Chitturi Perraju And Another v. Yedanapudi Venkamma And Others
Structured Summary of the Opinion (Sambasiva Rao, J.)
Factual and Procedural Background
This batch of matters arises out of a long-running suit originally filed in 1941 (O.S. No. 674/41, District Munsif's Court, Bandar) concerning partition and entitlement in respect of several parcels of land that were the subject of a series of settlement deeds (Exs. P.1–P.4). The trial court passed a decree on 28-11-1942, an appeal and compromise followed in the Madras High Court (S.A. No. 1151 of 1944) resulting in a preliminary compromise decree dated 3-9-1945 and, after commissioner's report and partitioning by metes and bounds, a final decree on 15-7-1947. The Commissioner prepared schedules (A, A-1, A-2, B, B-1, B-2) and five plans, which were annexed to the final decree.
After the final decree, numerous execution petitions, applications for mesne profits, amendment petitions and cross-appeals were instituted by the parties across many years (including E.P. Nos. 104/1948, 160/1953, 248/1958, 17/1960, 28/1962, 10/1966 and appeals such as A.S. Nos. 46/1960, 12/1967, C.M.S.A. Nos. 38/1961 and 14/1968, L.P.A. No. 177/1964, and C.M.P. No. 10873/1966). A recurring factual difficulty was alleged discrepancies in survey numbers and extents (old survey numbers vs. re-survey numbers), which respondents said made certain schedule items, particularly those in A-2 schedule, not capable of identification and hence not executable.
The present opinion bundles and decides several of these matters together. The Court first addressed L.P.A. No. 177 of 1964 (challenging dismissal of C.M.S.A. No. 38 of 1961), considered res judicata and identifiability issues for A-2 schedule lands, and then disposed of related appeals (including C.M.S.A. No. 14 of 1968 and C.M.S.A. Nos. 48 & 49 of 1968) and the amendment petition C.M.P. No. 10873 of 1966 (seeking amendment of schedules in the compromise/preliminary decree to add re-survey numbers).
Legal Issues Presented
- Whether the principle of res judicata (Section 11, CPC) barred the later execution petition (E.P. No. 17 of 1960 / L.P.A. No. 177 of 1964) on the ground that earlier orders had decided that the decree was not capable of execution because the property was not identifiable.
- Whether the disputed lands described in the A-2 schedule of the final decree could be identified (i.e., whether execution could be carried out despite alleged discrepancies in survey numbers and extents).
- Whether this Court should decide identifiability itself or remit the matter to the trial court for inquiry.
- Whether a consent/compromise decree that refers to properties not strictly within the original suit (i.e., extraneous properties) is executable in the executing court (Order 23 Rule 3 CPC issue).
- Whether the schedules of a preliminary/final decree (and plans annexed) could be amended after the event to substitute or add re-survey numbers (application under Sections 151, 152, 153 CPC) and, if so, under what circumstances.
- Whether objections alleging that a minor was improperly represented, or that the preliminary decree was merely declaratory and not executable, or that registration requirements were not satisfied, precluded execution or amendment.
Arguments of the Parties
Appellants' Arguments (as represented in the opinion)
- Sri Venkatarama Sastry (for appellants / plaintiff-decree-holders) contended that the earlier orders did not satisfy the requirement of being heard and finally decided for res judicata to apply; conditions 1–4 of res judicata were conceded but the crucial requirement (final decision) was denied in respect of I.A. No. 808 of 1959 and E.P. No. 248 of 1958.
- He argued that the A-2 schedule lands could be identified from the material on record, notably the commissioner's plans and the final decree annexures, and therefore execution could and should be carried into effect.
- He sought clearance of the execution impasse by either remitting to the trial court or, given the delay and availability of material, urged the Court to decide identifiability itself.
- He sought amendment of the schedules in the preliminary/final decree to incorporate re-survey numbers under Sec. 152 CPC as clerical corrections where identity is clear.
Respondents' / Third Defendant's Arguments (as represented in the opinion)
- Sri K.B. Krishna Murthy and Sri Krishnamurthy (for respondents / third defendant) argued that earlier orders and execution proceedings had already found (or effectively found) that the lands were not identifiable, so res judicata (including constructive res judicata) should preclude the later execution proceedings.
- They relied on the Amin's and Karnam's reports that certain survey numbers (e.g., 10/1) did not exist or were confusing, and that discrepancies in numbers and extents made implementation impossible.
- They contended the minor was not properly represented originally, so the compromise and resulting decrees were not binding on him (though this point had been litigated previously in O.S. No. 109 of 1946 and appeals).
- They argued that the preliminary compromise decree dealt with properties beyond those in the original suit and that a consent decree cannot be executed in respect of those extraneous items (relying on Order 23 Rule 3 CPC authorities and the view of some High Courts).
- They objected to the proposed amendment under Sec. 152 CPC on the ground that the correction sought was not merely clerical but substantive (and referred to authorities such as Ramakrishnan v. Radha Krishnan to show limits of Sec. 152 where underlying documents themselves require rectification).
Table of Precedents Cited
| Precedent | Rule or Principle Cited For | Application by the Court in this Opinion |
|---|---|---|
| Alturi Bapanna v. Innuganii Vengayya (1937 2 M.L.J. 296 at 301) | Execution proceedings are subject to the principle of res judicata; a judgment-debtor's failure to raise objections may amount to constructive res judicata. | Referred to as authority that res judicata applies to execution; Court used it while analysing whether prior orders constituted a final decision capable of operating as res judicata. |
| Ritakuer v. Alakhdeo Narain Sing (47 I.C. 154) | Where a court with jurisdiction disposes of a judgment-debtor's objection on merits, that decision binds the decree-holder until set aside. | Cited to explain binding effect of decisions on execution matters; Court distinguished because earlier orders in the present case were not held to be final decisions on the merits. |
| Vyasacharya v. Daji Baba (A.I.R. 1944 Bom. 20) | Supports the view that decisions on execution and related objections may have binding effect. | Noted among authorities supporting res judicata in execution; Court considered it in context but concluded earlier orders in this case were not final. |
| Algappa Chettiar v. Somasundaram Chettiar (1937 M.W.N. 465) | Construction once placed on a document or decree by a competent court before which the question was directly and substantially in issue is conclusive between the parties. | Used to explain the general rule that prior construction is final between parties; Court nonetheless examined whether prior orders had been finally decided on the point of identifiability (they had not). |
| Parsopam Gir v. Narbada Gir (Privy Council) | Section 11 CPC requires a final decision; res judicata implies the court has exercised its judicial mind and come to a final decision after argument and consideration. | Quoted to stress that an order must be final (with merits considered) to attract res judicata; applied to hold the order dated 16-4-1959 was not a final decision. |
| Chandra Singh v. Midnapur Zemindary Co. | Finality requirement for res judicata; an order subject to a higher court's decision is not final. | Cited for the same point as Parsopam Gir; Court relied on this principle to find prior orders not final. |
| Ram Kirpal v. Rup Kuar (6 All. 369 P.C.) and Beni Bam v. Kanhumal (7 All. 102 P.C.) | Principle of finality of construction applicable to decrees; decisions of construction are conclusive between parties. | Quoted in discussion on finality of constructions placed by competent courts; Court acknowledged these authorities but found earlier orders here not final on the crucial factual question. |
| Heamana Kumari v. Midnapur Zamindari Co. (A.I.R. 1919 P.C. 79) | Discussed in context of execution of compromise decrees and extent to which courts will enforce terms of compromise. | Appears in the chain of authorities analyzing whether an executing court can entertain objections about extraneous terms of a compromise; Court sided with view that such objections should be by appeal, not execution-stage objections. |
| Ranjit Singh v. Gobardhan Chandra (50 Cal. W. No. 447) | Supports the proposition that a compromise including extraneous matters need not be rejected entirely and operative part may be restricted to suit-related terms. | Relied upon in Court's survey of authorities on executability of consent decrees containing extraneous terms; Court followed the view that executing court should not refuse execution on that ground but objections go by appeal. |
| Hari Chand v. Magi Mal (A.I.R. 1917 Lah. 282) | Similar authority on the approach to compromise decrees including extra-suit matters. | Used in the Court's comparative discussion of authorities on the executability of compromise decrees. |
| Manager of Sri Meenakshi Devasthanam v. Abdil Kasim Sahib (I.L.R. 30 Mad. 421) | Authority supporting view that executing court cannot entertain objection to compromise decree; objection must be taken by appeal. | Cited in the Court's discussion; the Court agreed with the high court approach (Madras) that executing court should not refuse to execute on such grounds. |
| Shyam Lal v. M. Shuamlal (A.I.R. 1933 All. 649) ; Lal Singh v. Mohan Singh (A.I.R. 1933 Lah. 623); M.D. Ismail v. Bibi Shama (A.I.R. 1934 Pat. 203) | Authorities supporting the view that executing courts should not refuse execution of operative terms of a compromise decree and that objections should be by appeal. | Placed in the survey of conflicting authorities; Court adopted the approach favouring execution-stage limitation of such objections. |
| Gurdev Singh v. Chandrikah Singh (I.L.R. 36 Cal. 193) | Calcutta High Court's contrary view that compromise terms extraneous to suit render the operative part inoperative for execution. | Noted as part of the conflicting authority set; Court preferred the Madras/this Court's approach instead of Gurdev Singh. |
| Vishna v. Ramachandra (A.I.R. 1932 Bom. 46 / 486) | Bombay High Court view that a decree giving effect to compromise terms not relating to the suit cannot be executed to that extent. | Noted as part of the conflict of authorities; Court rejected this restrictive approach and followed Madras/this Court's reasoning. |
| Vankataseshaiah v. Pullaiah Chetty | Authority that consent decrees may be corrected under Sec. 152 where omission is clerical and the decree indicates intention to embody compromise. | Relied upon to support the proposition that clerical or inadvertent errors in consent decrees may be corrected under Sec. 152 CPC. |
| Sheodhyan Singh v. Sanichara Kuer (Supreme Court) | Mistake in plot number is a misdescription not affecting identity where identity is well established; mistake may be rectified. | Followed as authority supporting correction when identity of property is established despite misdescription; applied to permit amendment when identity is clear. |
| Sri Rajah Rao Pradyumna Krishna Mahipathi Suryarao Bahadur v. Sri Rao Papayyamma Rao | Authority holding that wrong description in disputed items may be corrected if conveyance had also passed those items. | Used to support amendment where identity and conveyance line up with the decree and parties' intention. |
| Ramakrishnan v. Radha Krishnan (Madras High Court Bench decision) | Limits Sec. 152: it corrects errors directly involved in proceedings, not mistakes in underlying documents (e.g., mortgage deed) which require specific relief (Sec. 31 Specific Relief Act). | Cited by respondents; Court distinguished it on facts because the present petition did not seek to rectify Exs. P.2 and P.4 themselves and dealt only with schedules in the decree; accordingly the decision did not bar the present correction under Sec. 152. |
| Sutyanarayana v. Purnayya Pannandlai | Sec. 152 intended to correct errors, mistakes and omissions arising in the suit or copied into it; Court can do justice by correcting such errors. | Quoted to support a liberal view of Sec. 152 and to justify correction of decree schedules in suitable cases. |
| Katamraju v. Paripgranandam Rajamannar | Where a mistake in plaint schedule is carried over to decree schedule, Court has power under Secs. 152 and 153 to correct decree even after second appeal. | Applied to support power to amend decrees/schedules to correct survey-number errors when identity is not in doubt. |
| Krishna Poduval v. Lakshmi Nathiar | Distinguished Ramakrishnan; amendment allowed under Sec. 152 where error in assignment deed carried to plaint and decree schedules but identity/boundaries were not in dispute. | Relied upon to permit amendment of decree/plaint schedules when underlying documents also contain errors but identity is clear and no rectification of the underlying deed was sought in the petition. |
Court's Reasoning and Analysis
The Court proceeded in a structured manner addressing (i) res judicata; (ii) identifiability of A-2 schedule lands; (iii) whether to adjudicate identifiability itself or remit; and (iv) the amendment petition for adding re-survey numbers to decree schedules.
Res judicata analysis
- The Court set out the well-known pre-conditions for res judicata (based on Section 11 CPC) and listed five conditions that must be satisfied (matter in issue same; same parties or those under whom they claim; same title; the earlier court competent; matter heard and finally decided).
- Although the appellants conceded conditions 1–4, they contested the fifth—whether the earlier orders (I.A. No. 808 of 1959 and E.P. No. 248 of 1958) were heard and finally decided.
- The Court examined the order dated 16-4-1959 (E.P. No. 248 of 1958) which simply dismissed the execution petition and stated the decree-holders may file a fresh E.P. after disposal of an amendment petition. The Court held this was not a decision on merits and not a final adjudication on the identifiability issue; rather it postponed the matter pending amendment proceedings.
- Referencing Parsopam Gir v. Narbada Gir and Chandra Singh v. Midnapur Zemindary Co., the Court emphasized that res judicata requires a final decision wherein the court exercised its judicial mind and decided the contested matter.
- The earlier order of 1-10-1959 dismissing I.A. No. 808/1959 did so on grounds of want of jurisdiction, not by deciding the merits of identity; that too could not operate as res judicata.
- Conclusion: the orders relied on by respondents did not constitute a final decision and hence did not bar the later execution petitions on the ground of res judicata.
Identifiability of A-2 schedule lands
- The Court reviewed the Commissioner’s plans and the final decree (which expressly adopted the Commissioner’s report, plans and schedules and annexed Plans Nos. 1–5 and Schedules A, A-1, A-2, B, B-1, B-2).
- The Court noted the commissioner had surveyed and divided plots by metes and bounds, prepared schedules and plans showing measurements and boundaries, and even detailed irrigation-channel points (clauses/sub-clauses in the decree).
- The Amin's return and the Karnam's report were examined: they had relied on ostensible discrepancies in survey numbers and extents (e.g., old survey No. 10/1 vs. present R.S. No. 31) and reported inability to deliver. The Court found the Amin/Karnam had not consulted the plans and measurements carefully and had failed in their duty.
- The Court held that the plans themselves reconciled old and re-survey numbers (e.g., Plan No. 1 showing old No. 10/1 equated to R.S. No. 31 and recording measured extents of Ac.7-27), that boundaries were clearly described, and that slight variances in extent between surveys were not obstructive to identification (boundaries prevail over extent discrepancies).
- The Court also relied on parties’ conduct: the plaintiffs and third defendant had repeatedly used old numbers; the third defendant himself, in a petition for re-delivery (E.A. No. 1096 of 1959), supplied both old and re-survey numbers and matching boundaries—demonstrating shared understanding of identity.
- Conclusion: the A-2 schedule properties were identifiable on the basis of the plans, schedules and attendant material; objections about survey-number and minor extent discrepancies were insufficient to prevent execution, and the objections appeared tactical to evade execution.
Whether to decide identifiability or remit
- The Court considered remitting the matter to the trial court but, given the long delay, the availability of the necessary material on record, and the interest of finality, the Court decided it would itself determine identifiability.
- It proceeded to adjudicate identifiability (see reasoning above) and concluded in favour of the decree-holders as to identification.
Executability of compromise decree and amendment of schedules
- On the objection that a consent decree purporting to give effect to matters extraneous to the suit cannot be executed as to those matters (Order 23 Rule 3 CPC issue), the Court surveyed conflicting authorities (Madras/this Court vs. Calcutta/Bombay).
- The Court sided with the Madras High Court and a Division Bench of this Court (Haran Chandas v. Hyderabad State Bank), holding that objections to compromise terms extraneous to the suit should not be entertained for the first time in execution proceedings but taken by appeal; the executing court should execute operative parts that relate to the suit.
- On amendment (C.M.P. No. 10873 of 1966) to add re-survey numbers to schedules, the Court analysed Secs. 151, 152 and 153 CPC and authorities. It distinguished cases where the underlying document itself was sought to be rectified (Ramakrishnan v. Radha Krishnan) from cases where only the decree/schedule required correction and the identity/boundaries were not in dispute.
- The Court held that where identity is clear and an error is clerical/inadvertent (e.g., omission of re-survey numbers while the parties had adopted old numbers), amendment under Sec. 152 CPC is permissible to correct the record and aid execution.
- It concluded that the present amendment related only to the schedules in the decree and plans (not to Exs. P.2 or P.4 themselves) and could be granted where identity of the lands is beyond doubt.
Holding and Implications
Holding:
- Primary rulings: The Court held that the orders relied upon by the respondent did not constitute a final decision for the purposes of res judicata; the A-2 schedule properties are identifiable from the final decree, commissioner's plans and attendant record; amendment of the decree schedules to add re-survey numbers is permissible under Sec. 152 CPC where the identity is clear.
- Disposition (as recorded in the opinion): L.P.A. No. 177 of 1964 and C.M.S.A. No. 14 of 1968 are allowed with costs; C.M.S.A. Nos. 48 and 49 of 1968 are dismissed with costs; the execution petitions E.P. Nos. 17/60 and 10/60 are remanded to the District Munsif's Court, Avanigadda for disposal in the light of the observations in this judgment; the amendment petition C.M.P. No. 10873 of 1966 to amend schedules by adding re-survey numbers is granted (with no order as to costs in that petition).
Implications:
- Direct practical effect: execution proceedings in respect of the A-2 schedule properties are not barred by res judicata and should be proceeded with; the trial court is instructed to effect delivery (or otherwise proceed) guided by the Court's detailed findings on identifiability and the annexed plans and schedules.
- The decree-schedules will be amended to include the re-survey numbers indicated in the amendment petition, thereby facilitating identification and execution.
- The Court applied established principles (on res judicata, finality of decision, identification by boundary and plans, and the scope of Sec. 152 CPC for clerical corrections) to the particular facts rather than announcing a novel legal rule; the opinion resolves the disputes between these parties and remands execution for implementation in accordance with its findings.
Note: This summary strictly reflects the matters, arguments, authorities and conclusions as they appear in the provided opinion. No facts, arguments or holdings have been added beyond what is stated in the opinion text.
Sambasiva Rao, J.:— This batch of cases provides a classical illustration of abuse of processed of Court. They asise in execution. The suit was filed in the year 1941 and a decree therein was passed in 1942. Though nearly 27 long years have gone by, the curtain is not yet drawn on the litigation and the parties still continue to be at logger heads. The parties have taken recourse to every available and conceivable strategem in fighting each other, with the result that they have not reached the stage of finality to that dispute.
1. The properties which are the subject matter of the execution and the others, originally belonged to the second defendant in O.S 674/41 D.M.C Bandar. On 6-3-1937 he executed Ex. P. 1, a settlement deed in favour of hit wife, the first defendant, in respect of nearly Ac. 21-69 cents, The first defendant, in her turn, executed Ex. P. 2 another settlement deed on 5-8-1989, conveying about Ac. 7-35 cents to the plaintiff who are her daughtor's sons And another extent of 6 acres to her daughter Annapoornamma. The third defendant is said to have been adopted by defendants 1 and 2 in 1940. The first defendant executed yet another settlement deed Ex. P. 4 on 6-3-1940 in favour of the third defendant, conveying to him properties which were not covered by Ex. P. 2. Evidently, some disputes arose between the parties. Consequently, the plaintiffs filed O.S No. 674 of 1941 in the District Munsif's Court, Bandar for declaration of their title and for recovery of possession of properties covered by Ex. P. 2. The present defendants 1 to 3 were defendants in that suit. After contest, that suit was decreed on 28-11-1942. A.S No. 167/43 filed on behalf of the third defendant (who was then a minor) against the decree was allowed. The plaintiffs carried the matter in second appeal to the High Court of Madras in S.A No. 1151 of 1944. There was a compromise between the parties at that stage and a compromise preliminary decree was passed in the second appeal on 3-9-1945. However, the natural mother of the minor third defendant filed O.S No. 109 of 1946 for setting aside that compromise decree, alleging that the minor was not properly represented in the prior proceedings and the compromise therein was not beneficial to him. In the mean while, the plaintiffs filed I.A No. 584 of 1946 to pass a final decree in accordance with the compromise deeree in O.S No. 674 of 1942. After the Commissioner filed his report in regard to the actual partition of the different items of the property in accordance with the terms of the compromise, a final decree was passed on 15-7-1947. The Commissioner took elaborate pains to divide the properties by metes and bounds. In order to help implementation of the terms of the compromise decree, he prepared six schedules and five plans in accordance with which he recommended the partition to be effected. ‘A’ schedule showed the details of the properties to which the plaintiffs were immediately entitled to possession. A-1 schedule related to the properties which were allotted to the plaintiffs in which D-1 was given life interest. In A-2 schedule, the properties in which D-2 was given life interest with remainder estate to the plain tiffs were shown. Similarly properties which were allotted to the third defendant with immediate possession were shown in the B schedule. B-1 schedule contained properties which were allotted to him and in which the first defendant was given life interest. Likewise B-2 schedule showed the details of the properties which were allotted to the third defendant and in which life interest was given to the second defendant. The five plans showed how the division as per these schedules should be actually made on the land. To execute this final decree, the plaintiffs filed E.P No. 104 of 1948 on 31-3-1948. A schedule properties were delivered to them. A few months the reafter O.S No. 109 of 1940 filed on behalf of the third defendant for setting aside the compromise decree was dismissed on 4-9-1948, after repelling the contentions advanced on his behalf. A.S No. 494 of 1949 was filed in the High Court of Madras against the dismissal of the suit. During the pendency of that appeal, a stay was sought and obtained in C.M.P No. 6493 of 1949 on 24-10-1949. of the execution of the compromise decree passed in S.A No. 1151 of 1944. In the meanwhile, the plaintiffs filed I.A No. 1237 of 1948 for mesne profits on the schedule properties which they had taken delivery of and they were awarded to them by the Court on 2-2-1950. On 26-4-1950 the second defendant died. On his death, A-2 an B-2 schedule properties reverted to the third defendant as per the compromise preliminary decree and the final decree. On behalf of the third defendant, the decree directing payment of mesne profits passed in I.A No. 1237 of was appealed against in A.S No. 74 of 1950 on the file of the Subordinate Judge's Court, Bandar. That was, however, dismissed. A.S No. 494 of on the file of the High Court of Madras filed against the decree and judgment in O.S No. 109 of 1946 was dismissed on 7-8-1952. Thus, the decision rejecting the third defendant's suit for setting aside the compromise decree became final. Thereupon, on 17-3-1953., the plaintiffs filed E.P No. 160 of 1953 to recover mesne profits from A schedule properties awarded to them in 1. A. No. 1237 of 1948. As a counter blast, E.A No. 1091 of 1953 was filed on 29-7-/953 on behalf of the third defendant, for redelivering the A schedule lands that had been delivered to the plaintiff in E.P No. 104 of 1948. E.P 160 of 1953 to recover mesne profits from A schedule was granted on 27-8-1934. On 11-8-54 E.A No. 1091 of 1953 for redelivery of the A schedule properties filed on behalf of the third defendant was dismissed. Since the second defendant had died, the plaintiffs became entitled to take possession of the A 2 schedule properties as per the compromise decree and accordingly, they filed an execution petition for delivery of those proper-ties on 8-8-1965. That E.P was rejected ou 1-9-1955 without even being numbered. The plaintiffs again filed E.P No. 248 of 1958 on 20-1-1958 for deli-very of the A-2 schedule properties. The mesne profits awarded in I.A No. 237 of 1948 were deposited into Court on behalf of the third defendant on 1-1-1968. An objection was raised on behalf of the third defendant to E.P No. 248 to 1958 that it was barred by time. The Court rejected this objection and held on 4-8-1958, as a preliminary point, that the E.P was in time. The third defendant carried this decision in appeal and second appeal about the bar of linitation. Both of them were dismissed in the meanwhile, delivery proceedings in respect of the A-2 schedule properties were started. On 9-1-1959 the Amin returned the delivery warrant stating that delivery could not be effected, as it was difficult to locate the A-2 schedule property on the land. The Amin's return was based on the report of the karnam of the village dated 7-1-1959, who said in his report that the Survey numbers as mentioned in the decree did not exist. Consequently on 6-5-1959 the plaintiffs filed A. Nos. 808 of 1959 in the District Munsif's Court, Bandar for amendment of the survey numbers as they were stated in the decree. On 16-4-1959 the Court directed in E.P No. 248 of 1958 that the decree-holder may renew his execution petition after the disposal of the amendment petition I.A No. 808 of 1959. Thereupon, the third defendant filed on 20-7-1959 E.A No. 109 of 1959 for restitution of mesne profits which he had deposited into Court on 1-3-1959 and E.A No. 1096 of 1959 for redelivery of A schedule properties. The plaintiffs' application, I.A No. 208 of 1959 for amendment of the decree was dismissed by the District Munsif's Court on 1-10-1959 saying that it bad no jurisdiction to do so. The plaintiffs once again filed an execution petition for delivery of A-2 schedule properties in E.P No. 17 of 1960 on 9-12-1959. That execution petition was, however, dismissed on 29-2-1960 for non-prosecution of amendment proceedings before proper authorities. The plaintiff carried the matter in appeal in A.S No. 46 of 1960. The parties filed a joint memo therein on 15-11-1960 that item 3 of A-2 schedule could be identified. On the basis of this Joint Memo, the appellate Court allowed A.S No. 46 of 1960 in respect of item 3 and dismissed it in respect of items 1 and 2 of A-2 schedule. C.M.S.A No. 38 of 1961 was filed by the plaintiffs in the High Court against the dismissal of their appeal A.S No. 46 of 1960, in so far as items 1 and 2 of A-2 schedule were concerned. They also filed E.P No. 28 of 1962 for delivery of item 3 of A-2 schedule, which was admitted by the third defendant to be identified and in respect of which A.S No. 46 of 1960 was allowed. E.A Nos. 1095 and 1096 filed by the third respondent for restitution of mesne profits and for redelivery of A schedule properties were renumbered as E.A Nos. 4 and 5 of 1960 respectively and both of them were dismissed on 9-7-1964. Along with them, E.P No. 28 of 1962 filed by the plaintiffs for delivery of item 3 of A-2 schedule was also heard and disposed of by a common order. That E.P was granted. Basi Reddy J. (as he then was) dismissed on 26-10-1964, C.M.S.A No. 38 of 1961 filed by the plaintiffs is so far as items 1 and 2 of the A-2 schedule were concerned. It is against this decision that L.P.A 177 of 1964 has been filed by the plaintiffs. The plaintiffs also filed E.P No. 10 of 1966, which was practically renewal of E.P No. 28 of 1962, for delivery of the property described in item 2 of the A-2 schedule. This execution was granted by the Court of first instance on 30th of September, 1966. However, the third defendant preferred A.S No. 12 of 1967 against this order to the Subordinate Judge's Court, Machilipatnam. In view of Basi Reddy J's., decision in C.M.S.A No. 38 of 1961, this appeal was allowed and the E.P was dismissed. C.M.S.A No. 14 of 1968 is directed against the dismissal of A.S No. 12 of 1967, by the plaintiffs. The third defendant had filed A.S Nos. 3 and 6 of 1965 on the file of the Sub Court, Bandar against the dismissal of his petition in E.A Nos. 5 and 4 of 1960 respectively. Both the appeals were dismissed and the third defendant filed C.M.A.S Nos. 48 and 49 of 1968 against these two Orders, dismissing A.S Nos. 3 and 6 of 1965. In the meanwhile, the plaintiffs filed C.M.P No. 10875 of 1966 in the High Court of Madras for amendment of the schedules in the decree in S.A No. 1151 of 1944 and since the matter is within the purview of this Court, it was returned by the Madras High Court and represented in this Court, This is the chronological sequence of the tortuous litigation that has been carried on by the parties so far and this is how these matters before us have arisen. The above narration of facts shows that all these matters are intrinsically connected with each other and can be conveniently considered and disposed of together. We, therefore, propose to dispose them of in a common order.
2. We take up first L.P.A No. 177 of 1964. The plaintiff-decree-holders have preferred this appeal against the judgment in C.M.S.A No. 38 of 1961. Basi Reddy, J., dismissed the said civil miscellaneous second appeal mainly on the ground of resjudicata, which is stated by the learned Judge in the penultimate paragraph of his Judgment, which reads as follows:
“It follows, therefore, that interpretation placed upon the decree in the present case by the competent Court in I.A No. 808 of 1959 which decided the facts of E.P 248 of 1958, would operate as resjudicata in respect of the present execution petition. In the previous execution petition it was held by the court that as the final decree stood, it was not capable of execution because the property was not identifiable. That being so, I am of opinion that a subsequent application on the footing that the decree is executable, is not maintainable and is barred by the principle of resjudicata. Although the lower appellate court has not put the matter as clearly as the first court, I am of the view that the present execution petition is not maintainable.”
3. The learned Judge was also of the opinion that both the Courts had found concurrently that the lands in question were not identifiable. If these two objections to the maintainability of the execution petition No. 17 of 1960 (out of which this L.P.A arose) are valid then this Letters Patent Appeal should fail.
4. The law on the point is well settled. The principle of resjudicata applies not only to suits but also to the execution proceedings. The leaned Judge referred to a decision of a Division Bench in Alturi Bapanna v. Innuganii Vengayya 1937 2 M.L.J 296 at 301. The learned judges held in that case at page 301.
“If a Judgment-debtor with due notice of the proceedings fails to raise any objection on any of these grounds, it must be held by the principle of constructive resjudicata that his failure to do so has the same legal effect as if it had been raised and decided against him.”
5. In Ritakuer v. Alakhdeo Narain Sing 47 I.C 154 it was held that—
“Where rightly or wrongly, a court with jurisdiction, had disposed of the judgment debtor's objection on the merits and has decided that the decree holder was not competent by reason of a defect of parties to proceed with the execution, the decision was binding on the decree-holder till it was set aside.”
6. The Bombay High Court took the same view in Vyasacharya v. Daji Baba A.I.R 1944 Bom. 20. Further, in Algappa Chettiar v. Somasundaram Chettiar 1937 M.W.N 465 a Division Bench of the Madras High Court had an occasion to consider whether the construction, once placed on a document or a decree by a competent Court before which the question was directly and substantially in issue, is conclusive between the parties. After a review of the case law, Varadachari J., speaking for the Bench observed at page 468:
“Though the construction of a document may for certain purposes be regarded as involving a question of law, e.g, for the purposes of Sec. 100 C.P.C it is well established that a construction once placed on a document by a competent court before which the question was directly and substantially in issue, is conclusive between the parties and it is immaterial that the property involved in the subsequent suit is not the same as that which formed the subject matter of the first suit. The issue in the former litigation was whether the decree in O.S No. 169 of 1910 was a personal decree against Chidambara (see the first issue in Ex 3.) and that was decided by both the Courts in plaintiff's favour. [hold that this interpretation of that decree is conclusive between the parties even for the purposes of the present litigation. The decisions of the Privy Council in Ram Kirpal v. Rup Kuar (6 All 369 P.C) and Beni Bam v. Kanhumal (7 All 102 P.C) showedthat the principle of finality of construction is equally applicable to decrees though the question, there arose in the course of proceedings in execution and not in a separate suit.”
7. But, at the same time the very principle and policy of Sec 11 C.P.C should be borne in mind. In order to attract the bar of resjudicata, certain pre-conditions should be satisfied. It is not every matter decided in a former proceeding that can be pleaded as resjudicata in a subsequent proceeding. To constitute a matter resjudicata the following conditions must exist:
(1) The matter directly and substantially in issue in the subsequent proceeding must be the same matter which was directly and substantially in issue either actually or constructively in the earlier proceeding.
(2) The former proceeding must have been one between the same parties or between parties under whom they or any of them claim.
(3) The parties must have litigated under the same title in the former proceeding.
(4) The Court which decided the former proceeding must have been a Court competent to try the subsequent proceeding or the proceeding in which such issue is subsequently raised.
(5) The matter directly and substantially in issue in the subsequent proceeding must have been heard and finally decided by the Court in the earlier proceeding.
8. What is contended in the present case is, that the Execution Petition No. 17 of 1960 is barred by resjudicata by virtue of the interpretation placed upon the decree that is sought to be executed in I.A No. 808 of 1959 and E.P No. 248 of 1958 Sri Venkatarama Sastry, appearing for the appellants does not dispute the existence of the conditions 1 to 4 of resjudicata. But he streneously contends that I.A No. 808 of 1959 and E.P No. 248 of 1958 (the decision in which is said to operate as resjudicata to the present execution petition) were not heard and finally decided by the Court on the earlier occasion and, therefore, the orders therein do not operate as resjudicata to the present execution petition. The question in this context, therefore, is whether those two petitions were heard and finally decided by the Court.
9. We have already stated the manner in which these two applications were filed. We will now refer to the relevant passages in the orders in those two application in order to find out whether they were heard and finally (decided by the Court the District Munsif's Court, Masulipatnam dismissed, on 16-4-1959, E.P No. 248 of 1958 by stating:
“E.P dismissed. The decree holders may file fresh E.P after disposal of amendment petition.”
10. It is impossible to understand this order as it stands, as an order on merits passed after hearing and weighing relevant contentions of the parties. As the Privy Council held in Parsopam Gir v. Narbada Gir Sec. 11 requires that there should be a final decision. The very concept of resjudicata implies a matter on which the Court has exercised its judicial mind and has after argument and consideration, came to a decision on a contested matter. The mere fact that a matter directly and substantially in issue in a suit was directly and substantially in issue in a former suit is not sufficient to constitute the matter resjudicata it is also essential that it should have been heard and finally decided. If the order in the former proceeding merely stated that it was subject to a decision of a higher court the decision could not be a final one. (Vide Chandra Singh v. Midnapur Zemindary Co. Applying these principles, we do not find tnat the order in E.P No. 248 of 1958 dated 16-4-1959 purported to give a final decision. It did not even pretend to consider the merits and demerits of the contentions of the parties. It dismissed the E.P by merely saying that a fresh execution petition might be filed after the disposal of amendment petition. It should be noted that T.A No. 868 of 1959 filed by the plaintiffs decree holders for amendment of the schedules in the decree was pending by that time. The order thus merely postponed the decision in the case till after the amendment petition was disposed of. By no stretch of imagination, could it be said that such an order was one which finally decided the matter in dispute after hearing the parties.
11. Sri K.B Krishna Murthy, however, contends that this order should be read with an earlier order passed by the Court an the same application on 10-3-1959, wherein it was suggested that the schedules in the decree should be amended before the execution petition was proceeded with further. We cannot acceed to this argument. In the frist place that order, said to have been passed on 10-3-1959, was not relied on by the judgment-debtor as operating as resjudicata. In fact, Basi Reddy J., did not advert to it. Secondly that order has not been placed before the Court. Sri K.B Krishnamurthy brings to our notice a causl reference made to an order of 10-3-1959 in the judgment of the District Munsif's Court in E.P 17/60. Such casual reference is not adequate to sustain the plea of resjudicata. In any case, we are not satisfied that that order, either by itself or read with the order of 16th April, 1959 passed in E.P No. 248 of 1958, can operate as resjudicata to the present execution petition. At best the order of 10th March, 1959 was only a suggestion that the schedules in the decree might be amended before further execution proceedings were taken. The latter order of 16th April, 1959 merely stated that another execution petition might be filed after the disposal of the amendment petition (I.A No. 808 of 1959). Even reading them together, it is not possible for us to hold that the Court has decided the contentions of the parties on their merits and decided the matter finally. In this execution petition, there was no consideration of the contention that the properties were identifiable despite the small descrepancies in the survey numbers or R.S Nos. and in the absence of any decision on that point that the, decree was in executable, it cannot be said that there is a final decision on the crucial matter in the earlier decision. In our view, the order in E.P No. 248 of 1958 is practically of the nature of returning the execution petition seeking some particulars, which may be represented afterwards. Surely such an order cannot operate as res judicata for a fresh execution petition.
12. The District Munsif's Court Machilipatnam dismissed I.A No. 808 of 1959 for amendment of the plaint schedules on 1st October, 1959. i.e, about 5-½ months after E.P No. 248 of 1958 was rejected. The following two points were framed for consideration therein. (1) Whether this Court has jurisdiction to make the amendment proposed? and (2) If so, whether the amendments are to be allowed? The Court held on the first point that it was only the High Court which could entertain any application for amendment, because it was that Court that had passed the preliminary decree, in accordance with which alone the final decree was passed by the trial Court. It held on point (2) that in view of its conclusion on point (1) it was not fit to go into the question on merits as to whether the amendments were to be allowed Or not. This is once again an order passed without going into the merits of the case. The application for amendment was dismissed wholly on the ground that the Court had no jurisdiction. Obviously, such an order cannot operate as res judicata.
13. Even so, Sri Krishnamurthy, argues that by a reading of these orders together it must, by necessary implication, be held that the lands could not be identified and it is not, therefore, open to the plaintiffs to now argue that they can in fact be identified. We cannot agree with this argument. Both the applications viz., E.P No. 248 of 1958 and I.A No. 808 of 1959 were rejected and dismissed on technical grounds. The merits of the contention between the parties as to the identity of the lands was never gone into. There was not even an attempt on the part of the Court, on both the occasione, to find out whether the final decree could really be executed and the division of the lands adumbrated therein could be implemented. In the circumstances, it would be futile to argue that the Court, by necessary implication, found that the lands could not be identified. This contention is, therefore, without any substance.
14. The learned counsel for the respondent then lays great stress on the observation of Basi Reddy J., that the two lower Courts had concurrently found that the lands could not be identified. It is no doubt true that the learned Judge has opined that both the Courts have concurrently found that the lands could not be identified. With respect, we are unable to agree with this opinion. We have carefully gone through the judgments of both the lower Courts. The Court of first instance, after referring to the contentions of the parties, referred to the question of identifiabtllty in paragraph 4 of its judgment. It observed—
“There are admittedly discrepancies in the survey numbers and prima facie it cannot readily be said that the properties of which the decree-holders now seek delivery are the same as those mentioned in the preliminary and final decrees. It will need some enquiry to ascertain whether there was a mistake in mentioning the survey numbers in the compromise petition, and if so, what are the items, really contemplated between the parties”
15. Having said so, one would expect the Court to make the necessary enquiry into the question. Unfortunately the Court did nothing of the sort. It later referred to the amendment petition filed by the plaintiffs-decree-holders and its dismissal by the Court. In view of that dismissal, it felt that “it will be only aggravating the controversy to direct delivery disregarding patent discrepancies.” For that reason, the present E.P No. 17 of 1960 was dismissed by the Court of first instance. We cannot understand these observations as a finding, after necessary enquiry, that the lands could not be identified. To similar effect is the judgment of the District Judge, Krishna Sn A.S No. 46 of 1959 (filed against E.P No. 17 of 1960). In paragraph 3 of his judgment, the learned District Judge referred to the discrepancies between the survey umbers and the discrepancies in the extents of the lands and then observed.
“It is, therefore, clear that the properties sought to be delivered cannot be definitely ascertained from the preliminary and final decrees because of the discrepancies.”
16. It referred to the dismissal of the amendment petition I.A No. 808 of 1959 and then observed that—
“It may or may not be resjudicata between the parties but the fact remains that the court has already expressed its view that execution cannot be proceeded with without amendment of the decree being got done by the High Court and, therefore, the filing of the present execution petition once again would only be considered with great caution.”
17. Finally, the learned Judge expressed the opinion that it would be a case of substituting something which is not in the decree which the executing Court is not competent to do and, therefore, that the learned Munsif was correct in his, view that he could not proceed to deliver the properties when there are serious discrepancies about the identity as between the decree and the execution petition for which amendment must be brought from the proper Court. However, on the basis of the joint memo, item (3) of A-2 schedule was directed to be delivered to the plaintiffs-decree-holders. Once again, even in this appellate order, we find that the reference was made only to the discrepancies in the survey numbers and the extents of the items. Needless to say that the present difficulty arose out of these discrepancies. But, unfortunately the Courts did not endeavor to resolve that difficulty by making the necessary enquiry as to whether, despite (he said apparent discrepancies, the actual intention of the parties and that of the final decree can be ascertained and the lands be identified. The Court did not even care to notice that before passing the final decree, the Court had Appointed a Commissioner who took great pains to survey the lands and divided them into different plots as per the directions of the Court and the provisions of the preliminary decree and prepared the schedules as well as plans with meticulous care. Though they felt the need for an enquiry, both the Courts lb irked doing it, by referring to the rejection of the amendment application, I.A No. 808 of 1959. The conclusions of the Courts below cannot certainly-constitute findings of fact as to impossibility of identifying the different plots.
18. For these reasons, we hold that there is no bar for our consideration or the question as to the identity of the lands, arising out of resjudicata or concurrent findings of fact.
19. It is the contention of Sri Venkatarama Sastry, the learned counsel fpr the appellants that the lands described in A-2 schedule can be identified on the basis of the material available on record, while Sri Krishnamurthy, the learned counsel for the respondents contends that it is not possible to do so. Having come to the conclusion that there is no bar of res-judicata, we have Considered whether we should remit the matter back to the Court of first instance with a direction to consider whether the lands are identifiable or whether we should do it ourselves. In view of the unending litigation between the parties and the considerable delay that has so bar occurred in determining the actual rights of the parties and also because of the availability of the necessary material on record, we have come to the conclusion that it would be in the best interests of justice and the partiies, if we decide the question her and now. We therefore, proceed to consider whether the A-2 schedule properties are identifiable.
20. When an Amin was appointed to effect the delivery of the A-2 schedule properties, he sent a report dated 9-1-1959 wherein he stated that he had sought the help of the Karanam of Yeddanapudi, but the Karnam looked at the schedule and his books and gave a report stating that there was no such number as 10/1 and that no delivery could be made. The Amin reported that the delivery, for that reason could not be effected. The Karnam in his report stated that there was no survey No. 10/1. Survey No. 10 was only a full number, the extent of which wag Ac. 2-44 cents only. That was in the possession of the Government, as it was irrigation channel Poramboke But, at the same time, he referred to the Commissioner equating survey No. 10/1 to Re. S. No. 31. In regard to Re. S No. 31, the extent in the village accounts of that number was Ac. 7-40, while A-2 schedule showed only Ac, 7-27 cents resulting in a difference of 13 cents in extent. There was sub-division in Re. S. No. 31 also. He expressed a doubt as to which of the sub-divisions delivery was to be effected. For those reasons, the Karnam felt that the delivery of lands could no take place. In fact, these are the discrepancies in numbers and extents that are sought to be relied on by the respondents in support of their contention that the lands in A-2 schedule cannot be identified. There cannot be any possible doubt that the delivery of possession should be in accordance with the final decree passed in O.S No. 674/41. While passing the final decree, the Court stated in its preamble that it pursued the Commissioner's report and the divisions made by him. In fact, we find thait the schedules actually adopted the method of division recommended by the Commissioner in his report, plans and schedules, These schedules and plans were annexed to the final decree. Clause (1) of the final decree says—
“that plaintiffs do get Acs. 7-24 cents of wet and dry land as per plana 1 to 5 and schedules A, A-1 and A-2 here to anexed; valued Rs. 3,000/-.”
21. Clause (3) provides—
“that plaintiffs do take immediate possession of the A schedule property of Acs. 4-24 cents, while 1st and 2nd defendants are to have life interest in and enjoy the A-1 schedule property of Acs. 1-50 cents and A-2 schedule property of 1-50 cents respectively, which should revert to plaintiffs after the death of 1st and 2nd defendants.”
22. The above are the two operative clauses in the final decree in so far a A-2 schedule is concerned. Reference to Sub Clauses (a), (b) and (c) of clause (6) of the final decree may also be usefully made in this connection.
23. They read as follows:
“(a) that a Bode to take water be dug from the Bode on the west of D. No. 10/1, wet land in the viliage of Yeddanapudi upto BG on the east, and thence to the north and south as per plan Not 1(b) that the BODE up to E(mark) in R.S 192 and 193 in old Survey No. 114 in the village of Movve, as per plan No. 2, be extended upto F;
(c) that a Bode be dug to take water from A-1, B-1, A-2, B-2 as per plan, from the Bheema River drain on ease as per plan No. 75, of Peda-pudi village, as per plan No. 5 to the land, lying to the west between Nos. 1 and 2 shares.”
24. Then, at the end of the decree it was stated that;
“Commissioners plans Nos. 1 to 5, and plaint schedule copies, A, A-1, A-2, B, B-1 and B-2 are annexed hereto.”
25. Thus, the plans prepared by the Commissioner became part of the final dccree-A2 schedule annexed to the final decree is as follows:—
Details of A-2 schedule in which defendant No. 2 is given life interest and were allotted to plaintiffs. 1. Yaddanapudi village Pamarru Sub Registrar, Plan 10/1 Ac. 7-35 Ac. 7-27 Ac. 0-63 1 East; Ayyanki Donka; South; Land given by plaintiffs to def. 1; West Plaintiff's land; North: Plaintiffs land, 2. Pedapudi village Pamarru Sub Registrar Plan 75 Ac. 2-89 Ac; 2-89 Ac. 0-53 5. East. Plaintiffs land, South: Veddanapudi Nageswara Rao West: Vemulapalli Ramaya North: Land given by plaintiffs to Def. 1. 3. Movya village Challapalli Sub Registraar Plan Old Ac. 2-10 Ac. 2-10 Ac. 0-34 2 Survey 114 Re-survey 192, 193 East: Land given by plaintiffs to def, 1: South: Y. Nageswara Rao: wests Tatineni Appayya; North: Yeddanapndi Veukarama; Total: Ac. 1-50
26. Reading the relevant clauses and sub clauses of the final decree with the A-2 schedule, it is clear that great care was taken by the Commissioner and the Court in demarcating the plots and also in providing irrigation facilities to the separated plots. It was far that purpose sub-clauses (a) to (c) of clause (6) made provision for irrigation channels. Nothing was left indefinite or vague Even the points of irrigation channel were fixed on the plans. We have carefully scrutinised the plans attached to the final decree. The plans give the extents of the lands on actual measurement and also the measurements of the different plots after delimitation as per the six schedules; When measurements were given in such detail, that too with reference to a specific plan, we fall to see any difficulty in identifying these plots of land. In addition and for greater precisions the boundaries also were given in the schedules including the A-2 schedule. It is not anybody's case that there is difficulty about boundaries it is well settled that even if there is some discrepancy about the actual extent of the land, the boundaries prevail. In view of this legal position, we are at a loss to know how the Courts below or for that matter the karnam and the Amin on the previous occasion felt difficulty in identifying the lands. Nobody, excepting the karnam, referred to the plans annexed to the final decree. Even the karnam did not refer to the actual measurements of the entire plots and also their sub divisions given in the plots. He merely referred to the ostensible desparity in the extents and numbers of fields and with a stroke of pen rejected the whole idea of demarcation as impossible. This, in our view was clearly failure to discharge his function and duty.
27. Even the so called discreapancies in the numbers and the extents of tbe lands do not present any insurmountable difficulty. If only plan No. 1 was studied, it would show that the Commissioner himself gave the old as well as the new numbers. He specifically wrote R.S No. 31 after survey No. 10/1 Since the plaint schedule referred to that land by Survey No. 10/1, he included that number in his plan No. 1 in addition to the new R.S No. 31. Plan No. 1, therefore, makes it perfectly clear that in so far as item (1) of A-2 schedule is concerned, its former survey No. 10/1 is present R.S No. 31, Since the plan did not refer to any sub divisions in R.S No. 31, it should necessarily mean that the entire R.S No. 31 was dealt with in the plan. One should not forget that the delivery should take place in accordance with the final decree and the plans and schedules annexed thereto. If that is so, when the plan itself makes it clear that Survey No. 10/1 was equivalent to R.S No. 31 there cannot be any possible discrepancy in stating the number of item (i) of A-2 schedule, which could cause any confusion or difficulty. Similarly, about the extent of the land, the report of the Commissioner makes it clear that on actual measurement of the land he found that R.S No. 31 was of Ac. 7-27 cents. The Commissioner was so careful as to state in plan No. 1 that the original line along AB (Central line) had been shifted two links towards north to equalise areas of main shares 1 and 2. It should be noted in this connection that the principle adopted was to divide those plots in two equal shares, one share ultimately going to the plaintiffs and the other half share ultimately going to the third defendant. When the plans, which are parts of the final decree are to definite and categorical, we wonder how the lower Courts had felt any difficulty about locating the different plots. Great stress is laid by Sri Krishnamurthy upon reference to 10/1 in the A-schedule as Re. Survey No. From this, he wants to argue that there is confusion between the survey number and there-survey number. It is because of this slight variation, the Commissioner took care to clarify the position by giving the survey number as well as resurvey number in the plans. That apart, strictly speaking, A-2 schedule does not refer to 10/1 as Re. Survey Number. In A-1 and A-2 schedules, 10/1 was merely referred as survey number. It is common case that in 1925 re-survey was conducted and afterwards all the numbers were being referred to as Re. S. Nos. Therefore, at present there arc no survey numbers as such, If any reference is made to a survey number, that should by necessary implication mean the number as it stood before the re-survey number. There is no dispute that old Survey No. 10/1 corresponds to present Survey No. 31. We do not, therefore, fee any confusion or difficulty which can be said to be reasonable. Similarly, in regard to the second item of A-2 schedule, which is a plot of 0-53 cents in Pedapudi village it forms part of Survey No. 75. That is once again old survey number, the present re-survey number being 74. When survey No. 75 is given it should be understood as old survey number. In fact, in item 3 of A-2 schedule both old survey number and the new Re. Nos. are given. In any case, boundaries were fully described and they furnish the necessary guidance.
28. The conduct of the parties also shows that they understood the survey numbers given in the schedules as old survey numbers. Re. Survey was made in 1925. But the suit was filed in 1941. That is long after to Re. Survey. In fact, the settlement deed executed by the second defendant in favour of first defendant in 1937 and the subsequent settlement deed executed by the first defendant in favour of the plaintiffs and the third defendant and one of her daughters were also subsequent to the Re-survey. All the same, they adopted old survey numbers. Obviously in the plaint also the plaintiffs gave the same numbers. In all these, boundaries were exactly the same in addition to the number. In the schedules to the compromise decree, the same numbers as well as the boundaries were stated. What is more important is the description of the properties in the schedule to the plaint in O.S No. 109 of 1946, which was the third defendant's suit for setting aside the compromise decree. In that suit also, the same number 10/1 and the same extent Ac. 7-35 were adopted, though the number was referred to as demarcation number. The lame boundaries as in the previous plaint schedules were given. More than anything else, the name of the filed as ‘Tadi Chenu’ was given. Therefore, the third defendant himself or his guardian knew the land and identified it as ‘Tadi Chenu’. Consequently, the final decree in O.S No. 674/41, and the schedules thereto adopted the old survey numbers though the Commissioner in the plans took care to point out the re-survey number also. When A schedule properties were delivered to the plaintiffs, the first plaintiff-decree holder passed a delivery receipt. Therein also the same numbers, extents and boundaries were given. We have stated in the narration of facts that the third defendant filed E.A No. 1096 of 1959 for re-delivery of the A-schedule properties which had been delivered to the plaintiffs-decree-holders on 31-3-1958. It should be noted that A Schedule contains all the three survey numbers mentioned in A-2 schedule, as it deals with some other portions of lands comprised in those numbers. While seeking redelivery of these survey numbers, it is very important to note that the third defendant gave the numbers as per 1925 survey as well as 1951 survey. For survey No. 10/1 of Yeddanapudi Village, in his application for re-delivery he gave R.S No. 31 as per 1925 survey and R.S No. 31/1 as per 1951 survey. For Survey No. 75 of Pedapudi Village, the third defendant gave in his petition R.S No. 74 as per 1925 survey and R.S No. 74/1 as per 1951 survey. Similarly, for Survey No. 114 of Movva Village the third defendant gave R.S No. 193 as per 1925 as well as 1952 surveys, The boundaries he gave to these R.S Nos. exactly tally with the boundaries given in A-schedule. The schedule to E.A No. 1096 of 1959 also refers to (he slight variations in the extent which were found out after re-survey. It is eommon knowledge that from survey to survey, there may be slight variations in extents. If there is any doubt, the schedule to the third defendant's own petition for re-delivery dispels it completely. The parties were dealing exactly with the same lands/about which they had no doubt or confusion. If there was any difficulty in Identification, it passes cur comprehension how items 1, 4 and 5 of the A schedule, which formed other parts of the same fields as the three items in A-2 schedules, could be located and handed over to the plaintiff-decree-holders on 31-3-1958, for re-delivery of which the third defendant filed E.A No. 1096 of 1959. Very significant is also the circumstance that the karnam who said that it was not difficult to locate the land bearing survey No. 101 attested the delivery receipt dated 31-3-1958, under which a specified portion of survey No. 10/1 was handed over to the plaintiffs-decree-holders. He similarly attested delivery receipt in respect of another item of A schedule, relating to survey No. 75 of Pedapudi Village and another delivery receipt in respect of 0-37 cents in Survey No. 192. It relates to the third item of the A-2 schedules.
29. From the above, it is clear that the parties had no doubt whatever about the identity of the lands with which they were dealing, including the landin A-2 schedule. It is obvious that these objections have subsequently been raised only for the purpose of evading and avoiding, if possible, the execution of the final decree. When location of the lands as per A2 schedule is possible then the plaintiff-decree-holders should be put in possession of them. The Court of first instance should, therefore, take immediate steps to do so with the help of the plans and schedules annexed to the final decree.
30. C.M.S.A No. 14 of 1968 is directed against the decision of the Subordinate Judge, Machilipatnam in A.S No. 12 of 1967 who purported to allow that appeal in view of the decision of Basi Reddy, J., in C.M.S.A No. 38 of 1951 (against which L.P.A No. 177 of 1964) has been fifed. We have already stated that in A.S No. 46 of 1960 the parties filed a joint memo on 15-11-1960 that the properties as per item 3 of A-2 schedule could be identified. On the basis of that joint memo, the Court allowed the appeal to the extent of the said third item. For the purpose of getting delivery of the property described in the third item, the plaintiffs-decree-holders filed E.P No. 10 of 1966. The executing Court granted that application in view of the joint memo, but the appellate Court allowed the appeal of Defendant No. 3. A.S No. 12 of 1967 should have been dismissed by the learned Subordinate Judge, Machilipatnam in view of what had happened. But being under a wrong impression of the decision of Basi Reddy J., he allowed it and dismissed the execution petition 10 of 1966. The third defendant himself admitted that the land in item 3 could be identified. In any case, we have held that there is no bar of res judicata Therefore, E.P No. 10 of 1966 thould be allowed and the execution sought therein should be granted. Accordingly C.M.S.A No. 14 of 1968 is allowed.”
31. We have already stated how the third defendant came to file C.M.S As. Nos. 41 and 49 of 1968. He had filed E.A Nos. 1095 and 1096 of 1959-for restitution of mesne profits which he had paid in respect of A Schedule properties and for redelivery of A-schedule properties which had been given posses-lion to the plaintiffs-decree holders. They were subsequently renumbered as E.A Nos. 4 and 5 of 1960. They were dismissed on 9-7-1964. Thereupon, he filed A.S Nos. 3 and 6 of 1965 on the file of the Sub-Court, Bandar which also were dismissed. G.M.S As. 48 and 49 of 1968 are directed against the dismissal of these appeals. Exactly the same contentions as have arisen in L.P.A No. 177 of 1964 arise in this ease also. We have already held that there if no bar of res judicata and that the lands described in the six schedules to the final decree could be identified. In fact, as far as A-schedule properties are concerned, which are the subject matter of these two C.M.S.A.S, the third defendant himself filed an application for redelivery giving the new R.S Nos. and extents. There is, therefore, no substance in the contention that the lands cannot be identified. Therefore, the contentions of the third defendant-appellant are rejected.
32. Even then, Sri Krishnamurty raises several other objections to our upholding the claims of the plaintiffs-decree-holders. Firstly, he contends that the minor was not properly represented in O.S No. 674 of 1941 and therefore, neither the preliminary decree nor the final decree passed therein is binding on him. This objection is, however, wholly pointless. O.S No. 109 of 1945 was filed on behalf of the third defendant for setting aside the compromise decree. That was dismissed as untenable. Not content with such dismissal, an appeal also was preferred. That also met with the same fate. Thus, that decision became final and now the third defendant cannot avoid the compromise decree. He is certainly bound by it.
33. His next object is, since the preliminary compromise decree dealt with immoveable properties other than those originally included in the plaint, it should have been registered. Such registration could be done only of the original preliminary decree. But what was registered in this case was only a certified copy of the preliminary decree granted by the Court. According to Sri Krishnamurthy this is not sufficient in law. But, as we have said the third defendant adopted every strategem to fight the plaintiffs-decree-holders. He raised this objection on a former occasion and carried the matter right upto this Court in G.M.S.A No. 516 of 1954. Chandra Reddy J. dismissed that appeal on 15th July, 1954 holding that registration of certified copy of a decree was sufficient compliance with the requirements of Sec. 17 of the Indian Registration Act. Therefore, this objection is not available to the third defendant.
34. Still another objection is that the preliminary decree in the case only declares the rights of the parties and that by itself is not an executable decree. For that reason, even the final decree is cot executable. But, on a reading of the preliminary decree we are not in a position to agree with Mr. Krishmamurthy holding that the preliminary decree is merely a declara-tory one and not executable. On a reading of the material clauses together, it la clear that the preliminary decree not only declares the rights of the parties to the respective shares, but also empowers them to effect a division of the properties in accordance with the provisions of the preliminary decree between themselves if possible, and with the aid of the Court if necessary, by having a final decree passed. The very conception of a final decree implies executability. It means that the lights as declared by the preliminary decree should be implemented in a specified manner. The very fact that clause 10 of the decree empowers the parties to effect a division in accordance with its provisions and also to seek the passing of a final decree shows that it is an executable decree. Further clause (11) providing for mesne profits from Fasli 1355 till delivery of possession and that the said mesne profits shall be determined by Court in an appropriate proceeding, also shows that the preliminaiy decree is clearly executable. Indeed, a final decree was passed in pursuance of this decree We, therefore, find no force at all in the contention of the learned counsel.
35. Yet another objection is raised that a consent decree dealing with properties other than tbe suit properties is not executable, to the extent of the other properties. The justification for this contention is that in the compromise that was arrived at between the parties, not only the properties that were given to the plaintiffs by the old couple, viz., defendants 1 and 2, but also the properties given to the third defendant, were clubbed together and divided though in the plaint the plaintiffs sought declaration and possession in respect of the properties given to them alone. In support of this contention, reliance is placed upon Order 23 Rule 3 of C.P.C which is in the following terms;
“Where it is proved to tbe satisfaction of the Court that a suit has been adjusted wholly or in part by any lawful agreement or compromise, or where the defendant satisfies the plaintiff in respect of the whole or any part of the subject matter of the suit, the Court shall order such agreement, compromise or satisfaction to be recorded, and shall pass a decree in accordance therewith so far as it relates to the suit.”
36. Emphasis is laid on the last words “so far as it relates to the suit.” It is contended that though the decree may refer to the other properties also, the actual operative portion of the decree should be confined only to the items of the properties that are subject matter of the suit. By virtue of registering such decree, the rights of the parties may be made secure. But, the decree, as such, cannot become executable in respect of the properties which are not the subject mater of the suit. This is how the objection as to the executability of the compromise decree in this behalf is placed before us. It is true there is conflict of opinion, between different High Courts on this point. The Calcutta and Bombay High Courts took the view that such a decree is no executable to the extent of the other properties. Bat, our own High Court has taken a contrary view.
37. In Haran Chandas v. Hyderabad State Bank a Division Bench of this Court took the view that an objection as to the execution of a consent decree, the operative part of which gives effect to terms of compromise which do not relate to the suit cannot be entertained by the executing Court. Manohar Pershad J., as he then was speaking for the Courts observed at page 58:
“It is true that having regard to the provisions of Order 23 Rule 3 C.P.C the decree has to be passed only B.O far as the compromise relates to the suit. But a compromise which includes matters extraneous to the suit is not unlawful and cannot be rejected in its entirety. Vide Ranjit Singh v. Gobardhan Chandra (50 Cal. W. No. 447) and Hari Chand v. Magi Mal (A.I.R 1917 Lah. 282). The proper course for the Court in cases where the compromise comprises matters unconnected with the suit is to recite the compromise as a whole in its decree or in the from as a schedule to the decree for purposes of reference; but to restrict the operative part of the decree to those terms of the compromise which relate to suit. We agree with the contention of the learned counsel for the appellant that in such a case the decree would be executable only in respect of (he matters that relate to the suit and the remaining terms of the compromise, i e., those which are not incorporated in the operative part of the decree may be enforced by means of a separate suit. We may in this connection refer to Heamana Kumari v. Midnapur Zamindari Co., (A.I.R 1919 P.C 79) Shankar Bal Krishna v. Shree Gopal Krishen Sansthan (A.I.R 1941 Nag. 197), Balbsar Misir v. Tekesaa Misir (A.I.R 1939 All. 454) Makhan Lal v. Khagendranath (A.I.R 1936 Cal. 446) Rajagopalan v. Subbarama (A.I.R 1919 Mad. 305) and Vishna v. Ramachandra (A.I.R 1932 Bom. 46?). But where the operative part of the decree gives effect to terms of a compromise which do not relate to the suit, question arises whether the executing court is entilted and bound to refule toexecute the decrer. On this question, there is a conflict of decisions. On the one hand, it has been held by the High Court of Madras, Allahabad, Lahore, and Patna that the executing court cannot refuse to execute the decree in such a case Vide Manager of Sri Meenakshi Devasthanam, Madura v. Abdil Kasim Sahib (I.L.R 30 Mad 421) Shyam Lal v. M. Shuamlal (A.I.R 1933 All. 649) Lal Singh v. Mohan Singgk (A.I.R 1933 Lah. 623) and M.D Ismail v. Bibi Shama (A.I.R 1934 Pat 203) The reason according to the Madras High Court is that an objection to the decree cannot be allowed to be raised in the executing court, but must be taken by way of appeal Sabapathi v. Vanmahalinga (A.I.R 1915 Mad 210) The High Court of Calcutta and the High Court of Bombay have held on the other hand that such a decree is inoperative and invalid and cannot be executed in so far as it gives effect to the terrms of a compromise not relating to the suit. Gurdev Singh v. Chandrikah Singh (I.L.R 36 Cal. 193). and Vishnu v. Ramachandra (A.I.R 1932 Bom. 486). We find ourselves in agreement with the view expressed by the High Court of Madras that such an objection cannot be raised in the executing court and must be taken by way of appeal.”
38. The learned Judges thus agreed with the view expressed by the High Court of Madras and held that suoh an objection cannot be raised in the exe_ outing Court and must be taken only by way of appeal. With respect, we are inclined to agree with the view taken by this Court as well as the Madras High Court, in preference to the view taken by the Calcutta and Bombay High Courts. Therefore, this objection also must be repelled.
39. The result is that L.P.A No. 177 of 1964 and C.M.S.A No. 14 of 1968 are allowed with casts and C.M.S.A Nos. 48 and 49 of 1968 are dismissed with coats, and the E.P Nos. 17/60 and 10/60 are remanded back to the District Munsif's Court, Avanigadda for disposal in the light of the observations in this Judgement.
40. Now remains the application, C.M.P No. 10873 of 1966 for amendment of the decree passed in S.A No. 1151 of 1944. It was in thif second appeal the compromise preliminary decree was passed and in pursuance of that preliminary decree, the trial Court passed the final decree also. The preliminary decree was passed on 3-9-1945 It contained he schedules appended to the memo of compromise, wherein the parties adopted the old survey numbers as given in Exs P-2 & P. 4, though resurvey had been made by that time and resurvey numbers were continued in the trial decree, its schedules and plans also. But, as we have pointed out, in some of the plana the Commissioner gave new resurvey numbers in addition to the original survey numbers. When that third defendant raised an objection that there was some discrepancy in the survey numbers and the extents of the land described in the schedules, the plaintiffs-decree-holders applied in the court below for amendment of the schedules. But, that application, in I.A No. 808 of 1969 was rejected on 1-10-1959. Therefore, they filed the present application for amendment, soon after their C.M.S.A No. 38 of 1961 was dismissed by this Court. It was originally filed in the High Court of Madras which passed the preliminary decree, but it was returned by that Court and the parties represented it in this Court. The petition is filed under Secs. 151, 152 and 153 of the Civil Procedure Code. The petition is in the following terms:
“For the reasons stated in the accompanying affidavit the petitioners herein pray that this Hon'ble Court be pleased to amend the Schedules to the memorandum of compromise included in and made part of the decree of this Hon'ble Court in the above Second Appeal dated 3rd September, 1945 and also to make similar amendment as may be necessary in the final decrees, schedules and plans as follows:
(a) In Schedule A to Ex. P. 2 after the words ‘Resurvey Number’ the figure ‘31’ ‘may be mentioned and the words, old Survey No’ be added before 10/1,
(b) In Schedule B attached to Ex.P 4
(i) Item 1-Movva Village after the figure ‘114’ the words and figures ‘R.S No. 193/3’ may be mentioned;
(ii) Item 2-Yeddanapudi Village, after ‘D. No. 31/1’ the words and figures ‘R.S No. 1/1’ may be mentioned;
(iii) Item 4 Pedapudi, after ‘D. No. 75’ the words and figures ‘R.S No. 74’ may be mentioned.”
41. It is to be noted that the plaintiffs do not seek an amendment of either Ex. P. 2 or Ex. P. 4 as such. What they pray for is only the amendment of the schedules in the preliminary decree and the final decree and the plans therein-A reference; to the schedules in Exs. P. 1 and P. 4 is made, because in the schedules to the memo of compromise those numbers given in the schedules to the documents were adopted. Therefore, the pertinent point that should be noted is that the plaintiffs do not seek an amendment of the schedules to Exs. P. 2 and P. 4.
42. Sri K.B Krishnamurty objects to the amendment on more than on ground Firstly, he contends that a consent decree can be amended only by agreement between and consent of parties and cannot be corrected by the Court exercising Exs jurisdiction under Secs. 151 to 153. The learned counsel may be correct if it is a substantial correction that is sought. If, on the other hand, the correction is only of a clerical error, committed by a mutual mistake of parties in preparing their compromise petition, there is no reason why it should not come within the purview of Sec. 152 G.P.G In that case, what the Court has to examine is whether it is a clerical error and whether it has crept into the record on account of a mutual mistake of both the parties to the compromise when these requirements are satisfied, we have do doubt that the Court has jurisdiction to correct such an accidental error in the record. To the same effect, is the decision of this Court in Vankataseshaiah v. Pullaiah Chetty wherein it was held—
“Where a decree is passed by consent of parties it should always so appear on the face of it as drawn up. It is however not necessary that it should record the compromise between the parties verbatim. It is enough it the terms of the compromise are indicated with sufficient clearness. The form of a consent decree omitting to embody the compromise between the parties can be corrected under Sec, 152 if the decree indicates that the court had the intention to embody such compromise therein.”
43. Therefore, the real question that has to be considered is whether the numbers that are sought to be introduced in the places of the old ones relate to the same properties which the parties, by their consent, made the subject matter of their compromise. In other words, it is the identity of the properties that is important. If the Court is certain that the parties were dealing with a certain set of properties and it has no doubt about their identity, the error, if any, in the description of such properties that crept into the record can be corrected.
44. In this case, as we have held in the main batch of cases, there is no doubt about the identity of the properties with which the parties have dealt with in their compromise petition, They were clearly specified by boundaries and marked in plans. The only discrepancies that have crept into the description are in regard to the numbers and the extents. As far as the numbers are concerned, they were adopted from the old survey and perhaps tbe extents also were taken from the old survey. The Re. Survey that was done in the year 1925 showed slight variations in the extents. Such slight variations from survey to survey are common. It is wholly beyond doubt from the record and particularly from E.A No. 1096 of 1959. filed by the third defendant himself for redelivery of the A schedule properties wherein he gave the numbers of all the different lota as per 1925 survey as well as 1951 survey along With their boundaries, that what the old survey of the lands numbers became what numbers in the re-survey. They substantially tally with the numbers given by the petitioner in his amendment petition. Thus, there is no difficulty about the identity of the lands and fixing their new numbers as per the resurvey. When that is the case, there cannot be any difficulty about granting of an amendment even of a consent decree under Sec. 152, In Sheodhyan Singh v. Sanichara Kuer the Supreme Court held—
“When there was a misdescription ofthe property in the final decree for sale and the sale certificate, but the identity of the properly sold was well established the mistake in the plot number must be treated as a misdescription which did not effect the identity of the property sold.”
45. Following this deeision a Division Bench of this Court held in Sri Rajah Rao Pradyumna Krisna Mahipathi Suryarao Bahadur v. Sri Rao Papayyamma Rao that though there was a wrong description in regard to the disputed items, they were also conveyed to the first defendant in that case. This object tion must, therefore, fail.
46. Sri Krishnamurthy, next contends that the amendent that is prayed for is not merely of a clerical error and, therefore, cannot be corrected under Sec. 152 C.P.C the amendment petition seeks only a clarification by referring to the existing numbers as survey numbers and to add new resurvey numbers also long with them. Time and again, we have pointed out that the parties described the different plots in the compromise petition with reference to the old survey numbers. If only the scribe or the parties then noted that there were resurvey numbers also to the said plots, they could have either adopted them or added them along with the old survey numbers. When everything else in the description of the property including the boundaries was carefully done, the mere reference to the old numbers, when the new survey numbers had by then come into vague, we have no hesitation in holding, is a clerical mistake that can be corrected under Sec. 152 C.P.C
47. Even now the learned counsel for the respondent objects to the proposed amendment contending that it would be tantamount to correcting the schedules in Exs. P. 2 and P. 4. He relics upon a Bench decision of the Madras High Court in Ramakrishnan v. Radha Krishnan. This case does not support the objection raised to this present petition. In that case, an error arose in the judgment, the preliminary decree, and the final decree passed upon a mortgage deed, which itself contained the error. Therefore, the petitioner sought the correction of not only the record of the Court but also the mortgage deed itself. Rejecting this request, the Division Bench held that Sec. 152 C.P.G is for the purpose of correcting errors directly involved in the proceeding, and is not intended to rectify mistakes in documents upon which suits are brought. Hence, when there is a mistake in the insertion of a wrong survey number in the mortgage deed and the error is repeated in the plaint and the decree, the Court cannot rectify the error in the mortgage deed under Sec. 152 as it is not a clerical error or omision. The remedy lies by way of suit under Sec. 31 of the Specific Relief Act, We respectfully agree with the learned Judges in this statement of law. But, that was with specific reference to the circumstances of the case before them, wherein the mortgage deed itself upon which the judgment, the preliminary and final decrees were passed, was also sought to be amended. But, in the present case, as we have stated, there is no prayer for amending Ess. P. 2 and P. 4. In fact, there is no need, as far as the present amendment application is concerned, to amend them. From the Court's record, it is obvious that the omission to refer to the Re survey numbers has crept in by inadvertance of the parties. We do not, therefore, think that the decision of this Division Bench would come in the way of granting the amendment sought by the plaintiffs decree holders. On the other hand, there is enough authority to support the view that such amendments can be granted under Sec. 152.
48. In Sutyanarqyna v. Purnayya Pannandlai, J., observed that
“The object of empowering the Court to correct decrees and orders is to correct errors, and if it may be shown that an alleged mistake falls within the class of errors dealt with by Sec. 152, it seems to put an unnecessary hindrance upon the power to do justice which the section, gives to say that the only mistake of which the Court can take cognizance are those made either in the plaint or subsequent documents in Courts.
There is nothing which limits the powers of the Court under Sec. 152 to correcting errors, mistakes and omissions, which arise in the suit. Nothing prevents the Court from doing justice in an appropriate case where such mistakes arose by reason of copying an erroneous document into the plaint A suit for rectification of the instrument and decree is not the only remedy; an application for review may be appropriate, but that is no obstacle under Sec. 152 to an application”
49. It must also be noticed that this decision was distinguished in the later Bench decision in Ramakrishnan v. Radhakrishnan. Bur, however as we have said, the later case was dealing with an application for amendment of the mortgage dead itself.
50. In Katamraju v. Paripgranandam Rajamannar, Officiating C.J, as he then was held that—
“Where a mistake had crept into the description of an item of property in the plaint schedule and ihe mistake had been carried over in the decree schedule, the Court has power under Secs. 152 and 153 to correct the error in the decree even after the disposal of the second appeal. It would not be correct to treat application for amendment as one under Order 5 Rule 16 for amendment of pleadings.”
51. Krishnaswami Naidti J, in Krishna Poduval v. Lakshmi Nathiar distinguished the earler Bench decision in Ramakrishnan v. Radhakrishnan. In the case before the learned Judge, there were errors in the assignment deed, which were continued in the plaint schedule and the decree schedule But, the application Bought only the amendment of the plaint shedule and the decree schedule and there was no dispute as regards the identity of the property or its boundaries Under the circumstances the learned Judge granted the amendment holding;
“Where an application is filed for correction of an error as regards the survey numbers of an item of property to the plaint schedule and the decree schedule and there is no dispute as regards the identity of the property or boundaries to it, the amendment may be allowed under Sec. 152 The fact that the assignment deed of the property also has the same errors cannot disentitle the applicants to have the error set right if they are entitled to it under the Code.”
52. The learned Judge distinguished the Bench decision in Ramakrishnan v. Radha Krishnan on the ground that it related to rectification of the document itself and that in the case before him, no such rectification was sought as the plaintiffs had not based their claim on that document. In the case before us also the plaintiiffs-decree-holders, who seek the execution, are claiming on the basis of the compromise petition and the consequential compromise decree.
53. Consequently, we cannot refuse to grant the amendment because similar errors had also occurred in Exs. P. 2 and P. 4, If the parties want any rectification of those deeds, it is open to them to file a suit for rectification under Sec. 31 of the Specific Relief Act. But, that is no bar to the granting of the present amendment petition.
54. The above discussion shows that there is no difficulty about the identity of the properties that are dealt with by the parties, There is also no doubt about the new numbers that the properties have been given in the Re-survey.
55. We are also of the opinion that introducing the new numbers in the schedules and the plans may help the parties to finalise their rights under the compromise decree very soon and that such an amendment is needed by interests of justice. We have therefore, no hesitation in granting the application. However we make no order as to costs in this petition.
56. Orders accordingly.
Alert