court reaffirmed the limited scope of judicial interference with arbitral awards: where an arbitrator decides in accordance with contractual terms and within authority, courts should not reappraise evidence or substitute their view for that of the arbitrator.
  • Because the distributorship agreement was determinable (Clause 28), specific performance/restoration is not an appropriate remedy under Section 14(1)(c) of the Specific Relief Act; the correct remedy, where applicable, is compensation for the notice period (as explained in Indian Oil v. Amritsar Gas Service), not restoration. The Single Judge's order to restore distributorship thus conflicted with settled law.
  • The opinion does not announce a novel legal principle; it applies existing authorities (notably Saw Pipes and Indian Oil v. Amritsar) to the facts and confirms that no patent illegality or ground under Section 34 justified setting aside the award in this case.

Final operative line in the opinion: the order of the Single Judge is set aside, the appeal is allowed, the arbitrator's award dated 15.09.1999 is confirmed, and there are no costs.

    Bharat Petroleum Corporation Limited v. Rajarajeswari Agency

    R. Banumathi, J.:— Aggrieved against the order of the learned Single Judge in OP No. 295 of 2000 (dated 31.10.2003), setting aside the award passed by the arbitrator, Bharat Petroleum Corporation Limited (BPCL) has preferred this appeal.

    2. The brief facts giving rise to this appeal are as follows:

    (i) The first respondent is physically handicapped ex-serviceman. LPG distributorship was granted to the first respondent in 1996 for supply of LPG cylinders for household consumers in Saligramam Area. There were frequent complaints from customers due to market backlog. For shortage of 249 cylinders, a debit note for Rs. 3,73,500 was raised on 31.07.1994 and part-payment against the same was received from the first respondent-distributor on 08.01.1996 (Rs. 2,11,650) and not the entire amount. The balance amount of Rs. 1,61,850 was due to the company on account of SV/TV amount. In spite of letters, which were duly acknowledged by the first respondent-distributor, no amount was paid. When senior sales officer of appellant-Corporation had visited the godown and the showroom in the morning of 28.01.1997 there were no signs of any distribution of refill cylinders. The godown and showroom were found to be closed and number of customers were waiting for making their refill bookings. The distributorship was terminated as per Clause 27(g) and 27(n) of the distributorship agreement, by termination letter dated 21.02.1997 Aggrieved by the termination of distributorship, the first respondent-distributor raised the dispute and the second respondent- Mr. S.K Dutta, was appointed as the sole arbitrator.

    (ii) Upon consideration of rival contentions of the parties in the light of terms of the agreement, the learned arbitrator found that the first respondent-distributor admitted the default of making delayed payment. Since there was default in making payment of the money, the learned arbitrator has held that BPCL is within its right to terminate the agreement and there were also other breaches such as, shortage of cylinders and pressure regulators and in spite of notice given to the first respondent-distributor, the cylinders and pressure regulators were not returned to BPCL and the learned arbitrator took the view that the termination was not wrongful.

    (iii) Challenging the award, the first respondent-distributor had filed a petition under Section 34 of the Arbitration Act, to set aside the award. Upon consideration of contention of both parties, the learned Single Judge set aside the award observing that the appellant-Corporation is bound to act in accordance with Marketing Discipline Guidelines (MDG) for LPG marketing as formulated by three LPG marketing companies. The learned Single Judge took the view that the appellant-Corporation has not followed the guidelines and proper procedure in dealing with the alleged irregularities or illegalities and the termination is in violation of principles of natural justice and also MDG.

    3. Challenging the impugned judgment, Mr. R. Murari, the learned counsel for the appellant-Corporation has submitted that the irregularities fall under Clause 27(g) and 27(n) of the distributorship agreement and the arbitrator has rightly held that the termination was done according to the rules and guidelines. It was submitted that when the arbitrator has upheld the termination, the learned Single Judge was not right in setting aside the award. Placing reliance upon Indian Oil Corporation Limited v. Amritsar Gas Service, 1991 (1) Arb. LR 97 (SC), it was submitted that when the contract is terminable, which in its nature determinable, the learned Single Judge was not right in granting the relief of restoration of contract/restoration of distributorship, which is against the principles.

    4. Submitting that the scope of interference with award is very limited under Section 34 of the Arbitration Act, the learned counsel for the appellant- Corporation has further argued that when the arbitrator has acted within the terms of reference, the learned Single Judge ought not to have set aside the award.

    5. On behalf of the first respondent-distributor, Mr. R. Krishnamoorthy, the learned senior counsel has submitted that the first respondent has duly explained the delayed payment due to his financial problems and any such delayed payment could only be a minor offence, which does not warrant termination of distributorship. The learned senior counsel further urged that, when the arbitrator has not taken note of MDG for LPG and the learned Single fudge having regard to the nature of irregularities rightly set aside the award and ordered restoration of distributorship, the same cannot be interfered with.

    6. In the light of contentions of both parties, we are required to determine the following points:

    (i) Exercising the power under Section 34 of the Arbitration Act, whether the learned Single Judge was justified in setting aside the award ?

    (ii) The distributorship agreement being a contract, which in its nature determinable, can it be specifically ordered to be restored ?

    7. The terms and conditions of distributorship are specified in the agreement. Clause 27 of the agreement provides for termination of the agreement by the Corporation forthwith on the happening of any of certain specified events. In this case, the distributorship agreement was cancelled invoking Clause 27(g) and 27(n) of the distributorship agreement, which eads as under:

    “27. Notwithstanding anything to the contrary herein contained, the Corporation shall also be at liberty at its entire discretion to terminate this agreement forthwith upon or at any time after the happening of any of the following events, namely—

    xxxxxxxxx

    (g) if the distributor shall for any reason make default in payment to the Corporation in full of his outstandings as appearing in the Corporation's books of account beyond 4 days of demand by the Corporation.

    xxxxxxxxx

    (n) if the distributor shall either by himself or by his servants or agents commit or suffer to be committed any act which, in the opinion of the General Manager of the Corporation for the time being at Bombay whose decision in that behalf shall be final, is prejudicial to the interest or good name of the Corporation or its products, the General Manager shall not be bound to give reasons for such decision.”

    8. Insofar as the complaint of delay in making payment, it is seen the money which was due to be deposited with BPCL on 06.07.1996, 21.07.1996, 06.08.1996, 21.08.1996, 06.09.1996 and 21.09.1996 was in fact paid by first respondent by demand draft only on 20.02.1997, 22.02.1997 and 03.03.1997

    9. Delay in making payment was admitted by the first respondent-distributor. But, the first respondent-distributor explained the delay saying that he faced some financial problems, on account of which there was delay in payment of SV/TV amount and part-payment was made on 20.02.1997 and 22.02.1997 by two demand drafts. The first respondent has stated that to show his bona fide, he has also paid the balance amount of Rs. 87,108 on 03.03.1997, even after termination of his distributorship. As per the terms of agreement, the money collected by distributor from the customers of BPCL is to be deposited with appellant-Corporation on fortnightly basis on the 6th of the month in respect of the first fortnight and on the 6th of the succeeding month in respect of the second fortnight and the same has been clearly stated in the letter dated 08.12.1986 issued by the appellant-Corporation to the first respondent even on the date of execution of the distributorship agreement (Vide Page 21, Paper Book, Volume II). Admittedly, there was delay in making payment. This aspect has been well considered by the learned arbitrator, while answering Issue No. 1, the arbitrator has rightly held that the first respondent has defaulted in sending the amount due to appellant-Corporation on the due date.

    10. As against the shortage of 249 cylinders, a debit note for Rs. 3,73,500 was raised on 31.07.1994, and only part-payment against the same was received from the first respondent-distributor on 08.01.1996 The responsibilities of the distributor are described in the terms of agreement/‘Bharatgas Manual’. As per the terms of the agreement, the ownership of the cylinders and pressure regulators belong to the appellant-Corporation and the first respondent is bound to account for the said cylinders and pressure regulators.

    11. The first respondent himself has admitted the shortage of cylinders. But, the first respondent contended that few cylinders were stolen from the godown and certain cylinders were given to G. Mallika, when the first respondent-distributor was not in effective control over the distributorship. In his letter dated 12.12.1997, the first respondent has stated that one Gopalakrishnan, Assistant Commissioner of Sales Tax, had financed him through his wife G. Mallika and required a security from him and that he had an agreement with the said G. Mallika strictly for financial management. The said letter elaborates about the civil dispute between the first respondent and the said G. Mallika. By a reading of the letter, it is seen that the said G. Mallika had obtained an interim ex parte injunction restraining the first respondent-distributor from interfering with the financial management and that she had taken over the godown and office with all the documents and equipments.

    12. Later, on the application filed by the first respondent-distributor, the interim ex parte injunction was vacated. The first respondent has further alleged that even thereafter, he could not take possession and that he had obtained an injunction against the said Gopalakrishnan and his wife G. Mallika. When the authorised distributor was entangled in a civil dispute with a third party regarding running of distributorship, obviously, it would affect the distribution of LPG and consumer service could not have been effectively carried out.

    13. Mr. R. Krishnamoorthy, the learned senior counsel has submitted that the plea of the first respondent-distributor was not at all considered by the learned arbitrator and the arbitrator was not right in finding that the appellant-Corporation was justified in invoking Clause 27(n) of the distributorship agreement. As per Clause 27(n) extracted earlier, when the distributor either by himself or by his servants or agents commit or suffer to be committed any act which, in the opinion of the General Manager of the Corporation is prejudicial to the interest or good name of the Corporation or its products, the dealership could be terminated and the General Manager is not bound to give any reasons for such decision and such decision shall be final. When the first respondent was entangled in civil dispute, that civil dispute must have obviously resulted in disruption of supply of LPG, which would evidently be prejudicial to the interest of the appellant-Corporation. In our considered view, the arbitrator has rightly held that the appellant-Corporation was justified in invoking Clause 27(n) of the distributorship agreement and the termination was not wrongful.

    14. As per Section 28(3) of the Act, in all cases, the arbitral tribunal shall decide in accordance with the terms of the contract and shall take into account the usage of the trade applicable to the transaction. By perusal of the award, we find that the arbitrator has examined the matter in reference to the terms of the agreement. When the parties are governed by the terms of agreement, the learned Single Judge was not right in referring to MDG for LPG marketing as formulated by the three LPG marketing companies. Such general MDG cannotprevail upon the terms of agreement between the appellant-Corporation and the distributor. We are of the view that the learned Single Judge was not right in saying that the delay in making payment was only a minor offence and the punishment ought to have been warning for the first offence, fine of Rs. 2,000 for the second offence, suspension for the third offence and termination has got to be issued only for the fourth offence.

    15. The award can be set aside only on one or more of the seven grounds set forth in Section 34 of the Arbitration and Conciliation Act, 1996 (for short “the Act”). So long as the arbitrator has decided the matter in accordance with the terms of the contract and has acted within his authority and according to the principles of fair play, the award of the arbitrator is ordinarily final and conclusive. The arbitrator's adjudication is generally considered binding between the parties, for he is a tribunal selected by the parties and the power of the court to set aside the award is restricted to the instances set out in Section 34 of the Arbitration Act.

    16. In Oil and Oil & Natural Gas Corporation Ltd. v. Saw Pipes Ltd., (2003) 5 SCC 705 : AIR 2003 SC 2629 : 2003 (2) Arb. LR 5 (SC) the Supreme Court has held that an award contrary to substantive provisions of law or the provisions of the Arbitration and Conciliation Act, 1996 or against the terms of the contract would be patently illegal and if it affects the right of the parties, it would be subject to interference under Section 34(2) of the Act. The Supreme Court has observed thus:

    “13. The question, therefore, which requires consideration is—whether the award could be set aside, if the arbitral tribunal has not followed the mandatory procedure prescribed under Sections 24, 28 or 31 (3), which affects the rights of the parties ? Under sub-section (1)(a) of Section 28 there is a mandate to the arbitral tribunal to decide the dispute in accordance with the substantive law for the time being in force in India. Admittedly, substantive law would include the Indian Contract Act, the Transfer of Property Act and other such laws in force. Suppose, if the award is passed in violation of the provisions of the Transfer of Property Act or in violation of the Indian Contract Act, the question would be—-whether such award could be set aside ? Similarly, under sub-section (3), the arbitral tribunal is directed to decide the dispute in accordance with the terms of the contract and also after taking into account the usage of the trade applicable to the transaction. If arbitral tribunal ignores the terms of the contract or usage of the trade applicable to the transaction, whether the said award could be interfered ? Similarly, if award is a non-speaking one and is in violation of Section 31(3), can such award be set aside ? In our view, reading Section 34 conjointly with other provisions of the Act, it appears that the legislative intent could not be that if the award is in contravention of the provisions of the Act, still however, it couldn't be set aside by the court. If it is held that such award could not be interfered, it would be contrary to the basic concept of justice. If the arbitral tribunal has not followed the mandatory procedure prescribed under the Act, it would mean that it has acted beyond its jurisdiction and thereby the award would be patently illegal which could be set aside under Section 34.”

    17. Further, in Oil and Oil & Natural Gas Corporation Ltd. v. Saw Pipes Ltd. (supra) the Supreme Court has considered the scope of interference of arbitral award on the ground of public policy in great detail and observed that the phrase “Public Policy of India” is not required to be given a narrower meaning and that wider meaning is required to be given, so as to prevent frustration of legislation and justice, the Supreme Court has held thus:

    “31. Therefore, in our view, the phrase “Public Policy of India” used in Section 34 in context is required to be given a wider meaning. It can be stated that the concept of public policy connotes some matter which concerns public good and the public interest. What is for public good or in public interest or what would be injurious or harmful to the public good or public interest has varied from time to time. However, the award which is, on the face of it, patently in violation of statutory provisions cannot be said to be in public interest. Such award/judgment/decision is likely to adversely affect the administration of justice. Hence, in our view in addition to narrower meaning given to the term “public policy” in Renusagar's case, 1994 Supp (1) SCC 644, it is required to be held that the award could be set aside if it is patently illegal. The result would be—award could be set aside if it is contrary to:

    (a) fundamental policy of Indian Law; or

    (b) the interest of India; or

    (c) justice or morality; or

    (d) in addition, if it is patently illegal.

    Illegality must go to the root of the matter and if the illegality is of trivial nature it cannot be held that award is against the public policy. Award could also be set aside if it is so unfair and unreasonable that it shocks the conscience of the court. Such award is opposed to public policy and is required to be adjudged void.”

    18. There exists a long catena of cases through which the law seems to be rather well settled that the reappraisal of evidence by the courts is not permissible. In Ispat Engineering & Foundry Works v. Steel Authority of India Ltd., (2001) 6 SCC 347 : AIR 2001 SC 2516 : 2001 (2) Arb. LR 650 (SC) Their Lordships of the Apex Court referring to various other judgments of the Apex Court including Union Of India… v. Bungo Steel Furniture (Pr.) Ltd.…., AIR 1967 SC 1032, has held that the court had no jurisdiction to investigate into the merits of the case or to examine the documentary and oral evidence in the record for the purposes of finding out whether or not the arbitrator has committed an error of law. The court as a matter of fact cannot substitute its own evaluation and come to the conclusion that the arbitrator had acted contrary to the bargain between the parties.

    19. Holding that intervention of court is envisaged in a few circumstances, like in case of fraud or bias by arbitrators, violation of natural justice, etc. in McDermott International Inc. v. Bum Standard Co. Ltd., (2006) 4 MLJ 456 : 2006 (2) Arb. LR 498 (SC) the Supreme Court has held as follows (para 55 of Arb. LR):

    “53. The 1996 Act makes provision for the supervisory role of courts, for the review of the arbitral award only to ensure fairness. Intervention of the court is envisaged in few circumstances only, like, in case of fraud or bias by the arbitrators, violation of natural justice, etc. The court cannot correct errors of the arbitrators. It can only quash the award leaving the parties free to begin the arbitration again if it is desired. So, scheme of the provision aims at keeping the supervisory role of the court at minimum level and this can be justified as parties to the agreement make a conscious decision to exclude the court's jurisdiction by opting for arbitration as they prefer the expediency and finality offered by it.”

    20. While setting aside the award, the learned Single Judge has observed that the arbitrator has given a go-by to the guidelines and it is violative of not only the fundamental principles of natural justice, but also the procedure and guidelines of the Corporation. As per Clause 23(c) of the terms of agreement, except with the previous written consent of the Corporation, the distributor shall not enter into any arrangement, contract or understanding, whereby the operations of the distributor are or may be controlled/carried out or financed by any other person, firm or company, whether directly or indirectly and whether in whole or in part. Even according to the first respondent, G. Mallika has financed the first respondent-distributor and that the first respondent-distributor has entered into an agreement with the said G. Mallika for financial management, for which, admittedly, there was no approval or written consent by the appellant-Corporation. There was a civil dispute between the first respondent and the said G. Mallika and both of them obtained injunction orders. When, there was a civil dispute and interim injunction was passed, the ultimate sufferers would be the consumers, resulting in deficiency in service of supply of LPG and dissatisfaction of the consumers. In such facts and circumstances, the learned arbitrator has held that the appellant-Corporation was justified in invoking Clause 27(n) for termination of the distributorship agreement. Unless, it is demonstrated to the court that such reasonings of the arbitrator are erroneous, the court cannot interfere with the award.

    21. Observing that the order of termination of distributorship is not legal and proper, the learned Single Judge has ordered restoration of distributorship. Mr. R. Murari, the learned counsel for the appellant-Corporation has contended that in view of Clause 28, the agreement is determinable in nature and it would fall under Section 14(1) of Specific Relief Act, the same cannot be specifically enforced by the order of the court. In support of his contention, the learned counsel placed reliance on Indian Oil Corporation Limited.

    22. Clause 28 permits either party, without prejudice to the foregoing provision or anything to the contrary contained in the agreement, to terminate the agreement by giving 30 days' notice to the other party, without assigning any reason for such termination.

    23. Section 14(1)(c) of the Specific Relief Act provides inter alia that the contract, which is in its nature determinable cannot be specifically enforced when there is a specific clause authorising and enabling either party to terminate the agreement in the event of happening of the events specified therein. In the present case, Clause 28 permitted either party “without prejudice to Clause 27 or anything to the contrary” contained in the agreement to terminate the agreement by thirty days' notice to the other party without assigning any reason for such termination. We find that the agreement being of a determinable nature is not specifically enforceable in view of Section 14(1)(c) of Specific Relief Act, which was not taken note of by the learned Single Judge, while ordering restoration of distributorship agreement.

    24. In Indian Oil Corporation Limited v. Amritsar Gas Service (supra) the Supreme Court had an occasion to consider the terms of agreement of distributorship of Indian Oil Corporation. The said agreement could also be terminated in accordance with the terms of agreement as per Clauses 27 and 28. The appellant was appointed as distributor of LPG of Indian Oil Corporation and such distributorship was terminated without notice and the distributor had filed a suit for restoration and damages. The application was missed by all courts below including High Court. In the SLP, the Supreme court ordered reference to arbitrator. The arbitrator passed an award holding t the firm was entitled to continuance of distributorship and ordered restoration. Setting aside the award of the arbitrator on the ground that there in error of law apparent on the face of the record and that grant of relief, viz, restoration of distributorship cannot be sustained Hon'ble Supreme Court has held as under:

    “12. xxxxxxxxx

    This finding read along with the reasons given in the award clearly accepts that the distributorship could be terminated in accordance with the terms of the agreement dated 01.04.1976, which contains the aforesaid Clauses 27 and 28. Having said so in the award itself, it is obvious that the arbitrator held the distributorship to be revocable in accordance with Clauses 27 and 28 of the agreement. It is in this sense that the award describes the distributorship agreement as one for an indefinite period, that is, till terminated in accordance with Clauses 27 and 28. The finding in the award being that the distributorship agreement was revocable and the same being admittedly for rendering personal service, the relevant provisions of the Specific Relief Act were automatically attracted. Sub-section (1) of Section 14 of the Specific Relief Act specifies the contracts which cannot be specifically enforced, one of which is ‘a contract which is in its nature determinable’. In the present case, it is not necessary to refer to the other clauses of sub-section (1) of Section 14, which also may be attracted in the present case since clause (c) clearly applies on the finding read with the reasons given in the award itself that the contract by its nature is determinable. This being so granting the relief of restoration of the distributorship even on the finding that the breach was committed by the appellant-Corporation is contrary to the mandate in Section 14(1) of the Specific Relief Act and there is an error of law apparent on the face of the award which is stated to be made according to ‘the law governing such cases’. The grant of this relief in the award cannot, therefore, be sustained.

    14. The question now is of the relief which could be granted by the arbitrator on its finding that termination of the distributorship was not validly made under Clause 27 of the agreement However, the arbitrator having held that Clause 27 was not available to the appellant-Corporation, the question of grant of relief on that finding has to proceed on that basis. In such a situation, the agreement being revocable by either party in accordance with Clause 28 by giving thirty days' notice, the only relief which could be granted was the award of compensation for the period of notice, that is, 30 days. The plaintiff-respondent no. 1 is, therefore, entitled to compensation being the loss of earnings for the notice period of thirty days instead of restoration of the distributorship. The award has, therefore, to be modified accordingly. The compensation for thirty days' notice period from 11.03.1983 is to be calculated on the basis of earnings during that period disclosed from the records of the Indian Oil Corporation Ltd.” The facts of the present case are identical to the facts of the aforementioned decision of the Supreme Court inasmuch as the distributorship agreement in the instance case is also terminable by the appellant-Corporation on the happening of certain events. In the present case also, the agreement was terminable on the happening of certain events. There is no manner of doubt that-the contract by its nature, especially in view of Clause 28, is determinable in nature. The terms of agreement being revocable at the instance of either party, in our view, the learned Single Judge was not right in ordering restoration of distributorship.

    25. When the arbitrator has analysed the rival contentions of parties in accordance with the terms of the agreement, the learned Single Judge was not right in setting aside the award referring to MDG. In our view, the award of the arbitrator does not suffer from any patent illegality warranting interference and, therefore, the judgment of the learned Single Judge is unsustainable.

    26. For the foregoing reasons, the order of the learned Single Judge in OP No. 295 of 2000 dated 31.10.2003 is set aside and this appeal is allowed. The award of the arbitrator dated 15.09.1999 is confirmed. No costs.