Translate
Text Highlighter

Bookmark

PDF

Share

Report a problem
AMICUS AI
Citation Codes
Equivalent Citations
citation codes
Case Number
Attorney(S)
Judges
Acts
  • Article 120 of Indian Limitation Act, 1908 (corresponding to Article 113 of Indian Limitation Act, 1963,
  • Article 120 of Limitation Act, 1908 corresponding to Article 113 of Limitation Act, 1963.9. Distinction
  • SECTION 42 SPECIFIC RELIEF ACT
  • provisions of Order II Rule 2 C.P.C
  • Order II Rule 2 of C.P.C
  • Order VI Rule 17 C.P.C7.
  • Order II Rule 2 C.P.C
  • Order VI Rule 17 CPC
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Equivalent Citations
citation codes
Case Number
Attorney(S)
Judges
Acts
  • Article 120 of Indian Limitation Act, 1908 (corresponding to Article 113 of Indian Limitation Act, 1963,
  • Article 120 of Limitation Act, 1908 corresponding to Article 113 of Limitation Act, 1963.9. Distinction
  • SECTION 42 SPECIFIC RELIEF ACT
  • provisions of Order II Rule 2 C.P.C
  • Order II Rule 2 of C.P.C
  • Order VI Rule 17 C.P.C7.
  • Order II Rule 2 C.P.C
  • Order VI Rule 17 CPC
Smart Summary

Structured Summary of the Opinion — Civil Revision Petition against allowance of Amendment (I.A. No. 2125 of 1992)

Factual and Procedural Background

This revision petition challenges the order dated 21-9-1992 which allowed the plaintiffs' amendment petition (I.A. No. 2125 of 1992) in O.S. No. 117 of 1984 pending before the Principal District Munsif, Ongole.

The original suit (O.S. No. 117/1984) was instituted by neighbours (plaintiffs and defendants) seeking permanent and mandatory injunctions. Plaintiffs alleged that defendants had illegally opened windows and ventilators into the plaintiffs' property and had laid a latrine pipe in specified portions (marked P2, P3, P4 and P5). An Advocate-Commissioner was appointed and, during inspection, reported the existence of a channel constructed by the defendants.

Following the Advocate-Commissioner's report, the plaintiffs filed I.A. No. 2125 of 1992 under Order VI Rule 17 CPC to amend their plaint to seek mandatory relief to close/remove that channel. It was not disputed the channel existed before the inspection report. The Advocate-Commissioner's report was filed in 1984; three years elapsed by 1987; the amendment petition was filed in 1992. The trial court allowed the amendment petition but recorded that the application was belated and the relief was time-barred; it held that limitation could be considered at the time of final disposal and sought to compensate delay by imposing costs of Rs. 50/-. The defendants (who opposed the amendment in the trial court) are the petitioners in this revision.

Legal Issues Presented

  1. Whether the principles under Order II Rule 2 CPC (which bar a subsequent suit in certain circumstances) operate to bar the present amendment under Order VI Rule 17 CPC in the same suit.
  2. Whether the amendment seeking mandatory relief to remove a channel is barred by limitation (i.e., whether the alleged wrong is a completed one-time wrong or a continuing wrong affecting computation of limitation).
  3. Whether the trial court erred in allowing the belated amendment while simultaneously recording that it was time-barred and that the petition was belated, and whether imposition of a nominal cost (Rs. 50/-) could cure such illegality.

Arguments of the Parties

Petitioners' (Defendants') Arguments

  • Learned counsel Mr. M.V.S. Suresh Kumar submitted that the amendment petition was barred by the principles enunciated under Order II Rule 2 C.P.C. and that the lower court should not have allowed the amendment while holding that the petition was belated and the relief was time-barred.

Respondents' (Plaintiffs') Arguments

  • Learned counsel Mr. P. Srirama Murthy contended that Order II Rule 2 C.P.C. had no application to the amendment sought and that the nuisance (the constructed channel) was a continuing wrong, so the relief was not barred by limitation.
  • The respondents further relied on A.K. Gupta v. Damodar Valley Corporation (AIR 1967 SC 96) to argue that limitation is not always a relevant factor in applications for amendment of pleadings — specifically, that amendments which do not add a new cause of action but present a different approach to the same facts may be allowable even after the statutory period.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Nur Mohammad v. Gauri Shankar, AIR 1920 Lahore 195 Distinction between a wrong which is one-time and a continuing wrong (channels discharging water giving rise to fresh cause of action each time). Used as authority for the proposition that where a channel discharges water repeatedly causing fresh injury each time, the wrong is continuing and limitation runs from the last act.
Lal Singh v. Hira Singh, AIR 1921 Lahore 242 Limitation for suit for removal (thatched sheds) falls under Article 120 of Limitation Act, 1908 (6 years) — corresponding Article 113 (3 years) under 1963 Act. Cited to show that removal actions are subject to specific limitation rules; used in support of concluding that such claims are time-governed and not necessarily continuing.
Mt. Kokla v. Kalian Mal, AIR 1923 Allahabad 452 Limitation for mandatory injunction runs from the date of construction (i.e., from the date the wrongful act was completed). Relied upon to support the view that the limitation period commences when the injury (construction) was complete.
Haru Ram v. Kaliyana Ram, AIR 1929 Lahore 88 Application of the principle that where water is discharged through parnalas repeatedly, each discharge may constitute a fresh cause of action (continuing wrong). Noted as following the proposition in Nur Mohammad; contrasted with facts of the present case.
Khair Mohd. Khan v. Mt. Jannat, AIR 1940 Lahore 459 (Full Bench) Authoritative statement that if the injury was complete on a particular date it cannot be termed a continuing wrong merely because effects continue; cause of action arises once and for all when injury is inflicted. Fortified the court's view that where the channel was constructed once and injury completed, the wrong is not continuing and limitation runs from construction date.
Sarba Singh v. Mibarik Singh, AIR 1961 J & K 53 Relied upon Nur Mohammad; held repeated discharge each time gave rise to fresh cause of action (continuing wrong). Cited to illustrate past decisions where channels/parnalas were held to create continuing wrongs — contrasted with present facts.
Raja Ram v. Bahadur, AIR 1989 Allah. 115 Referenced earlier decisions (Bhag Singh, Meghu Mian, Pabia) and did not lay down an independent proposition. Cited to show that some High Court decisions merely referred to prior authorities and did not alter the existing proposition regarding continuing vs. completed wrongs.
Bhag Singh v. Sewa Singh, AIR 1953 Pepsu 150; Meghu Mian v. Kishun Ram, AIR 1954 Patna 477; Pabia v. Badia, AIR 1957 Raj. 175 Cases referenced in Raja Ram; related to earlier jurisprudence on similar factual/legal issues. Mentioned as part of the chain of authorities discussed in Raja Ram; the court noted their place in the jurisprudential background.
A.K. Gupta v. Damodar Valley Corporation, AIR 1967 SC 96 General rule: amendments should not be used to set up a new cause of action, particularly when a suit on that cause would be barred; but an amendment that does not introduce a new cause of action, only a different approach to the same facts, may be allowed even after limitation has expired. Cited by respondents; court examined and distinguished this Supreme Court decision because in A.K. Gupta the amendment was based on the same contract (same cause of action), whereas in the present case the amendment sought to add mandatory relief based on a distinct completed wrongful act (construction of a channel) that had not been questioned earlier.

Court's Reasoning and Analysis

The court's reasoning proceeds in two main strands: (A) the relationship between Order II Rule 2 CPC and amendment under Order VI Rule 17 CPC, and (B) the limitation analysis turning on whether the alleged wrong is continuing or complete.

A. Order II Rule 2 CPC and Amendment under Order VI Rule 17 CPC

The court explained that the bar created by Order II Rule 2 CPC operates to prevent a second suit on matters or reliefs which could have been sought earlier; it is directed at subsequent suits. However, the court held that the principles of Order II Rule 2 CPC do not apply to an amendment sought in the same suit under Order VI Rule 17 CPC. In other words, a plea that would be barred as a second suit need not preclude a party from seeking amendment to the original suit to plead that relief; Order II Rule 2 cannot be invoked to restrain amendment under Order VI Rule 17 CPC.

B. Limitation — Completed Wrong vs. Continuing Wrong

The court stressed that the pivotal question for limitation is whether the wrong complained of was committed once for all by a particular date (a completed wrong) or whether it was a continuing wrong (a series of acts giving rise to fresh causes of action).

- If the wrong is complete at a particular date, limitation runs from that date (for mandatory injunctions the relevant Limitation Act provisions were traced to Article 120 of the Limitation Act, 1908 and Article 113 of the 1963 Act).
- If the wrong is continuing (for example, repeated discharge of water through a channel/parnala), limitation would be computed from the date of the last continuing wrong.

Applying those principles to the facts, the court observed that in the present case the channel was constructed by the defendants at a particular time and was found to exist on the Advocate-Commissioner's inspection (report filed in 1984). The court found that the injury was complete when the channel was constructed; it was not a case of repeated constructions or repeated separate acts creating fresh injuries. The dominant grievance is the existence of the channel itself and the remedy sought was to remove that channel. Thus, the court characterized the wrong as complete at the time of construction and not as a continuing wrong.

The court relied on Full Bench authority (Khair Mohd. Khan v. Mt. Jannat) for the proposition that an injury complete on a date is not converted into a continuing wrong merely because its effects continue subsequently.

C. Application to the Amendment Application and Trial Court's Conduct

Given that the Advocate-Commissioner's report was in 1984 and that three years elapsed by 1987, while the amendment petition was filed only in 1992, the court concluded the amendment was clearly time-barred if the wrong was a completed one. The court criticized the trial court for allowing the belated amendment despite itself recording that the petition was belated and the relief time-barred, and for attempting to cure the delay and perceived illegality by imposing a nominal cost of Rs. 50/-. The court held that the trial court failed to properly apply its mind and erred in treating a substantive limitation defect as something curable merely by a small cost.

Holding and Implications

Holding: The Civil Revision Petition is allowed.

Implications and direct consequences:

  • The court held that the amendment seeking mandatory relief to remove the channel was time-barred because the wrong (construction of the channel) was a completed act existing on the date of the Advocate-Commissioner’s report (1984), and limitation had expired before the amendment application (filed in 1992).
  • The court found that the trial court erred in allowing the belated amendment while simultaneously recording its time-barred character and in attempting to justify allowance by imposing nominal costs; such an approach was deprecated.
  • As to immediate procedural effect, the Civil Revision Petition is allowed; the opinion records "with no order as to costs." The opinion does not purport to announce any broader, novel legal principle beyond applying and distinguishing existing authorities on continuing vs. completed wrongs and the limits of amendment under Order VI Rule 17 CPC.

Note: This summary is based exclusively on the information contained in the provided opinion. No external facts or inferences beyond the opinion have been added.

    Shaik Peda Adam And Ors. v. Shaik Adam And Ors.

    1. This revision petition is directed against the Order dated 21-9-1992 allowing the amendment petition of the plaintiffs in I.A No. 2125 of 1992 in O.S No. 117 of 1984 on the file of the Court of the Principal District Munsif, Ongole.

    2. The defendants, who opposed unsuccessfully, are the petitioners. The said suit was instituted seeking relief of permanent injunction and mandatory injunction. Plaintiffs and the Defendants are the neighbours having house properties. The plaintiffs' complaint is that windows and ventilators were illegally and unlawfully opened by the defendants into the property of the plaintiffs intruding their rights and as such mandatory injunction was sought for, to close the same. Preventive relief of permanent in unction was sought for restraining the defendants from laying the latrine pipe in portion marked P2 P3 P4 and P5.

    3. Advocate-Commissioner was appointed to inspect the suit property. In the course of inspection, it was found that a channel was there constructed by the defendants. Then a petition in I.A No. 2125 of 1992 under Order VI Rule 17 CPC was filed seeking amendment of the plaint incorporating a relief for the grant of mandatory injunction to close that channel also. It is not disputed that the channel was existing even before. Even computing the time from the date of the report of the Advocate-Commissioner, three years lapsed in the year 1987, while the petition for amendment was filed in the year 1992. The amendment petition was contested; but, it was allowed even while holding that the petition was belated and that the relief was time barred. But, however, that will be considered at the time of disposal of the suit and that the delay caused can be compensated by awarding costs of Rs. 50/-. The defendants, aggrieved by the said order, preferred this revision petition.

    4. Mr. M.V.S Suresh Kumar, the learned counsel for the petitioners, submits that the amendment petition was barred by the principles enunicated under Order II Rule 2 C.P.C He also submits that the lower court ought not to have allowed the same even while holding that petition was belated and that relief was also time barred.

    5. Mr. P. Srirama Murthy, the learned counsel for the respondents, on the other hand, submits that Order II Rule 2 C.P.C has got no application and that the nuisance caused by the defendants by constructing a channel was a continuing one and as such, there was no limitation as it was a continuing wrong.

    6. On the premise that the channel was existing as on the date of the institution of the suit and the plea of mandatory in unction was available as on that date, but was not sought for, it is true that it cannot be claimed later. But, such a waiver applies only when a second suit is instituted for the said relief and only second suit is barred under the provisions of Order II Rule 2 C.P.C But, when amendment is sought for in the same suit seeking the relief which was not sought for at the time of the presentation of the suit, the principles under Order II Rule 2 of C.P.C have got no applicatioa. To avoid the disability of Order II Rule 2 C.P.C for filing the subsequent suit, in the existing suit, amendment can be sought for and as such, Order II Rule 2 C.P.C cannot be a bar for invoction of Order VI Rule 17 C.P.C

    7. In so far as the second submission is concerned that the application for amendment was belated and that even while holding that the relief was time barred and also application as belated, the action of the lower court in allowing the amendment in a casual and routine manner stating that the same can be compensated by awarding costs of Rs. 50/- has got to be deprecated. A court of law has to judge the things in accordance with law and not by whims and fancies stating something and deciding contra to it. The court below has clearly stated that the relief sought for is time barred even computing the limitation from the date of the Advocate-Commissioner's inspection or report.

    8. Advocate-Commissioner's report was filed in the year 1984 and 3 years have elapsed in the year 1987. Petition for amendment seeking the relief of mandatory in unction for removing the channel was filed in the year 1992. Application of limitation is dependent upon the vital factor as to whether a wrong complained of has already been committed once for all by a particular date or is it a continuing wrong. In the first case, the limitation is 3 years from the date of the wrong committed, while in the second case the limitation is alive as it is a continuing wrong and from the date of the last of the continuing wrongs, the limitation has to computed. If the first instance is applicable, clearly the amendments barred by limitation, while it is otherwise if it is the second instance. The legal provision to which the limitation is traceable is Article 120 of Limitation Act, 1908 corresponding to Article 113 of Limitation Act, 1963.

    9. Distinction between a wrong and a continuing wrong came up for consideration in the decisions rendered in Nur Mohammad v. Gauri Shankar (1) AIR 1920 Lahore 195; Lal Singh v. Hira Singh (2) AIR 1921 Lahore 242, Mt. Kokla v. Kalian Mal (3) AIR 1923 Allahabad 452; Haru Ram v. Kaliyana Ram (4) AIR 1929 Lahore 88; Khair Mohd. Khan v. Mt. Jannat (5) AIR 1940 Lahore 459; Sarba Singh v. Mibarik Singh (6) AIR 1961 J & K 53; and Raja Ram v. Bahadur (7) AIR 1989 Allah. 115. Allahabad High Court in Raja Ram v. Bahadur (7 supra) did not lay down any proposition of its own and by making a reference to the decisions in Bhag Singh v. Sewa Singh (8) AIR 1953 Pepsu 150; Meghu Mian v. Kishun Ram (9) AIR 1954 Patna 477; and Pabia v. Badia (10) AIR 1957 Raj. 175, the said judgment was rendered. In the said case, the relief sought for was mandatory injunction for closing doors, ventilators and windows opened by the defendants in their houses affecting the rights of the plaintiffs.

    10. In Sarba Singh v. Mibarik Singh (6 supra), the Jammu and Kashmir High Court also did not lay down a proposition of law by its own, but relied upon tine proposition laid down in Nur Mohammad v. Gauri Shankar (1 supra). In the said case, it was held that each time the defendants discharged water through their parnala. There was fresh cause of action as it was a continuing wrong. Same is the case in Haru Ram v. Kaliyana Ram (4 supra). The said judgment simply followed the decision in Nur Mohammad (1 supra).

    11. In the judgments referred to above, parnalas (channels) for flowing water were constructed by the defendants in their properties and from time to time they were discharging water through the said parnalas into the properties of the plaintiffs and as such, each time when the water was being discharged, there was injury caused to the plaintiff and in that sense it was a continuing injury. But, in the instant case, there is a clear cut distinction as the channel was already constructed by the defendants in the land claimed by the plaintiffs as their own and the injury was complete when the channel was constructed. It is not that there is series of encroachments and illegal action of construction of channels time and again. The channel was constructed at a time and by a particular period. It is the existing of the channel, which is complained of and that is the dominating factor constituting a wrong, which is said to be remedied and not the discharge of water therefrom. The relief is to remove the channel and the act complained of was complete as on the date of the construction of the channel, which was found to be existing on the date of the Advocate-Commissioner's inspection in the year 1984. My above view is fortified by the Full Bench Judgment of the Lahore High Court rendered in Khair Mohd. Khan v. Mt. Jannat (5 supra), in which it was authoritatively held that if the injury was complete on a particular date, the same cannot be termed as a continuing wrong even though the damage caused by that injury might continue and that in such a case, the cause of action to the person injured arises once and for all at the time when the injury is inflicted and the fact that the effects of injury are felt by the aggrieved person on subsequent occasions does not make the injury a continuing wrong so as to give him cause of action in each such occasion.

    12. In Lal Singh v. Hira Singh (2 supra), the Lahore High Court held that for removing the thatched sheds, the suit for mandatory injunction was to be laid within 6 years under Article 120 of Indian Limitation Act, 1908 (corresponding to Article 113 of Indian Limitation Act, 1963, where the limitation is reduced to 3 years).

    13. In Mt. Kokla v. Kalian Mal (3 supra), it was held by Allahabad High Court that the limitation for mandatory injunction runs from the date of construction of Chabutra (platform). The said two decisions also lend support to my view.

    14. Learned counsel for the respondents then cites the decision in A.K Gupta v. Damodar Valley Corporation (11) AIR 1967 SC 96 to support his argument that if limitation is not an aspectto be considered in application for amendment of the pleadings and seeking relief thereon. In the said judgment, it was held that in the matter of allowing amendment of pleadings, the general rule is that a party is not allowed by amendment to set up a new case or a new cause of action particularly when a suit on the new cause of action is barred and that where, however, the amendment does not constitute the addition of a new cause of action or raise a different case, but amounts to merely a different or additional approach to the same facts, the amendments is to be allowed even after expiry of the statutory period of limitation. But, in the said case, the suit was on the contract seeking only interpretation of the clause for a decision of rights of the parties under it and for no other purpose and the cause of action was the contract itself on which the suit was based and that the amendment sought to introduce a claim based on the same cause of action, namely the same contract and introduced no new case or facts. In that case, a contract of work contained a clause to the effect that in case of increase in prevailing lab our rate of more than 10%, the contractor shall be entitled to charge proportionate increased rates subsequent to the making of the contract. There was increase in the labour rate by 20% and a dispute arose between the parties as to whether under the clause, the contractor was entitled to whole amount or only part of it. As the sole difference between the parties was about interpretation, the contractor filed a suit against respondents only claiming declaration that on a proper interpretation of the clause, he was entitled to enhancement of the 20% above the tendered rates. Contractor's interpretation of the clause was challenged though no material fact was disputed. The suit was decreed, but was reversed on appeal in view of Section 42 of the Specific Relief Act. The plaintiff then sought the leave of the High Court to amend the plaint by adding extra relief for a decree for contract money or such other money as was to be found due on proper account being taken. But the amendment was disallowed and as such, the plaintiff appealed to the Supreme Court. But, the said Judgment of the Supreme Court is distinguishable from this case as in the Supreme Court, the cause of action was the contract and the interpretation was involved and further relief by amendment sought for was only based on the said cause of action without introducing any new cause of action and in that context, the Supreme Court held that amendment was disallowed without reference to the limitation aspect. But, in the instant case, the cause of action is construction of a channel, which was never questioned in the suit and for the first time after 8 years of the institution of the suit, a mandatory injunction is sought for removing the said channel. Construction of the said channel was over at a particular point of time and it was existing as on the date of the Commissioner's report. Merely because water used to be discharged into the said channel does not mean to say that there was a continuing wrong.

    15. In this view of the matter, the relief by amendment was clearly time barred and the lower court having held so, ought not have allowed the amendment. That apart, when amendment petition has to be filed within a reasonable period, by no stretch of imagination can it be said that 8 years period is a reasonable period for filing amendment petition. While considering the plea for amendment of pleadings, the delay plays important role and if there is unreasonable and unexplained delay, certainly it is aground for refusing amendment and in the instant case, such a delay is there and that too accepted by the lower court. But, the lower court still allowed the amendment petition without proper application of mind and casually thinking that the illegality can be cured by imposition of costs of Rs. 50/-, which is a wrong approach. The lower court ought to have realised that it was exercising a common law court jurisdiction and not extraordinary jurisdiction, which is the prerogative of the courts of record.

    16. In the result, the Civil Revision Petition is allowed. But, in the circumstances, with no order as to costs.