The Secretary, K.S.E.B & Anr. Etc. v. M.V Abraham & Anr. Etc.

Kerala High Court
Sep 1, 2006
Important Paras
Please sign up to view Important Paras.
Smart Summary (Beta)

Factual and Procedural Background

These appeals arise from nine suits filed by the first respondent (O.S. Nos. 138/1991, 139/1991, 140/1991, 141/1991, 71/1992, 72/1992, 78/1992, 79/1992 and 80/1992). The defendants are the Kerala State Electricity Board (KSEB), the Deputy Chief Engineer, Lower Periyar Project, and the National Project Construction Corporation Ltd. (NPCC). Against decrees in those suits the KSEB filed a series of appeals (A.S. Nos. 470/1994, 490/1994, 523/1994, 521/1994, 574/1994, 522/1994, 525/1994, 558/1994 and 519/1994) and the third defendant (NPCC) also filed separate appeals.

The plaintiffs claimed possession of approximately nine acres of garden land south of the Periyar River and west of Karimanal Hills. Although the land originally was forest land and the plaintiffs had no title, they asserted possession since 1966 and alleged that they had cleared and improved the land (planting rubber, coconut, cocoa, pepper, arecanut, jack, mango and other trees). The Lower Periyar Hydro Electric Project, implemented by KSEB, required excavation and removal of earth and stones; those works were entrusted to NPCC.

Plaintiffs alleged that from October 1983 the defendants dumped excavated materials on the northern side of the plaint schedule properties and on the southern side of the Periyar River, reducing the river width, raising water levels, causing a bund at the mouth of Karimanal Canal to break, and thereby submerging and destroying improvements on the plaint schedule properties. Plaintiffs sought damages and a mandatory injunction to restore their properties.

Earlier, plaintiffs had filed O.S. No. 507/1989 (transferred and renumbered as O.S. No. 164/1990) seeking a prohibitory injunction restraining further dumping; a Commissioner reported on the damage, and that earlier suit was withdrawn by the plaintiffs without prejudice to file a fresh suit. Claims in the nine suits were limited to specified sums (ranging from Rs. 4,500 to Rs. 1,50,000 as listed in the opinion).

Defendants pleaded that the plaintiffs had no title (the land was river puramboke), that dumping was on river puramboke and served as protection, that any damage was caused by unprecedented rainfall (a natural calamity), and that the present suits were barred by Order II Rule 2 and/or Order XXIII where applicable. The trial proceeded with 11 plaintiff witnesses (PWs 1–11) and two defence witnesses (DWs 1–2) and documentary exhibits were marked.

Legal Issues Presented

  1. Whether the present suits are barred by Order II, Rule 2 of the Code of Civil Procedure (i.e., whether plaintiffs split their cause of action by omitting a relief in an earlier suit).
  2. Whether withdrawal of the earlier suit (O.S. No. 507/1989 renumbered O.S. No. 164/1990) invokes Order XXIII, Rule 1 and precludes the plaintiffs from instituting fresh suits on the same subject-matter.
  3. Whether plaintiffs who lack title to State land (river puramboke) but are in possession and made improvements can claim damages from the defendants for tortious acts causing loss to those improvements.
  4. Whether the trial Court's findings (that defendants dumped excavated material and that damage was caused by defendants' acts rather than natural calamity) are perverse or unsustainable on the record.
  5. Whether a mandatory injunction to restore the land to its original condition is appropriate where plaintiffs do not have title to the land.

Arguments of the Parties

Appellants' (Defendants') Arguments

  • The suits are barred by Order II, Rule 2 of the Code of Civil Procedure because the earlier suit (O.S. No. 507/1989) arose on the same cause of action and the plaintiffs omitted to seek compensation in that earlier suit.
  • The earlier suit having been dismissed/withdrawn, the plaintiffs are precluded from instituting fresh suits; Rule 1(4) of Order XXIII was invoked in their submissions.
  • The plaint schedule properties are river puramboke (Government property) encroached by the plaintiffs and therefore plaintiffs have no entitlement to damages for improvements.
  • The dumping was made only on river puramboke and not on the properties claimed by the plaintiffs; any loss was due to unprecedented rainfall (natural calamity) and not defendants' negligence.
  • The third defendant contended the suit was not maintainable without impleading the State and that disposal of materials was carried out under KSEB's direction and supervision in accordance with the agreement.

Respondents' (Plaintiffs') Arguments

  • The earlier suit was only for a prohibitory injunction (to restrain further dumping) and did not seek damages; the plaintiffs reserved the right to sue later for mandatory relief and compensation — hence the cause of action for damages in the present suits is different.
  • The defendants dumped excavated materials on the river adjacent to the plaint schedule properties and thereby reduced the width of the river, raised water levels and caused the bund to break; the Commissioner’s report (Ext. A1) and witnesses corroborated the dumping and resultant damage.
  • Damage was caused by the defendants' negligent and unreasonable acts, not by natural calamity; defendants had the burden to produce documentary proof regarding the location of the authorised dumpyard (Thookupara) but failed to do so.
  • Although plaintiffs had no title, they were in undisturbed possession and had made improvements; they were entitled to compensation for tortious acts of the defendants who made no claim of title.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Kunjan Nair Sivaraman Nair v. Narayanan Nair, AIR 2004 SC 1761; (2004) 3 SCC 277 Explains scope and ambit of Order II, Rule 2 — that sub-rule (3) bars a second suit only if it is based on the same cause of action as the earlier suit and reliefs omitted earlier were available on that cause of action. The Court relied on this decision to require that defendants show identity of the cause of action between earlier and present suits before invoking the bar under Order II, Rule 2; held that this test was not satisfied here.
Gurbux Singh v. Bhooralal, AIR 1964 SC 1810 (1964 (7) SCR 831) Holds that a plea under Order II, Rule 2 is a technical bar that must be established satisfactorily by producing pleadings in the previous suit to prove identity of cause of action. The Court applied this principle to conclude that defendants, having not produced the pleadings and judgment of the earlier suit, failed to establish the bar under Order II, Rule 2.
Bengal Waterproof Ltd. v. Bombay Waterproof Manufacturing Co., (1997) 1 SCC 99; AIR 1997 SC 1398 Cited (via Kunjan Nair) in relation to the principles governing Order II, Rule 2 and splitting of claims. Relied upon indirectly through Kunjan Nair to support the Court's analysis of what must be shown to invoke Order II, Rule 2; the Court treated the authorities as requiring strict proof of identity of cause.
Dalip Singh v. Mehar Singh Rathee, (2004) 7 SCC 650 States the sine qua non for applicability of Order II, Rule 2 is that a plaintiff entitled to more than one relief in respect of the same cause of action has omitted to sue for some relief without the leave of the Court. The Court used this precedent to reinforce that the bar under Order II, Rule 2 applies only when omission to sue for a relief on the same cause of action is established — which the defendants failed to do here.
Rev Fr. K.C. Alexander v. State of Kerala, AIR 1973 SC 2498 Holds that a trespasser on Government land who plants trees cannot claim compensation from the Government on eviction; no obligation on Government under the specified statute to compensate. The Court considered this authority but distinguished it: here the plaintiffs did not sue the Government and the defendants (KSEB/NPCC) had not asserted title; thus the reasoning in Rev Fr. K.C. Alexander did not prevent plaintiffs from claiming damages against the defendants for tortious acts.

Court's Reasoning and Analysis

The Court reviewed the trial Court's factual findings, the evidence led and the legal contentions, and proceeded in two main strands: (A) whether the suits were barred by procedural rules concerning splitting of cause of action; and (B) the merits on liability and quantum.

A. Procedural bar — Order II, Rule 2 and Order XXIII, Rule 1

  • The appellants relied on Order II, Rule 2 (and associated sub-rules) to argue that plaintiffs split their claim by seeking only an injunction earlier and later suing for damages. The Court noted sub-rules (2) and (3) of Rule 2 and the penalising object behind the rule: to prevent vexatious or split litigation.
  • The Court applied established authority (notably Gurbux Singh and Kunjan Nair) that a defendant invoking Order II, Rule 2 must produce the pleadings and judgment in the earlier suit to establish identity of cause of action — a technical bar which must be proved, not presumed.
  • Here, the defendants did not produce the pleadings or judgment from the earlier suit (O.S. No. 507/1989 renumbered 164/1990). On that basis, and on the material before the Court, the earlier suit's cause of action was held to be different: the earlier suit sought a prohibitory injunction (prospective relief to prevent future dumping) while the present suits sought damages for loss already sustained (retrospective relief).
  • The Court further observed that where a suit has been withdrawn, Order XXIII Rule 1 applies; under sub-rule (4) withdrawal without permission can preclude fresh suit only if the subject-matter/claim is the same. The Court concluded that the subject-matter here was different and the defendants had not satisfied the tests to invoke the bar.
  • Relying on Dalip Singh, the Court reiterated that the sine qua non for Order II, Rule 2 is an omission to sue for available relief on the same cause of action without leave; that requirement was not established.

B. Merits — Liability, evidence and quantum

  • The trial Court found (after considering PWs 1–9, the Commissioner's report Ext. A1, and DW1 admissions) that defendants had dumped excavated materials in the Periyar River and on the side of the plaint schedule properties, thereby reducing the river width and causing damage to plaintiffs' improvements. The appellate Court concurred with that factual appreciation and found no perversity.
  • The Court emphasized evidentiary points relied upon by the trial Court: the Commissioner’s report specifying filled portions of the river (width measurements), the admission by DW1 that earth was dumped and water escaped through the southern side, and the defendants' failure to produce documents proving that the authorised dump site was Thookupara.
  • The Court placed the burden on the defendants to produce documentary proof regarding the authorised dumping area, as that was a fact especially within their knowledge; failure to produce such proof undermined defendants’ case that dumping did not occur as alleged.
  • On the contention that plaintiffs had no title and thus could not claim damages (relying on Rev Fr. K.C. Alexander), the Court distinguished that authority: plaintiffs had not sued the Government; the defendants did not assert title to the land; and plaintiffs were shown to be in peaceful possession and to have made improvements. Consequently, plaintiffs could recover damages from the defendants for tortious acts.
  • Regarding quantum, the Court held that the trial Court considered facts and evidence in detail, partially allowed claims and reduced claim amounts where appropriate; the appellate Court found the quantum awarded to be just and reasonable and declined to interfere.
  • The trial Court had refused mandatory injunction on the ground that plaintiffs lacked title; the appellate Court found that conclusion correct and noted it was not challenged by respondents.

Holding and Implications

Holding: The appellate court confirmed the judgments and decrees of the trial court and dismissed the appeals. The Memorandum of Cross-Objections by the plaintiffs (seeking higher damages) was dismissed. There was no order as to costs in the appeals.

Implications:

  • Direct effect on the parties: The trial Court's findings of liability (that defendants dumped materials causing damage) and the awards of damages were upheld; plaintiffs were entitled to and had, according to the opinion, executed the decrees and recovered the awarded damages.
  • The plaintiffs' request for mandatory injunction was correctly refused because they did not have title to the land; that particular relief therefore remains unavailable.
  • The Court found that procedural bars under Order II, Rule 2 and Order XXIII did not apply because defendants failed to prove identity of cause of action by producing earlier pleadings and judgments; consequently, the present suits were maintainable. This decision applied existing precedent rather than announcing a new rule of law.
  • No broader or novel precedent was stated to have been created by this decision; the Court applied and followed established authorities in arriving at its conclusions.
Appeal dismissed.
Show all summary ...

Sankaran, J.:— These appeals arise out of nine suits filed by the first respondent in the respective appeals as O.S Nos. 138 of 1991, 139 of 1991, 140 of 1991, 141 of 1991, 71 of 1992, 72 of 1992, 78 of 1992, 79 of 1992 and 80 of 1992. The defendants in the suit are the Kerala State Electricity Board; The Deputy Chief Engineer, Lower Periyar Project and the National Project Construction Corporation Ltd. Against the judgments and decrees in the suits mentioned above, the Kerala State Electricity Board filed A.S Nos. 470 of 1994, 490 of 1994, 523 of 1994, 521 of 1994, 574 of 1994, 522 of 1994, 525 of 1994, 558 of 1994 and 519 of 1994 respectively. The third defendant challenged the judgments and decrees in the suits in A.S Nos. 596 of 1994, 660 of 1994, 613 of 1994, 623 of 1994, 616 of 1994, 599 of 1994, 600 of 1994, 627 of 1994 and 601 of 1994 respectively.

2. The plaintiffs claim possession in respect of about nine acres of garden land lying on the south of Periyar River and on the western side of Karimanal Hills. The plaintiffs have no title to the property. The property originally is a forest land. The plaintiffs claim that they are in possession of the property from 1966 onwards. They also claim that they cleared the forest, levelled the land and made valuable improvements in the property by planting rubber trees, coconut trees, cocoa, pepper wines, arecanut trees, jack trees, mango trees and other miscellaneous' trees and plants. A project called Lower Periyar Hydro Electric Project was implemented by the first defendant at the Karimanal Hills in Lower Periyar area. The project area consists of about 100 acres of land situated on the east of Karimanal Canal. A power house was constructed at the site and necessary buildings were also constructed. It was necessary to level the land, remove earth and stones from the hills for implementing the project. The work of excavation, removal and dumping of earth and stones and the construction of power house was entrusted by defendants 1 and 2 with the third defendant. National Project Construction Corporation Ltd.

3. The plaintiffs contended that the defendants started the work of removing earth and stones from the project area from October, 1983 onwards and deposited the same on the northern side of the plaint schedule properties and also in the 2/3 portion of the southern side of the Periyar River. It was contended that the dumping area was not the Periyar River or the southern side of it, but a place called Thookupara, about four kilometres away from the project site. It was contended that the width of the River was reduced due to dumping of earth and the water level in the Periyar River rose about 20 feet high. Separating the plaint schedule properties and the project area, there is a canal called Karimanal Canal. A bund was constructed at the mouth of the Karimanal Canal for facilitating transport of earth and stones from the hills. It was contended that due to the rising of water level and the resultant high pressure and flow of water, the bund broke and water rushed to the property of the plaintiffs submerging substantial portion of the property. The improvements in the plaint schedule property were destroyed. A new canal having about 50 feet width and ten feet depth was formed in the plaint schedule properties due to the flow of water. The plaintiffs contended that their, property was damaged and they sustained heavy loss due to the illegal activities of the defendants which resulted in the rising of water level and breaking of the bund. The act of the defendants were negligent and unreasonable and they did not take necessary precautions expected of them. The filling of a portion of the Periyar River with earth was an illegal act. The plaintiffs claimed damages on account of the loss sustained by them. They also prayed for a mandatory injunction for restoring their property to the original condition by removing the earth and stones from their property and filling the canal which came into existence.

4. The plaintiffs had filed another suit as O.S No. 507 of 1989, on the file of the Court of the Subordinate Judge of Ernakulam, for permanent prohibitory injunction restraining the defendants from further dumping of soil and earth in the properties in possession of the plaintiffs, reserving a right to file a separate suit for mandatory injunction and for recovery of damages. O.S No. 507 of 1989 was transferred to the Sub-Court, Muvattupuzha, where it was renumbered as O.S Nov. 164 of 1990. A Commissioner was appointed in that case and the Commissioner submitted a report indicating the damage caused to the properties in possession of the plaintiffs. It was contended by the plaintiffs that since the reliefs prayed for in O.S No. 164 of 1990 became infructuous, that suit was withdrawn without prejudice to file a fresh suit.

5. The plaintiff in the respective suits claimed damages on various grounds. But, the claim was limited to Rs. 1,50,000/- in O.S No. 138 of 1991, Rs. 85,000/- in O.S No. 139 of 1991, Rs. 40,000/- in O.S No. 140 of 1991, Rs. 44,000/- in O.S No. 141 of 1991, Rs. 1,25,000/- in O.S No. 72 of 1992, Rs. 40,000/- in O.S No. 71 of 1992, Rs. 4-5,000/- in O.S No. 78 of 1992, Rs. 1, 29, 500/- in O.S No. 79 of 1992 and Rs. 45,000/- in O.S No. 80 of 1992.

6. Defendants 1 and 2 filed a written statement and the third defendant filed a separate written statement. The defendants contended that the plaintiffs are not entitled to any relief, since the property possessed by them is river puramboke land which was encroached by the plaintiffs. The area earmarked for dumping the excavated soil from power house and switchyard is the downstream of power house on the left bank of the Peryar River. The area thus earmarked was found insufficient. The excavated soil was deposited only in the river puramboke land which is lying in between the properties claimed by the plaintiffs and the river. In fact, the deposit of such excavated soil constitutes a protection to the land encroached by the plaintiffs. When it was found that the dumpyard was filled up with soil making it impossible for further dumping of soil, an additional area was made available to the third defendant on the river puramboke for dumping. However, specific instructions were given to the third defendant not to deposit the soil in the area already encroached upon by private parties. The plaintiffs have no title to the plaint schedule property. It was contended that no damage was caused to the plaintiffs due to the acts of the defendants and the rising of water level in the river was a natural calamity. No damage was caused to the improvements in the encroached land. The flow of water in the Karimanal canal was never blocked. The damage, if any, caused to the property is due to the unprecedented rain fall and not due to any act of the defendants. The defendants are, therefore, not liable to pay compensation to the plaintiffs. The plaintiffs are also not entitled to get restoration of the property to its original condition. The plaintiffs have no cause of action to institute the suit. The third defendant contended that the suit is not maintainable without impleading the State as a party to the suit, since the property claimed by the plaintiffs belonged to the State. The third defendant contended that the disposal of earth and other materials from the work site was done by the third defendant as per the agreement and at the specific instruction, supervision and direction of the Kerala State Electricity Board. The third defendant did not dump soil in the river so as to reduce its width. Dumping of soil was not made in the properties claimed by the plaintiffs or in the river as alleged. No damage or injury was caused to the plaintiffs or their properties. In O.S No. 507 of 1989, on the file of the Sub-Court, Ernakulam, which was transferred to the Sub-Court, Muvattupuzha and renumbered as O.S No. 164 of 1990, written statement was filed by the third defendant. When the suit came up for trial in the list, the plaintiffs therein did not press their claim and the suit was dismissed. Therefore, the present suit is hit by Rule 2 of Order II of the Code of Civil Procedure.

7. Before the trial Court, PWs. 1 to 11 were examined and Exts. Al to A12 were marked on the side of the plaintiffs. DWs. 1 and 2 were examined and Exts. Bl and B2 were marked on the side of the defendants. Ext. XI was also marked as produced by the witness.

8. The trial Court held that the suit is not bad for non-joinder of the State. The State is not a necessary party as no steps were taken to evict the plaintiffs from the land in their possession. It was held, after considering the documentary and oral evidence in the case, that the defendants dumped excavated materials in the Periyar River and in the banks of the river and rejected the contention that damage was caused to the property of the plaintiffs due to natural calamity. It was found that the plaintiffs sustained loss due to the negligent act of the defendants by dumping excavated materials in the Periyar River, on the side of the plaint schedule properties. The trial Court took note of the fact that the defendants did not produce any document to show that the area earmarked for depositing excavated materials was not at Thookupara, as contended by the plaintiffs. The evidence of PWs. 1 to 9 were considered by the trial Court and believing their evidence, it was held that the defendants dumped excavated materials in the river, thereby reducing the width of the river. The trial Court took note of the admission made by DW 1 that water escaped through the southern side of the place where the excavated materials were dumped. DW 1 had also admitted that excavated materials were dumped in the river. Ext. A1 report filed by the Commissioner in O.S No. 507 of 1989 was relied on by the Court below. The Commissioner who prepared Ext. A1 report was examined as PW 1. The report clearly indicates that earth and stones were dumped on the southern portion of the Periyar River at about one-half of the total width of the river at the place where the plaint schedule properties are situated. The report also would indicate that the width of the filled up portion was 100 feet on the western side and 80 feet on the eastern side. It has come out in evidence that damage is caused to the property in the possession of the plaintiffs. The trial Court has analysed the evidence in detail and came to the conclusion that damage was caused not due to natural calamity, but due to the acts committed by the defendants. There is nothing to indicate that the appreciation of evidence made by the trial Court is perverse or illegal. All the relevant facts were taken note of by the Court below and the evidence has been properly discussed and appreciated. If the case of the defendants is that the dumping area was not Thookupara as alleged by the plaintiffs, they could have produced necessary documents in their possession. The burden of proof in this regard is evidently on the defendants since that is a fact especially within their knowledge. On a reappraisal of the evidence in the case, we concur with the view taken by the Court below that damage was caused due to the acts of the defendants and not due to natural calamity as contended by them.

9. Learned counsel for the appellants contended that the suits are hit by Rule 2 of Order II of the Code of Civil Procedure, since the earlier suit filed by the plaintiffs for injunction was dismissed as withdrawn. It was contended that at the time when O.S No. 507 of 1989 was filed, the cause of action on which the present suits were filed was available to the plaintiffs and they having not included the relief for compensation in the earlier suit, the present suits are barred. Rule 2 of Order II of the Code of Civil Procedure provides that every suit shall include the whole of the claim which the plaintiff is entitled to make in respect of the cause of action. Sub-rule (2) of Rule 2 provides that where a plaintiff omits to sue in respect of, or intentionally relinquishes, any portion of his claim, he shall not afterwards sue in respect of the portion so omitted or relinquished. Sub-rule (3) of Rule 2 provides that a person entitled, to more than one relief in respect of the same cause of action may sue for all or any of such relief, but he omits, except with the leave of the Court, to sue for all such reliefs, he shall not afterwards sue for any relief so omitted. It is not in dispute that the earlier suit was withdrawn by the plaintiffs. Rule 1(4) of Order XXIII of the Code of Civil Procedure provides that where the plaintiff abandons any suit or part of claim under sub-rule (1) or withdraws from a suit or part of a claim without the permission of the Court, he shall be precluded from instituting any fresh suit in respect of such subject-matter or such part of the claim. The specific case of the plaintiffs is that the earlier suit was filed only for an injunction restraining the defendants from further dumping soil in the River and surrounding areas and the right of the plaintiffs to claim damages and to sue for mandatory injunction was reserved. The cause of action on which the earlier suit was filed is evidently different from the cause of action in the present suits. The prayer for injunction is based on an apprehension on the part of the plaintiffs that the acts of the defendants may further cause loss or injury to the plaintiffs whereas the claim for damages in the present suit is based on the injury or loss already caused to them or sustained by them.

10. In Kunjan Nair Sivaraman Nair v. Narayanan Nair (AIR 2004 SC 1761: (2004) 3 SCC 277: 2004 (1) KLT 1082 (SC), the Supreme Court considered the scope and ambit of Rule 2 of Order II of the Code of Civil Procedure and held thus (Para 8 of AIR):

“……..So far as sub-rule (3) is concerned, before the second suit of the plaintiff can be held to be barred by the same, it must be shown that the second suit is based on the same cause of action on which the earlier suit was based and if the cause of action is the same in both the suits and if in the earlier suit plaintiff had not sued for any of the reliefs available to it on the basis of that cause of action, the reliefs which it had failed to press into service in that suit cannot be subsequently prayed for except with the leave of the Court. It must, therefore, be shown by the defendants for supporting their plea of bar of O. II, R. 2, sub-r. (3) that the second suit of the plaintiff filed is based on the same cause of action on which its earlier suit was based and that because it had not prayed for any relief and it had not obtained leave of the Court in that connection, it cannot sue for that relief in the present second suit…..”

The Supreme Court in Kunjan Nair Sivaraman Nair's case relied on the Constitution Bench decision in Gurbux Singh v. Bhooralal (1964 (7) SCR 831): (AIR 1964 SC 1810 and Bengal Waterproof Ltd. v. Bombay Waterproof’ Manufacturing Company (1997) 1 SCC 99: AIR 1997 SC 1398). In the Constitution Bench decision in Gurbux Singh's case the Supreme Court held thus (at p. 1402, Para 6 of AIR):

“………As the plea is a technical bar it has to be established satisfactorily and cannot be presumed merely on basis of inferential reasoning. It is for this reason that we consider that a plea of a bar under O. II, R. 2, Civil Procedure Code can be established only if the defendant flies in evidence the pleadings in the previous suit and thereby proves to the Court the identity of the cause of action in the two suits. It is common that the pleadings in C.S No. 28 of 1950 were not filed by the appellant in the present suit as evidence in support of his plea under O. II, R. 2, Civil Procedure Code……”

In Kunjan Nair's case (AIR 2004 SC 1761, Para 10) (supra) the Supreme Court held thus:

“……….The salutary principle behind O. II, R. 12 is that a defendant or defendants should not be vexed time and again for the same cause by splitting the claim and the reliefs for being indicated in successive litigations. It is, therefore, provided that the plaintiff must not abandon any part of the claim without the leave of the Court and must claim the whole relief or entire bundle of reliefs available to him in respect of that very same cause of action. He will thereafter be precluded from so doing in any subsequent litigation that he may commence if he has not obtained the prior permission of the Court.”

11. The pleadings in O.S No. 507 of 1989 (renumbered as O.S No. 164 of 1990) are not produced in the present case. The judgment in that case is also not produced. As held in Gurbux Singh's case (AIR 1964 SC 1810) (supra), the defendants have to establish the necessary ingredients to found their plea under Order II, Rule 2 of the Code of Civil Procedure. The defendants having failed to produce the necessary pleadings and judgments in respect of the earlier case, they are precluded from contending that the present suit is barred under Order II, Rule 2 of the Code of Civil Procedure. On the basis of the materials available before Court, it is clear that the cause of action in the earlier suit is different from the cause of action in the present suit.

12. In Dalip Singh v. Mehar Singh Rathee ((2004) 7 SCC 650: 2005 AIR SCW 3311), the Supreme Court held that the sine qua non for applicability of Order II, Rule 2 of the Code of Civil Procedure is that a person entitled to more than one relief in respect of the same cause of action has omitted to sue for some relief without the leave of the Court. It is contended by the defendants that the Court below omitted to raise an issue as to whether the suit is hit by Rule 2 of Order II of the Code of Civil Procedure and, therefore, the Judgment and decrees are bad in law. If an issue on that aspect was omitted to be raised, the defendants could very well appraise the Court to raise the necessary and proper issues. The parties understood the respective contentions put forward in the case. The defendants having failed to produce the necessary materials and data to prove their contentions with regard to the availability of Order II, Rule 2 of the Code of Civil Procedure, it cannot be said that the suits are hit by Rule 2 of Order 11 of the Code of Civil Procedure. Moreover, the earlier suit having been withdrawn, the provision which applies is Order XXIII, Rule 1 of the Code of Civil Procedure and in such a case, the plaintiffs shall be precluded from instituting any fresh suit only if the subject-matter or the claim is the same in the earlier suit and the present suits. As already stated, the earlier suit was only for an injunction to restrain the defendants from further committing the offending acts whereas the present suits are based on the consequences of the illegal acts of the defendants. The claim put forward in the earlier suit is entirely different from the claim put forward in the present suits and the subject-matter and cause of action are also different. The earlier suit having been withdrawn, the contention that the present suits are hit by Order II, Rule 2 of the Code of Civil Procedure would not be available to the defendants, since Rule 1 of Order XXIII comes into play and if the bar under sub-rule (4) of Rule 1 of Order XXIII is not applicable, the maintainability of the present suits cannot be doubted.

13. The learned counsel for the appellants contended that the plaintiffs are not entitled to get damages, since they have no title to the property in respect of which the cause of action is alleged. It is not in dispute that the plaint schedule properties belong to the Government. It is also not in dispute that the plaintiffs were in possession and undisturbed enjoyment of the plaint schedule properties. It is evident from Exts. B1 and B2 files that for drawing the Lower Periyar Kochi 220 KV line, trees from the plaint schedule property in O.S.N 78 of 1992 and O.S No. 141 of 1991 were cut and removed and compensation was paid to the plaintiffs therein. Exts. B1 and B2 files were produced by defendants 1 and 2 as directed by the Court on the request of the plaintiffs. The defendants 1 and 2 did not produce the file containing the agreement for drawing 220 KV Line, in spite of a direction issued by the Court. The files were not produced on the ground that they were not available in the office of the Kerala State Electricity Board. Exts. A10, A11 and A12 also would prove that compensation was paid to some of the plaintiffs on cutting trees from their properties for drawing the 220KV line.

14. Learned counsel for the defendants relied on the decision of the Supreme Court in Rev Fr. K.C Alexander v. State of Kerala (AIR 1973 SC 2498), in support of their contention that the plaintiffs are not entitled to claim damages on account of the loss of improvements. In AIR 1973 SC 2498, the Supreme Court held that where a person trespassed into Government land and planted trees, it is not obligatory upon the Government to give him notice under Section 9 of the Travancore Land Conservancy Act (Act 4 of 1091) and that he cannot on eviction claim compensation for the trees planted by him on the Government land. In the present case, the plaintiffs did not lay any claim against the Government for damages. The Government have not initiated any proceedings to evict the plaintiffs. That the plaintiffs cannot have any claim against the Government for compensation is not a ground available to the defendants in the present suits to resist a claim for damages against them. Admittedly owing to the cutting of the trees the plaintiffs have lost their means of livelihood. The defendants did not claim any title to the properties in question. They have no case that their property have been trespassed upon by the plaintiffs and effected improvements. So long as the defendants have no claim of title to the properties in question, they are not entitled to raise a contention that the plaintiffs cannot claim damages in respect of the improvements on the ground that the lands in question belong to the Government. Such a plea is available only in favour of the Government and not to the Kerala State Electricity Board or the third defendant, who entered into the agreement for construction of a project with the Kerala State Electricity Board. The plaintiffs having proved that they were in possession and enjoyment of the properties and that they have effected the improvements and the defendants having put forward no claim of title to the properties, the plaintiffs are entitled to compensation for the tortious acts done by the defendants due to which the plaintiffs sustained loss and injury.

15. As regards the quantum of compensation, the trial Court has considered the facts and circumstances proved in the case in great detail and partly allowed the claims put forward by the plaintiffs. The damages awarded by the Court below are just and reasonable. The plaintiffs had put forward various claims and they had limited their claim to lesser amounts. The Court below has still reduced the quantum and awarded only lesser amounts. On a consideration of the findings arrived at by the Court below, in the light of the evidence on record, we are of the view that the Court below has not committed any error in fixing the quantum of damages.

15A. The Court below refused the prayer for mandatory injunction on the ground that the plaintiffs have no title to the plaint schedule properties. The finding of the Court below is correct. The respondents have not challenged that finding of the trial Court.

16. It is submitted that the plaintiffs have already executed the decrees and recovered the damages awarded. The suits were filed in 1991 and 1992 and the Court below disposed of those suits on 31-1-1994.

17. For the aforesaid reasons, we confirm the judgments and decrees and dismiss the appeals. In the facts and circumstances of the case, there will be no order as to costs in the appeals.

In the Memorandum of Cross-Objections, the plaintiffs have raised a contention that the amount awarded as damages is low. We are of the considered view that the quantum of damages awarded by the Court below is just and reasonable in the facts and circumstances of the case. The Memorandum of Cross Objections are accordingly dismissed. No costs.

Appeal dismissed.