Satish Kumar Petitioner v. Bses Yamuna Power Ltd. And Anr. S

Delhi High Court
Mar 7, 2018
Smart Summary (Beta)

Factual and Procedural Background

The petitioner, Satish Kumar, alleged that on May 19, 2016 a high-voltage wire of BSES Yamuna Power Ltd (respondent No.1) snapped and fell on him, his wife and two children while they were at their residence in Shiv Vihar, East Karawal Nagar. The petitioner's younger son suffered severe burn injuries, had a leg amputated (on June 24, 2016) and subsequently died on July 18, 2016. The petitioner made written complaints to the SHO, PS Karawal Nagar on July 14 and July 21, 2016; after a representation under Section 156(3) Cr.P.C., an FIR No. 0259 under Sections 285/337/304 IPC dated August 3, 2016 was registered against respondent No.1.

The petition was filed under Article 226 seeking, inter alia, compensation of Rs.10,00,000/-, an enquiry against responsible officers and costs. Initially the petition named BSES Yamuna Power Ltd and the Government of NCT of Delhi; Reliance General Insurance Company Ltd (respondent No.3) was later impleaded. Respondent No.1 and respondent No.3 filed counter-affidavits; respondent No.2 did not file a counter-affidavit. The matter was heard by the High Court which directed written submissions; the Court also attempted mediation without success.

Legal Issues Presented

  1. Whether the writ petition under Article 226 of the Constitution is maintainable in respect of claims founded on tort/negligence arising out of the electric-line accident.
  2. Whether liability to pay compensation in this case can be determined in writ proceedings or requires trial before a Civil Court where disputed questions of fact (including negligence) are to be adjudicated.

Arguments of the Parties

Petitioner's Arguments

  • The petitioner asserted negligence on the part of respondent No.1 resulting in serious injury and death of his son and sought compensation (Rs.10,00,000/-), an enquiry and costs.
  • The petitioner relied on several authorities (including decisions of the Supreme Court and this Court) in support of relief by way of writ and/or compensation (specific citations reproduced in the precedents table below).

Respondent No.1's Arguments

  • Challenged maintainability of the writ petition relying on the principle that actions in tort and negligence require proof in Civil Court (citing Chairman, Grid Corporation of Orissa Ltd & others v. Sukamani Das and Anr).
  • Asserted that the HVDS line snapped because of unauthorized interference by the owner of the adjacent house (tying a rope and pulling the HVDS line to facilitate construction activities), not because of any dereliction by respondent No.1.
  • Relied on findings of an Accident Enquiry Committee and the Delhi Police investigation, which, according to respondent No.1, attribute responsibility to the owner of the neighbouring property and corroborate the respondent's defence.
  • Contended that the quantum claimed (Rs.10,00,000/-) had no basis in writ proceedings and would require proof at trial.

Respondent No.3 (Reliance General Insurance Company Ltd) Arguments

  • Also challenged maintainability of the petition citing Chairman, Grid Corporation (supra) and this Court's authorities that disputed factual issues must be tried in Civil Court.
  • Pointed to an insurance policy in favour of respondent No.1 for the relevant period and stated that any liability, if established, would be subject to the policy terms (including a Compulsory Excess Clause limiting recoverable amounts to Rs.5,00,000/- as per the policy wording).
  • Stated that any payment, if required, should be discharged by respondent No.1 first and then claimed under the insurance policy as per policy terms.

Ms. Shabnam (owner of adjacent property) Arguments

  • Denied liability to pay compensation; the final police report and Accident Enquiry are said to attribute responsibility to her, but she appeared and denied liability in these proceedings.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Chairman, Grid Corporation of Orissa Ltd & others v. Sukamani Das and Anr (1999) 7 SCC 298 That actions in tort/negligence involving disputed questions of fact are not appropriate for adjudication in writ jurisdiction under Article 226; such issues require trial. The Court applied the principle to conclude that disputed factual questions exist and that the writ petition is not the proper remedy to determine liability for compensation; the petitioner should seek relief in Civil Court.
Chairman, Railway Board v. Mrs. Chandrima Dass & Ors AIR 2000 SC 988 Relied upon by the petitioner as authority in support of grant of compensation in certain cases involving State/authority liability. The Court found such authorities distinguishable because in those cases negligence/ liability of the authority had been established; thus they had no applicability to the facts before it.
Fatima and Anr v. National Zoological Park 232 (2016) DLT (DB) Relied upon by the petitioner as a case where authority was held negligent/vicariously liable. The Court held this precedent not applicable to the present facts because those cases involved findings of negligence against the authority, which is not the case here.
2011 (14) SCC 481 MCD v. Association of Uphaar Tragedy Victims Relied upon by the petitioner as authority for authorities being held liable and for principles on compensation. The Court observed that Uphaar-type authorities being held liable in other cases does not assist the petitioner here where negligence by respondent No.1 is disputed.
Duli Chand & Anr v. State & Anr Writ Petition (Civil) Nos. 12457/2006 and 12458/2006 Authority for the proposition that disputed questions of fact can only be decided by Civil Courts and not in writ petitions. Referred to by respondent No.3; the Court treated it as support for relegating the petitioner to Civil Court for determination of disputed facts and liability.
SDO, Grid Corporation of Orissa Limited v. Timudu Oram (2005) 6 SCC 156 Used by respondents in support of the maintainability objection in cases involving disputed factual issues on negligence. The Court treated it as consistent with the principle that writ jurisdiction is not the forum to decide disputed factual issues of tort/negligence.
Abdul Haque and Ors v. BSES Yamuna Power Ltd and Ors 142 (2007) DLT 526 Discussed accident enquiry findings and the existence of disputed factual matters in similar incidents. The Court cited the case (and its para 11) as support for the conclusion that disputed facts arising from accident enquiries require trial and are not amenable to determination in writ proceedings.
W.P.(C) No. 4140/2001 K.K. Mehta and Anr. v. Delhi Vidyut Board and Anr. Division Bench authority affirming that matters involving disputed factual issues regarding negligence are not to be decided in writ jurisdiction. The Court noted that this Court has followed the principle and relied upon it in reaching the conclusion on maintainability.
New India Assurance Co. Ltd. v. Satender and Ors AIR 2007 SCC 324 Relied upon by respondent No.1 on matters relating to quantum of compensation. The Court recorded that the respondent relied on this authority regarding principles on quantum, but held that quantum here must be determined in a trial; it nonetheless granted an ex-gratia interim payment.
(2017) 3 SCC 115 State of Himachal Pradesh and others v. Naval Kumar Alias Rohit Kumar Referenced by the petitioner for compensation awarded by courts; demonstrates appellate review of quantum when negligence was conclusively found. The Court observed this decision was distinguishable because in that case the High Court had conclusively held negligence of the State; that is not the situation in the present matter.
Rajeev Singhal & Anr v. M.C.D. (East Delhi Municipal Corporation) & Anr W.P.(C) No. 6349/2014 Recent Division Bench authority cited as following the principle that disputed factual issues preclude resolution in writ proceedings. The Court noted that this Court has followed the same position and relied on it in its reasoning on maintainability.

Court's Reasoning and Analysis

The Court identified the threshold legal issue as the maintainability of the writ petition under Article 226 and whether liability for compensation can be determined in writ proceedings. The Court examined the pleadings, counter-affidavits and the Accident Enquiry Committee and police investigation material placed on record by respondent No.1.

Applying settled law (notably Chairman, Grid Corporation of Orissa Ltd v. Sukamani Das and other Division Bench and Single Bench authorities), the Court reasoned that where disputed questions of fact and issues of tort/negligence arise, the writ jurisdiction is not the proper forum because such questions require evidence and trial. The Court found that respondent No.1 had a specific defence — supported by the Accident Enquiry report and police investigation — that the HVDS line snapped due to unauthorized interference by the owner of the adjacent property (tying and pulling the line), which attributed responsibility to a third party. This placed in issue the question whether respondent No.1 was negligent or whether third-party intervention caused the accident.

Because such factual disputes exist and because competing factual narratives and defences are raised (which cannot be conclusively resolved on affidavits), the Court concluded that the petitioner must be relegated to a Civil Court to seek monetary relief and to establish negligence/causation at trial.

Noting the severe human consequences (burn injuries, amputation and death) and the delay that a trial may entail, and after unsuccessful mediation attempts, the Court nevertheless exercised its discretion to grant limited interim relief: an ex-gratia payment of Rs.2,00,000/- by respondent No.1 to the petitioner, specifically stating that this direction was without prejudice to the substantive positions of respondent No.1 and respondent No.3 and without expressing any finding on negligence or culpability.

Holding and Implications

Holding: The writ petition is not a proper forum to determine liability for compensation in this case (claims in tort/negligence involve disputed questions of fact). The petitioner is relegated to a Civil Court to pursue the claim on merits. However, respondent No.1 is directed to pay an ex-gratia amount of Rs.2,00,000/- to the petitioner within two months of receipt of the copy of the order. The petition stands disposed of.

Implications:

  • The direct, immediate effect is that respondent No.1 must pay Rs.2,00,000/- to the petitioner as ex-gratia interim relief within two months.
  • The substantive claims concerning negligence, causation and quantum of compensation are to be adjudicated by the Civil Court; the High Court made no determination on negligence or liability and expressly left those issues to trial.
  • The order is rendered without prejudice to the defences of respondent No.1 and respondent No.3 (including insurance policy contentions and liability limits) and does not create a precedent finding respondent No.1 negligent.
Show all summary ...

IN THE HIGH COURT OF DELHI AT NEW DELHI

Judgment reserved on: February 13, 2018

Judgment delivered on: March 07, 2018

+ W.P.(C) 9947/2016

SATISH KUMAR

..... Petitioner Through: Mr. Shiv Charan Garg, Adv. versus

BSES YAMUNA POWER LTD AND ANR

..... Respondents

Through: Mr. Manish Srivastava, Adv. for R1. Mr. Vikas Bhadana, Adv. for R3. Mr. Sandeep Jain, Adv. for

Ms. Shabhnam, the neighbour.

Mr. Rahul Bakshi, Adv. for PS-

Karawal Nagar.

CORAM:

HON'BLE MR JUSTICE V. KAMESWAR RAO

J U D G M E N T

V. KAMESWAR RAO, J

1. The present petition has been filed with the following prayers:-

"It is, therefore, most respectfully prayed that under the facts and circumstances stated above and in the interest of justice and equity, this Hon'ble Court may graciously be pleased to :-

i) pass appropriate writ, direction or order to the respondents in the facts and circumstances of the case;

ii) direct the respondents no.1 and 2 to pay a

1

sum of Rs.10,00,000/- jointly and severally to the petitioner as compensation;

iii) direct the respondents no.1 and 2 to hold enquiry against the responsible officer due to spoiling life of a child;

iv) Cost of the petition may also be awarded in favour of the petitioner and against the respondents;

v) Any other or further relief or order which this Hon'ble Court may deem fit and proper also be passed in favour of the petitioner and against the respondent."

2. It is the case of the petitioner that he along with his wife and two children aged about 10 years and 4 years were residing in A-469, Gali No. 10, Phase-VI, Shiv Vihar, East Karawal Nagar, Delhi-110094. On May 19, 2016 a high voltage wire of the BSES Yamuna Power Ltd broke down and fell on all of them, which resulted in their burning. It is stated, on June 24, 2016, the petitioner's son's leg was amputated to save his life. On July 14, 2016 he gave a complaint in writing to the SHO, PS Karawal Nagar, Delhi. On July 18, 2016 the son of the petitioner expired during his treatment in the hospital. It is his case, no official came and contacted him for registration of FIR against BSES, respondent No.1. On July 21, 2016, the petitioner again sent a letter to the SHO and intimated about the death of his son. However, no FIR was registered even then. On July 29, 2016, a representation under Section 156(3) Cr.PC was sent to the DCP, North-East District, which resulted in an FIR No 0259 under Section 285/337/304 IPC dated August 03, 2016 was registered against the respondent No.1.

3. It is his case, the incident has resulted in great mental

2

agony, trauma and monetary loss due to the negligence on the part of the respondents, for which he is liable to be compensated. I may state here that initially the petition was filed against two parties BSES Yamuna Power Ltd and the Government of NCT of Delhi. Thereafter, on the submission of the learned counsel for the respondent No.1 Reliance General Insurance Company Ltd, respondent No.3 was also impleaded as a respondent.

4. The respondent No.1 has filed a counter affidavit, wherein it is the stand that the present petition under Article 226 of the Constitution of India is not maintainable in view of the judgment of the Supreme Court in the case of Chairman, Grid Corporation of Orissa Ltd & others v. Sukamani Das and Anr (1999) 7 SCC 298, wherein it was held that all the cases where action in tort and negligence are required to be established, writ petition is not the proper remedy and the claimant has to establish the same before the Civil Court. It is the case of the respondent No.1 that on May 19, 2016 at about 9.50 am, a complaint was received by duty T.O about the snapping of an HVDS line in Gali no.9, Phase-VII, Shiv Vihar, Delhi. The T.O. forwarded the information to the then on duty line men Rajeev Sharma and Ramlal, both of whom immediately switched off supply of electricity to the area from the RMU and went to the aforementioned spot where an HVDS line was found lying down on the ground. It is also stated that the owner of the house under construction adjacent to the petitioner's house was issued a notice on May 15, 2016 for maintaining the safety requirements as per law. It is the case of the respondent No.1 that the owner of the

3

adjacent house failed to comply with the safety requirements, a complaint against the owner of the house under construction adjacent to the petitioner's house was lodged on May 19, 2016 with SHO, PS Karawal Nagar. It is averred that an enquiry of the respondent No.1 has revealed that HVDS line has been pulled towards the opposite side of the gali by tying rope around it. It is further stated that such an act was the doing of the owner of the house adjacent to the petitioner's, who tied rope around the HVDS line and pulled the same to facilitate the lanter saria to reach the upper floor and that it's due to such an illegal act of the owner of the adjacent house, the wires were snapped and the HVDS line socket fell on the ground. It is the case of the respondent No.1 that there was no complaint of any sparking or fault in the HVDS line before the incident.

5. The respondent No.2 has not filed any counter affidavit.

6. The respondent No.3, in its counter affidavit has also taken an objection on the maintainability of the petition by relying upon the judgment in the case of Chairman, Grid Corporation of Orissa Ltd & others (supra). The respondent No.3 also relied upon the judgment of this Court in the case of Duli Chand & Anr

v. State & Anr Writ Petition (Civil) Nos. 12457/2006 and 12458/2006, wherein it was held that issues involving disputed question of facts can only be decided by the Civil Court and not in a writ petition. The respondent No.3 also refers to an insurance policy having been issued in favour of the respondent No.1 for the period between April 02, 2016 to April 01, 2017 and the liability of the respondent No.3, if any would be subject to the

4

terms and conditions of the said policy only and cannot be beyond the said terms and conditions in any case whatsoever. It is also stated, if any liability is saddled against the respondent No.1, the same would be only of Rs.5,00,000/- as per Compulsory Excess Clause of the insurance policy. It is also stated that if any liability is fastened upon, then the same must be first discharged by the respondent No.1 and thereafter the claim shall be lodged by the respondent No.1 with the respondent No.3.

7. Rejoinder to the counter affidavits has been filed.

8. I have heard the counsel for the parties including Mr. Sandeep Jain, Advocate for Ms. Shabnam, the owner of the adjacent property. After hearing the counsel for the parties, the counsels were directed to file written submissions. The respondent No.1 has only filed the written submissions. I note that the learned counsel for the petitioner has already filed a synopsis, which is on record.

9. Mr. Shiv Charan Garg, learned counsel for the petitioner apart from reiterating the case as set up in the pleadings on behalf of petitioner has also relied upon the judgment of the Supreme Court in the cases of Chairman, Railway Board v. Mrs. Chandrima Dass & Ors AIR 2000 SC 988, Fatima and Anr v. National Zoological Park 232 (2016) DLT (DB). He also relied upon the judgment of the Supreme Court in the case reported as

2011 (14) SCC 481 MCD v. Association of Uphaar Tragedy Victims. He reiterates the prayers as made in the writ petition.

10. Mr. Manish Srivastava, learned counsel appearing for the respondent No.1 would challenge the maintainability of the writ

5

petition stating that there is no negligence on the part of the respondent No.1, which resulted in the unfortunate incident. According to him, as per the report of enquiry conducted by Accident Committee, it is clear that the accident occurred due to the electric current from broken HVDS lead, which had fallen down due to unauthorized interference by the owner of the adjacent house to the petitioner. According to him, the owner of the house tied rope around the HVDS line and pulled the same towards opposite side to facilitate lanter saria to reach the upper floor and owing to the unwanted pull, the messenger wire got snapped and HVDS line socket fell down causing burning. According to him, it was the owner of the adjacent house who failed to comply with the safety requirements. A complaint against the owner of the house under construction was also lodged on May 19, 2016. He relied on the investigation done by the Delhi Police, which corroborated the incident and the aforesaid facts. In the final report, the Police has categorically concluded Ms. Shabnam the owner of the adjacent house is responsible for electrocution of the deceased Master Ronak. It is his case that there is no dereliction of duty/negligence on the part of the respondent No.1. On the quantum of compensation, the claim of Rs.10,00,000/- made in the prayer clause is without any basis. It is also stated, such a claim must necessarily be proved by way of a trial. He relies upon the following judgments in support of his case on the maintainability of the writ petition:-

(i) Chairman, Grid Corporation of Orissa Ltd & others v. Sukamani Das and Anr (1999) 7 SCC 298;

6

(ii) SDO, Grid Corporation of Orissa Limited v. Timudu Oram (2005) 6 SCC 156;

(iii) Abdul Haque and Ors v. BSES Yamuna Power Ltd and Ors 142 (2007) DLT 526;

(iv) W.P.(C) No. 4140/2001 K.K. Mehta and Anr. v. Delhi Vidyut Board and Anr.

11. On the question of quantum of compensation, he relies on the judgment of New India Assurance Co. Ltd. v. Satender and Ors AIR 2007 SCC 324.

12. The learned counsel for the respondent No.3 has reiterated the stand taken by the said respondent in their counter affidavit.

13. The learned counsel for Ms. Shabnam would deny the liability of Shabnam to pay compensation.

14. Having heard the learned counsel for the parties, the first and foremost issue to be decided in this case is, whether the present petition is maintainable under Article 226 of the Constitution of India and the liability to pay any compensation need to be decided by way of a trial whereby evidence as to who was negligent need to be proved.

15. To answer this issue, it is necessary to first of all come to a conclusion that there are disputed question of facts. The respondent No.1 has taken a stand that in terms of the Accident Committee report dated July 07, 2016, it was because of the acts of the owner of the neighbouring property, who had tied the rope around the HVDS line and pulled the same towards the opposite side to facilitate the lanter saria to reach to the upper floor and

7

owing to the unwanted pull, the messenger wire got snapped and the HVDS socket fell down, which resulted in the unfortunate incident. It is also the case of the respondent No.1 that the Delhi Police investigated the incident, which corroborated the aforesaid facts. In fact, the respondent No.1 has stated that even the final report of the Delhi Police records the negligence on the part of Ms. Shabnam, who has admitted the same. In view of the aforesaid position, Mr. Srivastava may be right in disputing the liability of respondent No.1 to pay any compensation. It can be said, there are no disputed question of facts. The Supreme Court in the case of Chairman, Grid Corporation of Orissa Ltd (supra), has held that in the cases of actions in tort and negligence, the same is required to be first established by the claimants. The relevant conclusion of the Supreme Court are as under:-

"In our opinion, the High Court committed an error in entertaining the writ petitions even though they were not fit cases for exercising power under Article 226 of the Constitution. The High Court went wrong in proceeding on the basis that as the deaths had taken place because of electrocution as a result of the deceased coming into contact with snapped live wires of the electric transmission lines of the appellants, that "admittedly prima facie amounted to negligence on the part of the appellants." The High Court failed to appreciate that all these cases were actions in tort and negligence was required to be established firstly by the claimants. Mere fact that the wire of the electric transmission line belonging to the appellant No.1 had snapped and the deceased had come into contact with it and had died was not by itself sufficient for awarding compensation. It also required to be examined

8

whether the wire had snapped as a result of any negligence of the appellants and under which circumstances the deceased had come into contact with the wire. In view; of the specific defences raised by the appellants in each of these cases they deserved an opportunity to prove that proper care and precautions were taken in maintaining the transmission lines and yet the wires had snapped because of circumstances beyond their control or unauthorized intervention of third parties or that the deceased had not died in the manner stated by the petitioner. These questions could not have been decided properly on the basis of affidavits only. It is the settled legal position that where disputed questions of facts are involved a petition under Article 226 of the Constitution is not a proper remedy. The High Court has not and could not have held that the disputes in these cases were raised for the sake of raising them and that there was no substance therein."

16. The aforesaid position of law has been followed by Division Bench of this Court in the case of K.K. Mehta and Anr. (supra) and also in a latest judgment in the case of Rajeev Singhal & Anr v. M.C.D. (East Delhi Municipal Corporation) & Anr W.P.(C) No. 6349/2014.

17. Further, in the case of Abdul Haque and Ors (supra), in para 11, it was held as under:-

"11. In its counter affidavit, the DVB raised a preliminary objection as to the maintainability of the petition on the ground that it involved disputed questions of fact. It was again pointed out that the DVB has ceased to exist and the successor-in- interest of the DVB, the BSES Yamuna Power Limited (BYPL) was imp leaded in its place. The BYPL by its affidavit dated 5.9.2005 placed on record a copy of the report dated 21.4.2005 of the

9

Accident Enquiry Committee which indicated that:

1. The illegal tappings are still existing and some of the residents of the colony are stealing electricity through these tappings.

2. All deteriorated conductor has been replaced with Dog Conductor.

3. The No. of residents of the area has extended their balconies/chajjas which has become accessible to BSES LV mains.

4. As reported by Manager (Oprn) information has been submitted to the MCD and Police Authorities for taking appropriate action.

5. The illegal construction are also found at site under LT Network of the Area due to which no proper vertical clearance found as per I.E. Rules.

6. Guarding through earth wire is existing at site to avoid accident due to snapping of conductor as per safety measures.

It was further pointed out in the Report that:

The Accident Enquiry Committee opined that similar conditions were prevailing at the time of accident. J.J. Cluster and J.J. Resettlement colony are still having considerable theft of energy which is a social problem and unless until strict laws are made to act as deterrent for the people indulging in theft of energy, it would be difficult to have 100% safety of consumer and residents in such like area."

18. Insofar as the reliance placed by Mr. Garg on the judgment of the Supreme Court in the case reported as (2017) 3 SCC 115 State of Himachal Pradesh and others v. Naval Kumar

10

Alias Rohit Kumar, wherein, in the said judgment the Supreme Court has modified the order of the High Court, which granted compensation of Rs.1 Crore 25 Lacs to the respondent to Rs.90 Lacs with 6% interest. In the said case, the High Court has conclusively held the negligence of the State and had accordingly granted the said relief, which is not the case herein in view of my aforesaid conclusion.

19. Similarly, the judgments in the case of Fatima and Anr (supra), Chairman, Railway Board (supra) and Uphaar (supra),

relied upon by Mr. Garg, would have no applicability in the facts of this case as in these cases also the Courts have held the authorities to be negligent/vicariously liable, which is not the case here.

20. That apart, there is an FIR registered against Ms. Shabnam and a final report has also been filed, but the same would not be conclusive, till such time the case is decided. Even, she appeared in these proceedings, on the basis of a Court notice issued to her. No relief can be granted in favour of the petitioner against Ms. Shabnam in these proceedings. That apart, there is an issue on the quantum of compensation as well. The appropriate would be that in the facts of this case, the petitioner is relegated to a Civil Court.

21. Pending adjudication by the Civil Court, it is noted that on February 09, 2017 attempt was made by the Court for the parties to arrive at an amicable settlement. The matter was also referred to the Delhi High Court Mediation & Conciliation Centre but no settlement could be arrived upon. There is no dispute that

11

the petitioner's son, had suffered burn injuries on his body resulting in amputation of his leg and subsequently his death. The loss cannot be compensated in terms of money. It is a common knowledge that such a loss would surely lead to mental agony, trauma. The petitioner must have incurred at least some expenditure. The trial may take time. Pending decision in such a suit, to provide succor to the petitioner and his family, this Court is of the view, in the peculiar facts of this case and without prejudice to the stand of the respondent No.1 and respondent No. 3, the respondent No.1 is directed to pay an amount of Rs.2,00,000/- to the petitioner as an ex-gratia amount. Ordered accordingly. It may be clarified here, this Court has not expressed itself on the negligence/culpability of the respondent No.1 or for that matter Ms. Shabnam. It goes without saying that the Civil Court shall decide the claim on merit on the basis of the facts, which arises for its consideration. Similar shall be in the case of FIR. The amount shall be paid within a period of two months from the date of receipt of copy of this order. Petition stands disposed of.

V. KAMESWAR RAO, J

MARCH 07, 2018/ak