AMICUS AI
Citation Codes
Equivalent Citations
citation codes
Case Number
Judges
Acts
  • LAND ACQUISITION ACT 1894
  • sub-sec. (2) of Section 16 and mechanism of the L.A Act
  • Section 10 read with Section 13(3) or Section 15.
  • Ss. 4 and 6 Notifications under L.A Act
  • L.A Act in sub-sec. (2) of S. 16
  • Secs. 13 to 15. Section 16(2)
  • L.A Act. Sub-sec. (2) of S. 16
  • (4) of S. 9 of the L.A Act
  • Act in Section 16(1)
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Equivalent Citations
citation codes
Case Number
Judges
Acts
  • LAND ACQUISITION ACT 1894
  • sub-sec. (2) of Section 16 and mechanism of the L.A Act
  • Section 10 read with Section 13(3) or Section 15.
  • Ss. 4 and 6 Notifications under L.A Act
  • L.A Act in sub-sec. (2) of S. 16
  • Secs. 13 to 15. Section 16(2)
  • L.A Act. Sub-sec. (2) of S. 16
  • (4) of S. 9 of the L.A Act
  • Act in Section 16(1)
Smart Summary

Factual and Procedural Background

These seven petitions, arising from lands in village Dhandarphal (BK), Taluka Sangamner, District Ahmednagar, challenge the validity of acquisition notifications and proceedings. The petitioners are owners of different lands notified for acquisition under Sections 4 and 6 of the Land Acquisition Act, 1894 ("L.A. Act"). The lands were sought to be acquired for resettlement of persons displaced by the Upper Pravara Project. The Government of Maharashtra issued a notification dated 16 May 1978 under Section 11(1) of the Maharashtra Re-settlement of Project Displaced Persons Act, 1976 ("the Act") making the Act applicable to the project and specifying villages likely to fall in the affected or benefited zones; Dhandarphal was so specified. Before issuance of Section 6 notifications, the petitioners objected in writing asserting that proper enquiry under the Act had not been made. Subsequent notices under sub-sections (3) and (4) of Section 9 of the L.A. Act were issued, the urgency clause was applied, and the petitioners were called to deliver possession under Section 17(1) of the L.A. Act. The petitions press for quashing of the notifications, notices and acquisition proceedings.

Legal Issues Presented

  1. Whether acquisition proceedings and the notifications under the L.A. Act are valid when the steps required by Sections 13 to 15 of the Maharashtra Resettlement Act, 1976 (assessment, survey, provisional and final declarations) were not complied with.
  2. Whether Section 16(2) of the Resettlement Act — which permits compulsory acquisition "also" under the Land Acquisition Act, 1894 — permits the Government to proceed under the L.A. Act independently of the processes mandated by Sections 13 to 15 of the Resettlement Act.
  3. Whether notifications under Sections 4 and 6 of the L.A. Act and consequent proceedings could be validly issued and pursued without completing the assessment and identification steps mandated by Sections 13 to 15 of the Resettlement Act.

Arguments of the Parties

Petitioners' Arguments

  • The petitioners contended that Sections 13 to 15 of the Maharashtra Resettlement Act have not been complied with — specifically, no survey/assessment of land required or available, and no provisional or final declaration as required by Sections 14 and 15 has been made.
  • Because compliance with Sections 13 to 15 is a condition precedent, any acquisition under Section 16(2) (even where the L.A. Act mechanism is invoked) is invalid if those preconditions were not satisfied.
  • The notifications under Sections 4 and 6 of the L.A. Act and subsequent acquisition proceedings are therefore incompetent and liable to be quashed for failure to follow the statutory resettlement procedure.

Respondents' Arguments

  • The respondents, through Mr. Saldhana, argued that non-compliance with Sections 13 to 15 may prevent acquisition under sub-sections (3) and (4) of Section 16 of the Resettlement Act, but does not prevent acquisition under the Land Acquisition Act because sub-section (2) of Section 16 expressly preserves powers of acquisition under the L.A. Act.
  • Reliance was placed on the word "also" in Section 16(2) (and in sub-section (3)) to argue that acquisition under the L.A. Act is an independent mode available to the Government, separate from the acquisitions contemplated by sub-sections (3) and (4) of Section 16.

Table of Precedents Cited

No precedents were cited in the provided opinion.

Court's Reasoning and Analysis

The judgment conducts a statutory and contextual analysis of the Resettlement Act and its interaction with the L.A. Act. The court's reasoning proceeds in structured steps:

  1. The Act is a special, self-contained code for resettlement of certain displaced persons; its provisions (including Sections 10, 13–17 and Schedules A & B) collectively govern how land is to be identified, acquired and allotted for resettlement.
  2. Sections 13 to 15 establish mandatory, preliminary processes: a Resettlement Officer must survey and ascertain lands from which persons will be displaced, identify lands available for grant, draw lists of lands that may be included in the benefited zone or other specified areas, and make provisional and final declarations after giving affected persons reasonable opportunity. These steps determine the "land pool" and extent of land "required" for the purposes of the Act.
  3. Section 16 contemplates acquisition for resettlement either by negotiation (Section 16(1)) or by compulsory acquisition. Section 16(2) refers to compulsory acquisition "under the Land Acquisition Act, 1894" and deems such acquisition a public purpose. However, the court reads this reference as adopting the L.A. Act's mechanism for acquisition only for lands that have been identified as "required" under the Resettlement Act. Thus, recourse to the L.A. Act does not displace or negate the obligation to conduct the prerequisite assessment and declarations under Sections 13 to 15.
  4. The court rejects the respondents' argument that Section 16(2) creates an independent route to acquire land under the L.A. Act without first complying with Sections 13 to 15. A close reading shows that Section 16 integrates the acquisition mechanism into the resettlement scheme; sub-sections (3) and (4) indicate sources from which land is to be acquired for resettlement and must be read in the context of the prior identification/assessment process.
  5. The court notes textual support for this construction in Section 13(3)(c) and in the structure of Section 16, which show that certain lands are to be acquired through the L.A. Act mechanism only after being identified as required under the Resettlement Act. The word "also" in Section 16(2) is read as indicating an additional mode of acquisition (compulsory acquisition through the L.A. Act in addition to negotiation), not as creating a separate, standalone basis that bypasses Sections 13–15.
  6. The court observes that permitting an option to acquire under either the Resettlement Act or the L.A. Act, independently and without discernible criteria, would raise Article 14 (equality) concerns because it would leave arbitrary choice without standards.
  7. Applying this statutory interpretation to the facts, the court finds no material produced by the respondents showing that the assessment, provisional and final declarations required by Sections 13–15 were ever made. The acquisition officer could not properly decide what lands were "required" absent those processes. Thus, notifications under Sections 4 and 6 of the L.A. Act and subsequent acquisition proceedings were issued and pursued without the mandatory preconditions; they are therefore incompetent and invalid.

Holding and Implications

HOLDING: The Court allowed all seven petitions. ALL SEVEN PETITIONS ARE ALLOWED; THE ACQUISITION PROCEEDINGS ARE QUASHED.

Direct consequences for the parties:

  • The notifications and land acquisition proceedings impugned in these petitions were quashed for failure to comply with Sections 13 to 15 of the Maharashtra Re-settlement of Project Displaced Persons Act, 1976.
  • The petitioners were awarded costs to be paid by the respondents.

Broader implications:

This opinion does not elaborate broader consequences beyond the direct effect on these proceedings. It concludes that the statutory preconditions in Sections 13 to 15 are indispensable before acquisition powers under Section 16(2) (by recourse to the L.A. Act) can be lawfully invoked. No further pronouncement about setting a new precedent beyond the case-specific ruling is discussed in the opinion.

Petitions allowed.

    Gulab Shankar Walve And Etc. Etc. v. The Spl. Land Acquisition Officer And Another

    Deshpande, A.C.J:— These seven petitions raise a common question of law and can, therefore, be disposed of by this common judgment. The lands in dispute, notified for acquisition u/ss. 4 and 6 of the Land Acquisition Act, 1894 (hereinafter referred to as the L.A Act), are all situate in village Dhandarphal (BK), Taluka Sangamner, District Ahmednagar. The petitioners in these seven petitions are the owners of those different lands. It is not in dispute that these lands are sought to be acquired for the purpose of rehabilitating the displaced persons, affected by the Upper Pravara Project in Ahmednagar District. The Government of Maharashtra has issued a Notification dt. 16th May 1978 u/s. 11(1) of the Maharashtra Re-settlement of Project Displaced Persons Act, 1976 (hereinafter referred to as the ‘Act’). The provisions of the Act are made applicable to the said Upper Pravara Project. The Notification also specifies the villages likely to fall in the affected or benefited zones of the said Project, as required under the said S. 11(1). Dhandarphal (BK) village is one of the villages notified as being a village in the benefited zones. Ss. 4 and 6 Notifications under L.A Act have been issued thereafter in all these cases. Before S. 6 Notification was issued, objections in writing were raised by all the petitioners asserting that proper enquiry under the Act was not made. Subsequently, even notifications and notices under sub-secs. (3) and (4) of S. 9 of the L.A Act have been issued and the urgency clause was thereafter applied, and the petitioners were called upon to deliver possession of the respective lands u/s. 17(1) of the L.A Act. The validity of the said notifications, notices and the acquisition proceedings is challenged in all these petitions.

    2. Mr. Abhale, Mr. Thorat, Mr. Lalit and Mr. Kerkar, the learned Advocates appearing for the petitioners raised several points in support of these petitions. It, however, appears to us to be enough to take notice of only one point as to the non-compliance with Ss. 13 to 15 of the Act. This point goes to the root of the matter and the present proceedings are liable to be quashed on that count itself.

    3. It is necessary to examine the scheme of the Act to deal with this contention. The Act is a special piece of legislation providing for resettlement of “certain” persons displaced from lands required for any projects of public utility. Apart from providing for cash grants, S. 10 of the Act contemplates resettling as many displaced persons as possible on the land (1) in the benefited zone, or 2(a) in other villages, or 2(b) in areas to be specified under the said section and some other lands forming part of the “land pool” as defined u/s. 2(11). The “land pool” has to be worked out in accordance with Ss. 13 to 15 of the Act and secured by the modes indicated in S. 16. S. 13(1) makes it clear that even the land of the ‘Gaothan’ affected by the project is liable to be acquired for such resettlement.

    4. Which “certain” persons displaced by any such project should be resettled by recourse to the provisions of this Act is left to the decision of the Government. The Government has to notify such “project” u/s. 11(1) of the Act and also expressly apply the provisions of the Act in relation to the said project. The Government has to specify in the said notification the villages and areas which are likely to be in the affected or benefited zones of the said project. The Act would obviously have no application to the acquisition of lands for resettlement of the persons displaced by any project not so notified. S. 12 prevents alienation of any land situated in the villages specified in the notification u/s. 11 without the prior permission of the Government. S. 13 requires the Resettlement Officer to take a survey and ascertain the extent of land from which persons would be displaced and the land available for grant to such displaced persons from the sources enumerated in Cls. (a) to (e) of Sec. 13(3) and to draw a list of lands (1) that may be included in the benefited zone or villages or areas which may be specified under Section 10. Sections 14 and 15 further require such Resettlement Officer to make an estimate after giving reasonable opportunity to the persons affected of land required for the project and would be affected thereby and the area likely to be benefited and make first provisional and then final declaration in respect thereof. Then follows Sec. 16 indicating modes of acquisition of land required for the purposes of the Act. Section 17 then provides for the grant of land to the displaced persons. Area of land to be acquired and granted is subject to the limitations and restrictions indicated in Section 16 and 17 and Schedules ‘A’ & ‘B’ details of which are not relevant to the point under consideration excepting to emphasize that the Act furnishes a self-contained code in the matter of resettlement.

    5. The Act contemplates acquisition of the required land either by negotiation under Section 16(1) or by compulsory acquisition under Section 16(2) thereof. The words “any land required for carrying out the purposes of the Act” in Section 16(1) or words to that effect in Section 16(2) obviously refer to the land in respect of which assessment, as to the requirements of displaced persons and availability of land for the grants is made under Section 13, and specification whereof is made under Section 10 read with Section 13(3) or Section 15. The extent of the area affected and benefited is notified under Section 15. This is further made clear under sub-secs. (3) and (4) of S. 16 indicating the sources of the land in respect of which acquisition powers under sub-sec. (2) of S. 16 are intended to be exercised. Thus, the land to be acquired under sub-sec. (2) of S. 16 cannot be ascertained till the steps contemplated u/ss. 13 to 15 for its identification are taken. Any acquisition, such as in the present cases, without first complying with Ss. 13 to 15, cannot but be held to be incompetent and bad in law.

    6. Mr. Saldhana, the learned Assistant Government Pleader appearing for the respondents could not draw our attention to any material indicating that assessment of the extent of the land required and available or extent of the area affected or benefited, was ever made as required u/Ss. 13 to 15 of the Act. This point is specifically raised by the petitioners in their petitions and the hearing of the case was adjourned earlier to enable him to produce material to that effect. The affidavits of the respondents in all these cases do not show, if and when such assessment as required u/s. 13 and provisional and final declaration as required under S. 14 or 15, were made. As seen earlier, this was obligatory. The acquisition officer cannot decide as to how much and which area of land is required for the purposes of the Act. It is impossible to identify the land covered by sub-secs. (3) and (4) of S. 16 and liable to be acquired unless this is done. The compliance with the requirements of Ss. 13 to 15 is simply indispensable and is condition precedent for invoking the acquisition powers under the L.A Act contemplated to be exercised u/s. 16(2) of the Act once the Project together with affected or benefited villages are notified u/s. 11 of the Act. Any notifications u/s. 4 or S. 6 of the L.A Act or further proceedings thereunder could not have been issued or taken without following the provisions of Ss. 13 to 15 of the Act. These proceedings are, therefore, not legal and are liable to be quashed.

    7. Mr. Saldhana, however, contends that non-compliance with Ss. 13 to 15 of the Act may prevent acquisition of land under the Act contemplated under sub-secs. (3) and (4) of S. 16 but not the acquisition under the Land Acquisition Act of 1894, the powers in respect to which are expressly preserved under sub-sec. (2) of S. 16, enabling the Government to acquire the required land by recourse to L.A Act “talso”. Mr. Saldhana strongly relied on the word “also” in sub-sec. (2) as also in sub-sec. (3) in support of his contention that such acquisition under the L.A Act is independent of the acquisition powers provided under sub-secs. (3) and (4) of S. 16 of the Act. This contention assumes as if acquisition of land contemplated under sub-sec. (2) of S. 16 is not under the Act but is under the L.A Act and is different from and independent of the powers of acquisition under sub-secs. (3) and (4) of the Act and that the officer has an option to acquire the required land u/s. 16(2) or Ss. 16(3) and 16(4) of the Act.

    8. This makes it necessary to examine contents of S. 16. It is convenient to quote the some in extenso to test the validity of this contention.

    “Sec. 16(1) The State Government may enter into an agreement with any person for the purchase or exchange, of any land required for carrying out the purposes of this Act.

    (2) Subject to the provisions of this section, the State Government may also for carrying out the purposes of this Act compulsorily acquire land under the Land Acquisition Act, 1894, and the acquisition of any land for the said purposes shall be deemed to be a public purpose within the meaning of that Act.

    (3) The State Government may also acquire lands included in a gaothan in the affected zone as far as practicable according to the provisions of Part 1 of Schedule ‘A’ hereto.

    (4) For the purpose of resettling displaced persons on land, the State Government may, subject to any rules made “in this behalf, acquire land from holdings in the benefited zone or from any village or area specified under Section 10 as far as practicable, according to the provisions of Part II of Schedule ‘A’ hereto.

    (5) All lands acquired under this section shall form part of the land pool.”

    The section is not very happily worded. A superficial reading thereof may give some apparent plausibility to the contention of Mr. Saldhana. A close examination of the different clauses, however, would expose the fallacy and untenability thereof.

    9. To begin with, acquisition of land is an integral part of the resettlement scheme of this Act and all the provisions of the Act would apply to such acquisitions as soon as any project is notified u/s. 11 of the Act. S. 16 providing for such acquisition power, contemplates acquisition of the required land for this purpose either by negotiation or by recourse to statutory compulsion under the L.A Act. The question of acquisition of any land cannot arise unless preliminary processes as to assessment of land required and available, affected and benefited, by the project as contemplated u/Ss. 13 to 15 of the Act are finalised. Reference to L.A Act in sub-sec. (2) of S. 16 is intended to adopt the mechanism of acquisition evolved thereunder. Recourse, thereto for this compulsory acquisition by itself does not make the acquisition otherwise than under the Act and cannot relieve the authorities of their obligation to comply with Ss. 13 to 15 of the Act.

    10. Secondly, it is fallacious to assume that S. 16 contemplates two different modes of compulsory acquisitions i.e one under this Act and the other under the L.A Act. Sub-sec. (2) of S. 16 merely adopts the L.A Act for the requirement of the land under this Act. Creating fiction of the purposes of the Act being a public purpose is intended to remove any possible doubts as to the validity of the contemplated acquisitions. Sub-secs. (3) and (4) merely indicate the source from which the lands required are to be acquired by recourse to the provisions of the L.A Act u/s. 16(2) of the Act. The wording of cl. (c) of S. 13(3) of the Act fortifies this view and demonstrates the fallacy of the contention. The extent of land liable to be acquired and covered by Sub-secs. (3) and (4) of S. 16 has to be first ascertained and area thereof identified. This can be done only on preliminary assessment and enquiry u/Ss. 13 to 15 of the Act. Any assumption that sub-sec. (2) is independent or unconnected with Sub-secs. (3) and (4) would prevent application of L.A Act to the acquisition of lands covered by Sub-secs. (3) and (4) of S. 16. The Act does not provide for any other mechanism of acquisition, and the fiction of acquisition being for public purpose would also be inapplicable in that case. All this goes a long way to show how contrary contentions are ill-founded.

    11. This apart, S. 16 cannot be so interepeted as to permit option of acquiring land under this Act or under the L.A Act without exposing it to the attack of being violative of Art. 14 of the Constitution, as it would be difficult to find out, in that case, any criteria with section to determine, when and why the one should be invoked and not the other.

    12. Our attention was also drawn to the wording of cls. (c) and (d) of S. 13(3) of the Act, suggesting that the basis of acquisition of land covered by cl. (c) is different from the one covered by cl. (d). The detailed description of land under cl. (c) tallies with its description under sub-sec. (4) of S. 16. This is another instance of bad drafting. It is difficult to know why this land is placed in separate cl. (c) when it is liable to be covered also by cl. (d). In the context now, the cl. (d) shall have to be interpreted to cover only lands acquired by negotiation and the “Goathan” land covered by sub-sec. (3) of S. 16 though it is wide enough to cover land referred to in cl. (c). We have already seen how express reference to the L.A Act in cl. (c) herein fortifies our view that acquisition of lands covered by sub-sec (4) of S. 16 can be secured only by recourse to L.A Act and by no other provisions of this Act and how this rather runs counter to Mr. Saldhana's arguments.

    13. The reliance on the word “also” in Sec. 16(2) is equally misconceived. The word is intended to highlight the availability of one more mode of securing the required land under the Act in addition to its acquisition by negotiations provided for in sub-sec. (1) and not to emphasise any power of acquisition unconnected with Secs. 13 to 15. Section 16(2) contemplates recourse to the L.A Act for the acquisition of the land “required” for the purposes of the Act. Such “requirement” can be ascertained only by the process as provided under Secs. 13 to 15 of the Act. Sub-sections (3) and (4) only reflect the crystallisation of this process and it is for the land so required that mechanism of the L.A Act is intended to be adopted under Sec. 16(2) of the Act. The word ‘also” in sub-section (3) does not have any significance excepting to emphasise that even land ‘affected’ is liable to be acquired if needed for ‘gaothan’ though the Act contemplates resettlement on benefited and other zones.

    14. It is true that the lands in dispute are all situated in a village which is one of the villages notified as likely to be in the benefited zone under Section 11(1) of the Act. Mr. Saldhana relies on this and contends that the lands in dispute are in either case liable to be acquired. This contention is untenable. The likelihood of a land being in the benefited zone under S. 11(1) is not the same thing as its being found to be so after enquiry under Sec. 15 of the Act. As stated earlier, objections raised are fundamental and deserve to be upheld.

    15. Thus once the project is notified under S. 11, the acquisition of the land from the benefited zone and other sources is liable to be governed by the provisions of this Act, and the powers under sub-sec. (2) of Section 16 and mechanism of the L.A Act cannot be invoked unless first the assessment and ascertainment as contemplated under Sections 13 to 15 of the Act is finalised. Such acquisition is subject to the limitation indicated in Sub-secs. (3) and (4) of Sec. 16 of the Act and Schedule thereto. Looking at from this point of view, the notifications and the land acquisition proceedings initiated and carried on by the respondents in the present cases are liable to be quashed.

    16. In this view of the matter, the petitions deserve to be allowed. We accordingly allow all the seven petitions and make the Rules absolute and quash the acquisition proceedings. The petitioners will get the costs from the respondents.

    Petitions allowed.